Program Name or Ancillary Text eere.energy.gov
Process Heating Assessments
Process Heating Assessments
Michael R. MullerUSARutgers University, Center for Advanced
Energy Systems
U.S.- Brazil Industrial Energy Efficiency WorkshopRio de Janeiro , BrazilAugust, 2011
2 | Industrial Energy Efficiency eere.energy.gov
• Introduction• Elements of an ESA in Process Heating• The PHAST Tool• Case Study: Powder Processing• Case Study: Cast Iron Pipes
Outline
3 | Industrial Energy Efficiency eere.energy.gov
What Is Process Heating ?
FurnacesOvensHeatersKilnsDryers
Supplying heat to materials using
for further processing in manufacturing operations
4 | Industrial Energy Efficiency eere.energy.gov
Importance of Process Heating
ProcessCooling
1%
Process Heating 38%
Steam 35%
Other4%Electro-chemical
2%
Motor Systems
12%
Facilities 8%
Manufacturing Energy Use by Type of System
(%)
5 | Industrial Energy Efficiency eere.energy.gov
• Hot = Metal Melting– Blast furnaces: 900 °C to
1300 °C (1600 °F to 2300 °F)
Process Heating Temperatures
6 | Industrial Energy Efficiency eere.energy.gov
• Low Temperature Drying Processes: 70 °C (160 °F)
Low Temperature Processes
7 | Industrial Energy Efficiency eere.energy.gov
Energy distribution in a typical heating system
Furnace Heat Input
Heat inFlue Gases
8 | Industrial Energy Efficiency eere.energy.gov
“Save Energy Now” Energy Assessments
• Assessments of targeted industrial systems by Qualified Specialist using the DOE software tools
• Energy Assessment Report identifies potential energy and cost savings
• Plants are selected by DOE based on several factors, including: The plant’s energy consumption The company’s intention to include other similar plants
within their company
8
9 | Industrial Energy Efficiency eere.energy.gov
A Process Heating ESA
Conduct Plant Visit
Analyze and Report Results
GatherPreliminaryData
Follow-up
Train Plant Staff
• Teams are DOE Energy Experts and plant personnel
• Teams focus only on process heating systems
• Plant personnel trained on DOE software tools
10 | Industrial Energy Efficiency eere.energy.gov
Energy Expert spends 3 days on site
Day 1• Safety briefing, tour plant• Overview of DOE PHAST Tool to plant personnel• Agree on potential energy efficiency
opportunities to investigate• Initiate data collection for potential opportunities
Day 2• Continue data collection• Apply PHAST tool to quantify potential
opportunities• Plant lead and expert agree on opportunity
results
Day 3• Wrap up tool analyses• Plant lead and expert ensure they agree on
opportunity results• Closeout meeting in p.m. to review results
11 | Industrial Energy Efficiency eere.energy.gov
• The Process Heating Assessment and Survey Tool (PHAST) was developed by Oak Ridge National Laboratory in cooperation with the Industrial Heating Equipment Association (IHEA).
• A subcommittee consisting of members from major industries (i.e., petroleum refining, chemical) and equipment suppliers acted as an advisor during the tool’s development.
• Development efforts were supported by The Office of Industrial Technologies Program (ITP) of the US Department of Energy (DOE).
What is PHAST?
Process Heating Assessment and Survey Tool (PHAST)
12 | Industrial Energy Efficiency eere.energy.gov
• A tool that can be used to: – Estimate annual energy use and energy cost for
furnaces and boilers in a plant – Perform detail heat balance and energy use analysis
that identifies areas of energy use, efficiency and energy losses for a furnace
– Perform “what-if” analysis for possible energy reduction and efficiency improvements through changes in operation, maintenance and retrofits of components/systems
– Obtain information on energy saving methods and identify additional resources
What is PHAST?
Process Heating Assessment and Survey Tool (PHAST)
13 | Industrial Energy Efficiency eere.energy.gov
• Where: Delaware, USA• What: Microcrystalline Cellulose• How: Wood pulp is cooked with bleach, caustic soda and
steam
– then spray dried
Case Study
14 | Industrial Energy Efficiency eere.energy.gov
• Cellulose reacts with chemicals at 50°C for 2-3 hrs.– the reaction changes the physical form from fiber to powder
• Slurry is then pumped to a spray tower where it is dried by heated air– NOTE – the dryers evaporate water from the slurry, and
therefore remove water at below boiling temperatures • it was necessary to make adjustments to the PHAST inputs
because water removed from process stream is required to be at 100 °C
• Resultant power retains water absorbency which is very useful
Case Study
15 | Industrial Energy Efficiency eere.energy.gov
• Two of three dryers had waste heat recovery using a glycol loop
• Third dryer had no space for air preheat– But, waste heat could be used to preheat other two dryers!!
• Plant had not included energy associated with evaporation in their analysis
Waste Heat From Dryers
Slurry Inlet - powder and water
Air Inlet
Air Preheat - glycol Loop
Air Heating
(Nat Gas)
Dryer Wet Air
Glycol Loop
Exhaust Air
Product
16 | Industrial Energy Efficiency eere.energy.gov
Data Logger Results
• Temperature sensors on two cooling loops overnight shows correct behavior (upper) and total valve failure (lower)
• Multiple days were needed to be able to see this
17 | Industrial Energy Efficiency eere.energy.gov
Results For Powder Processing
IDENTIFIED PLANT BEST PRACTICES
1 Instrumentation and control of key systems 2 General use of waste heat throughout plant 3 Aggressive paybacks for energy projects (3 years) 4 Level of insulation on dryers is high – can allow them to live outdoors 5 Compact plant design is efficient, although making changes in such close quarters is difficult
ENERGY SAVINGS OPPORTUNITY SUMMARY INFORMATION
Identified Opportunity
Savings/yr $ kWh MMBtu Fuel Type N,M,L
Increase rate of scrubber flow to increase recovered heat in glycol loop
$57,600 4800 Nat Gas N
Repair observed missing insulation $3360 280 Nat Gas N Lower O2 in flue gas to 2% from 3.5% $95,000 7919 Nat Gas N Recover Waste Heat from Bowen Dryer $260,323 21694 Nat Gas M Use organic rankine cycle engines to make power from low quality waste heat sources
$106,000 1,000,000 Electricity L
Replace heat exchangers for city water and purified water to directly heated systems
$286,010 23834 Nat Gas M
Use 20% of exhaust gas as recirculation $160,000 13,333 Nat Gas L Eliminate flash steam – use in other processes $159,428 13,285 Nat Gas M
18 | Industrial Energy Efficiency eere.energy.gov
• Where: NJ, USA• What: Cast Iron Pipe for Water Systems• How: Cupula Furnace and Annealing Oven
Case Study
19 | Industrial Energy Efficiency eere.energy.gov
• Cast iron is made from pig iron in a tall furnace• Liquid cast iron is spun into a pipe form• Concrete is sprayed on the pipe and provides a coating• Cold pipes are then painted
Case Study
20 | Industrial Energy Efficiency eere.energy.gov
• Major savings were identified by annealing pipes before they cooled down
• Plant felt mixing pipe sizes in the ovens let them be more fully utilized– But to do this there were long waiting times and pipes
cooled to nearly room temperature
Melt Room and Annealing Disconnect
21 | Industrial Energy Efficiency eere.energy.gov
• Natural gas use was monitored closely for three days
• Comparing to bills showed large amount of natural gas use unaccounted for
• Cause is failure to setback ovens when not in use
Ghost Use of Natural Gas
22 | Industrial Energy Efficiency eere.energy.gov
Results for Iron Pipe Foundry
ENERGY SAVINGS OPPORTUNITY SUMMARY INFORMATION Identified Opportunity
Savings/yr
$ kWh MMBt
u Fuel Type
N,M,L
Use moving walls or flaps or at least reflectors to limit radiation energy loss from both ends
$21586 1440 Nat Gas N
Review and update control scheme to insure temperatures/burner settings are accurate
$70153 4680 Nat Gas N
Improve annealing oven operation to eliminate push-pull $259,000 17,280 Nat Gas N
Track and Eliminate “Ghost” Natural Gas Use
$570,000 38000 Nat Gas N
Use solid state humidity sensors as feedback on concrete dryers
$3780 252 Nat Gas N
Repair oven hot spots $4300 317 Nat Gas M Evaluate operations and model processes to optimize performance proactively
$158,000 9415 Coke/Nat
Gas M
Utilize waste heat from oil cooler and water jackets to make electricity
$215000 1,440,000 Electricity L
23 | Industrial Energy Efficiency eere.energy.gov
• Process heating assessments can find very large savings for plants
• Some important recommendations require the three days to be observable
• Using the PHAST tool can quantify savings – Works best on very hot processes
• Training plant people on gathering data and analyzing data can have lasting impacts
Conclusions
24 | Industrial Energy Efficiency eere.energy.gov
Obrigado!!
Perguntas???