Roman Pot Project
Design and integrationMarco Oriunno, CERN
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
Some facts….The mechanical prototype 2004 has proven to work well -> upgrade for LHC
• Integration of one horizontal pot
• Integration of one dedicated BPM
• Enlarged size of the pot
• Thin window with improved flatness (~ 50 microns)
• New concept for the integration of cables and cooling
• Choice of Motors - LHC graded
• Vacuum issues
• RF issues
• LHC Integration issues
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
Final design of the Roma pot Unit:
•Upgrade of the Prototype tested in the SPS in 2004
•Vertical and Horizontal units interconnected by a bellow
•Dedicated Beam Position Monitor integrated in the unit
•Pre-series production ready to start in Czech Republic
•First unit ready to be tested at CERN in January 2006
TOTEM Roman Pot
Final design for LHC
Prototype SPS 2004
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
Layout around IP5
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
Pot Design• Brazing of the thin window
• Two boxes ready at the end of September
• Vacuum test
• Metallurgical test0.5 mm
0.2 mm
Test Vacuum Chamber for the pot
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
BPM Button•Adapted design for TOTEM
•Price offer received from CERAMTEC (in negotiation)
• Possibility to exploit CERN technology
• Delivery in 10 weeks after the contract signature
RF test bench in production in Prague
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
Services
Enlarged pot size
Integration of a new volume for the services : “Champignon” concept
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
1. The advantages for TOTEM of a compensation system interconnected to the machine vacuum have been understood and studies (Vacuum Physics calculations) are expected to confirm such a feature.
2. The fragility of the window during the bakeout phase has been argued from FEM calculations -> The Roman Pot system will be designed to be bakeable; extensive bakeout test to be done on the pot prototypes in September. Alternatives: Full bakeout of the system or integration of a temporary protective refrigeration system on the window.
3. Other points :
• RP vacuum gauges read by the machine vacuum control
• 316LN for the BPM buttons (already ordered at CERN)
• VacuumPraha is recognized as a firm able to supply system for LHC applications (particular interest in their development of ion pump)
• Installation of RP is not on the critical path of the machine, more details after the consolidation of the LHC planning
Vacuum Design issues
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
RF Design issues
Detailed study done by M.Deile under the supervision of F.Caspers
• Measurements in the SPS test beam with H/E antennas
• Measurements in the lab with a network analyzer using a wire-beam
•Experience based on similar measurements done for other LHC equipment
Conclusions (see Mario’s talk at the 6th RPTB
• Tightness of Roman Pot for e.m. fields:E-field attenuation by the windows: ≥ 60 dB @ 40 MHzB-field attenuation by the windows: 50 - 60 dB @ 40 MHz• EMI in detector electronics still to be measured• Beam coupling impedance of RP without ferrites: ≤ 1200 Ω• Good improvement with ferrites (factor 1/5)• Ferrite geometry to be optimized
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
RP Station at 147 m
Additional Sector valves
http://totem.web.cern.ch/Totem/
TOTEM Collaboration Meeting
19 September 2005M.Oriunno, CERN PH-TOT
Future plans
Pre-series of the vacuum chamber ready end of November :
Vacuum Characterization and measurement on the compensation system
Final test on the Full Pot prototype
Integration study on the detector assembly
Tunnel Integration & cabling