• Electricity (No electricity)
• Wind heavy wind
• traffic condition medium/ heavy condition
• No Pedestrian • Adjunct
structure • 1 METER LEVEL
DIFFERENCE AT LEFT SIDE OF PRINCES EXIST
PRINCES FREEWAY PRINCES EXIST
3m 16m
10m
2975
1424
TRUCK CAR
SPEED
SITE DIMENSION
DRIVING DIRECTION
VEHICLE TYPE&AVERAGE DIMENSION
SITE VEGETATION
7AM, 0⁰
10AM, 15⁰
12AM, 29⁰
15AM, 15⁰
17AM, 5⁰
WINTER SEASON SUN POSITION SUMMER SEASON SUN POSITION
5AM, 0⁰
9AM, 45⁰
12PM, 70⁰
15PM, 50⁰
17PM, 29⁰
18PM, 13⁰
19PM, 6⁰
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
‘SOMETHING NEW’
SCALE 1: 2000
“SOMETHING NEW” is an epitome of a city in terms of its large scale and dynamics. The project was involved new technology specifi-cally parametric design generates new design notion and interpretation of Gateway project. Driven innovative idea will announce the en-try point into metropolitan Melbourne, at the western interchange and forming a gateway to the city. The project creates a unique view with its height as well as granting a visual access through to the interior and exterior of the design. Experience of various materials during the design process, as a result, 795 pieces of welded steel mesh work together with the overlapping design to perform as a new visual icon for the highway for Wyndham City Council.
ideas: learning from the past
generating new concept
Spacing of layers: 200mmNumber of layers : 26
Rod ø 12mm Length: 2400mm; Quantity: 11520; Span: 780mm
Welded mesh in plan
Welded mesh in elevation
Night view day view
raining- water
shadow effect
rusting overlaping mesh
MODEL EXPERIEMENTSquare Adding layers expandig dimension different experience(3 parts)
developing entries details of the entry
scale changing overlapping trim creating space “rolling in the deep”
tunnel adding layers simplify enclosure
ABPL 30048 ARCHITECTURE DESIGN STUDIO AIR DEGUO HOU 387313, YIFANG YIN 387291, SABRINA SHUK KWAN FUNG 374433, JUNYAN QI 345247
timeline in the gateway
internal experiencesite plan
shadow effect
construction
Top Related