St Kitts Geothermal ProjectGGA Conference – WFES 2017
ADNEC - Abu Dhabi, UAE18th September 2017
REVEAL YOURGEOTHERMAL POTENTIAL
GGA Conference - WFES Abu Dhabi - 18.01.2017
• French Geothermal Company homebased in the Caribbean & France
• Providing engineering services to qualify & manage Geothermal resources: Geosciences Project Development
• Focus on LAC region & SIDS
Who are we
GGA Conference - WFES Abu Dhabi - 18.01.2017
Our expertise
1. Data acquisition & processing
2. Conceptual modeling
3. Simulations
4. Resource assessment & Drilling program
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Teranov is lead partner & coordinator of
French Geothermal Research Program (40 MUS$) to develop innovative methodologies and expert tools to better characterize geothermal resource Supported and co-financed by the French Gov 2 private partners associated with Top 10 French Universities
& Research Labs totaling 50 geoscientists:
Our Geoscience organisation
GGA Conference - WFES Abu Dhabi - 18.01.2017
• The Gov. of the Federation of St Kitts & Nevis and Teranov entered into a Memorandum of Understanding and a Roadmap in sept 2015
• The MoU covers the geothermal development from A to Z: The exploration phase The development and construction phase The long term exploitation phase
• The Roadmap sets: The agenda & the objectives The partners’ contributions The legislative framework modifications (Dec 2015)
• Main partners’ engagements: Build broad support for the project as well as to manage public expectations Provide open and transparent communication at each phase of the project
Public Private Partnership
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Previous Caribbean regional preliminary studies, including GeothermicaItaliana in 1992, have identified two main areas of interest on St Kitts, which remained unexplored until now due to the lack of surface manifestation:
• North-Western area was favored considering:
Existing data/analysis Surface manifestations Land use
Background and areas of interest
95°C
a : 50°C
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Geological field survey implemented• Rock sampling & petrological analysis implemented• Review of the geological map done
Surface studies: Geology
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Samplings realized: Ground water Surface and sea water Gas and ground gas
• Temperature assessment of the reservoir : 212°C
Surface studies: Geochemistry
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Gravimetric: Acquisition of 300 measurement points for this survey Validates structures
Surface studies: Geophysics 1
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Magnetism: Acquisition: drone and boat Validates structures
Surface studies: Geophysics 2
GGA Conference - WFES Abu Dhabi - 18.01.2017
• InfraRed: Acquisition: Drone Assess thermal flow
at the sea resurgence
Surface studies: Geophysics 3
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Magnetotelluric (MT): 80 MT soundings were recorded - 60 MT pointsused for the model Models developed :
• 1D and 3D Resistivity models• 3D MT-GRAV joint Inversion model
Surface studies: Geophysics 4
Sandy point village
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Based on: Geology Field observations Digitalized Elevation Model Magnetism Gravimetry
Surface studies: Structural analysis 1
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Essential input for: Understanding of the revervoir geometry and control Identification and optimisation of the drilling targets
Surface studies: Structural analysis 2
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Inputs for the reservoir capacity estimate: Reservoir geometry Temperature Porosity Conversion factors
• Establish conceptual model of the reservoir
Surface studies: Ressource assessment 1
Upflow zone 200°C
SW-NE section including fumaroles
GGA Conference - WFES Abu Dhabi - 18.01.2017
• Resource estimate using the stored heat method following the Australian code net of power plant losses (-10%) but without pumping losses
• Probabilistic estimation: Resource estimation between 18 to 36 MWe P50 estimation of the plant capacity = 27 MWe P90 = 18 MWe meaning that according to our analysis and based on available surface data, 90% of chance to have more than 18 Mwe
• Complete 3G exploration works are currently under independant Peer Review process by GRG (USA).
Surface studies: Ressource assessment 2
GGA Conference - WFES Abu Dhabi - 18.01.2017
Project implementation: next steps
• Next major project milestones: Geothermal Agreement signature in March Exploratory drilling financing to be completed Full Environmental and social Impact Assessment - Public awareness Exploratory drilling and final resource assessment
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4Surface data acquisition (Geology, Geophysics, Geochemistry)
Ressource assessment
Drilling targets & peer review
Geothermal agreement signature
Exploration drilling funding
Environmental impact assessment & Public Awereness
Well drilling and testing
Final assessment of the ressource
Power plant engineering and design
Development drilling
Power plant construction
Power plant commissionning
2015 20212019 20202016 2017 2018