Proposed Bike Lanes for Summer 2021 – Summer 2022
Resurfacing ProgramVirtual Public Engagement #2 July 25 – August 11, 2021
Project Overview
• Six (6) new bike facilities are proposed to be installed as part of the Department of Public Works’ (DPW) annual citywide paving and resurfacing program for FY22 that runs from summer 2021 through summer 2022 • The corridors were identified based on 2015 Richmond Bicycle Master Plan and support the City’s Vision Zero Action Plan by using our Better Streets multimodal approach to improve safety for all • Each proposed project includes safety improvements, such as high‐visibility crosswalks for people who walk, accessible curb ramps for people who roll, and dedicated space for people to bike or scoot
2Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Project Timeline
Project Identification
Concept Design
Detailed Design Final Design
3Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Construction
May 202
1
April 202
1
March 202
1
June/July 20
21
July/Aug
ust 2
021
Augu
st 202
1
Beginn
ing
Septem
ber 2
021
We are here!
Proposed Corridors
• Brookland Parkway, from Arthur Ashe Boulevard/Hermitage Road to Brook Road (0.8 miles)• Colorado Avenue, from Hampton Street to Dance Street (0.9 miles)• Grove Avenue, from Shadwell Road to Seneca Road (0.8 miles)• Marshall Street, from 29th Street to 21st Street (0.5 miles)• Walmsley Boulevard, from the west City line to Belmont Road (1 mile) • Warwick Road, from Hull Street to Richmond Highway (3 miles)
4Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Summary of Public Engagement #1
• The online survey ran from May 16 through May 30, 2021• Concept designs were shown, including cross‐section options for each section/corridor• Respondents rated the options for each section/corridor from “Strongly Approve” to “Strongly Oppose” • Over 1,100 responses recorded (THANK YOU!) • Over 1,200 individual comments received
5Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Summary of Public Engagement #1
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 6
10%
90%
Do you live in the City of Richmond?
NOYES
29%
71%
Do you work in the City of Richmond?
NOYES
Summary of Public Engagement #1
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 7
No ‐ I don't bike.(10%)
Yes ‐ I bike and I'm interested, but I am
concerned about safety.(45%)
Yes ‐ I'm a confident cyclist.
(45%)
Do you ride a bike and how would you describe yourself as a cyclist?
46%57%
94%
7%16%
0%10%20%30%40%50%60%70%80%90%100%
If you currently bike, what is the nature of your biking?
Public Engagement #2
• Fill out the survey to provide general feedback on each of the proposed projects.Link: https://www.surveymonkey.com/r/YHSG3SR
• Review and comment on the detailed designs. A summary of each corridor is provided in the following slides. Link: https://richmond.konveio.com/bikelanes
• Public comment period open:Sunday, July 25 through Wednesday, August 11, 2021
8Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Brookland Parkway – Project Overview
Limits: Arthur Ashe Boulevard/ Hermitage Road to Brook Road
Length: 0.8 miles
Summary: convert existing parking‐adjacent buffered bike lanes to protected bike lanes
9Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Brookland Parkway – May Survey Results
• Presented “Existing Conditions” + 2 Options 1. Curbside parking‐protected bike lanes 2. Median‐side buffered bike lanes with curbside parking
• Received over 1,000 responses and nearly 400 comments • Comments included: • Concerns about speeding and use of the existing buffered bike lane to illegally pass on the right
• Support for protected bike lanes, like those on nearby Brook Rd • Request for regular sweeping of bike lanes and for physical barrier between parked cars and curbside bike lanes
10Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Brookland Parkway – May Survey Results
11Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
0
100
200
300
400
500
600
ExistingExisting Conditions
Brookland Parkway – May Survey Results
12Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
0
100
200
300
400
500
600
Option 1Option 1 – Parking‐Protected Curbside Bike Lanes
Brookland Parkway – May Survey Results
13Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
0
100
200
300
400
500
600
Option 2Option 2 – Median‐Side Buffered Bike Lanes
Brookland Parkway – Detailed Design
• Option 1 (Parking‐Protected Curbside Bike Lanes) chosen as preferred alternative, including: • Addition of flexposts within the buffer, similar to what is provided on the nearby Brook Rd lanes • Evaluation of intersections at Rennie Ave/Loxley Rd and Robin Hood Rd
14Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Brookland Parkway – Detailed Design
15Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Brookland Parkway – Detailed Design
16Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Colorado Avenue – Project Overview
Limits: Hampton Street to Dance Street
Length: 0.9 miles
Summary: no existing bike facility, addition of separated bike lanes
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 17
Colorado Avenue – May Survey Results
• Presented “Existing Conditions” + 3 Options 1. Two‐way cycletrack on 1 side with no on‐street parking 2. One‐way buffered bike lanes (both directions) with no on‐street parking 3. One‐way buffered bike lane on 1 side with parking on opposite side
• Received over 700 responses and nearly 200 comments • Comments included: • Concerns about existing travel speeds• Support for proposed facility to connect nearby schools and parks • Request for physical barrier between the bike lane and adjacent travel lane
18Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Colorado Avenue – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 19
0
50
100
150
200
250
300
350
400
ExistingExisting Conditions
* Note: street width varies, most constrained
section shown
Colorado Avenue – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 20
0
50
100
150
200
250
300
350
400
Option 1Option 1 – Two‐Way Cycletrack on 1 Side
* Note: street width varies, most constrained
section shown
Colorado Avenue – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 21
0
50
100
150
200
250
300
350
400
Option 2Option 2 – One‐Way Buffered Bike Lanes on Each Side
* Note: street width varies, most constrained
section shown
Colorado Avenue – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 22
0
50
100
150
200
250
300
350
400
Option 3Option 3 – One‐Way Buffered Bike Lane on 1 Side with Parking
* Note: street width varies, most constrained
section shown
Colorado Avenue – Detailed Design
• Option 2 (One‐Way Buffered Bike Lanes on Each Side) chosen as preferred alternative, including: • Addition of flexposts within the buffer, similar to other “protected” bike lane facilities in the City • Retention of 2 existing accessible parking spaces on 1700 block
• While Option 1 had high percentage of respondents strongly supporting, concerns over accommodating existing GRTC bus stops and turn conflicts at intersections with two‐way cycletrack make Option 2 more favorable
23Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Colorado Avenue – Detailed Design
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 24
From Hampton Street to Randolph Street From Randolph Street to Dance Street
Colorado Avenue – Detailed Design
25Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Grove Avenue – Project Overview
Limits: Shadwell Road to Seneca Road
Length: 0.8 miles
Summary: existing shared lane markings (sharrows), addition of separated bike lanes
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 26
Grove Avenue – May Survey Results
• Presented “Existing Conditions” + 3 Options 1. Buffered bike lanes in existing parking lane (parking removed) 2. Curbside parking‐protected bike lanes (1 travel lane in either direction
removed, parking retained)3. Curbside buffered bike lanes with separate jog lane (1 travel lane in either
direction and parking removed)
• Received nearly 650 responses and over 200 comments • Comments included: • Concerns over existing speeds and congestion impacts of removing travel lane• Support for facility for use by existing cyclists and joggers
27Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Grove Avenue – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 28
0
50
100
150
200
250
300
350
ExistingExisting Conditions
Grove Avenue – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 29
0
50
100
150
200
250
300
350
Option 1Option 1 – Buffered Bike Lanes
Grove Avenue – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 30
0
50
100
150
200
250
300
350
Option 2Option 2 – Parking‐Protected Bike Lanes
Grove Avenue – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 31
0
50
100
150
200
250
300
350
Option 3Option 3 – Buffered Bike Lanes with Jog Lane
Grove Avenue – Detailed Design
• Option 1 (Buffered Bike Lanes) chosen as preferred alternative• Feedback (strongly approve vs. approve) varied over the 3 options provided, but general support was expressed for the addition of bike facilities along the corridor • Due to short project segment, decision was made to retain 2 travel lanes in either direction at this time • While strong support for a separate “jog lane”, the width of proposed bike lane + buffer should provide enough room for joggers and cyclists
32Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Grove Avenue – Detailed Design
33Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Grove Avenue – Detailed Design
34Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Marshall Street – Project Overview
Limits: 29th Street to 21st Street
Length: 0.5 miles
Summary: existing shared lane markings (sharrows) on some blocks, addition of treatments as designated “bike‐walk street”
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 35
Marshall Street – May Survey Results
• Presented “Existing Conditions” + 2 Options 1. Shared lane markings with addition of painted centerline 2. Yield street with advisory bike lanes
• Received over 550 responses and nearly 200 comments • Comments included: • Concerns about existing travel speeds • Concern that addition of centerline would cause people driving to closely pass those cycling• Interest in the “advisory bike lane” concept but concern over the application on this street only leading to confusion
36Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Marshall Street – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 37
Existing Conditions
0
50
100
150
200
250
Existing
Marshall Street – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 38
Option 1 – Shared Lane Markings with Centerline
0
50
100
150
200
250
Option 1
Marshall Street – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 39
Option 2 – Yield Street/Advisory Bike Lanes
0
50
100
150
200
250
Option 2
Marshall Street – Detailed Design
• Modified Option 1 (Shared Lane Markings) chosen as preferred alternative, including: • No centerline added, except for short segments (20‐ft) added at intersections to help calm traffic
• Corner clearance markings to delineate existing on‐street parking • Marked crosswalks at every intersection, including side streets
• While there was support for the “Advisory Bike Lane” concept, conflicts with existing bus service on a “Yield Street” make the concept infeasible at this time. Also a new type of facility should be Citywide application with robust education effort
40Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Marshall Street – Detailed Design
41Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Marshall Street – Detailed Design
42Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Walmsley Boulevard – Project Overview
Limits: the west City line to Belmont Road
Length: 1 mile
Summary: no existing bike facility, addition of shoulder‐running bike lanes
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 43
Walmsley Boulevard – May Survey Results
• Presented “Existing Conditions” + 1 Option 1. Paved shoulder‐running bike lanes
• Received over 500 responses and over 100 comments • Comments include: • Concerns about existing travel speeds and comfort of shoulder bike lanes for those who cycle
• Request for maintenance of the shoulder, including sweeping of gravel that accumulates • Need for dedicated space for those who walk as current sidewalks end at Belmont Road
44Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Walmsley Boulevard – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 45
Existing Conditions
0
50
100
150
200
250
300
350
Existing
Walmsley Boulevard – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 46
Option 1 – Shoulder‐Running Bike Lanes
0
50
100
150
200
250
300
350
Option 1
Walmsley Boulevard – Detailed Design
• Moving forward with Option 1 (Shoulder‐Running Bike Lanes)• While there is strong support for the addition of sidewalk, that is unfortunately outside the scope of this project.
47Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Walmsley Boulevard – Detailed Design
48Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Walmsley Boulevard – Detailed Design
49Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Warwick Road – Project Overview
Limits: Hull Street to Richmond Highway
Length: 3 miles
Summary: no existing bike facility, addition of separated bike lanes
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 50
Warwick Road – May Survey Results
• Presented “Existing Conditions” + 3 Options 1. Curbside buffered bike lanes with wide buffers 2. Buffered bike lanes with standard buffer width and curbside shoulder3. Median‐side buffered bike lanes
• Received nearly 550 responses and over 125 comments • Comments included: • Support for dedicated bike facility in the Southside and requests for additional protection within the buffer and connections to other nearby facilities
• Support for wide bike lane buffers due to existing travel speeds along corridor• Concerns that the shoulder concept would lead to driving in the bike lane
51Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Warwick Road – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 52
Existing Conditions
0
50
100
150
200
250
300
Existing
* Note: street width varies, section between Hopkins Rd & Belt Blvd shown
Warwick Road – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 53
Option 1 – Curbside Bike Lanes with Wide Buffers
0
50
100
150
200
250
300
Option 1
* Note: street width varies, section between Hopkins Rd & Belt Blvd shown
Warwick Road – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 54
Option 2 – Curbside Bike Lanes with Shoulder
0
50
100
150
200
250
300
Option 2
* Note: street width varies, section between Hopkins Rd & Belt Blvd shown
Warwick Road – May Survey Results
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 55
Option 3 – Median‐Side Buffered Bike Lanes
0
50
100
150
200
250
300
Option 3
* Note: street width varies, section between Hopkins Rd & Belt Blvd shown
Warwick Road – Detailed Design
• Option 1 (Curbside Bike Lanes with Wide Buffers) chosen as preferred alternative, including: • Addition of flexposts within the buffer • Two‐stage left‐turn turn boxes to connect to north‐south bike lanes on Broad Rock Road • Additional intersection treatments to align with removal of travel lane along corridor
56Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Warwick Road – Detailed Design
Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2 57
From Hull Street to Belt Boulevard From Belt Boulevard to Richmond Highway
* Note: street width is 1‐ft narrower on either side of median (26’‐6”) between Hull Street and Hopkins Road, where buffer will be 6‐ft
Warwick Road – Detailed Design
58Proposed Bike Lanes for Summer 2021 ‐ Summer 2022 Resurfacing Program – Virtual Public Engagement #2
Next Steps
• DPW will use the feedback provided in the survey and on the detailed design plans to finalize the design and plan for each proposed facility before implementation begins in September. • If you have other questions or if you need an alternate way to provide comment, please contact the project manager:
Emily Dalphy Phone: 646‐0346Email: [email protected]