Download - Renovation of Forest Arms Apartments

Transcript
Page 1: Renovation of Forest Arms Apartments

Renovation of Forest Arms Apartments

Wayne State UniversityMartin BrosnanBen GorczycaAnel MelkicSteve Trpcevski

Page 2: Renovation of Forest Arms Apartments

Credentials

Ben Gorczyca – Construction Management Anel Melkic – Environmental Engineering Steve Trpcevski – Transportation Engineering Martin Brosnan – Environmental Engineering

Page 3: Renovation of Forest Arms Apartments

Presentation Forecast

Project Objective Site Description Design Criteria Proposed Solutions

– LEED Certification– Pedestrian Safety & Parking– Green Alley

Recommendations Summary Questions

Page 4: Renovation of Forest Arms Apartments

Forecast

Project Objective Current Site & Building Description Project Criteria Summary

Page 5: Renovation of Forest Arms Apartments

Project Objective

Provide more housing alternatives near WSU campus

Solution– Purchase and Renovation of Forest Arms

Apartments LEED Certified Pedestrian Safety Measures & Adequate Parking Green Alley Conversion

Page 6: Renovation of Forest Arms Apartments

Site Description

Page 7: Renovation of Forest Arms Apartments

Criteria

LEED Certification – Anel– Achieve enough points to become certified– Recommended work must be feasible

Transportation – Steve– Make any safety modifications necessary for safety of

pedestrians– Ensure adequate and safe parking

Green Alley Conversion – Martin– Transform the existing alley into a safe, environmentally

friendly walkway and outdoor area– Feasible to create

Page 8: Renovation of Forest Arms Apartments

Summary

Project Objective Current Site & Building Description Project Criteria Summary

Page 9: Renovation of Forest Arms Apartments

LEED Certification

Anel Melkic

Environmental Engineer

Page 10: Renovation of Forest Arms Apartments

Forecast

Problem Overview Solution Recommendation Summary

Page 11: Renovation of Forest Arms Apartments

Problem

Very old development– Not environmentally friendly– Lacks energy efficiency potential of modern

structures

Page 12: Renovation of Forest Arms Apartments

Solution

LEED certify the building

LEED rating system– Five categories:

Sustainable Sites (28 pts) Water Efficiency (10 pts) Energy and Atmosphere (37 pts) Materials and Resources (13 pts) Indoor Environmental Quality (12 pts)

Page 13: Renovation of Forest Arms Apartments

Solution

LEED rating system– Four levels of certification:

Certified (40-49 pts) Project Goal Silver (50-59 pts) Gold (60-79 pts) Potential Platinum (80+ pts)

Page 14: Renovation of Forest Arms Apartments

Credit Examples

SS Cr. 2 (5 pts)– Renovate an existing structure

WE Cr. 1 (2 pts)– Reduce potable water use for irrigation by 50%

MR Cr. 4 (2 pts) – Use 20% recycled materials

IEQ Cr. 4 (3 pts)– Use low-emitting paints, coatings, and sealants

Page 15: Renovation of Forest Arms Apartments

Credit Examples

EA Cr. 1 (3-21 pts) % Energy Cost Savings Points8 3

10 412 514 616 718 820 922 1024 1126 1228 1330 1432 1534 1636 1738 1840 1942 2044 21

Page 16: Renovation of Forest Arms Apartments

LEED Point Distribution

0 10 20 30 40 50 60 70 80 90 100

Total

IEQ

MR

EA

WE

SS

Category

Points

Page 17: Renovation of Forest Arms Apartments

Recommendations

Register project with GBC Implement all proposed credits Apply for certification

Page 18: Renovation of Forest Arms Apartments

Summary

Problem Overview LEED Solution Recommendation

Page 19: Renovation of Forest Arms Apartments

Transportation Engineering

Steve Trpcevski

Transportation Engineer

Page 20: Renovation of Forest Arms Apartments

Forecast

The Problem Solutions Criteria Met Recommendations Summary

Page 21: Renovation of Forest Arms Apartments

The Problem

Pedestrian safety Parking is limited

Page 22: Renovation of Forest Arms Apartments

Solution (Part I): Reducing Lanes

Reduce the number of through lanes from 3 to 2 Raise curbs through outer most lanes Reduces crosswalk distance by 24 feet

Page 23: Renovation of Forest Arms Apartments

Solution 2 (Part II): Adding Parking

44 additional parking spaces required Raised curbs from reducing lanes leaves space available for

parking Additional parking spaces directly in front of building

Page 24: Renovation of Forest Arms Apartments

Solution 3 (Part III): Blocking off Alleys

2 of 6 alleys within the location of interest affect design Blocking them off increases the number of parking spaces Raise curb height of alley entrance/exit to deny entrance from Forest

Avenue

Page 25: Renovation of Forest Arms Apartments

The Design

Page 26: Renovation of Forest Arms Apartments

Solution (Part IV): Traffic Signals

Traffic signal re-configuration Highway Capacity Software (HCS) Level of Service (LOS) required to be C

Page 27: Renovation of Forest Arms Apartments

Criteria

Increase the safety of pedestrians by introducing traffic calming measures

Add sufficient amount of parking at a feasible cost

Page 28: Renovation of Forest Arms Apartments

Recommendations

Reduce number of lanes by adding curbs

Block off two alleys to increase parking space

Add 44 parking spaces Re-configuration of traffic signals

are unnecessary Charge future tenants for parking

permits

Page 29: Renovation of Forest Arms Apartments

Summary

The Problem Solutions Criteria Met Recommendations

Page 30: Renovation of Forest Arms Apartments

Green Alley

Martin Brosnan

Environmental Engineer

Page 31: Renovation of Forest Arms Apartments

Green Alley Overview

Problem Solution

– Technology/Techniques– Stormwater Impact

Layout/Design/Recommendations

Page 32: Renovation of Forest Arms Apartments

Problem

Disrepair Dirty Dark Unsafe

Page 33: Renovation of Forest Arms Apartments

Green Alley?

Environmentally Friendly Technology/Techniques Hydrology Aesthetically Pleasing Safe

Page 34: Renovation of Forest Arms Apartments

Technology/Technique

Re-Grading Permeable Pavement High Albedo Pavement Dark-sky Lighting

Page 35: Renovation of Forest Arms Apartments

Re-Grading

Page 36: Renovation of Forest Arms Apartments

Permeable Pavement

Page 37: Renovation of Forest Arms Apartments

High Albedo Pavement

Page 38: Renovation of Forest Arms Apartments

Dark-sky Lighting

Page 39: Renovation of Forest Arms Apartments

Hydrology

Pavers and plants reduce stormwater runoff Q=CiA

– Initial C = 0.85– New C = 0.20

Factor of 4 reduction

Page 40: Renovation of Forest Arms Apartments

Layout/Design/Recommendations

Concrete

Page 41: Renovation of Forest Arms Apartments

Criteria Met

Proposed Alley is safe, bright, beautiful, and environmentally friendly

Proposed Alley uses materials and techniques that are feasible and reliable

Page 42: Renovation of Forest Arms Apartments

Green Alley Overview

Problem Solution

– Technology/Techniques– Stormwater Impact

Layout/Design/Recommendations

Page 43: Renovation of Forest Arms Apartments

Conclusion Forecast

Problem Recommendations Summary Conclusion

Page 44: Renovation of Forest Arms Apartments

Problem Recommendations

LEED Certification– Register with the USGBC– Apply for certification

Pedestrian Safety & Parking– Reduce the number of lanes on Forest Ave, and block two alleys

to increase available parking by 44 spaces– Implement parking permit system for tenants– Re-configuration of traffic signals are unnecessary

Green Alley Conversion– Create a green alley that is safe, bright, beautiful,

environmentally friendly by using feasible reusable materials

Page 45: Renovation of Forest Arms Apartments

Presentation Summary

Project Objective Site Description Design Criteria Proposed Solutions

– LEED Certification– Pedestrian Safety & Parking– Green Alley

Recommendations

Page 46: Renovation of Forest Arms Apartments

Conclusion

We hope that our presented findings encourage acceptance of this proposal

Thank you

Page 47: Renovation of Forest Arms Apartments

Questions?