RIBA Plan of Work 2013
www.ribaplanofwork.com
RIBA Plan of Work
Plan of Work for Design Team Operations
1967 1973
1998
2007
2013
1963
What is the RIBA Plan of Work?
“The Outline Plan of Work organises the process of managing, and designing building projects and administering building contracts into a number of key Stages”
Cultural Issues - It is not a schedule of services document and is not
intended to be contractual
- Stages “loosely” defined yet widely interpreted and used for major milestones
RIBA Plan of Work 2013: Website
www.ribaplanofwork.com
RIBA Plan of Work 2013: Publications
www.ribaplanofwork.com
RIBA Plan of Work 2013: Bespoke Practice or Project Plan
2016
• L0 – Processes & protocol
• L1 – Geometry & data
• L2 – Analogue to digital
RIBA Plan of Work 2013: BIM
project outcomes
information in-use
RIBA Plan of Work 2013: A Paradigm Shift
1. More efficient design processes
2. Data for operational use (COBie)
3. Better Briefing = Better Outcomes
do more with the same budget . . . and reduce carbon!
RIBA Plan of Work 2013: Building a continuous cycle of improvement
• Start at the end
• Defining outcomes
• Making early decisions on handover strategy
• Using post occupancy evaluation
• Learning from completed projects
Unified Industry Stages
Assembling a Collaborative Project Team
contractor led team subcontractors/specialist (designing) subcontractors/
model manager
client team Project manager / Financial Advisers / QS
design team Lead Designer / Architect /
M&E Engineer / C&S Engineer Acoustics / Fire / Catering / Landscape
Assembling a Collaborative Project Team
client team Project manager / Financial Advisers /QS1
design team
Lead Designer Architect
M&E Engineer C&S Engineer/QS2
Acoustics/Fire/ Catering/Landscape
frameworkcontractor
Subcontractors/ specialist (designing) subcontractors/QS3
Assembling a Collaborative Project Team
Assembling a Collaborative Project Team
a collaborative project team
Design Team Contractor
Assembling a Collaborative Project Team
Assembling a Collaborative Project Team
Project Roles Table
Contractual Tree
• Digital data – analogue to digital
• Level of Detail (Development)
• Client Questions
• What is in a stage report?
Assembling a Collaborative Project Team
Design Responsibility Matrix incorp. Information Exchanges
Assembling a Collaborative Project Team
Multi-disciplinary Schedules of Services
Assembling a Collaborative Project Team
Design Responsibility Matrix incorporating Information Exchanges
& Multi-disciplinary Schedules of Services
Assembling a Collaborative Project Team
Model Production and Delivery Table
Assembling a Collaborative Project Team
BG/6
Assembling a Collaborative Project Team
COBie
Assembling a Collaborative Project Team
www.bimtaskgroup.org
Digital Plans of Work
• Stages
• Roles
• Deliverables
Assembling a Collaborative Project Team
Level of Detail
Assembling a Collaborative Project Team
RIBA Plan of Work 2013: future activity
• Updates (digital) in line with Feedback
• Co-ordination with contractual landscape
• Additional tools added to www.ribaplanofwork.com
• RIBA Agreements
o Further work on Project Roles
o Greater emphasis on facilitating a project team
o Incorporation of multi-disciplinary Schedules of Services
RIBA Plan of Work 2013
www.ribaplanofwork.com