Submitted by10810027 – L Nikhil Reddy10810028 – Laxmi Narasimha
Boddu10810031 – Mayank Jain10810063 – Swagat Patra10810071 – Vema Jagadish
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 2/79
Why study Power Industry?
Electricity supply is a fundamental priority of the central governmentpolicy.
Major objective pertaining to power sector in 11th 5-year plan is“ Power for all” by 2012.
Total requirement of funds estimated in11th 5-year plan is 10,31,600crore rupees.
Indian power industry accounts for 3.4% of global energy
consumption making it 6th
largest consumer in the world.
No other industry’s output is as important as that of Power Industry,because most of the goods or services produced directly orindirectly require power from production to consumption.
Power is utilized to in three key sectors of any country’s economy, –
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 3/79
Indian Power Sector – History
The Indian Power Sector has history over 100 year history
1880s – First electrification – small hydro project in Darjeeling
1889 – Commercial production & Distribution starts in Calcutta
Indian Electricity Act, 1910
1947 – Power generating capacity only 1,362 MW
The Electricity (Supply) Act, 1948 – SEB formation
Creation of central generation companies
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 4/79
Indian Power Sector – History(continued)
Central Electricity Authority (CEA) was established as a statutoryauthority
1956 – Industrial Policy Resolution reserves production of power forpublic sector
1960s and 70s – Impetus for expansion of rural electrification
1975 – NTPC and NHPC set up
1989 – NPTC set up. Renamed POWER GRID in 1992
1991 – Liberalization; amendments in Electricity (Supply) Act
1992 – Ministry of Power was constituted
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 5/79
Indian Power Sector – History(continued)
1995 – Policy for Mega power projects introduced
1998 – CERC and SERCs set up
2001 – Energy Conservation Act
2003 – New Electricity Act
2008 – Re-structuring APDRP (Accelerated Power Development andReforms Programme)
2009 – Amendments in Mega Power Policy
2011 – Installed power capacity of approximately 170,230 MW
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 6/79
History – Fast facts
The US was the first country that generated electricity.
CESC (Calcutta Electric Supply Company ) Limited, pioneer in Indiacommenced power generation and distribution in Kolkata, in 1899.
CESC acquired the license to provide electricity to Calcutta city onJanuary 7, 1897.
The electrification of Kolkata city took place in 1899 India also started hydro electric generation by the end of 19th
century.
The power plant at Darjeeling and Shimsha (Shivanasamudra) wasestablished in 1898 and 1902 respectively and is one of the first inAsia.
The 4.5 megawatt hydroelectric power station near Sivasamudramfalls of the Cauvery in Karnataka was the first major power station inIndia
The Indian power sector has been regulated for almost a century.
The Electricity Act 1910 was the first act that was introduced to
govern the Indian power sector. The Electricity (Supply) Act 1948 was introduced after
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 7/79
Post-independence pre-reformphase (up to 1991)
The development of the electricity sector to respective statesthrough the creation of State Electricity Boards (SEBs).
SEBs expected to develop networks of transmission lines addgeneration capacity.
The low tariffs for agricultural sector were sought to be coveredthrough higher tariffs on industrial and commercial consumers
The distortions of such cross subsidization, resulted in increasing
theft and leakages, loss of accountability of revenue,misreporting.
SEBs fared miserably and by the 70s, many of the SEBs startedincurring losses because of many factors including direct politicalinterference in SEBs operation by their respective governments,
mismanagement, poor industrial relations, etc
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 8/79
Post-independence pre-reformphase (up to 1991) (continued)
Losses of the SEBs mounted this made SEBs increasinglydependent on budgetary allocations from their respectivegovernments reducing their ability to add generating capacity,and most importantly to carry out the periodic maintenanceand upkeep of their distribution assets.
C.E.A. (Central Electricity Authority) was established with theobject of providing Techno economic assistance to the saidState Electricity Boards, N.T.P.C., N.H.P.C. in the matter ofsetting up new power stations.
In 1969 Rural Electric Corporation and in 1975 N.T.P.C.(National Thermal Power Station and N.H.P.C. (NationalHydel Power Corporation) were formed to accelerate thegeneration of electricity in our country
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 9/79
Post-reform phase (after 1991)
The need to control fiscal deficit led toinitiation of reforms in the Electricity Sectorin early 1990s
Investment by the private sector (including foreigncapital) were allowed in electricity generation
Opening of the sector for private IndependentPower Producers (IPPs)
The enactment of the Electricity Act in the year
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 10/79
Post-reform phase (after 1991) (continued)
The Central Government came out with NationalElectricity Policy on 6th February 2005
To encourage greater private participation govt has
undertaken some measures like National Tariff Policy,National Electricity Plan, Competitive BiddingGuidelines, and Ultra Mega Power Projects.
Now 100 percent Foreign Direct Investment (FDI) is
allowed in generation, transmission and distributionsegments.
Incentives are given to the sector through waiver of
duties on capital equipments under the Mega PowerPolicy
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 11/79
Power policy in India ispredominantly controlled by…
Ministry of Power
Ministry of Coal
Ministry of New and Renewable Energy
And administered by
PSUs
Government Departments
Commissions
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 12/79
Indian Power sector
As per our Constitution, power industry is acombined responsibility of the State andCentral Governments.
According to the Electricity Supply Act (ESA)
Power sector comprises of three entities
State Electricity Boards (SEBs) Power Generating Companies
Licensees
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 13/79
Power sector at a glance – All India(Source: Website of Ministry of power)
State Sector
48%
Central Sector
31%
Private Sector21%
Installed capacities across sectors
Total installed power capacity in India approximately by 2011: 170,230 MW
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 14/79
Power sector at a glance – All India(continued) (Source: Website of Ministry of power)
Thermal Nuclear Hydro RESCentral 39122.23 4560 8685.4 0
Private 19755.52 0 1425 13964.66
State 52156.73 0 27257 2822.32
0%
10%
20%
30%
40%
50%
60%70%
80%
90%
100%
P r o p o r t i o
n
Power generation capacities of Public and privatesectors – by energy sources
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 15/79
Current scenario of Indian PowerIndustry
Coal54%
Gas
10%
Hydro22%
RES10%
Nuclear3%
Oil1%
Power produced by variousenergy sources
Fuel Capacity (in MW)
Coal 92418.38
Gas 17706.35
Oil 1199.75
Hydro 37367.40
Nuclear 4780.00
RES 16786.98
Total 170,228.86
Source: 2010-11 Annual report of Ministry of Power RES: Renewable Energy Resources
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 16/79
Source: 2010-11 Annual report of Ministry of Power
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 17/79
Power consumption – Breakup
Agriculture18%Domestic
21%
Industrial46%
Traction2%
Commercial8%
Miscellaneous
5%
Sector wise Power consumption
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 18/79
Growth of Power sector
The power capacity of India has increased approximately124times from 1362MW in the year 1947 to 170228.86MW in2011.
The global energy consumption has grown at a CAGR of
2.5% since 1999, reaching 11 billion tons of oil equivalent in2008.
Between 1980 and 2009, energy consumption increased byalmost seven times from 85,334 GWh to 596,943 GWh,
which corresponds to an average annual growth rate ofapproximately 7.1%.
The strongest increase was in the consumption by privatehouseholds, which increased by almost 14 times since 1980
at an average annual growth rate of 10%.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 19/79
Growth of Power sector – Powergeneration trend
(1 Unit = 1 kWh)
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 20/79
Power Requirement v/sAvailability
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 21/79
Power sector – Growth potential
The Eleventh Five Year Plan envisaged an additionalcapacity of 78,700 MW of which 19.9 per cent washydro, 75.8 per cent thermal and the rest was nuclear.As of December 31, 2009, 43,282 MW was under
construction.
Public sector power major National Thermal PowerCorporation (NTPC) is planning to scale up its
capacity from the present 30,000 MW to 75,000 MWby 2017.
India has launched its ambitious solar energy missionwhich aims to generate 20,000 MW of solar power by2022.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 22/79
Major Players of the Industry
Power Plant Name CapacityIn MW
Presence Future plans
National ThermalPower Corporation(NTPC)
33,000 Coal & Gas Plans to increase capacity to75,000 MW by 2017
National Hydro PowerCorporation (NHPC)
5,000 Hydro Planning to Double capacity innext 5 years
Tata Power 3,000 Gas, Hydro,Solar & Wind
Building numerous power plantsand transmission projects in JV
Reliance power 3x4,000 Hydro, Gas &
Coal
Plans of 35GW projects.
Adani Power Limited 1980 Coal (Mainlyimports coal)
Implementing3300MW in Maharashtra1320MW in Rajasthan16500MW in rest of the country
Damodar ValleyCor oration
2889 Hydro – 144MWThermal –
Additional 11000MW by 2012
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 23/79
Major Players of the Industry(continued)
Power Plant Name CapacityIn MW
Presence Future plans
Lanco Infratech 2,000 Coal 18GW under development
SJVN(A Joint Venture of
GoI and Himachal Pradesh)
1500 Hydro Trying to expand but facingproblems like NHPC
Nuclear PowerCorporation of IndiaLimited (NPCIL)
4500 Nuclear India is planning to add 2000MWin next decade
CPL Power PrivateLtd. (Largest foreign
investor in windpower)
450 Wind Plans to develop a 1320MWThermal plant, Which is due for
commissioning in Dec 2011
Neyveli LigniteCorporation (PSU)
2490 Coal It is also in to Lignite mining, Noplans for expansion of powerproduction
Torrent Power 1647.5 - Expanding only in Ahmedabad andUttar Pradesh
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 24/79
Market Share
NTPC, 19.38%
NHPC, 2.94%
Tata Power,1.76%
Reliance power,7.05%
Adani Power,1.16%
DVC, 1.70%
Lanco Infra,
1.17%
SJVN, 0.88%
NPCIL, 2.64%CPL Power Pvt.
Ltd., 0.26%
Neyveli LigniteCorporation ,
1.46%
Torrent Power,0.97%
Others, 58.62%
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 25/79
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 26/79
Suppliers – Another sect of Powerindustry
BHEL BEL
NEPC India Ltd
Suzlon Energy Tata BP Solar Kotak Urja Pvt. Ltd Moser Baer Pvt. Ltd Titan Energy Systems Ltd. Photon Energy Systems IndoSolar WEBEL SL Energy Systems etc.
K i i h i
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 27/79
Key organizations – theirfunctions
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 28/79
Competition
In 1990 nearly all energy sector operations were statecontrolled. The industry was inefficient and highlyunreliable.
But that is rapidly changing. For example, state-
owned oil companies of India had over 80 percent ofIndia’s exploration acreage before 1990.
Thanks to reforms in the 1990’s, that number is downto about 50 percent in 2008 even as the area under
exploration has increased roughly ten-fold. Competition and private capital has reinvigorated the
entire energy industry in India. The new identity ofIndia’s energy policy is marked by a free-marketoriented approach.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 29/79
Thermal Power Projects – Centre(Source:Wikipedia)
Project Name Operator State Capacity(M
W)Badarpur Thermal power plant NTPC NCT Delhi 705
Singrauli Super Thermal Power Station NTPC Uttar Pradesh 2000
Barsingsar Lignite Power Plant NLC Rajasthan 125
Rihand Thermal Power Station NTPC Uttar Pradesh 2000
NTPC Dadri NTPC Uttar Pradesh 1820
Feroj Gandhi Unchahar Thermal Power
Plant NTPC Uttar Pradesh 1050Tanda Thermal Power Plant NTPC Uttar Pradesh 440
Vindhyachal Super Thermal PowerStation NTPC Madhya Pradesh 3260
Korba Super Thermal Power Plant NTPC Chattisgarh 2100
Sipat Thermal Power Plant NTPC Chattisgarh 1000
Bhilai Expansion Power Plant NTPC-SAIL(JV) Chattisgarh 500
NTPC Ramagundam NTPC Andhra Pradesh 2600Simhadri Super Thermal Power Plant NTPC Andhra Pradesh 1000
Neyveli Thermal Power Station - I NLC Tamilnadu 1020
Neyveli Thermal Power Station - II NLC Tamilnadu 1470
Kahalgaon Super Thermal Power Station NTPC Bihar 2340
Bokaro Thermal Power Station B DVC Jharkhand 630
Chandrapura Thermal Power Station DVC Jharkhand 1250
Farakka Super Thermal Power Station NTPC West Bengal 1600Durgapur Thermal Power Station DVC West Bengal 350
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 30/79
Thermal Power Projects – State(Source:Wikipedia)
Project Name Operator State Capacity(MW)
Panipat Thermal Power Station I HPGCL Haryana 440Panipat Thermal Power Station II HPGCL Haryana 920
Faridabad Thermal Power Station HPGCL Haryana 55
Rajiv Gandhi Thermal Power Station HPGCL Haryana 600
Guru Nanak dev TP PSPCL Punjab 440
Guru Hargobind TP PSPCL Punjab 920
Guru Gobind Singh Super Thermal Power Plant PSPCL Punjab 1260
Suratgarh Super Thermal Power Plant RVUNL Rajasthan 1500
Kota Super Thermal Power Plant RVUNL Rajasthan 1240
Giral Lignite Power Plant RVUNL Rajasthan 250
Chhabra Thermal Power Plant RVUNL Rajasthan 500
Orba Thermal Power Station UPRVUNL Uttar Pradesh 1322
Anpara Thermal Power Station UPRVUNL Uttar Pradesh 1630
Panki Thermal Power Station UPRVUNL Uttar Pradesh 210
Parichha Thermal Power Station UPRVUNL Uttar Pradesh 640
Harduaganj Thermal Power Station UPRVUNL Uttar Pradesh 220Ukai Thermal Power Station GSECL Gujarat 850
Gandhinagar Thermal Power Station GSECL Gujarat 870
Wanakbori Thermal Power Station GSECL Gujarat 1470
Sikka Thermal Power Station GSECL Gujarat 240
Dhuvaran Thermal Power Station GSECL Gujarat 220
Kutch Thermal Power Station GSECL Gujarat 290
Surat Thermal Power Station GIPCL Gujarat 500
Akrimota Thermal Power Station GMDC Gujarat 250
Sat ura Thermal Power Station MPPGCL Madh a Pradesh 1017.5
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 31/79
Thermal Power Projects – State(continued) (Source:Wikipedia)
Project Name Operator State Capacity(MW)
Sanjay Gandhi Thermal Power Station MPPGCL Madhya Pradesh 1340Amarkantak Thermal Power Station MPPGCL Madhya Pradesh 450
Korba East Thermal Power Plant CSPGCL Chattisgarh 440
Dr Shyama Prasad Mukharjee Thermal PowerPlant CSPGCL Chattisgarh 500
Korba West Hasdeo Thermal Power Plant CSPGCL Chattisgarh 840
Koradi Thermal Power Station MAHAGENCO Maharastra 620
Nashik Thermal Power Station MAHAGENCO Maharastra 630
Bhusawal Thermal Power Station MAHAGENCO Maharastra 420Paras Thermal Power Station MAHAGENCO Maharastra 500
Parli Thermal Power Station MAHAGENCO Maharastra 1130
Kaparkheda Thermal Power Station MAHAGENCO Maharastra 840
Chandrapur Super Thermal Power Station MAHAGENCO Maharastra 2340
Ramagundam B Thermal Power Station APGENCO Andhra Pradesh 62.5
Kothagudem Thermal Power Station APGENCO Andhra Pradesh 720
Kothagudem Thermal Power Station V Stage APGENCO Andhra Pradesh 500Dr Narla Tatarao TPS APGENCO Andhra Pradesh 1760
Rayalaseema Thermal Power Station APGENCO Andhra Pradesh 840
Kakatiya Thermal Power Station APGENCO Andhra Pradesh 500
Raichur Thermal Power Station KPCL Karnataka 1720
Kolaghat Thermal Power Station WBPDCL West Bengal 1260
Bakreshwar Thermal Power Station WBPDCL West Bengal 1050
IB Thermal Power Plant OPGCL Orissa 960
Mettur Thermal Power Station TNEB Tamilnadu 840Tuticorin Thermal Power Station TNEB Tamilnadu 1050
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 32/79
Thermal Power Projects – Private(Source:Wikipedia)
Project Name Producer State Capacity(MW)
VS Lignite Power Plant KSK Rajasthan 125
Rosa Thermal Power Plant StageI Reliance Uttar Pradesh 600
Sabarmati Thermal PowerStation Torrent Power Gujarat 400
Mundra Thermal Power Station Adani power Gujarat 1980
Jindal Megha Power Plant Jindal Chattisgarh 1000
Lanco Amarkantak Power Plant Lanco Chattisgarh 600
Trombay Thermal Power Station Tata Maharastra 1400
Dahanu Thermal Power Station Reliance Energy Limited Maharastra 500
Wardha Warora Power Station KSK Maharastra 135
JSW EL-SBU-I Power Plant JSW Karnataka 260JSW EL-SBU-II Power Plant JSW Karnataka 600
Udupi Thermal Power Plant Lanco Karnataka 600
Neyveli Zero Unit STPS Tamilnadu 250
Budge Budge Thermal PowerPlant CESC West Bengal 750
Titagarh Thermal Power Station CESC West Bengal 240CESC Southern Generating
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 33/79
Hydro Power Projects (Source: Wikipedia)
Project Name Operator Location Capacity (MW)
Tehri Dam THDC India Ltd Uttarakhand 2400
Srisailam Dam APGenco Andhra Pradesh 1,670
Nagarjunasagar APGenco Andhra Pradesh 965
Sardar Sarovar SSNNL Gujarat 1,450
Baspa-II JHPL Himachal Pradesh 300Nathpa Jhakri SJVNL Himachal Pradesh 1,500
Bhakra Dam BBMB Punjab 1,325
Dehar BBMB Himachal Pradesh 990
Baira Suil NHPC Himachal Pradesh 180
Chamera-I NHPC Himachal Pradesh 540
Chamera-II NHPC Himachal Pradesh 300Pong BBMB Himachal Pradesh 396
Uri HydroelectricDam NHPC Jammu & Kashmir 480
Dulhasti NHPC Jammu & Kashmir 390
Salal NHPC Jammu & Kashmir 690
Sardar Sarovar 400Sharavathi KPCL Karnataka 1,469
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 34/79
Hydro Power Projects(continued)(Source:Wikipedia)
Project Name Operator Location Capacity(MW)
LinganamakkiDam Karnataka 55
Idukki KSEB Kerala 780
Bansagar Dam Madhya Pradesh 425
Bargi Dam Madhya Pradesh 105Madikheda Dam Madhya Pradesh 60
Omkareshwar NHPC Madhya Pradesh 520
Indira Sagar NHPC Madhya Pradesh 1,000
Loktak NHPC Manipur 105
Khuga Dam Manipur
Koyna MahaGenco Maharashtra 1,920Mulshi Dam Maharashtra 150
Jayakwadi Dam Maharashtra 12
Kolkewadi Dam Maharashtra
Rangeet NHPC Sikkim 60
Teesta-V NHPC Sikkim 510
Tanakpur NHPC Uttarakhand 120-
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 35/79
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 36/79
Solar Power Projects (Source: Wikipedia)
Project Name Peak Power (MW)
Sivaganga Photovoltaic Plant 5
Kolar Photovoltaic Plant 3
Itnal Photovoltaic Plant,Belgaum
3
Azure Power - PhotovoltaicPlant
2
Jamuria Photovoltaic Plant 2
NDPC Photovoltaic Plant 1
Thyagaraj stadium Plant-Delhi
1
Gandhinagar Solar Plant 1
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 37/79
Nuclear Power Projects (Source:
Wikipedia)
Project Operator State Capacity (MW)
Narora Atomic Power Station NPCIL Uttar Pradesh 440
Rajasthan Atomic PowerStation NPCIL Rajasthan 1180
Tarapur Atomic Power Station NPCIL Maharashtra 1400
Kakrapar Atomic Power Station NPCIL Gujarat 440
Kudankulam Nuclear PowerPlant NPCIL Tamilnadu 2000
Madras Atomic Power Station BHAVINI Tamilnadu 500
Kaiga Nuclear Power Plant NPCIL Karnataka 880Madras Atomic Power Station NPCIL Tamil Nadu 440
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 38/79
Mega Power Policy
Introduced in 1995 for providing impetus todevelopment of large size power projects in thecountry and derive benefits form economies ofscale.
Modified in 1998,2002, 2006 and 2009 torationalize the procedure for grant of megacertificates and facilitate quicker addiction ofcapacity.
17 power projects totaling of capacity about27GW have been granted mega power statusform April 2010 to Jan 2011
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 39/79
Ultra Mega Power Projects
Projects above 4000MW capacity
Each UMPP’s estimated investment is $4billion
Operated on Build, Own and Operate (BOO) model
Name of UMPP Developer
Mundra, Gujarat Tata Power Ltd.
Sasan, Madhya Pradhesh Reliance Power Ltd.
Krishnapatnam Reliance Power Ltd.
Tilaiya Reliance Power Ltd.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 40/79
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 41/79
Coal
India is the third largest producer of coal in theworld, with fourth largest reserves of coal in theworld
Despite this India imports coal to serve its domesticneeds.
Annual coal requirement of India is 700 million tons.
FY 2010-11 Imports increased 70% than expected
84 million tons i.e. 142million tons.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 42/79
Coal – Hurdles to extraction
Environmental clearances
Rehabilitation
Naxal movements
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 43/79
Coal – A look at history
The first coal mining operation commenced in1774 in the Raniganj coalfield on the banks ofRiver Damodar.
The introduction of steam locomotives andWW-I stimulated demand for coal, and
production peaked at 18 million tons (mts)during the 1920s
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 44/79
Coal - Producing companies
Coal India Limited. (A Maharatna Company with 8 subsidiaries)
Bharat Coking Coal Limited (BCCL)
Central Coalfields Limited (CCL)
Eastern Coalfields Limited (ECL)
Western Coalfields Limited (WCL)
South Eastern Coalfields Limited (SECL) Northern Coalfields Limited (NCL)
Mahanadi Coalfields Limited (MCL)
Central Mine Planning and Design Institute Limited (CMPDIL)
• Singareni Collieries Company Limited (SCCL) – (A jointventure of Government of Andhra Pradesh and Governmentof India sharing SCCL's equity capital in the ratio of 51:49. )
• Minerals and Metals Trading Corp: It is responsible for theconversion of imported coal into coke for metallurgical and
industrial purposes.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 45/79
1. ECL
2. BCCL
3. CCL
4. NCL0
5. WCL
6. SECL
7. MCL
8. NEC
9. SCCL
10. NLC
Coal M i f P
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 46/79
Coal – Main source of Power
generation
India Currently able to fulfill only 90% of its Energyrequirements.
54% of energy requirements are fulfilled by Coal. (Figures
in 2011)
Coal produced in India is completely utilized fordomestic purposes.
70% of coal produced is used for production ofelectricity
Remaining 30% by Steel, Cement and other heavyindustries
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 47/79
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 48/79
Coal and Lignite (FDI)
Private Indian companies setting up or operating power projects aswell as coal or lignite mines for captive consumption are allowedFDI up to 100%.
100% FDI is allowed for setting up coal processing plants, subject
to the condition that the company shall not do coal mining and shallnot sell washed coal or sized coal from its coal processing plants inthe open market and shall supply the washed or sized coal to thoseparties who are supplying raw coal to coal processing plants forwashing or sizing.
FDI up to 74% is allowed for exploration or mining of coal or lignitefor captive consumption.
In all the above cases, FDI is allowed up to 50% under theautomatic route subject to the condition that such investment shallnot exceed 49% of the equity of a PSU.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 49/79
Nuclear Power
India has a flourishing and largely indigenous nuclear powerprogram and expects to have 20,000 MWe nuclear capacityon line by 2020 and 63,000 MWe by 2032. It aims to supply25% of electricity from nuclear power by 2050.
Because India is outside the Nuclear Non-Proliferation Treatydue to its weapons program, it was for 34 years largelyexcluded from trade in nuclear plant or materials, which hashampered its development of civil nuclear energy until 2009.
Now, foreign technology and fuel are expected to boostIndia's nuclear power plans considerably. All plants will havehigh indigenous engineering content.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 50/79
Nuclear Power – Current status
Nuclear power supplied 15.8 billion kWh (2.5%) ofIndia's electricity in 2007 from 3.7 GWe (of 110 GWetotal) capacity.
In the year to March 2010, 22 billion kWh wasforecast, and for the 2010-11 year 24 billion kWh isexpected. For 2011-12, 32 billion kWh is nowforecast.
India's fuel situation, with shortage of fossil fuels, isdriving the nuclear investment for electricity, and 25%nuclear contribution is foreseen by 2050, when 1094GWe of base-load capacity is expected to be required.Almost as much investment in the grid system as in
power plants is necessary.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 51/79
Nuclear Power - Growth trends
Rose impressively from 60% in 1995 to 85% inthe period 2001-02
Then in 2008-10 the load factors dropped due to
shortage of uranium fuel.
Power reactors in mid 1990’s had some of theworlds lowest capacity factors.
The growth rate was plagued by lack of fuel andtechnical assistance from other countries due toIndia’s nuclear isolation .
N l P G th t d
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 52/79
Nuclear Power – Growth trends(continued)
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 53/79
Nuclear Power – Regulation
Main Policy Body
AEC-Indian Atomic Energy Commission
Regulator
AERB-Atomic Energy Regulator Board
Research Centre
BARC- Bhabha Atomic Research Centre
Commissioning Body
NPCIL-Nuclear Power Corporation Of IndiaLtd
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 54/79
Nuclear Power – Major players
The 1962 Atomic Energy Act prohibits private control of nuclearpower generation.
BHAVINI – Bharatiya Nabhikiya Vidyut Nigam Ltd focuses on fastbreeder reactors.
NTPC- National Thermal Power Corporation
GE - Two Tarapur 150 MWe Boiling Water Reactors on a turnkeycontract.
ATOMSTROYEXPORT – Russian firm is building the country's firstlarge nuclear power plant, comprising two VVER-1000 (V-392)reactors.
ROSATOM - Russian firm which is expected to built 18 larger 1200
MWe AES-2006 versions reactors
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 55/79
Nuclear Energy – Structure
Pl d N l Pl t I I di
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 56/79
Planned Nuclear Plants In India
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 57/79
Nuclear Power – Policies
The NPCIL and the Bharatiya Nabhikiya VidyutNigam Ltd (Bhavini) are the only companiesauthorized to build nuclear reactors in the
country.
Nuclear power plants to be set up at locationsaway from coalmine
Public sector investments to create nucleargeneration capacity to be stepped up.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 58/79
Wind & Solar
Since 2000, the global renewable energy capacityhas increased by approximately five times toreach 146,073 MW in 2008. This growth hasprimarily been driven by the wind and solar powersegment.
During the period 2000 –08, wind power and solarphotovoltaic (PV) capacity grew at a CAGR of27% and 44%, respectively.
The US now has the largest wind power capacity(25.2 GW, 20.7% of the total world capacity),followed by Germany (23.9 GW, 19.6% share).
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 59/79
Wind & Solar (continued)
Solar power, another key RE focus area globally,recorded a 69% y-o-y growth in generating capacity in2008. Spain (2.7 GW) and Germany (1.5 GW), whichtogether accounted for more than 75% of the growth.
India – fifth largest producer of wind energy in theworld, with a current installed wind capacity of 10,243MW.
The solar PV manufacturing capacity has made Indiaas the seventh largest producer of solar PV cellworldwide, with an installed manufacturing capacity of110MW in 2008.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 60/79
Wind & Solar - Development
Factors for development1. Massive gap between demand and supply.
2. Relatively lower cost due to technology.
3. Rapid development of domestic manufacturers.
4. Highly supportive government policies like JNNSM
5. Substantial subsidies and incentives for setting upany RES power plant.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 61/79
Attention needed…
As India moves forward with energy-policyreforms three issues need particular attention
1. Recent energy policies threaten the organizational
stability of state-owned companies.
2. India urgently needs to ramp up energy relatedR&D, which at present is inadequate.
3. India must strive to really understand thefunctioning of the energy systems of other majoreconomies.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 62/79
Imports & Exports
Coal Despite being the fourth largest reservoir of coal, India
imports coal to serve its domestic needs. Coal imports could jump nearly 70% in next fiscal year to
142 million tons from 2010-11 forecast purchases
Nuclear Major proportion of uranium is imported from other
countries Technology transfer takes place with major foreign players Nuclear fuel is imported from
Russia – Rosatom France – Areva Kazakhstan Brazil South Africa
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 63/79
Imports & Exports (continued)
Solar India has always been a net exporter of solar PV technology,
with about 66% of cumulative domestic PV production till 2009catering to overseas markets.
Germany is the most preferred source for solar PV imports,followed by Taiwan. During 2008-09, about 80% of the total solarPV imports were from Germany and Taiwan. The other countriesfor solar PV imports are Spain, China and Japan.
Year-wise export-import details of solar PV below:
I E
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 64/79
Imports & Exports
Wind Energy
An impressive average annual increase of 40.9% during the2004-2008 period.
Total trade in wind energy - US$ 4.0 bn in 2008, Exports -US$ 1.8 bn
Imports - US$ 2.2 bn, thereby resulting in a negative trade balance.
USA was India’s main export destination of wind energy productsin 2008 with exports amounting to US$ 355 mn (19.6% share).
Other major export markets included Brazil (US$ 156 mn;8.6%share), Australia (US$139mn;7.7%), Spain (US$ 107 mn; 5.9%)and Portugal (US$ 87 mn; 4.8%).
I & E
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 65/79
Imports & Exports
In terms of imports, China and Germany were by far,the two biggest sources with imports amounting toUS$ 639 mn and US$ 600 mn, respectively.
China and Germany accounted for 55.7% of India’stotal imports of wind energy and related componentsin 2008.
China overtook Germany in 2008 to become thelargest source of import for India.
The other major sources of imports in 2008 includedItaly (US$ 129 mn; 5.8% share), USA (US$ 121 mn;
5.4%), and Japan (US$ 106 mn; 4.8%).
Eff F i I
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 66/79
Effect on Foreign Investment
Electricity Act, 2003, made provision for 100% FDI inpower sector.
Despite this only two to three foreign investors turned
up.
The power sector has attracted foreign directinvestment (FDI) worth USD 1.34 billion during April to
February 2009-10.
The cumulative FDI received by the power sectorbetween April 2000 and February 2010 was USD 4.53
billion.
T i i P
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 67/79
Taxation in Power sector
Current Scenario:
As per the existing provisions of the Income TaxAct, 1961, an Undertaking set up in any part of
India for the Generation or Generation andDistribution of power or Reconstruction or revivalof a power generating unit if it begins to generatepower at any time during the period beginning on1st April, 1993 to 31st March, 2011 is eligible forProfit based deduction subject to fulfillment ofother conditions stipulated under the provisions ofthe Income Tax Act, 1961.
T ti i P t
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 68/79
Taxation in Power sector (continued)
Direct Tax Code (DTC) Proposals DTC 2010 would replace the Income Tax Act, 1961 and, hence, it is
provided that the businesses eligible for profit-linked incentives underthe Income Tax Act, 1961 regime as of 31 March 2012, whose taxholiday period has not expired, shall continue to be eligible for profit-linked tax incentives for the unexpired period, subject to the followingconditions
The method of computation of profits shall be as per DTC 2010, exceptthat capital expenditure and pre-commencement business expenses willnot be allowed as a deduction.
The period of deduction shall not include a period for which deductionwas not allowable under the Income Tax Act, 1961. However, questionmay arise as to whether the restriction will apply only during the periodof tax holiday or on a perpetual basis. Question may also arise if thelimitation on grant of capital allowances, including depreciation, will alsoextend to assets acquired prior to March 2012 and which have alreadybecome part of the block of assets.
The taxpayer continues to satisfy the conditions as specified under
T ti i P t
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 69/79
Taxation in Power sector (continued)
Effect on Undertaking set up on or after 1st April, 2012: An Undertaking set up in any part of India for the Generation or
Transmission or Distribution of power and if it begins to generatepower at any time on or after 1st April, 2012 will be eligible forinvestment-based incentives wherein capital expenditure andexpenditure prior to commencement of Business shall be allowed
as Business Expenditure except expenditure incurred onacquisition of any Land including Long Term Lease, Goodwill orFinancial Instrument.
Moreover, the Direct Tax Code has also allowed PowerCompanies to offset Losses against the Profits of other
infrastructure projects or corporate income in the current year aswell as future years which is a welcome measure.
The Direct Tax Code, 2010 has curtailed the some of theprovisions of Income Tax Act, 1961 even though it is positive stepfor the Power Sector and beneficial to Existing as well as New
Power Undertakings.
P li d R l ti
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 70/79
Policy and Regulations
To promote renewable energy technologies in thecountry, the government has put in place somesubsidies & fiscal incentives.
• Income tax breaks• Accelerated depreciation
• Custom duty/duty free import concessions
• Capital/Interest subsidy
• Incentives for preparation of Detailed Project Reports(DPR) and feasibility reports
P li d R l ti
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 71/79
Policy and Regulations (continued)
100 percent income tax exemption for any continuous block ofpower for 10 years in the first 15 years of operations .
Providers of finance to such projects are exempt from tax on anyincome by way of dividends, interest or long-term capital
Accelerated 100-percent depreciation on specified renewableenergy-based devices or projects.
Accelerated depreciation of 80 percent in the first year of operations
Interest rate subsidies to promote commercialization of newtechnology
Lower customs and excise duties for specified equipment
Exemption or reduced rates of central and state taxes.
P li d R l ti
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 72/79
Policy and Regulations (continued)
Ministry for Non-Conventional Energy Sources mix of fiscal andfinancial benefits:
2/3rd of the project cost subject to a maximum of Rs. 2.00 crore per100 KW for procurement of modules, structures, power conditioningunits, cabling etc. to the implementing agency. The balance cost onland, extension of grid lines, transformers, civil works, foundation
and erection and commissioning, etc. is met by the implementingagency.
Up to Rs.1.0 lakh for the preparation of Detailed Project Report(DPR) for the grid interactive SPV power projects.
2.5 percent of its share of project cost, subject to a maximum ofRs.5 lakhs for performance evaluation, monitoring, report writing,etc. to the State Nodal Agency.
Interest subsidy of up to 4 percent to Financial Institutions
including IREDA, Nationalized Banks etc. for captive power projectsof maximum ca acit 200 KW b industr .
P li d R l ti
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 73/79
Policy and Regulations (continued)
Energy Conservation Act –
2001
Focus on energy efficiency
Standards and labeling
Designated consumers requirements Energy conservation building codes
Energy conservation fund
Bureau of Energy Efficiency
P li d R l ti
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 74/79
Policy and Regulations (continued)
Electricity Act 2003
Combined several existing pieces of legislation
Intended to accelerate growth of power sector
Targets additional 10 percent from renewableby 2012 (1000 MW/year capacity)
Competitive market-based
P li d R l ti
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 75/79
Policy and Regulations (continued)
Electricity Act 2003
Features include
National Electricity Policy
De-licensing of generation and captive generation Public ownership of transmission companies
Open access in transmission
Freedom for distribution of licenses
Establishment of State Electricity RegulatoryCommissions
License-free generation and distribution in rural areas
Polic and Reg lations
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 76/79
Policy and Regulations (continued)
Provisions and activities impacting the powersector:
Elimination of ceiling on foreign equity participation
Streamlining the procedure for clearance of powerprojects
Establishment of the Central Electricity RegulatoryCommission
Formulating an action plan to set up the National
Policy and Regulations
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 77/79
Policy and Regulations (continued)
State reforms impacting the power sector: Unbundling the State Electricity Boards (SEB) into
separate generation, transmission and distributioncompanies
Privatizing the generation, transmission and distributioncompanies
Setting up independent state electricity regulatorycommissions
Making subsidy payments for subsidized categories of
customers by state governments Making tariff reforms by state governments
enabling legislation and operational support extended tothe SEB/utility
improving operations of SEBs, particularly with regard to
better management practices, reduction of transmission
Road ahead
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 78/79
Road ahead…
Given the time remaining for exhaustion ofconventional sources, power would majorly beproduced from Renewable sources of energy
– Wind, Water, Sun, Biomass etc.
With huge support from the government,overall production capacity of the RES powerplants is likely to expand exponentially in thenext decade.
8/3/2019 Power Industry - India
http://slidepdf.com/reader/full/power-industry-india 79/79
Thank You