Download - Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Transcript
Page 1: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Maharashtra Engineering Service

Presentation By

Pravin Kolhe, Executive Engineer,

Maharashtra Water Resources Department

23 Aug 2014

Vishwabharato COE, Ahmednagar

1

Maharashtra Engineering Service, by Pravin Kolhe

Page 2: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

MESE

2

Maharashtra Engineering Service, by Pravin Kolhe

Page 3: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Maharashtra Engineering Service Examination (MESE)-Departments

3

1) •Water Resources Department (WRD)

2) •Public Works Department (PWD)

3) •Water Supply & Sanitation Department (WSSD)•Maharashtra Jeevan Pradhikaran

Maharashtra Engineering Service, by Pravin Kolhe

Page 4: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Hierarchy of Posts in PWD/WRD4

• Assistant Executive Engineer• Assistant Engineer Grade-1• Sub-Divisional Engineer• Sub-Divisional Officer

Deputy Engineer

Assistant Engineer, Grade-II

Sectional Engineer

Junior Engineer

Secretary

Executive Director/Director General

Chief Engineer

Superintending Engineer

Executive Engineer

Page 5: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

जलसं�पदा� विभा�गा�ची� रचीना�5

MWRD

Minister, MKVDC

Minister of State, WR

Secretary, WRD&D

Secretary, WRM &

CAD

Minister, WR (Other than MKVDC)

Minister of State, WR

Secretary, WRD&D

Minister of State, CAD

Secretary, WRM &

CAD

Minister, Kharland

Minister of State, Kharland

Secretary, WRD&D

Maharashtra Engineering Service, by Pravin Kolhe

Page 6: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

जलसं�पदा� विभा�गा�ची� रचीना�6

प्रधा�न सचि�व (२)

का�र्य का�री� स���लका (५) व महा�स���लका (२)

मु�ख्य अभिभाय�ता� (२२)

• स्था�पत्र्य-२०• र्य��त्रि�का�-१• त्रिवद्यु�त-१

अधी�क्षक अभिभाय�ता� (९१)

• स्था�पत्र्य-८१• र्य��त्रि�का�-५• त्रिवद्यु�त-५

क�य�क�र� अभिभाय�ता� (४६६)

• स्था�पत्र्य-४१६• र्य��त्रि�का�-२५• त्रिवद्यु�त-२५

Maharashtra Engineering Service, by Pravin Kolhe

Page 7: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

जलसं�पदा� विभा�गा�ची� रचीना�7

सहा�र्यका अभि%र्य�त� श्रे'णी�-२ (~२२००)

• स्था�पत्र्य-१६२४• र्य��त्रि�का�- ३००• त्रिवद्यु�त- ३००

शा�खा� अभि%र्य�त� (~५५००)

• स्था�पत्र्य-४८७४• र्य��त्रि�का�- ३००• त्रिवद्यु�त- ३००

उप-अभि%र्य�त� (~२३५०)

• सहा�र्यका का�र्य का�री� अभि%र्य�त� (१६६)• सहा�र्यका अभि%र्य�त�-श्रे'णी�-१ (६६०)• उपत्रिव%�त्रि.र्य अभि%र्य�त� (६४२)• उपत्रिव%�त्रि.र्य अधिधाका�री� (६४२)

उप-अभि%र्य�त� (स्था�पत्र्य) २११०

उप-अभि%र्य�त� (र्य��त्रि�का�) १२५

उप-अभि%र्य�त� (त्रिवद्यु�त) १२५

Maharashtra Engineering Service, by Pravin Kolhe

Page 8: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

8

स�ि1व • ९वरी1 3. १ अधाि1का1�री1�

• ~३०००

वरी1 3. २ अधाि1का1�री1�

• ~७०००

अत1�1�त13रीि1का कारी13म�1�री1�

• ~४०,०००

एका1�णी

• ~५०,०००

जलसं�पदा� विभा�गा�ची� रचीना�

Maharashtra Engineering Service, by Pravin Kolhe

Page 9: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Career Prospects9

AEE

Executive Engineer/US to GoM

Superintending Engineer/DS to GoM

Chief Engineer/JS to GoM

ED/DG/Secy to GoM

Principal Secretary to GoM

4 Years

After 12 Yrs

After 8 Yrs

After 5 Yrs

After 3 Yrs

AE112 Years SDE12

Years SDO12 Years

Through MPSC MESE-Gr A

MPSC MESE-Gr B

JE12 Years

Local Recruitment

AE2

12 Years

12 Years

Sect Er.

Page 10: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Posts in MPSC Exam10

• Promoted to EE after 4 years of serviceAssistant Executive

Engineer (AEE)

• Promoted to EE as per seniority of AE1• (Approx. 12~15 year)

Assistant Engineer, Grade-I (AE1)

• Promoted to DE as per seniority of AE2• (Approx. 12~15 year) & then EE (approx. 10 year)

Assistant Engineer, Grade-II (AE2)

Maharashtra Engineering Service, by Pravin Kolhe

Page 11: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

11

1)

• Maharashtra Engineering (Civil) Services Examination-Group-A (MESE-A)

• for AEE & AE1 Posts

2)

• Maharashtra Engineering (Civil) Services Examination-Group-B (MESE-B)

• for AE2 posts

MPSC Exams

Maharashtra Engineering Service, by Pravin Kolhe

Page 12: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Maharashtra Engineering Service, by Pravin Kolhe12

MESE-Group-A(AEE & AE1 Posts)

Page 13: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

13

1)• Preliminary Exam

2)• Main Exam

3) • Interview

Examination Pattern-Group A Exam

Maharashtra Engineering Service, by Pravin Kolhe

Page 14: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

1. Preliminary Exam14

• 1 Objective Type Paper• 100 Questions• 100 Marks• Time:- 2 Hours

Maharashtra Engineering Service, by Pravin Kolhe

Page 15: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

2. Main Written Exam (4 Papers, 750 Marks)15

• 1) Marathi, English & GK (Objective Type)

• 150 Marks, 150 Questions, Time: 90 minutes.

• 2) Civil Engineering Paper-I, II & III (3 Papers)

• Subjective Type

• Each Paper of 200 Marks

• Each Paper has 5 Sections (A, B, C, D, E)

• Each Section have 2 questions each with 40 marks

• Solve only one question from each section

• Solve total 5 Questions out of 10

• Time: 3 hours for each paper

Page 16: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Main Written Exam Syllabus-CE Paper-116

Section

Marks Topics

A 40 Strength of material, Theory of structure

B 40 Structural analysis, Steel structures

C 40 Design of Reinforced Concrete Structures

D 40 Concrete Technology, Pre-stressed Concrete

E 40 Application of Computer Programming to structures, Numerical Methods

Total 200Maharashtra Engineering Service, by Pravin Kolhe

Page 17: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Main Written Exam Syllabus-CE Paper-217

Section

Marks Topics

A 40 Surveying

B 40 Engineering Materials, Building planning

C 40 Building Construction, Estimating, Costing & Valuation

D 40 Geo-technical Engineering

E 40 Construction Planning and Management

Total 200Maharashtra Engineering Service, by Pravin Kolhe

Page 18: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Main Written Exam Syllabus-CE Paper-318

Section

Marks Topics

A 40 Fluid Mechanics

B 40 Engineering Hydrology, Irrigation Engineering

C 40 Highway Engineering

D 40 Bridge Engineering, Tunnelling

E 40 Water Supply Engineering, Waste Water Engg. & Pollution control, Solid Waste Management

Total 200Maharashtra Engineering Service, by Pravin Kolhe

Page 19: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

3. Interview (100 Marks)19

• Focus on Personality• 100 Marks• Time:-10~30 minutes• Study Projects in your district

• Total Marks = 750+100 = 850Maharashtra Engineering Service, by Pravin Kolhe

Page 20: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Maharashtra Engineering Service, by Pravin Kolhe20

MESE-Group-B(AE-2 Posts)

Page 21: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

21

1)• Preliminary Exam (100 marks)

2)• Main Exam (3 papers-550 marks)

3) • Interview (75 marks)

Examination Pattern-Group B Exam

Maharashtra Engineering Service, by Pravin Kolhe

Page 22: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

1. Preliminary Exam for AE222

• 1 Objective Type Paper• 100 Questions• 100 Marks• Time:- 2 Hours

Maharashtra Engineering Service, by Pravin Kolhe

Page 23: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

2. Main Written Exam for AE2 (3 Papers, 550 Marks)23

• 1) Marathi, English & GK (Objective Type)

• 150 Marks, 150 Questions, Time: 90 minutes.

• 2) Civil Engineering Paper-I & II (2 Papers)

• Objective Type

• Each Paper of 100 questions with 200 Marks• Time: 2 hours for each paper

Maharashtra Engineering Service, by Pravin Kolhe

Page 24: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

3. Interview for AE2 (75 Marks)24

• Focus on Personality• 75 Marks• Time:-10~30 minutes• Study Projects in your district

• Total Marks = 550+75 = 625Maharashtra Engineering Service, by Pravin Kolhe

Page 25: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Prelim Exam-Important Points25

Exam centre for Prelim & Mains Exam: Aurangabad, Mumbai, Nagpur and Pune.

Preliminary exam is just screening test. The marks of Prelim Exam are not intimated & not considered for final merit list

There is no re-revaluation system for Prelim Exam as it is multiple choice question based and answer key is available on MPSC website for self verification by candidate.

There is 25% negative marks for wrong answer in Prelim Only those candidates are allowed to appear for the Main Written Exam who

qualifies the Preliminary Exam.

Page 26: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Maharashtra Engineering Service, by Pravin Kolhe26

Strategy for Study

Page 27: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Main Written Exam Syllabus-Strategy27

There are 3 Papers of 3 Hr duration for total 600 Marks There are 5 sections in each paper for 40 marks each (i.e. A,

B, C, D, E) In each section there are 2 questions, solve any one. i.e. total 10 questions in a paper, each carrying 40 marks, i.e.

total 400 marks in a paper Attempt any ONE question from TWO, i.e. attempt 200 marks

from 400Maharashtra Engineering Service, by Pravin Kolhe

Page 28: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Main Written Exam Syllabus-Strategy28

Thus for 3 papers, attempt 600 marks out of 1200 Thus, for 4 papers, attempt 750 marks out of 1350 For interview, there are 100 marks Thus, attempt 850 marks out of total 1450 Generally topper gets 50 to 60% of 850 marks. i.e. 450 to 500 i.e. to be a topper, get 500 marks out of 1450 i.e. ~ 33% of total marks.

Maharashtra Engineering Service, by Pravin Kolhe

Page 29: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

Cut-offs29

Cut-off will be different for each post/each category. Generally cut-off line for main exam is decided such that there will be 10 to 12

times candidates will be called upon. Generally cut-off line for interview is decided such that there will be 2 to 3 times

candidates will be called upon and it will be different for each post/each category.

Min Percentile* for Cutoff in Main Exam for interview call are as follows- 1) General Candidates : Min. 35% 2) Backward Class : Min. 30% 3) Physically Disabled/Players : Min 20% *As per MPSC Ltr Dated 24/10/2013

Page 30: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

For details:-

For further details visit:- www.pravinkolhe.com/articles/mpsc_engg_service_exam.html

30

Maharashtra Engineering Service, by Pravin Kolhe

Page 31: Presentation By Pravin Kolhe, Executive Engineer, Maharashtra Water Resources Department 23 Aug 2014 Vishwabharato COE, Ahmednagar 1 Maharashtra Engineering.

THANK YOUThis presentations is available at www.pravinkolhe.com Er. Pravin Kolhe, email: [email protected], Mob: +91-8806-999-777