8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
1/124
OUTLINEOUTLINEI. INTRODUCTION
Mindanao River Basin Maps
II. FLOODS TOWARDS THE CREATION OF THETASK FORCE
Aerial Survey 2008 Photos of Flooded Areas Summary of the three (3) Executive Orders creating the Task
Force
Aerial Survey 2009
III. IMMEDIATE CAUSES OF FLOODING
IV.DAMAGES
V.EVACUEES
VI.RECOMMENDATIONS
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
2/124
Republic of the PhilippinesRESIDENTIAL TASK FORCEindanao River Basinehabilitation andDevelopment
. Executive Order No 753 A
-ASK FORCE MRBRD-ASK FORCE MRBRDonsolidated Reportonsolidated Reportnd Recommendationsnd Recommendations
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
3/124
. INTRODUCTIONINTRODUCTION
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
4/124
GUSANiverBasin
INDANAOiverBasin
MINDANAO RIVER BASINMINDANAO RIVER BASIN
RIVER BASIN IN THE PHILIPPINES
= , .Basin Area 23 170 Sqkm
.323 km.323 km
engthengthiversiversPulangiPulangi
Alala indanao Rindanao R .100 km.100 km.120 km.120 km
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
5/124
The Major Rivers within the Basin are:
1. Ala River
2. Banga River traversing Ala Valley in the South
3. Pulangi River with head water from Bukidnon,traversing Ligawasan Marsh
4. Mindanao River, Simuay River , and Tamontaka
River in the Lower Cotabato areawhich are the major egress of all river-flows inthe whole Mindanao River basin towards Illanabay
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
6/124
6
MINDANAO RIVER BASINMINDANAO RIVER BASIN
LA VALLEY
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
7/124
. ,LEV 1 500. .IGUA R
.ANUTO R.ULAMAN R
.ABACAN R .LANG R
.A LA SI LA R.LIP R
A KE B UL UA N .ANGA R
.HEAD WATER ALA R
.LEV 1600 M
A K E S E B U
.EPAKA R
AGANOY RALARIVER
LIGAWASAMARSH BULUAN R
B P A N A NM A R S HI B U N G A NM A R S H
A LI TU BO G R.A LA DU GA O R
ULETA R.ARAMAG RA TA YL AN R
A NU PA LI RAWAGA R
MINDANAOR
PAGALUNGANPIKIT
.LLAH R CROSSING A TU P IA NG
I BU NG AN R
IMUAY RAMONTAKARIVER
P U L AN G I
R I V E R
OTABATO CITYBRIDGE
:LEGEND
Rivers-xisting CutffChannel
arsh Area
SCHEMATIC RIVER FLOW
O W E R O T A B A T OI V E R B AS INiver FlowDirection
The Mindanao (Cotabato) River BasinThe Mindanao (Cotabato) River Basin.EAD WATER PULANGI R
7
Courtesy of RDC 12, FRANK_2008 presentation
N
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
8/124
. I FLOODS I FLOODSOWARDS THEOWARDS THEREATION OF THEREATION OF THE
ASK FORCEASK FORCE
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
9/124
Aerial survey taken after typhoons Frank and
Cosme last year (2008)
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
10/124 10
, ,a li m b a o ar ea S u l t a n K ud a r a tM a g u i n d a n a o
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
11/124 11
Delta Bridge
Photos taken in2008
o l u m e o fa t e r y a c i n t hf t e r t h ey p h o o n sr a n k a n do s m e i n 2 0 0 8
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
12/124
olume of wateryacinth underuirino bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
13/124
Quirino Bridge
DeltaBridge
M t
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
14/124
MatampayBridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
15/124 15
,ND VILLAGE AREA Cotabato City
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
16/124
( )Notre Dame Avenue in front of Notre Dame University
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
17/124
Creation of the Task Force
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
18/124
EO # Title Date
Executive Order# 743
Creating a Task Force onCotabato Flood Control
July 24, 2008
Executive Order
# 753
Creating a Presidential Task
Force for the Mindanao RiverBasin Rehabilitation
September 29,
2008
Executive Order# 753-A
Amending EO No. 753, series of2008, which created the
Presidential Task Force onMindanao River Basin
Rehabilitation and Development
January 5, 2009
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
19/124
ASK FORCE OFFICERSASK FORCE OFFICERSND MEMBERSND MEMBERS
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
20/124
Chairman:Archbishop Orlando B. Quevedo, OMI, DD
Co-Chairman:ARMM Governor Datu Zaldy Uy Ampatuan, AlHaj
(the Chairman of RDCC-ARMM)
Three Vice- ChairmenUndersecretaries of DPWH and DENR and Chairman of RDCC XII
Usec. Bashir Rasuman - DPWHUsec. Demetrio Ignacio DENR
PNP XII Director P/C Supt. Josefino Catalua - RDCCExecutive Secretary of the Task Force
Executive Director of the Task Force Secretariat/Support Office:
Solomon D. Badoy
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
21/124
MEMBERSRegional Directors/Head of Office of DPWH, CARBDP, DSWD, DOH,
DepEd, DILG, DENR, NEDA, RPDO, DAR, DA, BFAR, OCD andNIA of Regions XII and ARMM, AFP-Engineering Brigade/Philippine
Navy and PNP
and the
Local Government Chief Executives of the4 Provinces in Region XII:
Sultan Kudarat, South Cotabato, Sarangani, and Cotabatoand 1 Province in ARMM: Maguindanao
Cotabato City & Gen. Santos City
and the
Municipalities of: Lambayong in Sultan KudaratPigcawayan and Midsayap in CotabatoSultan Kudarat in Maguindanao
Sultan Sa Barongis in MaguindanaoDatu Montawal in Maguindanao
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
22/124
PTF MRBRDTECHNICAL WORKING GROUP
REHABILITATION and LONG-TERM DEVELOPMENT MEMBERS
RehabilitationChairperson
Regional Director Hadja Sinaolan Macarambon, DPWH 12
Co-Chair
Regional Secretary Razul K. Abpi, DPWH ARMM
Long-Term Development
Chairperson
OIC-Director Teresita Socorro C. Ramos, NEDA 12
Co-ChairExecutive Director Diamadel E. Dumagay, RPDO ARMM
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
23/124
Aerial Survey 2009
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
24/124
OLANDANG BRIDGE connectingMidsayap and Datu Piang
Damaged portionof the bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
25/124
Bridge 1
Bridge 3
Bridge 2
Olandang Bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
26/124
Site Inspection at Olandang Bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
27/124
27
CONVERGINGPOINT
ALA RIVER
BANGA RIVER
Kapingkong River
Ala River
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
28/124
Project Site
Repair/Rehab of Ala River Flood Control at Lambayong, Sultan Kudarat
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
29/124
LambayongMunicipalit
y
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
30/124
Lambayong Municipality
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
31/124
31
ALA RIVERR OJ EC T S IT E
LA RIVER
UL TA N S A B AR ON GIS
LAMBAYONG
,ns t a l l e d g a b i o n s m a t tr e s s e s a n d t i m b e r
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
32/124
, -i l es A l a R i v e r L a m b a y o n g Pr oj e c t,h a se I ( , )s of Ap ri l 1 3 2 009
As of June 20, 2009, (Monitoring/Site Inspection by TWG)
After the typhoon Jolina
Projectsite
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
33/124
LIGAWASAN MARSH
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
34/124
Pagalungan Bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
35/124
Tunggol Bridge
Montawal
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
36/124
Montawal
Tunggol Bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
37/124
Tunggol Bridge
T nggol Bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
38/124
Tunggol Bridge
Tunggol Bridge (Slope Protection collapsed)
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
39/124
Tunggol Bridge (Slope Protection collapsed)
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
40/124
In Libungantwo spans of Grebona Bridge linking Libungan, Alamada and Banisilan collapsed and swepaway
Grebona Bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
41/124
g
. ,id eo co u rt es y of Fr D av i d Pr oc a ll a DC C o c ia l A c t io n D ir e c t or of t h er ch di oc es e o f C ot ab at o
Denuded Mountains in Alamada
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
42/124
Denuded Mountains in Alamada
Simuay FloodControl Project
Timber piles at the suspected breachduring heavy rains last September 2008
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
43/124
.Phase I 2 65 kms:Accomplishment
. % = . .54 63 1 45 kms
Control Project( )Emergency works
Phase II
,during heavy rains last September 2008-the breach opened at around 50 60 m
,width and during the typhoon Jolina the-breach became huge with around 150 200 m
.and 1 5 m depth
LOCATION PLAN
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
44/124
LOCATION PLAN (Courtesy of Sir Flores)
THIS SITE
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
45/124
IMUAY RIVER
MBAL RIVER
:POINT OF CONVERGENCE
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
46/124
COURTESY : TO THEHOUSE OF BARANGAY
CHAIRMAN
SHORT MAPPING & BRIEFINGAT
AMBAL BRIDGE,BARANGAY ARATUC,
BULDON MUNICIPALITY
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
47/124
APPROACHINGTHE
CONVERGENCE
OFTWO RIVERS
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
48/124
HE SIDE AMBAL RIVER
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
49/124
HE SIDE SIMUAY RIVER
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
50/124
WO RIVERS TO SULTAN KUDARAT& OTABATO CITY AREA
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
51/124
VOLUME OF WATER FLOWING TO SULTAN KUDARAT& COTABATO CITY
SIMUAY RIVER AMBAL RIVER
O SULTAN KUDARAT
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
52/124
/BSERVATIONS COMPARISONS
IMUAY RIVER AMBAL
OLOR OF WATER OF AMBAL IS CLEARER COMPAREDO SIMUAY :ANDY FOR AMBAL MUDDY FOR SIMUAY
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
53/124
AMBAL
SIMUAY
HE BEHAVIOR OF FLOW OF THE TWO RIVERS OLUME OF WATER
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
54/124
A CLOSER LOOK OF AMBAL RIVER
RIVER BANK
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
55/124
E S I D E N T SO I N GO M E A U N D R Y
BOUT 20 ETERS HEIGHTF THE ERODED RIVERANK
.PPROX0meters
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
56/124
IMUAY RIVER
THE STILLNESS OF SIMUAY RIVER FLOW COMPARED TO AMBAL
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
57/124
AMBAL RIVER SIMUAY RIVER
UPSTREAMS OF THE TWO RIVERS
.PPROX0meters
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
58/124
he sites areormed by narrow-shape valley and-nderlain by in-lace sandstonehale rock/AVORABLE STABLE-or Slit Sediment-torage Gateless.ams
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
59/124
59
SIMUAY RIVER( ,u g u s t 2 2 0 0 9 - )TF MRB RD AE RI AL S UR VEY
LD ROUTE REACHEDPORTION
IMUAY RIVERUpstream
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
60/124
60
2008 ,ugust 17 2009
Simuay Flood Control Project ( Timber Piles )
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
61/124
61
Ground View( August 17, 2009 ocular inspection)
W
( )stimated width W of Breached Portionis -50 200 ( .)eters Ave
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
62/124
62
imuay River Old CourseBreached Portion
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
63/124
Agricultural lands in
Sultan Kudarat,Maguindanao
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
64/124
64
SULTAN KUDARAT, MAGUINDANAO
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
65/124
65
Interior part of Sultan Kudarat, Maguindanao
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
66/124
Dredging Operation by Vic Lao
Constructionh o t o t ak e n
, ,h o t o t a k en A u g u s t 2 2 0 0 9e ri al s ur ve yHeavy siltation at Bucana area
Bucana area
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
67/124
Mouth of Bucana
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
68/124
Damayan Dredger
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
69/124
( )Rio Grande Quirino Bridge site( )Rio Grande Matampay Bridge site
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
70/124
Matampay Bridge
Delta Bridge and Quirino Bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
71/124
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
72/124
.II IMMEDIATEII IMMEDIATEAUSES OFAUSES OFFLOODINGLOODING
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
73/124
q o n t i n uo u s h e a v y r a i n o v e r, , , ,u k i d n o n A g u s a n D a v a o L a n a o, ,o u t h C o t a b a t o N o r t h C o t a b a t o,u l t a n K u d a r a t M a g u i n d a n a oq u c h h e a v y d o w n p o u r d i s l o d g e de c t a r e s o f g r a s s a n d w a t e ry a c i n t h c o v e r i n g l a r g e p o r t i o n s
f t h e M i n d a n a o R i v e r B a s i n a n du s h e d t h e m d o w n r i v e r
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
74/124
qLong standing siltation of all the
rivers to and from the Mindanao RiverBasin itself, a problem compounded bya long period of inactivity in the SimuayRiver project and the dredging of RioGrande.
qFlood waters damaged the initialengineering projects done at the SimuayRiver and Ala River
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
75/124
q Silt and other debris that have clogged
the Mindanao River channels
qThe accumulation of sand, mud, and sediments brought about by water flowing from various parts in the areafurther worsened by the accumulation ofwater hyacinth (water lilies)
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
76/124
qThe large-scale transformation of the
original vegetation of the basins foreststo non-forestry purposes
q
qInappropriate land use practicesqq
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
77/124
IVV . DAMAGESDAMAGES
Cotabato Province
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
78/124
Cotabato ov ceIn Pigcawayan provincial, Barangay Roads and dikes damaged;
Libungan two spans of Grebona Bridge linking Libungan, Alamada andBanisilan collapsed and swept away;
Montawal the Tunggol bridge is at risk
Maguindanao
Sultan Kudarat The SimuayRiver flooding completely swept away thetimber piles done by FFJJ Construction (Simuay River Flood Control
Project Phase I); and a third breach was opened.Cotabato City
High siltation level of Rio Grande and the volume of water hyacinth withheavy rainfall caused flooding of all the low lying areas of CotabatoCity; siltation at the Bucana is increasingly undoing the work that Vic
Lao Construction did.Sultan Kudarat Province
Flood waters damaged the engineering work done at the Ala River,Lambayong area.
Areas declared under state of calamity
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
79/124
u lt an Ku d a ra t Pr ov in c eo tabat o Pr ovi nce
o u th C ot a ba to Pr o vi n cea ran ga ni P rov inc e
o ta b at o C it y ,u lt an Ku d a r at
Flood Affected Infrastructure along National Roads
,DC XII RPMC Field Monitoring Activity August- ,8 19 2009
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
80/124
Flood-Affected Infrastructure along National RoadsProvinces of South Cotabato and Sarangani
San Felipe Bridge- , , .along Midsayap Marbel Road Tantangan So
Cotabato
-Saravia Section along Marbel Gen, ,Santos National Road SaraviaKoronadal City
-
Pangyan Bridge along Sarangani Davao, ,del Sur Road Glan Sarangani
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
81/124
Koronadal City
- ,Lun Padidu Bridge along Sarangani Davao del Sur Road,Malapatan Sarangani
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
82/124
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
83/124
Tambilil Bridge. + .Km 1739 236 60 iguilBridge. + .Km 1675 247 46
Gabion
: / " "Damage Scoured Damaged Approach A: . .stimated cost P10 0M : / " "Damage Scoured Damaged Approach A-Damaged Flood Control Structure Gabion
: . .stimated cost P10 0M
umatil Bridgeumaba Bridge: / " "Damage Scoured Damaged Approach A
: , .stimated cost P500 000 00: / " "Damage Scoured Damaged Approach A
: , .stimated cost P500 000 00
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
84/124
ARMMRMM,arakan Bridge in Matanog Maguindanao
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
85/124
( -TIL Bridge Approaches Cotabato- )alabang Lanao del Norte Road
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
86/124
( - -urakan Box Culvert Cotabato Malabang)anao del Norte Road
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
87/124
( - -anuan Box Culvert Cotabato Malabang)anao del Norte Road
alabagan Section
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
88/124
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
89/124
( - )andslides Marawi Malabang Road
NORTHNORTH MM n BBg
AFFECTED AREAS as of August 20, 2009
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
90/124
ULTANKUDARAT
( )ORTHCOTABATO
OUTHCOTABATO
MAGUINDANAO
SARANGANI .en SantosCity
SULTANSULTANKUDARATKUDARAT
Mun.Mun. Bgy.Bgy.66 2020
NORTHNORTHCOTABATOCOTABATO
Mun.Mun. Bgy.Bgy.77 134134
COTABATO CITYCOTABATO CITY Bgy.Bgy.
3131
SARANGANISARANGANIPROVINCEPROVINCE
Mun.Mun. Bgy.Bgy.66 3333
SOUTHSOUTH
COTABATOCOTABATO
Mun.Mun. Bgy.Bgy.
44 4242
GEN. SANTOS CITYGEN. SANTOS CITY Bgy.Bgy.22
MAGUINDANAOMAGUINDANAO Mun.Mun. Bgy.Bgy.1414 8989
otal Cost of Damages
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
91/124
,n Infrastructure as of August 20 2009( )egion XII and ARMMhP 383.3 M
Estimated cost of damages to infrastructure (national roads and bridges) based on the reports from DPWH field offices
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
92/124
based o t e epo ts o W e d o ces
Province/City Cost of Damage
Cotabato Province P 216.5 M
Cotabato City P 10 M
South Cotabato Province P 4.3 M
Sultan Kudarat Province P 25 M
Sarangani Province P 102.9 M
ARMM (Maguindanao & Lanao) P 24.6 M
GRAND TOTAL P 383.3 M
otal Cost of Damages
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
93/124
&n Agriculture Livestock as of August,0 2009hP 824 million
otal Cost of Damages
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
94/124
,n Infrastructure&gricultureLivestock .h P 1 2 B
as of August 20, 2009 (Region XII and ARMM)
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
95/124
ctions done regardingInfrastructure1. Deployment of DPWH teams (Region XII,ARMM, and Sub-district Engineering Office),Cotabato City Engineering Office and of the
Watermaster to clear the Delta, Quirino, andMatampay bridges on a daily basis
2 Instructions from Task Force Region 12 DPWH
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
96/124
2. Instructions from Task Force, Region 12 DPWHDirector and Secretary Ebdane to fast track:
The building of a temporary detour for heavy vehicles,bypassing Grebona bridge, to connect Alamada and Libungan,as well as to make Grebona Bridge passable soonest;Improvement and opening of NIA Road to Nicaan bridge for
light vehicles.The soonest temporary closure of the Simuay River 3rd
breach(estimate two to three weeks) through which flood waters
passed towards Salimbao and Bulalo and at the same time therechanelling of the Simuay River Flood Control Project PhaseII towards the sea (estimate about three months); the newcontractor is committing about 20 heavy equipment for this
purposes and 60 million pesos are allocated for this project.
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
97/124
The preparation of plans to re-do the Ala RiverProject;
The deployment of a second Watermaster to the RioGrande (It will finally arrive in Cotabato City on August26, 2009);
The availability of funds to operate the Damayan on acontinuous basis;
The awarding of contract to continue the dredging oftheRio Grande River, including the updating of hydrotopographic survey;
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
98/124
Approval of other priority projects Tunggol Bridge,
Olandang, Bridge and three bridges in Lambayong,construction of drainage canal at Buluan creek, andimprovement/rehabilitation of Malu-ao to Guigekendrainage in Pigcawayan. (At the present moment, theapproach A of Tunggol bridge going to Davao is
under repair because of the collapse of slopeprotection)
Construction or upgrading of access roads on both
endsof Delta Bridge.
Water Master Classic III
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
99/124
I
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
100/124
Wate
rMaster
Clas
sicIII
Clearing of water hyacinths and grasses under the Quirino bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
101/124
a a o y g o ve rn m en a c o e c e ar ng o w a er y a c nt Ma ta m p ay b ri d ge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
102/124
Clearing of water hyacinth at Matampay bridge
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
103/124
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
104/124
. EVACUEES EVACUEES
INDIVIDUALS
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
105/124
Province/City No. of Families No. of Individuals
Cotabato Province 26,538 137,029
Cotabato City 31,462 131,201
South Cotabato Province 886 4,271
Maguindanao Province 25,096 126,014
Sultan Kudarat Province 8,428 42,140
Sarangani Province 3,449 13,320
Gen. Santos City 130 517
TOTAL 95,989 454,492
Damaged Houses 457 Totally 359 Partially
Casualties 24 dead 6 injured
In Sultan Kudarat Municipality
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
106/124
In Sultan Kudarat Municipality.flood waters still in Brgys
, , , ,Katuli Banubo Bulalo Calsada, .Limbo Salimbao and Gang Floodwaters mixed with mud from Simuay
River slowly moving towards Rio. ,Grande 1 498 IDP families are
still staying in various.evacuation centers But a total of
, .12 910 families were affected
Vehicles transporting affected families and
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
107/124
Vehicles transporting affected families andindividuals
Evacuees moving to the nearby evacuationcenters
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
108/124
Military trucks were used to transport Internally Displaced Persons( )IDPs
Cotabato City
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
109/124
Cotabato Citypayloader
CTIONS DONE FOR EVACUEES.1 The following agencies mobilized themselves the soonest possible time to:tend to the needs of evacuees
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
110/124
. /N G O s L o c a l N G O sv World Food ProgramvUNICEF
vJICA
v Supreme Masterv Operation Blessing 700 Clubv , .Canari Motorcycle Club Incv GMA Kapuso Foundationv ABS CBN Central Mindanaov KALASAG Foundation
v Mindanao Tulong Bakwet
v and othersv. ,US I N E S S E S T A B L I S H M E N TS a n d. ON CE R N E D I N D I V I DU A L S w ho x te nd ed f in an ci al,s s i s t a n c e r ,l i e f g o o d s u s e d, .l o t h in g s e t c G O O D N U M B E R O F S CH OO L S E R V E D A S E V A C U A T I ON C E N T E R S
!H A N K Y O U
. :G U sv o c a l G o v er n m e n t U n it s o f R e g io n X I I a n d R M M a nd t h e i r C hi e f E x e c u t i v e s a n d o f f i c i a l s. O VE RN ME NT A GE NC IE Sv / / / /a ti on al R eg io na l P ro vi nc ia l C it y u ni ci pa l D is as te r C oo rd in at in g C ou nc il s
v , ,P W H XI I an d A R M M D S W D X II D S W D A RM M n d D S WD L o c a l O ff i c esv & , ,O H X II D O H A R M M I P HO an d R H Usv o t a b at o Re g i o n a l a nd M e d i c a l C e n t e rvP N R Cv -A F A R M Mv E S D A X I Iv i li t a r y a n d P o l i ce O f f i c e r s a n dP e r s o n n e l. I V IC A ND RE LIG IO US ORGA N IZAT ION SvKaranchov RVM of Cotabato City and Davao Cityv Notre Dame Hospital
v Immaculate Conception Cathedralv ,Social Action Center Archdiocese ofCotabatov ,Piso Serbisyo Archdiocese of Cotabatov Mobilization by parishesv &Donations from Notre Dame CEAP
schools
. - :2 Action taken by the above named agencies
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
111/124
deployment of teams to rescue evacuees trapped by floods
and/or to bring them to safer areas; the use of dump trucks,payloaders, military trucks, freight trucks, patrolboats of Task Force Tugis, etc.
setting up of evacuations centers in public buildings(schools, gyms, etc) and church buildings (chapels, gyms,
parish halls, etc);
establishment of disaster operation centers;
immediate supply of bread and drinking water;
donation and distribution of relief goods, rice and
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
112/124
other food supplies, medicines, clothes, blankets,etc.; World Food Program donated severalthousands of sacks of rice;
medical missions by DOH ARMM, SALA'AM
37th IB with MDCC, RHU, IPHO and DOHARMM; referral os sick people to CRMC;
setting up of community kitchens, providing hotmeals;
provision of generators, water tanks.
oordination with different line agencies for quickesponse
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
113/124
Situation of children at the evacuationcenters
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
114/124
Emergency Stations at theCathedral
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
115/124
Relief distribution byconcerned agencies
Emergency Stations near crossingSalimbao and Bulalo
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
116/124
.I RECOMMENDATIONSI RECOMMENDATIONS
For the Office of the President to fast-track the following projects intheir order of priority:
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
117/124
Channelization and Bank Protection with
Sluice gate for Emergency Project at SimuayRiver and closure of the breach.
P
60,000,000.00
2. Immediate Deployment of One or TwoWatermaster for Task Force Deployment.
P -
3. Simultaneous dredging of Rio Grande deMindanao from Bucana to Quirino Bridge
(7 kms)
P 250,000,000.00
4. Tunggol Bridge II, Bank Protection,Channelization Phase 1 and Phase 2, Datu
Montawal, Maguindanao (very critical), bridgelinking Davao City and Cotabato City
P 70,000,000.00
their order of priority:
5. Repair of Olandang Bridge whichcollapsed one year ago during
P 49,000,000.00
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
118/124
6. Repair/ Rehabilitation of Ala River FloodControl, Channelization at Punol, Sigayan,
Panabungan, Papakan Section, Lambayong, SK
P 100,000,000.00
7. Repair/Rehabilitation of Ala River FloodControl & Bank Protection along Punol, Sigayan,
Papakan Section Lambayong, SK
P 100,000,000.00
8. Proposed Upgrading/Concreting of QuirinoDelta Bridge Access Road at Barangay Salimbao,Sultan Kudarat, Maguindanao
P 33,488,500.00
collapsed one year ago duringtyphoon Frank and Cosme
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
119/124
10. Construction of Pingiuaman Bridge ILambayong , Sultan Kudarat
P 40,000,000.00
11. Construction of Pinguiaman Bridge IILambayong, Sultan Kudarat
P 20,000,000.00
12. Construction of Sadsalan Bridge IILambayong, Sultan Kudarat
P 80,000,000.00
9. Repair and Rehabilitation of Ala River FloodControl, Channelization and Bank Protection
Sultan sa Barongis, Maguindanao
P 50,000,000.00
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
120/124
13. Construction of Drainage Canal at Brgy.Buluan Creek, Phase V, Brgy. Buluan,
Pigcawayan, CotabatoP
5,000,000.00
14. Improvement/Rehabilitation ofMalu-ao - Guigeken Drainage Canal,
Pigcawayan, Cotabato (Phase 1)
P
20,000,000.00
15. Protection Dike and Extension of Cut-offChannel of Libungan River, Phase 1 (NIA) P
15,000,000.00
16 R i /R h bili i f G b B id P 35 000 000 00
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
121/124
16. Repair/Rehabilitation of Grebona Bridge atBanisilan, Alamada
P 35,000,000.00
17. Replacement of Quirino Bridge P 203,060,000.00
P 50,000,000.00
TOTAL P 1,180,548,500.00
18. Preparation of Master Plan for
the Mindanao River Basin
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
122/124
Commendation
I commend all the government agencies( , ,and officials regional provincial
, ),municipal and city including the,military and police in their quick
mobilization of equipment and personnelto assist the thousands of evacuees in, .Cotabato City Region 12 and ARMM When
,crisis comes the assistance is
.thankfully fast and expeditious
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
123/124
,ense of Urgency Drive forActionI pray that our action on documentation
,for the release of funds deployment of
, personnel and equipment would be
similarly fast and expeditious withregard to the implementation of the
( . ., , , ) projects e g Rio Grande Simuay Ala
.that help prevent crises We all need a
sense of urgency and a drive for.immediate action
8/9/2019 +++PTF-MRBRD BRIEF _ 25August2009
124/124
End of Presentation
Thank you!