Download - Roman Pot Project

Transcript
Page 1: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

Roman Pot Project

Design and integrationMarco Oriunno, CERN

Page 2: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

Some facts….The mechanical prototype 2004 has proven to work well -> upgrade for LHC

• Integration of one horizontal pot

• Integration of one dedicated BPM

• Enlarged size of the pot

• Thin window with improved flatness (~ 50 microns)

• New concept for the integration of cables and cooling

• Choice of Motors - LHC graded

• Vacuum issues

• RF issues

• LHC Integration issues

Page 3: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

Final design of the Roma pot Unit:

•Upgrade of the Prototype tested in the SPS in 2004

•Vertical and Horizontal units interconnected by a bellow

•Dedicated Beam Position Monitor integrated in the unit

•Pre-series production ready to start in Czech Republic

•First unit ready to be tested at CERN in January 2006

TOTEM Roman Pot

Final design for LHC

Prototype SPS 2004

Page 4: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

Layout around IP5

Page 5: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

Pot Design• Brazing of the thin window

• Two boxes ready at the end of September

• Vacuum test

• Metallurgical test0.5 mm

0.2 mm

Test Vacuum Chamber for the pot

Page 6: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

BPM Button•Adapted design for TOTEM

•Price offer received from CERAMTEC (in negotiation)

• Possibility to exploit CERN technology

• Delivery in 10 weeks after the contract signature

RF test bench in production in Prague

Page 7: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

Services

Enlarged pot size

Integration of a new volume for the services : “Champignon” concept

Page 8: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

1. The advantages for TOTEM of a compensation system interconnected to the machine vacuum have been understood and studies (Vacuum Physics calculations) are expected to confirm such a feature.

2. The fragility of the window during the bakeout phase has been argued from FEM calculations -> The Roman Pot system will be designed to be bakeable; extensive bakeout test to be done on the pot prototypes in September. Alternatives: Full bakeout of the system or integration of a temporary protective refrigeration system on the window.

3. Other points :

• RP vacuum gauges read by the machine vacuum control

• 316LN for the BPM buttons (already ordered at CERN)

• VacuumPraha is recognized as a firm able to supply system for LHC applications (particular interest in their development of ion pump)

• Installation of RP is not on the critical path of the machine, more details after the consolidation of the LHC planning

Vacuum Design issues

Page 9: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

RF Design issues

Detailed study done by M.Deile under the supervision of F.Caspers

• Measurements in the SPS test beam with H/E antennas

• Measurements in the lab with a network analyzer using a wire-beam

•Experience based on similar measurements done for other LHC equipment

Conclusions (see Mario’s talk at the 6th RPTB

• Tightness of Roman Pot for e.m. fields:E-field attenuation by the windows: ≥ 60 dB @ 40 MHzB-field attenuation by the windows: 50 - 60 dB @ 40 MHz• EMI in detector electronics still to be measured• Beam coupling impedance of RP without ferrites: ≤ 1200 Ω• Good improvement with ferrites (factor 1/5)• Ferrite geometry to be optimized

Page 10: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

RP Station at 147 m

Additional Sector valves

Page 11: Roman Pot Project

http://totem.web.cern.ch/Totem/

TOTEM Collaboration Meeting

19 September 2005M.Oriunno, CERN PH-TOT

Future plans

Pre-series of the vacuum chamber ready end of November :

Vacuum Characterization and measurement on the compensation system

Final test on the Full Pot prototype

Integration study on the detector assembly

Tunnel Integration & cabling