Download - rogress E ergy · 2012. 12. 6. · planning efforts is greatly appreciated. Your signature below also indicates that you concur with the emergency classification system (including

Transcript
Page 1: rogress E ergy · 2012. 12. 6. · planning efforts is greatly appreciated. Your signature below also indicates that you concur with the emergency classification system (including

rogress E ergy

January 07, 2008

Mr. Chip Wildy, DirectorMarion County Emergency ManagementPost Office Box # 1987Ocala, Florida 34478-1987

Daniel L. RoderickVice PresidentNuclear Projects and ConstructionProgress EnergyFlorida. Inc.

NPC08-0005

As previously indicated in public announcements and meetings, Progress EnergyFlorida, Inc. is developing a Combined Operating License Application(COLA) forsubmittal to the U.S. Nuclear Regulatory Commission (NRC), in accordance withthe requirements of 10 CFR 52 for the Levy Nuclear Plant site near Inglis,Florida. The COLA outlines Progress Energy's plans for construction andoperation of two proposed power generating units at the new Levy site.

A key part of the COLA is the development of emergency plans which provideinformation sufficient to demonstrate compliance with pertinent regulatoryrequirements. These plans take credit, to the extent practical, for the site,federal, state, and local plans already in place for other nuclear generating unitsin Florida. With cooperation of the affected State and local agencies, ProgressEnergy has developed as part of its COLA the Levy Nuclear Power Plant Units 1and 2 Emergency Plan. The COLA Emergency Plan addresses onsite/offslteactivities to support a 2-unit site and includes a description of the emergencyclassification system for the new units required by NRC regulations. ProgressEnergy has worked with the nuclear industry to develop a set of initiatingconditions and emergency action levels consistent with the emergencyclassification system and appropriate to the proposed new nuclear plant design.

In addition to the COLA Emergency Plan, an evacuation time estimate has beendeveloped with input from various State and local government agencies inFlorida. The evacuation time estimate report is included in the COLA.

Emergency planning provisions of 10 CFR 52 and the COLA process require thatProgress Energy "make good faith efforts to obtain certifications from the localand State governmental agencies with emergency planning responsibilities" thatthe agency will participate in emergency planning and support emergencyresponse to the proposed new units, if constructed. At this time, we are seekingcertification from Marion County Emergency Management that:

15760 W.Powerline St.Crystal River, FL34428

T> 352.563.4800F> 352.563.4601

Page 2: rogress E ergy · 2012. 12. 6. · planning efforts is greatly appreciated. Your signature below also indicates that you concur with the emergency classification system (including

• the proposed emergency plans are practicable;• Marion County Emergency Management is committed to participating

in any further development of the plans, including any required fielddemonstrations; and

• Marion County Emergency Management is committed to executingtheir responsibilities under the plans in the event of an emergency.

The actual emergency planning arrangements would be finalized in a revisedletter of agreement at a later stage in the new facilities' licensing process.

Marion County Emergency Management's participation in these emergencyplanning efforts is greatly appreciated. Your signature below also indicates thatyou concur with the emergency classification system (including the initiatingconditions and emergency action levels) and evacuation time estimates proposedin the Levy Nuclear Plant COLA Emergency Plan.

Sincerely,

Daniel L. RoderickVP - Nuclear Project ConstructionProgress Energy orida Inc.

Marion County Emergency Management has reviewed the Emergency Plansupporting the Combined Operating License Application for two new proposedgenerating units at the Levy Nuclear Plant site and certifies the following:

• the proposed Emergency Plan is a thorough, practical, and useful tool foruse in managing real life events;

• Marion County Emergency Management will fully participate in thecontinuing planning efforts and scheduled field demonstrations for thisEmergency Plan;

• Marion County Emergency Management is committed to leading the effortto ensure that the health and safety of the public is maintained as thehighest priority in the implementation and continued improvement of theemergency preparedness and response plans for the Levy Nuclear PowerPlant site; and

• Marion County Emergency Management is committed to executing theirresponsibilities under the plans in the event of an emergency.

Page 3: rogress E ergy · 2012. 12. 6. · planning efforts is greatly appreciated. Your signature below also indicates that you concur with the emergency classification system (including

Furthermore, Marion County Emergency Management concurs with the proposedemergency classification system, initiating conditions, and emergency actionlevels described in the Emergency Plan and evacuation time estimate (LevyNuclear Plant Development of Evacuation Time Estimates, September, 2007).

It is my understanding that the specific nature of arrangements in support ofemergency preparedness for operation of the proposed new nuclear units will beclearly established in a properly executed and binding letter of agreement thatwill be included in the Emergency Plan, if and when Progress Energy proceedswith construction and operation of the new facility.

Signatur

Title

Progress Energy Florida, Inc.Daniel L. RoderickVice PresidentNuclear Projects and Construction

02t1 0 g'Date