© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
Photo Album for
Murray City Fire Department, UT
Job 33664
July 26, 2019
This week your cab completed the paint process, your
chassis was assembled, your pumphouse went
through the paint process, and your body completed
the paint process. Next week your cab may begin the
content installation process, your chassis may begin to
have powertrain components installed, and your body
may begin to have trim and wiring installed.
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04015 DSC04016
DSC04017 DSC04018
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04019 DSC06881
DSC06882 DSC06883
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC06884 DSC06885
DSC00341 DSC00342
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00343 DSC00344
DSC00345 DSC07126
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC07127 DSC07128
DSC07129 DSC07130
Top Related