Download - Pmi - Sam 3 (Star Tcc) Trip 3

Transcript

8/17/2019 Pmi - Sam 3 (Star Tcc) Trip 3

http://slidepdf.com/reader/full/pmi-sam-3-star-tcc-trip-3 1/1

TRAMO 3

TRAMO 5

F-SAM3ChanceFuse Link (K)Fast6A

TRAMO 2

TRAMO 4

R-BACKUS - 3P7.217kA @ 10kV(Asym)

R-BACKUS - PTrip 3

F-SAM3 - 3P

1.808kA @ 10kV(Asym)

F-SAM3 - 3P

1.808kA @ 10kV(Asym)

10K.5 1 10 100 1K5 50 500 5K

Amps X 10 PMI (Nom. kV=10, Plot Ref. kV=10)

10K.5 1 10 100 1K5 50 500 5K

Amps X 10 PMI (Nom. kV=10, Plot Ref. kV=10)

1K

.01

.1

1

10

100

.05

.5

5

50

500

S e c o n

d s

1K

.01

.1

1

10

100

.05

.5

5

50

500

S e c on d s

ETAP Star 12.6.0H

PMI - SAM 3

Project: Coordinacion Playas del Sur Location: CañeteContract: Luis Alata ContrerasEngineer: Ing. César Chilet

Fault: Phase

SAM 3

10 kV

SAM 2

10 kV

SAM 1

10 kV

PMI

10 kV

MT2

10 kV

TRAMO 2

O-->I R-BACKUS

TRAMO 3

TRAMO 4

TRAMO 5

F-SAM3

R-BACKUS