CEDSERRCH COR5U 52N82SE9889 2 .7541 EARNGEY010
Magnetic Survey for
DOME EXPLORATION (CANADA) LIMITED
on
PROJECT 2kk
Earngey Township, Ontario
(To Accompany maps 84-120-A,B,C)
RECEIVEDDEC 101984
MINING LANDS SECTION
November 20, 1984
INTRODUCTION
A magnetic survey was carried out for Dome
Exploration (Canada) Limited on Project 244 in March,
1984 with additional work completed on September 14, 1984.
The property consists of 44 unpatented
mining claims numbered as follows: KRL 775423 to KRL
775433 inclusive; KRL 775453 to KRL 775484 inclusive;
and KRL 775504 0 The claims are located on both sides
of Leg Lake in the southeast corner of Earngey Township.
They are in N. T. S. 52-N-2. Access to the claim group
was by fixed-wing aircraft approximately 9Okms east of
Red Lake, Ontario* The purpose of the survey was to
identify magnetic environments that appear to be
conducive for gold mineralization.
INSTRUMENTATION AND METHOD
The magnetic survey was carried out with two
Scintrex MP-2 proton magnetometers and one Geometrics
G 826. Diurnal corrections were accomplished using a
GMG MR 10 with a Barringer magnetometer as base-
station recording equipment.
A technical data sheet accompanies this report.
RESULTS
A number of magnetically high zones were
- 2 -
located by the magnetic survey. In general, these
features are long and linear, trend roughly northeast
and are as a rule narrow. This trend parallels the trend
of the volcanics and reflects the varying magnetite
content of the various geologic units*
Magnetic relief averages approximately 7*000
gammas above a background of approximately 60,000 gamma.
There are isolated peaks up to 21 t OOO gammas above
background.
The location of some of the more significant
zones is as follows:
(1) Line 18 S, ^EOO to line 3 S, 7E50. A possible
extension of this zone lies along the ends of the lines
from line 1 N, 9EOp to line 16 N, 10EOO.
(2) Line 19 S, 1E50 to line 5 S, OW50. This feature
f continues with a significant change in strike to E-W
from line 3 S, ONOO to line 1 N, 3E25. This geological
feature may warrant further investigation,
l (3) Line 17 S, 3W75 to line 1 S, 3W50 to line
7 N, 4WOO.
J (4) Line 5 N, 1EOO to line 16 N, 1E50.
l•M Further investigation of these magnetic
l
l
l
REG OMMENDATIONS
- 3 -
features should be carried out after evaluating their
geological setting. The portion of the zone that strikes
E-l/ warrants special consideration.
GEOSEAUCH CONSULTANTS LIMITED
^ V V, lit Thompson P. Eng.
GEOPHYSICAL TECHNICAL DATA
MAGNETIC SURVEY
Instrument: Scintrex MP 2 Proton
Magnetic field measured: Total
Accuracy- scale constant: 1 gamma
Diurnal correction method: Recording base-station
with readings at 30 second intervals.
Base station location: 17S25 on base line* 60170 gamma.
Number of readings at 25m stations; 2628
Total number of readings: 3911
Line spacing: 100 m
Contour interval: 100 gamma.
...n.stryof Report of WorkNatural , ~. . - .Resources (Geophysical, Geological,
jntano Geochemical and Expenditures)
M i r 52N82SE9889 2.7541 EARNGEY 900Type of S
Claim Holderls)
Magnetic j IDarngey Township[Prospector's Licence No.
IDoinc i^xploration (Canacla] Ltd.ddress
Box 270 1 1 First Canadian Place, Toronto, OntarioSurvey Company
n 14- * T 4-^ Consultants Ltd.Name and Address of Author {of Geo-Techmcal report)
Date of Survey (from fi to) JTotai Miles o* line Cut
01, 03 84! 20 1 1 84! 66 km.V Mo. ! Yr. l
3 84| 2n Yr - i o
. H. Thompson. Ste. 700. 88 University Avo, Toronto. OntarioCredits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days, (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days - ;-~ - ,'
Complete reverse side " ' ^ and eijtet totarts) here -
Airborne Credits
Note: Special provisions credits do not apply to Airbofc* C rC*YsJ^
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
' Gao^nysical
- Eftclfcor agnetic
. r. r , -^vlagneto neter
- RadftiMetric
'^Geological
Geochemical
Electromagnetic
Radiometric
Days perClaim
4o
Days per Claim
Days perClaim
ExpendituresType of Work Performed
Performed on•ww
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
S
InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per c aim selected in columns at right.
Date
December 7, 1984Recorded Holder qr Agent (Signature)
Certification Verifying Report of Worky
Mining Claims Traversed (List in numerical sequence)M
Prefix
KRL
ining ClaimNumber
775^2377^4?^
775^25775^26775^27775^28775^29775^30775^31775^32775^33775^t53
—27^5^ .-77.545577545^577^ii^777^/1^1877 c;u^q775460
-7.7-5^1. .-77 rJt62
^35kQ^77i-,ii^/!
Expend.Days Cr.
— ———
MPrefix
KRL
ming ClaimNumber
775465775^66775467
. 775468775-469--
-775-47.0..—775471775472775473775474775475775476775477775478775479775480
^775481J75M2 _
77548377J484
..7.755P4.....
Expend,Day-; O.
Total number of mining claims covered by this report of work.
1 hereby certify that l have a personal and intimate knowledge of the^Si*^et forth in the Report o f Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true. i\ G \ "J **7
Name and Postal Address of Person Certifying * ^ T r ̂ j f
- U,H.Thompson, Ste. -700, 88 University Ave. .Toronto. Ontariovyn t . 401 l Date dvrtifi
l Nov.
ed
2CL.
(Signature)
1362 (81/9)
KM.l I*"L
'•4*71* 1*4*71
~ \ KIVL~
|*4*7t7 I*4t7t
l ML l ML rf tem "ML
i l l *T*4*t 177*4*1
4t7*4 I 64*7**
sr 1 35' 33' 32'
E G-/884
1984 12 17 Your File: Our File: 2.7541
Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MO
Dear Sir:
We received reports tnd maps on December 10, 1984 for a Geophysical (Magnetometer) Survey submitted under Special Provisions (credit for Performance and Coverage) on Mining Claims KRL 775423 et al 1n the Township of Earngey.This material will be examined and assessed and a statement of assessment work credits will be Issued.
We do not have a copy of the report of work which Is normally filed with you prior to the submission of this technical data. Please forward a copy as soon as possible.
Yours sincerely,
S.E. YundtDirectorLand Management Branch
Whitney Block, Room 6643Queen's ParkToronto, OntarioM7A 1W3Phone: (416)965-4888
A. Barr:sc
cc: Dome Exploration (Canada) Limited P.O. Box 270 l First Canadian Place Toronto, Ontario M5X 1H1 Attn: Ed Plgulskl
z; O
Ontario
Ministry of Natural Resources
GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT
FUc.
Type of Survey(s Township or Are,
Claim Holder(s)
Survey Company Author of Repor
Address of Authc Covering Dates o
Total Miles of Lil
SPECIAL PROCREDITS REC
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT FACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
) Mamie tici Earngey Twp.
Dome Exploration (Canada) Ltd.Box 270, 1 First Canadian PI., Tor.Geosearch Consultants Limited
f W. H. Thompson,,Suite 700 - 88 University Ave.F Survey March
ic Cut
VISIONS )UESTED
ENTER 40 days (includes line cutting) for first survey.
ENTER 20 days for each additional survey using same grid.
1 to Nov. 20, 1984.(linecutting to office)66 Kins*
DAYS— , . , per claim Geophysical
M anPinJLrr ^0
Barl ! rtm^rir
-OtherCmlnpiral
AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)
Magnetometer, t,F.Wrrnmaanptir Radinmrtrir(enter days per claim)
DATF- Nov 20/84 sir.NATHRF.-f> /AN* l It&s^fj&Zsr?-
Res. Geol.Previous Surveys
"" 'AurJior of Report dr Agent
Qualifications t ^-.--J l^-J — *
File No. Type Date Claim Holder
MINING CLAIMS TRAVERSED List numerically
KRL 775423(prefix)775424
775425
775426
775427
775428
775^29
775430
775431
775432
775433
KRL 775464(number)
775466
775467
775468
775469
775470
775471
775472
77,547?
...............7.25.1*7.*....775453 72-5^757754:54 77J5476
775455775456
775457775458
..............7.7J&52775460
775^6.1.
...............7.75.4, 6,.?.
TOTAL CLAIM
...............7.ZJ5.H7.7......r? r*y t; li f** Q...............7.7J5.H7.S.....
72^48072^481
.....77^!*82.....................775.4..8.1....
775504Q 44
837 (5/79)
GEOPHYSICAL TECHNICAL DATA
GROUND SURVEYS If more than one survey, specify data for each type of survey
Number of Stations__________262R____________Number of Readings 391 1
Station interval ____?5 m_____________________Line spacing_____1 00 m
Profile scale ^^——^^.^—^———^—^^^——^-^—-——————————.——-—————.—^.—..——.
Contour interval _____100 gammas^___________^^_______________
Instrument —————S c in t r ex MP-2 Proton Precession Magnetometer———^—— Accuracy — Scale constant 1 gamma_____^^_______^_^_______^_____^
Diurnal correction method Recording base station with 30 second readings
Base Station check-in interval (hours)________________________________________
O
Base Station location and value 17+25 S on base line O+OO ; 601 ?0 gammas
ECTROMAGNETIC
Instrument
Coil configuration
Coil separation
AccuracyMethod: CD Fixed transmitter CD Shoot back CD In line
Frenuencv
CD Parallel line
(specify V.L.F. station)
Parameters measured__________________
Instrument
Scale constant.
Corrections made.
Base station value and location
Elevation accuracy.
InstrumentMethod CD Time Domain CD Frequency Domain
OKH
<Nt— 1
Pt*~-i0OH
QWua*— H
^H " — (j — j(-H
in53^
Parsm^tprs - On time Frequency
- Off time Ranpe
— Delay time
— Integration time
Power
Electrode array ... -- -
Electrode spacing . .
Tvoe of electrode
SELF POTENTIALInstrument^——-———-———^—-.—————-——...—-——^—^———..—— .,. Range.Survey Method ———-—^-^———————^^^———————-——————^———..—-.
Corrections made.
RADIOMETRIC Instrument -^-——.
Values measured .
Energy windows (levels)________________'..————-—.——'.——^^———.———— Height of instrument.————-.—-——.—-——.,____________Background Count.
Size of detector—————^—---———^———-—-————-.——————.^^—....—.———.
Overburden .———-^—.^———.^—-———^-^^^^—...—^----^^^^^——.—^———-———(type, depth - include outcrop map)
S (SEISMIC, DRILL WELL LOCKING ETC.)Type of survey Instrument .—— Accuracy .-—-^Parameters measured.
Additional information (for understanding results).
A1EM)RNK S Type of survey(s)
Instrument(s)(specify for each type of survey)
Accuracy—————....———^^—^^^(specify for each type of survey)
Aircraft used————^———-—-^—^—.——-.—^-——...—--.—————Sensor altitude-Navigation and flight path recovery method.
Aircraft altitude_________________________________Line Sparing Miles flown over total area__________________________Over claims only.
GEOCHEMICAL SURVEY - PROCEDURE RECORD
Numbers of claims from which samples taken.
Total Number of Samples. Type of Sample.
(Nature of Material)
Average Sample Weight——————— Method of Collection_________
Soil Horizon Sampled. Horizon Development. Sample Depth———— Terrain-———————
Drainage Development.————-———-—— Estimated Range of Overburden Thickness.
ANALYTICAL METHODS
Values expressed in: per cent p. p. m. p. p. b.
n nD
Cu, Pb,
Others—
Zn, Ni, Co, Ag, Mo, As.-(circle)
Field Analysis (.Extraction Method. Analytical Method- Reagents Used——
Field Laboratory AnalysisNo. ^.—.-.—-———
SAMPLE FKKrARATlON(Includes drying, screening, crushing, ashing)
Mesh size of fraction used for analysis ————.
Extraction Method. Analytical Method. Reagents Used.——
Commercial Laboratory (- Name of Laboratory —— Extraction
Analytical Reagents Used
.tests)
.tests)
-tests)
GeneraL General.
Mining Lands Section
Control Sheet
File No J). 75 V/
TYPE OF SURVEY GEOPHYSICAL
GEOLOGICAL
GEOCHEMICAL
EXPENDITURE
MINING LANDS COMMENTS:
Signature of Assessor
Date
January 25, 1985 Your File: 81-84 Our File; 2.7541
Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MO
Dear Sir:RE: Notice of Intent dated January 4, 1985
Geophysical (Magnetometer) Survey on Mining Claims KRL 775423, et al. In Earngey Township
The assessment work credits, as listed with the above-mentioned Notice of Intent, have been approved as of the above date.
Please Inform the recorded holder of these mining claims and so Indicate on your records.
Yours sincerely,
S. E. YundtDirectorLand Management Branch
Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1M3 Phone:(416)965-4888D. Isherwood:mccc: Dome Exploration (Canada) Limited
P.O. Box 270 1 First Canadian Place Toronto, Ontario M5X l HI Attention: Ed Plgulskl
Encl.
cc: Mr. G.H. FergusonMining ft Lands Commissioner Toronto, Ontario
cc: Resident GeologistRed Lake, Ontario
/JI~N Ministry OT Technical Assess)(Vyl Natural . .. . ^ . ..lyj R^urces Work CreditsOntario ^P
nent *2.7541
Date Mining Recorder's Report of1985 01 04 Workk- ^-8?
Recorded Holder DOME EXPLORATION (CANADA) LTD
Township or Area ^^ ̂ ^
Type ol survey and number of Assessment days credit per claim
Geophysical
Rariinmatric days
nthur days
Section 77 (19) S** "Mining Claim* AuetMd" column
Geological days
fienrhemiral days
Man days d Airborne O
Special provision S] Ground H
Q Credits have been reduced because of partial coverage of claims.
ED Credits have been reduced because of corrections to work dates and figures of applicant.
Mining Claims Assessed
KRL 775423 to 429 inclusive 775432 - 433 775453 to 480 inclusive 775482 to 484 inclusive 775504
Special credits under section 77 (16) for the following mining claims
20 DAYS 10 DAYS
KRL 775431 KRL 775430 775481
No credits have been allowed for the following mining claims
LJ not sufficiently covered by the survey 1 1 Insufficient technical data filed
The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical 60; Geological 40; Geochemical 40; Section 77(19) GO:
SSB I83JB)
ano
Ministry ofNaturalResources
1985 01 04
Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MO
Dear Sir:
Your File: 81-84 Our File: 2.7541
Enclosed are two copies of a Notice of Intent with statements listing a reduced rate of assessment work credits to be allowed for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record
sheets.For further information, if required, please contact Mr. R.J. Pichette at 416/965-4888.
Yoars sincerely,
Management Branch
Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3
,D. Isherwood:mc
Ends.
cc: Dome Exploration (Canada) Limited P.O. Box 270 l First Canadian Place Toronto, Ontario M5X l HI Attention: Ed Pigulski
cc: Mr. G.H. FergusonMining b Lands Commissioner Toronto, Ontario
845
Ministry ofNaturalResources
Ontario
Notice of Intent
for Technical Reports
1985 01 04
2.7541/81-84
An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.
If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.
If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.
If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Land Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.
846 (82/5)
Dome Exploration (Canada) Limited
Fxecutive Office
DELIVER
December 10, 1984
P.O. Box 2701 First Canadian PlaceToronto, OntarioM5X1H1(416) 364-3453Telex 065 24590Telecopier 366-1775
Lands Administration Branch Ministry of Natural Resources Room 6450, Whitney Block Queen's Park Toronto, Ontario M7A 1X1
Our Project No. 244
Attention; Mr. Ray Pichette
Re: Mining Claims KRL.775423 et al- Earngy Township, Uchi Lake Area
_____(M. 2157)________________
Dear Sir;
We enclose herewith, in duplicate, a report and plans by Geosearch Consultants Ltd. (W. R. Thompson), covering a magnetic survey performed on the above-noted 44 claims located in the Red Lake Mining Division.
This submission is made under the Special Provisions Regulations as to 40 days per claim.
Enclosed is a copy of the Report of Work which we forwarded to the Mining Recorder in Red Lake, Ontario.
Please date-stamp the enclosed copy of this letter and return it to me.
Yours very truly,
DOME EXPLORATION (CANADA) LIMITED
EAP:tc Enclosures
/ - s t^r^
Edward A. Pigulski Assistant Secretary
Copy For: Mr. Ray Pichette
Dome Exploration (Canada)
Executive Off.ce7 ioa/ 7, 1984
P0 BOX 2701 ^'rst Canadian Place Toronto. Ontario M5X 1 H 1 (416)364-3453 Telex 065-24590 Telecopier 366-1775
Mr. Scott RivettMining RecorderMinistry of Natural ResourcesP.O. Box 5003Red Lake, OntarioPOV 2MO
Our Project No. 244
Re: Mining Claims KRL.775423 et al- Earngy Township, Uchi Lake Area
_____(M. 2157),^^—————————————
Dear Mr. Rivett:
Enclosed is a Report of Work covering a Magnetic Survey (40 days for each claim) performed by Geosearch Consultants Ltd. (W. H. Thompson), on 44 mining claims as shown on the Report.
We will be delivering the survey report and plans, in duplicate, to the Land Management Branch of the Ministry for evaluation within the next week.
This assessment work is being filed under the Special Provisions Regulations.
Yours very truly,
DOME EXPLORATION (.CANADA) LIMITED
EAPstc Enclosures
Edward A. Pigulski Assistant Secretary
c. c. Mr, Ray Pichette (w. /ends.)
Ministry ofNaturalResources
OntariJ
Report of Work(Geophysical, Geological, Geochemical and Expenditures) PROJECT 244
Mining Act
Instructions: Please type or print. If number of mining claims traversed
exceeds space on this form, attach a list.Note: Only days credits calculated m the
"Expenditures" section may be enteredin the "Expend. Days Cr." columns.
- Do not use shaded areas below.Type of Survey(s)
MagneticClaim Holder(s)
Dome Exploration (Canada)Address
Box 270. 1 First CanadianSurvey Company
Geosearch Consultants Ltd.Name and Address of Author (of Geo-Technical report)
tt. H. Thompson. Ste. 700. 88
Ltd.
Township or Area
Earngey TownshipProspector's Licence No.
A21304
Place, Toronto, Ontario[Date of Survey (from Si to) Total Miles of line Cut-pt 03 84! 20 , 11 84 66 km.
1 Day j Mo.H y '- i Day | Mo. ] Yr.
University Ave. Toronto. OntarioCredits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter^AO days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Days perClaim
Man Days
Complete reverse side and enter total(s) here
Geophysical
- Electromagnetic
- Magnetometer ' i
l- Radiometric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Airborne Credits
Note: S pecial provisions Electromagnetic credits do not apply
Days per Claim
Days per Claim
to Airborne Surveys. Magnetometer
Radiometric
Expenditures (excludes power stripping)Type of Work Performed
Performed on Claim(s)
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
Date
December 7, 1984Recorded Holder ar Agent (Signature) '
Certification Verifying Report of
Mining Claims Traversed (List in numerical sequence)Mining Claim
Prefix
KRL
Number
77542T
77=1424
775425775426775^27
775^*28
775429
775430
775431
775432
775^33
775453
775W
., .275455-
775^5677^7
7754g877*54*5Q
77*i46O
775461
77546?
77546377 z.hf*li
Expend. Days Cr.
-
Mining ClaimPrefix Number
KRL 775465" T H
-.--.^"r.
: j ^
775466
..775467
775.468
77^469
77^470775^71
775^72
775^73775^7^
775475775476
775^771775^78
775479-775A80
JZ25^8.1775^82
775483
7^5484
-225-504
Expend. Days Cr.
Total number of mining claims covered by this report of work.
For Office Use OnlyTotal Days Cr. Recorded
Date Recorded
Date Approved as Recorded
Mining Recorder
Branch Director
l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.
Name and Postal Address of Person Certifying
, Ste. -?00, K8 University A tario
1362 (81/9)
Assessment Work Breakdown
Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..
Type of Survey
Technical Oayi Credit*
Line-cutting Oayt Total Credit*
Days per Claim
X 7
X 7
X 7
Locai/on ria
p
LE&
E/VD
Co
nto
ur
inte
rva
l...
....
,...
....
.. 1
00
0
gam
mas
lOO
Ogam
mo
conto
ur.
,
5000 g
am
ma
conto
ur.
De
pre
ssio
n....
....
....
....
For
Ab
solu
te-
valu
es-
aolo
l 6
^. ^
OO
V
Base
S
ia-f
ion
. .
. .
. .
. .
. A
//O
^eaJ
/rt
A MA
P
Key
52N82SE9889 2.7541 EARNGEY
20
0
TO
TA
L
FIE
LD
M
AG
NE
TO
ME
TE
R.
SU
RV
EX
by
GE
OS
EA
RC
H C
ON
SU
LTA
NTS
LTD
.-f
or
DO
ME
E
XP
LO
RA
TIO
N)
(CA
NA
DA
) L
IMIT
ED
PR
OJE
CT
Z44
-E
AR
NG
EV
T
WP
,O
NT
AR
IO
SC
AL
E-
1 :
ZB
OO
8
4-1
ZO
A
EA
RN
GE
Y
TU
P.
TO
TA
L
FIE
LD
M
AG
NE
TO
ME
TE
R S
UR
VE
X
by
GE
OS
EA
RC
H C
ON
SU
LTA
NT
S L
TD.
-fo
r
LEG
EN
Din
G
a. m
ma
t 9
Fo
r A
bsol
ute
va/u
es
add.
Con
tour
in
terv
al
......
....
....
...
1000
gam
mas
lOO
Oga
mm
a co
ntou
r
5000 g
amm
a co
nto
ur
Dep
ress
ion
DO
ME
E
XP
UD
RA
TIO
N
(CA
NA
DA
) L
IMIT
ED
PRO
JEC
T 2
44
EA
RW
GE
YO
NT
AR
IOM
AP
K
ey,
WS
4-
M. K
M-,
L3W
84 '1
ZO
SC
ALE
- l
: Z
5O
O
-t/
'-t/
LEGENDeaJ/fige /n Gammas
or Absolute values ac/d
Stolon
Contour interval .
lOOOgamma contour
5000 gamma contour.
Depression........,,.....
.1000 gammas
TOTAL FIELD MAGhJETOMETER SURVEX
byGEOSEARCH CONSULTAN15 LTD.
(fer
POME EXPLORATION (CAWADA) LIMITED
PROJECT 244MAP T\AIP
ONTARIO
- 25OO 84-12O C