Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 1 of 39
1
1.1 Price all liabilities, obligations and risk set forth or impliedin the contract ,not included in the rates and prices enteredelsewhere in the Bill of Quantities in complying with any Clause of the Conditions of Contract for the entire projectperiod.
1.1.1 Sum 1.00 15,000.00
1.1.2 Sum 1.00 15,000.00 1.1.3 Sum 1.00 11,250.00
1.1.4 Insurance against Damage to person and property Sum 1.00 7,500.00
1.1.5 Sum 1.00 7,500.00
1.1.6 Sum 1.00 7,500.00
1.2 Facilities and Items for the contractor
1.2.1 Sum 1.00 375,000.00 and offices including mobilisation of all required plant,site,infrastructure,equipment,tools, machinery and personneland their accomodation
1.2.2 mth 12.00 7,500.00
and offices including mobilisation and demobilisation of all required plant,site,infrastructure,equipment,tools, machinery and personnel and their accomodation.
1.2.3 Sum 1.00 15,000.00
1.2
Price should include all costs for items as specified in Particular specifications and be provided and maintainedduring entire project period.
1.2.1
1.2.1
1.2.1.1 Establish site offices for Engineer, including all furnishing, Sum 1.00 30,000.00equipment and fittings as detailed in the specifications
1.2.1.2 Demobilise site offices for Engineer, including all furnishings, Sum 1.00 7,500.00equipment and fittings as detailed in specifications
1.2.2 Maintain the site office for the Engineer in the project, mth 12.00 3,750.00including costs for rent
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
PRELIMINARIES AND GENERAL ITEMS
PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Advance Payment Bond
Performance Bond
Insurance of Works
Third Party Insurance
Insurance of Workmen
Establishment of the contractor's camp(s) ,plant
Operate and maintain the contractor's camp(s), plant
Demobilise Contractor's camp(s),plant and offices, including mobilisation of all required plant, site, infrastructure, equipment, tools, machinery and personnel and their accommodation
GENERAL (SPECIFIED) REQUIREMENTS
Facilities for the Engineer's Staff
Establish & remove offices on land provided by Client Floor area 50 - 150 m²
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 2 of 39
1.31.3.1 Rent accomodation Type D house (single unit - 4 12.00 1,500.00
bedrooms)
1.4
1.4.1 Provide Transport vehicles for Engineer supervision staff, as No. 4.00 35,000.00per specifications.
1.4.2 Operate, maintain and insure(comprehensive insurance) mth 12.00 3,750.00Engineers' vehicles, as per specifications.
1.4.3 Provide Telephone No. 2.00 500.00
1.4.4 Provide Water & Electricity sum 1.00 2,000.00
1.4.5 Provide Sign boards for each of the construction site as per No. 4.00 1,500.00description in particular specs.
1.5
1.5.1 3.00 7,500.00
Specifications
1.5.2 Provide Stationary & other consumables to specifications mth 12.00 1,500.00
1.5.3 Sum 1.00 5,000.00
1.6
1.6.1 12.00 1,200.00
1.6.2 12.00 500.00
1.6.3 12.00 350.00
1.6.4 12.00 200.00
1.6.5 12.00 400.00
1.6.6 12.00 300.00
1.6.7 Provide supporting staff to the Engineer representative mth 12.00 3,750.00as per specification
1.7
1.7.1
by Engineer
1.7.2 Fine sand No. 10.00 200.00
1.7.3 Coarse sand No. 10.00 200.00
1.7.4 No. 10.00 200.00
1.7.5 No. 10.00 200.00
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
Accommodation for the Engineer's Staff mth
Services for the Engineer's Staff
Equipment for use by the Engineer's staff
Provide Survey Equipment according to Engineers mth
Provision of National & International Standards As per clause 1.52 of the General Specifications
Attendance upon the Engineer's staff
Provide drivers (4 No.) mth
Provide Chainmen mth
Provide Secretary/typist mth
Provide Office messenger mth
Provide Security mth
Provide Servants/ Cleaners mth
Testing of Materials
By Third Party Inspection (natural materials) as directed
Aggregate
Stone fill
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 3 of 39
1.7.6 1.7.6.1 No. 10.00 250.00
1.7.6.2 No. 5.00 300.00
1.8 Testing of Works Testing of the whole of the works are part of the individual Sum 1.00 Bill of Quantities
1.9
1.9.1 Traffic diversion Sum 1.00 20,000.00
1.9.2 Sum 1.00 10,000.00
1.9.3 Access roads Sum 1.00 30,000.00
1.9.4 Sum 1.00 7,500.00
1.9.5 Compressed air for tunneling Sum 1.00 5,000.00
1.9.6 Sum 1.00 30,000.00
1.9.7 Sum 1.00 50,000.00
1.10 1.10.1
1.10.2 Sum 1.00 19,000.00
1.10.3 Percentage adjustment to provisional sum for %day work labour
1.10.4 Sum 1.00 22,800.00
1.10.5 Percentage adjustment to provisional sum for %
day work materials
1.10.6 Sum 1.00 28,500.00
1.10.7 Percentage adjustment to provisional sum for %day work plant
1.11
1.11.1 Work on site by nominated sub-contractor Sum 1.00 100,000.00
1.11.2 Percentage adjustment to work onsite by nominated %subcontractor
1.11.3 Upkeep and travel for Engineer's staff Sum 1.00 44,100.00
1.11.4 Install telephones for Engineers' staff Reverts to Employer Sum 1.00 1,000.00
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
By Third Party Inspection (man-made other than pipes) Concrete cubes
Steel Reinforcement
Temporary Works
Traffic regulation
De-watering
Bypass pipework where disruption for more than 12 hrs is anticipated (PROVISIONAL)
Relocation of existing services incl. tel., electr., sewer, etc where anticipated (PROVISIONAL)
PROVISIONAL SUMS Daywork
Labour (carried from Dayworks Schedule)
Material (carried from Dayworks Schedule)
Plant (carried from Dayworks Schedule)
PRIME COST ITEMS
at end of Contract.
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 4 of 39
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 5 of 39
1.11.5 Sum 1.00 12,000.00
1.11.6 Sum 1.00 1,000.00
1.11.7 Sum 1.00 500.00
1.11.8 mth 12.00 300.00
1.11.9 mth 12.00 300.00
1.11.10 Sum 1.00 10,000.00
1.11.11 Sum 1.00 20,000.00
1.12 Records and Documents
1.12.1 Photographical records of the site prior, during and after Sum 1.00 3,000.00completion of works. Documentation is to be prepared as perspecifications
1.12.2 Sum 1.00 6,750.00
1.12.3 "As-built" drawings as specified in the Specifications Sum 1.00 7,500.00
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
Provide computer equipment complete with accessories, e-mail service provider connection and software. Reverts to Employer at end of Contract.
Provide digital camera complete with accessories and software. Reverts to Employer at end of Contract
Maintenance of computer equipment and digital camera
Electricity and water bills for the Engineer's staff
Telephone bills for Engineer's staff
Miscellaneous goods and services for the Engineer.
Compensation and entry upon land.
Instruction manuals (operation and maintenance manuals) as specified in the Specifications
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 6 of 39
2
3
4
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
COLLECTION SHEET
PAGE NO.
1
TOTAL CARRIED TO GRAND SUMMARY
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 7 of 39
1
1.1 Price all liabilities, obligations and risk set forth or impliedin the contract ,not included in the rates and prices enteredelsewhere in the Bill of Quantities in complying with any Clause of the Conditions of Contract for the entire projectperiod.
1.1.1 Sum 1.00 15,000.00
1.1.2 Sum 1.00 15,000.00 1.1.3 Sum 1.00 11,250.00
1.1.4 Insurance against Damage to person and property Sum 1.00 7,500.00
1.1.5 Sum 1.00 7,500.00
1.1.6 Sum 1.00 7,500.00
1.2 Facilities and Items for the contractor
1.2.1 Sum 1.00 375,000.00 and offices including mobilisation of all required plant,site,infrastructure,equipment,tools, machinery and personneland their accomodation
1.2.2 mth 12.00 7,500.00
and offices including mobilisation and demobilisation of all required plant,site,infrastructure,equipment,tools, machinery and personnel and their accomodation.
1.2.3 Sum 1.00 15,000.00
1.2
Price should include all costs for items as specified in Particular specifications and be provided and maintainedduring entire project period.
1.2.1
1.2.1
1.2.1.1 Establish site offices for Engineer, including all furnishing, Sum 1.00 30,000.00equipment and fittings as detailed in the specifications
1.2.1.2 Demobilise site offices for Engineer, including all furnishings, Sum 1.00 7,500.00equipment and fittings as detailed in specifications
1.2.2 Maintain the site office for the Engineer in the project, mth 12.00 3,750.00including costs for rent,water, electricity,communicationand security
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
PRELIMINARIES AND GENERAL ITEMS
PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Advance Payment Bond
Performance Bond
Insurance of Works
Third Party Insurance
Insurance of Workmen
Establishment of the contractor's camp(s) ,plant
Operate and maintain the contractor's camp(s), plant
Demobilise Contractor's camp(s),plant and offices, including mobilisation of all required plant, site, infrastructure, equipment, tools, machinery and personnel and their accommodation
GENERAL (SPECIFIED) REQUIREMENTS
Facilities for the Engineer's Staff
Establish & remove offices on land provided by Client Floor area 50 - 150 m²
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 8 of 39
1.31.3.1 Rent accomodation Type D house (single unit - 4 12.00 1,500.00
bedrooms)
1.4
1.4.1 Provide Transport vehicles for Engineer supervision staff, as No. 4.00 35,000.00per specifications.
1.4.2 Operate, maintain and insure(comprehensive insurance) mth 12.00 3,750.00Engineers' vehicles, as per specifications.
1.4.3 Provide Telephone No. 2.00 500.00
1.4.4 Provide Water & Electricity sum 1.00 2,000.00
1.4.5 Provide Sign boards for each of the construction site as per No. 4.00 1,500.00description in particular specs.
1.5
1.5.1 3.00 7,500.00
Specifications
1.5.2 Provide Stationary & other consumables to specifications mth 12.00 1,500.00
1.5.3 Sum 1.00 5,000.00
1.6
1.6.1 12.00 1,200.00
1.6.2 12.00 500.00
1.6.3 12.00 350.00
1.6.4 12.00 200.00
1.6.5 12.00 400.00
1.6.6 12.00 300.00
1.6.7 Provide supporting staff to the Engineer representative mth 12.00 3,750.00as per specification
1.7
1.7.1
by Engineer
1.7.2 Fine sand No. 10.00 200.00
1.7.3 Coarse sand No. 10.00 200.00
1.7.4 No. 10.00 200.00
1.7.5 No. 10.00 200.00
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
Accommodation for the Engineer's Staff mth
Services for the Engineer's Staff
Equipment for use by the Engineer's staff
Provide Survey Equipment according to Engineers mth
Provision of National & International Standards As per clause 1.52 of the General Specifications
Attendance upon the Engineer's staff
Provide drivers (4 No.) mth
Provide Chainmen mth
Provide Secretary/typist mth
Provide Office messenger mth
Provide Watchmen mth
Provide Servants/ Cleaners mth
Testing of Materials
By Third Party Inspection (natural materials) as directed
Aggregate
Stone fill
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 9 of 39
1.7.6 1.7.6.1 No. 10.00 250.00
1.7.6.2 No. 5.00 300.00
1.8 Testing of Works Testing of the whole of the works are part of the individual Sum 1.00 Bill of Quantities
1.9
1.9.1 Traffic diversion Sum 1.00 20,000.00
1.9.2 Sum 1.00 10,000.00
1.9.3 Access roads Sum 1.00 30,000.00
1.9.4 Sum 1.00 7,500.00
1.9.5 Compressed air for tunneling Sum 1.00 5,000.00
1.9.6 Sum 1.00 30,000.00
1.9.7 Sum 1.00 50,000.00
1.10 1.10.1
1.10.2 Sum 1.00 19,000.00
1.10.3 Percentage adjustment to provisional sum for %day work labour
1.10.4 Sum 1.00 22,800.00
1.10.5 Percentage adjustment to provisional sum for %
day work materials
1.10.6 Sum 1.00 28,500.00
1.10.7 Percentage adjustment to provisional sum for %day work plant
1.11
1.11.1 Work on site by nominated sub-contractor Sum 1.00 100,000.00
1.11.2 Percentage adjustment to work onsite by nominated %subcontractor
1.11.3 Sum 1.00
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
By Third Party Inspection (man-made other than pipes) Concrete cubes
Steel Reinforcement
Temporary Works
Traffic regulation
De-watering
Bypass pipework where disruption for more than 12 hrs is anticipated (PROVISIONAL)
Relocation of existing services incl. tel., electr., sewer, etc where anticipated (PROVISIONAL)
PROVISIONAL SUMS Daywork
Labour (carried from Dayworks Schedule)
Material (carried from Dayworks Schedule)
Plant (carried from Dayworks Schedule)
PRIME COST ITEMS
Provide furniture for Engineer's office
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 10 of 39
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 11 of 39
1.11.4 Office stationary and consumables Sum 1.00
1.11.5 Upkeep and travel for Engineer's staff Sum 1.00 44,100.00
1.11.6 Maintain vehicles for Engineer's staff Sum 1.00
1.11.7 Sum 1.00 1,000.00
1.11.8 Sum 1.00 12,000.00
1.11.9 Sum 1.00 1,000.00
1.11.10 Sum 1.00 500.00
1.11.11 mth 12.00 300.00
1.11.12 mth 12.00 300.00
1.11.13 Sum 1.00 10,000.00
1.11.14 Sum 1.00 20,000.00
1.12 Records and Documents
1.12.1 Photographical records of the site prior, during and after Sum 1.00 3,000.00completion of works. Documentation is to be prepared as perspecifications
1.12.2 Sum 1.00 6,750.00
1.12.3 "As-built" drawings as specified in the Specifications Sum 1.00 7,500.00
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
Provide and install telephones and radio telephones for Engineer's staff Reverts to Employer at end of Contract.
Provide computer equipment complete with accessories, e-mail service provider connection and software. Reverts to Employer at end of Contract.
Provide digital camera complete with accessories and software. Reverts to Employer at end of Contract
Maintenance of computer equipment and digital camera
Electricity and water bills for the Engineer's staff
Telephone bills for Engineer's staff
Miscellaneous goods and services for the Engineer.
Compensation and entry upon land.
Instruction manuals (operation and maintenance manuals) as specified in the Specifications
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 12 of 39
2
3
4
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
COLLECTION SHEET
PAGE NO.
1
TOTAL CARRIED TO GRAND SUMMARY
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 13 of 39
1 Price all liabilities, obligations and risk set forth or impliedin the contract ,not included in the rates and prices enteredelsewhere in the Bill of Quantities in complying with any Clause of the Conditions of Contract for the entire projectperiod.
111 Sum 1
121 Sum 1 131 Sum 1
141 Insurance against Damage to person and property Sum 1
151 Sum 1
161 Sum 1
171 Facilities and Items for the contractor
171(i) and offices including mobilisation of all required plant,site,infrastructure,equipment,tools, machinery and personneland their accomodation
171(ii) Sum
and offices including mobilisation and demobilisation of all required plant,site,infrastructure,equipment,tools, machinery and personnel and their accomodation.
171(iii) Sum
2
Price should include all costs for items as specified in Particular specifications and be provided and maintainedduring entire project period.
21
2122
2122(i) Establish site offices for Engineer, including all furnishing, Sumequipment and fittings as detailed in the specifications
2122(ii) Demobilise site offices for Engineer, including all furnishings, Sumequipment and fittings as detailed in specifications
2162 Maintain the site office for the Engineer in the project, Sumincluding costs for rent,water, electricity,communicationand security
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $)
A PRELIMINARIES AND GENERAL ITEMS
PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Advance Payment Bond
Performance Bond
Insurance of Works
Third Party Insurance
Insurance of Workmen
Establishment of the contractor's camp(s) ,plant Sum 1
Operate and maintain the contractor's camp(s), plant
Demobilise Contractor's camp(s),plant and offices, including mobilisation of all required plant, site, infrastructure, equipment, tools, machinery and personnel and their accommodation
GENERAL (SPECIFIED) REQUIREMENTS
Facilities for the Engineer's Staff
Establish & remove offices Sum 1 on land provided by Client Floor area 50 - 150 m²
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 14 of 39
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 15 of 39
222244 Rent accomodation Type D house (single unit - 4
bedrooms)
23
2311(i) Provide Transport vehicles for Engineer supervision staff, as nr 4 per specifications.
2311(ii) Operate, maintain and insure(comprehensive insurance)Engineers' vehicles, as per specifications.
2321 Provide Telephone 2
2341 Provide Water & Electricity 52
2351 Provide Sign boards nr 4
24
2431 3 Specifications
2441 Provide Stationary & other consumables to specifications mth 12
2461
25
2511 12
2521 12
2541 12
2551 12
2561 12
2571 12
2581 Provide supporting staff to the Engineer representative mth 12as per specification
26
262 by Engineer
2622 Fine sand
2623 Coarse sand nr 10
2624
2625
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $)
Accommodation for the Engineer's Staff mth 6
Services for the Engineer's Staff
nr
wk
Equipment for use by the Engineer's staff
Provide Survey Equipment according to Engineers mth
Provision of National & International Standards Sum 1 As per clause 1.52 of the General Specifications
Attendance upon the Engineer's staff
Provide drivers (4 No.) mth
Provide Chainmen mth
Provide Secretary/typist mth
Provide Office messenger mth
Provide Watchmen mth
Provide Servants/ Cleaners mth
Testing of Materials
By Third Party Inspection (natural materials) as directed
nr 10
Aggregate nr 10
Stone fill nr 10
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 16 of 39
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 17 of 39
264 2642
2643
27 Testing of Works Testing of the whole of the works are part of the individual sum Bill of Quantities
28
281 Traffic diversion sum 1
282 1
283 Access roads sum 1
287 1
288 Compressed air for tunneling Sum 1
2891 1
2892 1
4 41
411
412 Percentage adjustment to provisional sum for %day work labour
413
414 Percentage adjustment to provisional sum for %day work materials
415
416 Percentage adjustment to provisional sum for %day work plant
5
51 Work on site by nominated sub-contractor sum 1
52 Percentage adjustment to work onsite by nominatedsubcontractor
532
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $)
By Third Party Inspection (man-made other than pipes) Concrete cubes nr 10
Steel Reinforcement nr 5
Temporary Works
Traffic regulation Sum
De-watering Sum
Bypass pipework where disruption for more than 12 hrs is anticipated (PROVISIONAL) Sum
Relocation of existing services incl. tel., electr., sewer, etc where anticipated (PROVISIONAL) Sum
PROVISIONAL SUMS Daywork
Labour (carried from Dayworks Schedule) Sum 1
Material (carried from Dayworks Schedule) Sum 1
Plant (carried from Dayworks Schedule) Sum 1
PRIME COST ITEMS
Provide furniture for Engineer's office Sum 1
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 18 of 39
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 19 of 39
533 Office stationary and consumables
534
537
538
539
5310
5311
5312
5313
5314
5315
58 Records and Documents
581 Photographical records of the site prior, during and after sum 1completion of works. Documentation is to be prepared as perspecifications
582 sum 1
583 "As-built" drawings as specified in the Specifications Sum 1
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $)
sum 1
Upkeep and travel for Engineer's staff sum 1
Maintain vehicles for Engineer's staff sum 1
Provide and install telephones and radio telephones sum 1 for Engineer's staff Reverts to Employer at end of Contract.
Provide computer equipment complete sum 1 with accessories, e-mail service provider connection and software. Reverts to Employer at end of Contract.
Provide digital camera complete sum 1 with accessories and software. Reverts to Employer at end of Contract
Maintenance of computer equipment sum 1 and digital camera
Electricity and water for the Engineer's staff sum 1
Telephone for Engineer's staff sum 1
Miscellaneous goods and services for the Engineer. sum 1
Compensation and entry upon land. sum 1
Instruction manuals (operation and maintenance manuals) as specified in the Specifications
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 20 of 39
2
3
4
TITLE: Preliminary and General Works
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $)
COLLECTION SHEET
PAGE NO.
1
TOTAL CARRIED TO GRAND SUMMARY
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 21 of 39
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 22 of 39
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 23 of 39
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 24 of 39
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 25 of 39
AMOUNT (US $)
-
-
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 26 of 39
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 27 of 39
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 28 of 39
Bill No. 1
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 29 of 39
1 Price all liabilities, obligations and risk set forth or impliedin the contract ,not included in the rates and prices enteredelsewhere in the Bill of Quantities in complying with any Clause of the Conditions of Contract for the entire projectperiod.
111 Sum 1
121 Sum 1 131 Sum 1
141 Insurance against Damage to person and property Sum 1
151 Sum 1
161 Sum 1
171 Facilities and Items for the contractor
171(i) and offices including mobilisation of all required plant,site,infrastructure,equipment,tools, machinery and personneland their accomodation
171(ii) Sum
and offices including mobilisation and demobilisation of all required plant,site,infrastructure,equipment,tools, machinery and personnel and their accomodation.
171(iii) Sum
2
Price should include all costs for items as specified in Particular specifications and be provided and maintainedduring entire project period.
21
2122
2122(i) Establish site offices for Engineer, including all furnishing, Sumequipment and fittings as detailed in the specifications
2122(ii) Demobilise site offices for Engineer, including all furnishings, Sumequipment and fittings as detailed in specifications
2162 Maintain the site office for the Engineer in the project, Sumincluding costs for rent,water, electricity,communicationand security
22
2244 Rent accomodation Type D house (single unit - 4bedrooms)
23
2311(i) Provide Transport vehicles for Engineer supervision staff, as nr 4 per specifications.
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
A PRELIMINARIES AND GENERAL ITEMS
PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Advance Payment Bond
Performance Bond
Insurance of Works
Third Party Insurance
Insurance of Workmen
Establishment of the contractor's camp(s) ,plant Sum 1
Operate and maintain the contractor's camp(s), plant
Demobilise Contractor's camp(s),plant and offices, including mobilisation of all required plant, site, infrastructure, equipment, tools, machinery and personnel and their accommodation
GENERAL (SPECIFIED) REQUIREMENTS
Facilities for the Engineer's Staff
Establish & remove offices Sum 1 on land provided by Client Floor area 50 - 150 m²
Accommodation for the Engineer's Staff
mth 6
Services for the Engineer's Staff
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 30 of 39
2311(ii) Operate, maintain and insure(comprehensive insurance)Engineers' vehicles, as per specifications.
2321 Provide Telephone 2
2341 Provide Water & Electricity 52
2351 Provide Sign boards nr 4
24
2431 3 Specifications
2441 Provide Stationary & other consumables to specifications mth 12
2461
25
2511 12
2521 12
2541 12
2551 12
2561 12
2571 12
2581 Provide supporting staff to the Engineer representative mth 12as per specification
26
262 by Engineer
2622 Fine sand
2623 Coarse sand nr 10
2624
2625
264 2642
2643
27 Testing of WorksTesting of the whole of the works are part of the individual sumBill of Quantities
28
281 Traffic diversion sum 1
282 1
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
nr
wk
Equipment for use by the Engineer's staff
Provide Survey Equipment according to Engineers mth
Provision of National & International Standards Sum 1 As per clause 1.52 of the General Specifications
Attendance upon the Engineer's staff
Provide drivers (4 No.) mth
Provide Chainmen mth
Provide Secretary/typist mth
Provide Office messenger mth
Provide Watchmen mth
Provide Servants/ Cleaners mth
Testing of Materials
By Third Party Inspection (natural materials) as directed
nr 10
Aggregate nr 10
Stone fill nr 10
By Third Party Inspection (man-made other than pipes) Concrete cubes nr 10
Steel Reinforcement nr 5
Temporary Works
Traffic regulation Sum
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 31 of 39
283 Access roads sum 1
287 1
288 Compressed air for tunneling Sum 1
2891 1
2892 1
4 41
411
412 Percentage adjustment to provisional sum for %day work labour
413
414 Percentage adjustment to provisional sum for %day work materials
415
416 Percentage adjustment to provisional sum for %day work plant
5
51 Work on site by nominated sub-contractor sum 1
52 Percentage adjustment to work onsite by nominatedsubcontractor
532
533 Office stationary and consumables
534
537
538
539
5310
5311
5312
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
De-watering Sum
Bypass pipework where disruption for more than 12 hrs is anticipated (PROVISIONAL) Sum
Relocation of existing services incl. tel., electr., sewer, etc where anticipated (PROVISIONAL) Sum
PROVISIONAL SUMS Daywork
Labour (carried from Dayworks Schedule) Sum 1 -
Material (carried from Dayworks Schedule) Sum 1 -
Plant (carried from Dayworks Schedule) Sum 1 -
PRIME COST ITEMS
Provide furniture for Engineer's office Sum 1
sum 1
Upkeep and travel for Engineer's staff sum 1
Maintain vehicles for Engineer's staff sum 1
Provide and install telephones and radio telephones sum 1 for Engineer's staff Reverts to Employer at end of Contract.
Provide computer equipment complete sum 1 with accessories, e-mail service provider connection and software. Reverts to Employer at end of Contract.
Provide digital camera complete sum 1 with accessories and software. Reverts to Employer at end of Contract
Maintenance of computer equipment sum 1 and digital camera
Electricity and water for the Engineer's staff sum 1
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 32 of 39
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 33 of 39
5313
5314
5315
58 Records and Documents
581 Photographical records of the site prior, during and after sum 1completion of works. Documentation is to be prepared as perspecifications
582 sum 1
583 "As-built" drawings as specified in the Specifications Sum 1
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
Telephone for Engineer's staff sum 1
Miscellaneous goods and services for the Engineer. sum 1
Compensation and entry upon land. sum 1
Instruction manuals (operation and maintenance manuals) as specified in the Specifications
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 34 of 39
2
3
4
TITLE: Preliminary and General Works Bill No. 1
ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
COLLECTION SHEET
PAGE NO.
1
TOTAL CARRIED TO GRAND SUMMARY
TITLE: Preliminary and General Works Bill No. 1 ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $) A GENERAL ITEMS 1A1 PRELIMINARY REQUIREMENTS
(CONTRACTUAL) 1A111 Advance Payment Security
Onshore (Local currency) Sum 1
1A121 Performance Security Onshore (Local currency) Sum 1
1A131 Insurance of Works
Onshore (Local currency) Sum 1 1A141 Third Party Insurance
Onshore (Local currency) Sum 1
1A161 Insurance of Workmen Onshore (Local currency) Sum 1
1A171 Establishment and maintenance Sum 1 of Contractors Camp, incl. Training Levy. Onshore (Local currency)
1A2 GENERAL REQUIREMENTS
1A21 Facilities for the Engineer's Staff
1A212.2 Establish & remove offices Sum 1 on land provided by Client Floor area 50 - 150 m² (Provisional)
1A213.2 Establish & leave offices on land Sum 1 provided by Client Floor area 50 - 150 m² (Rate Only -NOT CARRIED FORWARD)
1A22 Accommodation for the Engineer's Staff 1A223.4 Maintain house Type D house (single unit-3 bed) mth 6
1A224.4 Rented and furnished house Type D (single unit-3 bed) mth 6 1,500.00 9,000.00
1A224.5 Percentage on 1A224.4. % 9,000 -
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET Preliminary 1-A2
TITLE: Preliminary and General Works Bill No. 1 ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $) 1A23 Services for the Engineer's Staff
Signboards 1A234.1 Provide nr 3
1A234.2 Maintain wk 30
1A24 Equipment for use by the Engineer's staff 1A243.1 Survey Equipment -Provide mth 6
1A246 Provision of National & International Standards Sum 1 As per clause 1.52 of the General Specifications
1A25 Attendance upon the Engineer's staff 1A251.1 Driver Provide (1 No.) mth 6
1A252.1 Chainmen Provide mth 6
1A254.1 Secretary/typist Provide mth 6
1A255.1 Office messenger Provide mth 6
1A256.1 Watchmen Provide mth 6
1A257.1 Servants/ Cleaners Provide mth 6
1A26 Testing of Materials By Third Party Inspection (natural materials)
1A262.2 Sand nr 10
1A262.4 Aggregate nr 10
1A262.5 Stone fill nr 10
By Third Party Inspection (man-made other than pipes) 1A264.2 Concrete cubes nr 10
1A264.3 Steel Reinforcement nr 5 1A28 Temporary Works 1A282 Traffic regulation Sum 1 1A287 De-watering Sum 1
1A289.1 Bypass pipework where disruption for more than 12 hrs is anticipated (PROVISIONAL) Sum 1
1A289.2 Relocation of existing services incl. tel., electr., sewer, etc where anticipated (PROVISIONAL) Sum 1 TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
TITLE: Preliminary and General Works Bill No. 1 ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $) 1A4 PROVISIONAL SUMS
Daywork 1A411 Labour (carried from Dayworks Schedule) Sum 1 - 1A413 Material (carried from Dayworks Schedule) Sum 1 - 1A415 Plant (carried from Dayworks Schedule) Sum 1 - 1A5 PRIME COST ITEMS
1A532 Provide furniture for Engineer's office Sum 1 2,000.00
1A533 Office stationary and consumables sum 1 400.00
1A534 Upkeep and travel for Engineer's staff sum 1 1,200.00
1A537 Maintain vehicles for Engineer's staff sum 1 1,600.00
1A538 Provide and install telephones and radio telephones sum 1 500.00 for Engineer's staff Reverts to Employer at end of Contract.
1A539 Provide computer equipment complete sum 1 1,500.00 with accessories, e-mail service provider connection and software. Reverts to Employer at end of Contract.
1A5310 Provide digital camera complete sum 1 400.00 with accessories and software. Reverts to Employer at end of Contract
1A5311 Maintenance of computer equipment sum 1 200.00 and digital camera
1A5312 Electricity and water for the Engineer's staff sum 1 500.00
1A5313 Telephone for Engineer's staff sum 1 2,000.00
1A5314 Miscellaneous goods and services for the Engineer. sum 1 2,000.00
1A5315 Compensation and entry upon land. sum 1 1,000.00
1A54 Percentage adjustment to Items 1A533 to 1A5315 % 13,300 -
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET
TITLE: Preliminary and General Works Bill No. 1 ITEM No. D E S C R I P T I O N UNIT QUANTITY RATE (US $) AMOUNT (US $)
COLLECTION SHEET
PAGE NO. 1 2 3
TOTAL CARRIED TO GRAND SUMMARY
AMOUNT (US $)
AMOUNT (US $)
AMOUNT (US $)
AMOUNT (US $)
Top Related