TGreen Buildings: Policy and Practice
• Why Green Buildings?
• Why cogeneration?
• What’s the problem?
• Some issues
2
WH
YG
REEN
BU
ILDIN
GS
AN
DW
HY
CO
GEN
ERA
TION
Acting on the Split Incentive Problem: Green Buildings
3
Composition of GHG emission (2006)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Residential Commercial
Other (standby)
Appliances
(Cooking,
Refrigeration)
Light
Cooling (Air
conditioning)
Hot water
Space Heating
Source: National Inventory by Economic Sector 2006, Australian Government Department of Climate Change, June 2008
Can be influenced by
building construction
WH
AT’S
THE
PR
OB
LEM?
Potential cogeneration projects in the Melbourne CBD: Developer Information
4
Source: Citipower, Climate Change Policy Challenges for the Network, City of Melbourne 1200, 20 March 2009
SO
ME
ISSUES
Green Buildings: Wider Issues for the Energy Market
5
• The connection process
– Transparency
– Information sharing
– Timeliness
– Who pays
• The commercial problem
– The costs of Green Star vs the prospective benefits
• The regulatory debate
– Current regulatory debate about climate change and the energy market
– The changing nature of the distribution network
– Investment recovery: parallels with the water industry
• Responding to climate change
– The costs of the response: parallels with the introduction of the MRET Scheme
PO
SSIBLE
AC
TION
SMaking Cogeneration in the CBD Possible: Suggested Actions
6
Join the Green Buildings agenda requirements and the current regulatory debate about the DB’s role by responding to current public regulatory processes
• AEMC Inquiry into Impacts of Climate Change, responses to 2nd draft report due 3 August• AEMC Review of National Framework for Electricity Distribution Businesses Network
Planning and Expansion, responses to draft report due mid/late August
Provide a forum to co-ordinate developer interactions with Citipower at (sub) precinct level to reduce time and cost of individual connections/improve Citipower knowledge of potential applications
Investigate potential for joint/stand alone proposal for solution to issue outside the regulated network
SEED
AD
VISO
RY
CO
NTA
CTS
Seed Advisory
7
Patricia Boyce Peter Eben
Director Director
p> +613 9653 9460 p> +613 9653 9460
m> 0412 254 589 m> 0411 207 505
Top Related