RESOURCE ORDER INSTRUCTIONS
Exhibits 13 through 15 are examples of resource orders that must be placed whenmobilizing the military. Examples show overhead, supply, and equipment orders.
! S-1 through S-27 (supplies for military personnel) and S-37 throughS-44 (supplies for training cadre) are shipped directly to the militaryinstallation. Generally, these items are shipped on the jet with theMCADs and training cadre.
Ç S-6, logistic radio kit, is for the training cadre and needs to beordered only once at the beginning of the training assignment.The training cadre will ensure that the radios are transported tothe next military installation if multiple battalions are ordered.
Ç S-44, practice fire shelters, are to be ordered only once at thebeginning of the training assignment. The training cadre willensure that the shelters are transported to the next militaryinstallation if multiple battalions are ordered.
! S-28 through S-36 are shipped directly to the fire.
Ç S-36 (two-person tents) are ordered pending the type ofmilitary personnel activated. (The Marines will not require theuse of tents. Check with the particular Army unit to determineif the tents will be needed.)
INC
IDE
NT
/PR
OJE
CT
OR
DE
R N
UM
BE
R 2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBERRESOURCE ORDER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/Time
DeliverTo
Time AgencyID
RESOURCE ASSIGNEDRELEASED
From
To
To
From ETD
ETATim
e
ETADate To
5. DESCRIPTIVE LOCATION/RESPONSE AREA 6. SEC. TWN RNG Base MDM 8. INCIDENT BASE/PHONE NUMBER 9. JURISDICTION/AGENCY
10. ORDERING OFFICE
11. AIRCRAFT INFORMATION
BEARING DISTANCE BASE OR OMNI AIR CONTACT FREQUENCY Ground Contact FREQUENCY RELOAD BASE OTHER AIRCRAFT/HAZARDS
LAT. LONG.
13. ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN
INITIALDATE/TIME
7. MAP REFERENCE
ICS 259-3 (7/87) NFES 2202
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
INC
IDE
NT
/PR
OJE
CT
OR
DE
R N
UM
BE
R 2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBERRESOURCE ORDER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/Time
DeliverTo
Time AgencyID
RESOURCE ASSIGNEDRELEASED
From
To
To
From ETD
ETATim
e
ETADate To
5. DESCRIPTIVE LOCATION/RESPONSE AREA 6. SEC. TWN RNG Base MDM 8. INCIDENT BASE/PHONE NUMBER 9. JURISDICTION/AGENCY
10. ORDERING OFFICE
11. AIRCRAFT INFORMATION
BEARING DISTANCE BASE OR OMNI AIR CONTACT FREQUENCY Ground Contact FREQUENCY RELOAD BASE OTHER AIRCRAFT/HAZARDS
LAT. LONG.
13. ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN
INITIALDATE/TIME
7. MAP REFERENCE
ICS 259-3 (7/87) NFES 2202
INC
IDE
NT
/PR
OJE
CT
OR
DE
R N
UM
BE
R 2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBERRESOURCE ORDER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/Time
DeliverTo
Time AgencyID
RESOURCE ASSIGNEDRELEASED
From
To
To
From ETD
ETATim
e
ETADate To
5. DESCRIPTIVE LOCATION/RESPONSE AREA 6. SEC. TWN RNG Base MDM 8. INCIDENT BASE/PHONE NUMBER 9. JURISDICTION/AGENCY
10. ORDERING OFFICE
11. AIRCRAFT INFORMATION
BEARING DISTANCE BASE OR OMNI AIR CONTACT FREQUENCY Ground Contact FREQUENCY RELOAD BASE OTHER AIRCRAFT/HAZARDS
LAT. LONG.
13. ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN
INITIALDATE/TIME
7. MAP REFERENCE
ICS 259-3 (7/87) NFES 2202
Ord
er N
o.2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/TimeDeliver
ToTime Agency
IDRESOURCE ASSIGNED
RELEASEDFro
m
ToTo
Fro
mETD
ETATim
e
ETADate To
RESOURCE ORDER
CONTINUATION SHEET NO.__________ OF __________
NFES 2203 (7/87)
INC
IDE
NT
/PR
OJE
CT
OR
DE
R N
UM
BE
R 2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBERRESOURCE ORDER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/Time
DeliverTo
Time AgencyID
RESOURCE ASSIGNEDRELEASED
From
To
To
From ETD
ETATim
e
ETADate To
5. DESCRIPTIVE LOCATION/RESPONSE AREA 6. SEC. TWN RNG Base MDM 8. INCIDENT BASE/PHONE NUMBER 9. JURISDICTION/AGENCY
10. ORDERING OFFICE
11. AIRCRAFT INFORMATION
BEARING DISTANCE BASE OR OMNI AIR CONTACT FREQUENCY Ground Contact FREQUENCY RELOAD BASE OTHER AIRCRAFT/HAZARDS
LAT. LONG.
13. ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN
INITIALDATE/TIME
7. MAP REFERENCE
ICS 259-3 (7/87) NFES 2202
INC
IDE
NT
/PR
OJE
CT
OR
DE
R N
UM
BE
R 2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBERRESOURCE ORDER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/Time
DeliverTo
Time AgencyID
RESOURCE ASSIGNEDRELEASED
From
To
To
From ETD
ETATim
e
ETADate To
5. DESCRIPTIVE LOCATION/RESPONSE AREA 6. SEC. TWN RNG Base MDM 8. INCIDENT BASE/PHONE NUMBER 9. JURISDICTION/AGENCY
10. ORDERING OFFICE
11. AIRCRAFT INFORMATION
BEARING DISTANCE BASE OR OMNI AIR CONTACT FREQUENCY Ground Contact FREQUENCY RELOAD BASE OTHER AIRCRAFT/HAZARDS
LAT. LONG.
13. ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN
INITIALDATE/TIME
7. MAP REFERENCE
ICS 259-3 (7/87) NFES 2202
INC
IDE
NT
/PR
OJE
CT
OR
DE
R N
UM
BE
R 2. INCIDENT/PROJECT NAME 3. INCIDENT /PROJECT ORDER NUMBER 4. OFFICE REFERENCE NUMBERRESOURCE ORDER
12.RequestNumber
OrderedDate/Time
QTY
RESOURCE REQUESTEDNeeded
Date/Time
DeliverTo
Time AgencyID
RESOURCE ASSIGNEDRELEASED
From
To
To
From ETD
ETATim
e
ETADate To
5. DESCRIPTIVE LOCATION/RESPONSE AREA 6. SEC. TWN RNG Base MDM 8. INCIDENT BASE/PHONE NUMBER 9. JURISDICTION/AGENCY
10. ORDERING OFFICE
11. AIRCRAFT INFORMATION
BEARING DISTANCE BASE OR OMNI AIR CONTACT FREQUENCY Ground Contact FREQUENCY RELOAD BASE OTHER AIRCRAFT/HAZARDS
LAT. LONG.
13. ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN ORDER RELAYED
Req. No. Date Time To/From
ACTION TAKEN
INITIALDATE/TIME
7. MAP REFERENCE
ICS 259-3 (7/87) NFES 2202
Top Related