8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
1/27
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
2/27
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
Chelsea 5
Chelsea 4
Chelsea 3
Chelsea 2
Chelsea 1KC51
KC50
KC4 (KC56)Chelsea 6
Nine Elms 7
Nine Elms 6
W3
Vol 16 Figure 4.4.1for PEIR
Chelsea Embankment ForeshoreAir Quality and Odour -
Air Quality Monitoring Locations
Title:
Map Ref : ........................ .... 1PL03-AQ-10064Date : ............ .................. .... 2011/09/30Projection : ................ .......... British National Grid
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued
incomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be
Acquired or Used
!(Existing Local Authority
Continuous Monitors
!(Existing Local AuthorityDiffusion Tubes
!(New Diffusion Tubes(Project)
0 70 140 210 28035
Metres
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
3/27
TCBs
Monument
9.5m
Chelsea Reach
MHW
Shingle
12.4m
11.0m
ShingleMHW
Shingle
CHELSE
AEMBA
NKMENT
4.3m
4.9m
4.9m
RiverTh
ames
5.4m
(ArmyPensioners)
Chelsea
Reach
7.5m4.3m
rial
MeanHigh
Water
Royal Hospital
Pavilio
nC
ourt
1to5
15
CR
B
oroCons t&LBBd
y
BoroConst
,GL AslyCo
nst&LBBd
y
CCLW
!
!
!
!
#*
#*
")Q
!(
528480,177776
528342,177743
528505,177896
Trawl1
Trawl2
AL2
AL1
SE1
SE2
SW1
SW2
CS14X
528264,177840
Vol 16 Figure 5.4.1for PEIR
Chelsea Embankment ForeshoreAquatic Ecology
Sampling Locations
Title:
Map Ref : ......................... ... 1PL03-AE-20002Date : .............................. .... 2011/10/03Projection : ................ .......... British National Grid
0 20 40 6010
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,Paddington, London W2 1AF
Thames Water Utilities
Legend
Draft Limit of Land to beAquired or Used
!( CSO (Directly Controlled)
Airlift
")Q Quadrat
Seine Netting
#* Sweep/Kick Sample
! Coordinates of Sampling Area
Boat Fish Trawl
Sampling Area for Fish andBenthic Invertebrates
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
4/27
TCBs
Mu
Monument
9.5m
11.9m
Chelsea Reach
MHW
Shingle
MH
12.4m
11.0m
Shingle
M
Shingle
CHELSE
AEMB
ANKMEN
T
4.3m
4.9m
4.9m
RiverTh
ames
5.4m
Pensioners)
Chelsea
Reach
7.5m
4.3m
MeanHigh
Water
Hospital
Lister Hospital
4.3m
7.2m
GrosvP
avilio
nC
ourt
Water
1to
5
15
Hi
CR
BoroCons t&LBBd
y
BoroConst,
GL AslyCon
st&LBBdy
CCLW
A
A
A A
KENSINGTON & CHELSEA
WANDSWORTH
CITY OF WESTMINSTER
Vol 16 Figure 6.4.1for PEIR
Chelsea EmbankmentTerrestrial Ecology -
Phase 1 Habitat Survey
Title:
Map Ref : ........................ .... 1PL03-TE-40007Date : ............................. ..... 2011/10/03Projection : .................. ........ British National Grid
0 10 20 30 405
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
Legend
Draft Limit of Land to
be Acquired or Used
Local Authority Boundary
Scattered Trees
ACultivated/Disturbed Land
- Amenity Grassland
Hard Standing
Intertidal - Mud/Sand
Other - Tall Ruderal
Running Water
Scrub - Dense/Continuous
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
5/27
76
58
4
48
47
46
45
44 43
4139
38
37
36
31
3029
28 27
26
25
21
20
34-3532-33
40 42
49
5
3
2
1
17
10
9
18
19
19
50
16
15
14
13
12
11
Vol 16 Fig 7.4.1For PEIR
Chelsea Embankment ForeshoreHistoric Environment Feature
Title:
Map Ref : ........................ .... 1PL03-HE-60021Date : ............. ................. .... 2011/10/06Projection : .................. ........ British National Grid
0 25 50 75 10012.5
Meters
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
Legend
!( HE Feature/Findspot
") Past Investigation
" Statutorily Listed Building
HE Feature
Statutorily Listed Building
Wreck/Obstruction
Registered Park/Garden
Draft Limit of Landto be acquired or used
Study Area
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
6/27
3
6 2
7
5
4
9
1
8
Vol 16 Figure 8.4.1for PEIR
Chelsea Embankment ForeshoreLand Quality
Contaminative Land Uses
Title:
0 20 40 60 8010
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
Legend
Draft Limit of Land to be Acquiredor Used
Draft Limit of Land 250m Buffer
Past & present potentialcontamination sources
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Re f I te m I nfe rre d Da te o f
Operation
None
1 Timber Yard c1874-1896
2 Timber Yard c1875-1896
3 Dock c1896-1975
4
Battersea
Wharf c1896-1975
5
Disinfection
Station c1916-1973
6
Lister
Hospital
c1896 - present
7
Corporation
Depot
c1950-1967
8 De po t c 19 73
9
Electrical
Substation c1973
Off-site
On-site
Map Ref : ....................... ..... 1PL03-LQ-30002Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
7/27
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
8/27
&:&:
&:&:
&:
&:&:&:
&:
&:
"""
_
_
Vol 16 Figure 8.4.3for PEIR
Chelsea Embankment ForeshoreLand Quality - Environmental
Records and Waste Sites
Title:
Map Ref : ........................ .... 1PL03-LQ-30024Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid
0 20 40 60 8010
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Draft Limit of Land 250m Buffer
Waste
_ Past Potential Contaminated Industrial Uses" Registered Waste Transfer Sites
Hazards
&: Pollution Incidents to Controlled Waters_ Past Potentially Contaminated Industrial Uses
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
9/27
Lodge
(private)
El SubSta
EMBA
NKMEN
TGARDE
NS
10
4.8m
5
Chapel
Chap
el
(priv
ate)
6.8m
College Court
Great
Hall
se
19
18
20
TCB
Dock
MP
GROS
Viaduct
Dolphin
Mud
SL
MP
TCBs
MeanHighWater
Mud
SL
5.4m
SL
8.5m
123a
Monument
9.5m
SL
Bridge
11.9m
MHW
ChelseaReach
7.1m
MHW
SL
Viaduct
SL
Pumping Station
8.2m
MP
Shingle
Hard
GP
Western
RiverTha
MHW
FB
MP
Bridge
MPs
Chy
Viaduct
MHW
Chelsea12.4m
MP
11.0m
Grosvenor
SGantry
9.3m
Shingle
MHW
Dolphin
SL
Shingle
T u n n e l
GrosvenorCanal
MPs
8.5m
SL
124
Subway
PC
Shing le
MHW
Shingle
CHELSE
AEMB
ANKME
NT
4.3m
4.9m
Shingle
4.9m
23
17to2
0
4.8m
Tennis Courts
Festival PleasureGardens
22
6.6m
RiverTh
ames
5.4m
MeanHigh
Water
(Army Pensioners)
ChelseaR
each
ChelseaCo
urt
11to12
7.5m
21
Sluice
4.3m
Slopingm
asonry
War Memorial
Hard
MeanHigh
Water
CarPark
RoyalHospital
4.8m
5.2m
Shingle
CARR
IAGED
RIVEN
ORTH
5.1m
Lister Hospital
Gatliff
t16
Close
to
British T
1to20
164
R
S
Police Station
152
141
3
Transport1to120
177
Depot
PEABODYAV
153
1to16
1to20
58to73
GATLIFFROAD
PumpingStation
to
to
Chy
1to20
188
1to20
U
78
LB
DFn
CHELSE
ABRIDG
ERO
AD
FS
Figure
to
5.1m
38
to
Ranelagh
5.4m
117
5.1m
266
Royal Hospital
EBURYBRIDGE
ROAD
53
1to
42
Chelsea Gate
DFn
Statue
to
WellingtonBuildings
to
260
39
Stone
105
4.3m
5.8m
(siteof)
90
to
Stone
43to57
to
Court
Light Horse
237
52
66
79
116
249
261to
74
House
4.7m
21291to1
04
27
GATLIFF
7.2m
Ranelagh Gardens
Stone
Court
to
to
248
26
67
128
to
201
15
to
6.5m
ChelseaGardens to
MLW
MLW
MH&M
LW
MH&M
LW
EASTROA
D
1
to
1 4 2
WarwickBuildi n
g
Os wa ld
Bu i ld
in g
Centurion Building
HowardBuilding
1
to
159
1 to101
1to242
GrosvenorP
avilio
nC
ourt
Waterside
1to
5
15
Hirst Court
30
1t o48
10
Cubitt Building
1t o151
Grosvenor Waterside
HepworthCourt
1to97
20
Eus ta c e Bui l
in
1
to
1 7 0
P
Playground
Sw
ing
Br
idge
Bram
ah
Woods
House
1to198
WentworthCourt
4
House
9
BoroConst, GLAsly Con t
CR
Bor o
Cons t&
LB
Bdy
CCLW
BoroConst,
GLAslyCon
st &LBBdy
CCLW
CR
CR
Chelsea Gardens
Embankment Gardens
Pavilion Court
WANDSWORTH
KENSINGTON & CHELSEA
CITY OF WESTMINSTER
Vol 16 Figure 9.4.1for PEIR
Chelsea Embankment ForeshoreNoise and Vibration -Residential Receptors
Title:
Map Ref : ....................... ..... 1PL03-NV-40002Date : ............................. ..... 2011/09/30Projection : .................. ........ British National Grid
0 25 50 75 10012.5
Metres
Mapping reproduced by permission of Ordnance Survey on
behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
Legend
Draft Limit of Land to
be Acquired or Used
Local Authority Boundary
Residential Receptors
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
H
u
tim
..
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
10/27
!(
!(
!(!(
1
Lodge
(private)
El SubSta
EMBA
NKMEN
TGARDE
NS
TA
10
4.8m
5
r r
Chapel
nni urt
Chap
el
(priv
ate)
6.8m
College Court
TA
A
Great
Hall
se
1
19
18
2
TCB
Dock
MP
GRO
Viaduct
Dolphin
Mud
SL
MP
TCBs
Mean HighWater
Mud
SL
5.4m
SL
8.5m
123a
Monument
9.5m
SL
Bridge
11.9m
MHW
ChelseaReach
7.1m
MHW
SL
Viaduct
SL
Pumping Station
8.2m
MP
Shingle
Hard
GP
Western
RiverTha
MHW
FB
MP
Bridge
MPs
Chy
Viaduct
MHW
Chelsea12.4m
MP
11.0m
Grosvenor
SGantry
9.3m
Shingle
MHW
Dolphin
SL
Shingle
T u n n e l
GrosvenorCa
nal
MPs
8.5m
SL
124
Subway
PC
Shingle
MHW
Shingle
CHELS
EAEMB
ANKME
NT
4.3m
4.9m
Shingle
4.9m
23
17to2
0
4.8m
Tennis Courts
Festival PleasureGardens
22
6.6m
RiverTh
ames
5.4m
MeanHigh
Water
(Army Pensioners)
ChelseaRe
ach
ChelseaCo
urt
11to12
7.5m
21
Sluice
4.3m
Slopingm
asonry
War Memorial
Hard
MeanHigh
Water
CarPark
RoyalHospital
4.8m
.
5.2m
Shingle
CARR
IAGE
DRIVE
NORTH
5.1m
.
e
Lister Hospital
Gatliff
t1
6
Close
to
British T
I
1to20
164
t
R
t2
l y r un
S
t
Police Station
t2
152
141
t2
3
Transport1to120
l
u
t
mli
t t e
177
E
IE
L
E
2
Depot
PE
AB
OD
YA
V
153
1to
16
33
1to20
58to73
t
GATLIFFROAD
PumpingStation
to
to
t
r
t
Chy
1to20
t2
188
1to20
U
78
LB
DFn
CHELSEABR
IDGE
ROAD
FS
Figure
to
5.1m
38
.
to
Ranelagh
5.4m
117
5.1m
266
Royal Hospital
EBURYBRIDGE
ROAD
53
L
1to
42
Chelsea Gate
DFn
Statue
to
WellingtonBuildings
to
260
39
Stone
105
4.3m
5.8m
(siteof)
90
to
Stone
43to57
to
Court
Light Horse
237
52
66
79
116
249
261to
74
House
4.7m
21291to104
27
GATLIFF
7.2m
Ranelagh Gardens
Stone
Court
to
to
248
26
67
128
to
201
15
to
6.5m
ChelseaGardens to
MLW
MLW
MH&M
LW
MH&M
LW
EASTROAD
1
1
to
1 4 2
WarwickBu
ilding
Os wa ld Bu ild in g
Centurion Building
HowardBuil d
ing
1
to
159
1 t o 101
1to242
GrosvenorP
avilio
nC
ourt
Waterside
1to
5
15
Hirst Court
30
1t o48
10
Cubitt Building
1t o151
Grosvenor Waterside
HepworthCourt
1to97
20
Eus ta c e B
uilin
1
to
1 7 0
1
P
Playground
Swing
Bridge
Bram
ah
Woods
House
1to
198
WentworthCourt
4
House
9
BoroConst, GLAsly Con t L y
CR
Bor oCons t&
LB
Bdy
CCLW
BoroConst,G
LAslyConst
&LBBdy
CCLW
y
CR
CR
CS13B
CS13A
CS15X
8
7
6
5
4
3
2
1
1
1
CS14X
Vol 16 Figure 10.4.1for PEIR
Chelsea Embankment ForeshoreSocio-Economic - Context Plan
Title:
Map Ref : ......................... ... 1PL03-SE-20007Date : .............................. .... 2011/10/04Projection : ................ .......... British National Grid
0 20 40 60 80 10010
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,Paddington, London W2 1AF
Thames Water Utilities
Legend
Draft Limit of Land to beAcquired or Used
!( CSO (Directly Controlled)
!( CSO (Indirectly Controlled)
Site Context Features
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Site Context Features1. Thames Path and National Cycle Route2. Residential3. Ranelagh Gardens4. Royal Hospital South Grounds5. Royal Hospital Chelsea6. Lister Hospital7. Battersea Park8. Grosvenor Rail Bridge
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
11/27
KENSINGTON & CHELSEA
WANDSWORTH
CITY OF WESTMINSTER
Vol 16 Figure 11.4.1for PEIR
Chelsea Embankment ForeshoreTownscape and VisualDevelopment Pattern
and Scale
Title:
Map Ref : ........................ .... 1PL03-TS-40008Date : ............. ................. .... 2011/10/04Projection : ................. ......... British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Legend
Draft Limit of Land tobe Acquired or Used
Local Authority Boundary
Building Heights
(mts)
0 - 20m
20 - 40m
40 - 60m
60 - 80m
80 - 100m
>100m
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
12/27
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(!(
!(
!(
!(!(!(!(!(
!(
!(
!(!(
!(!(
!(
!(
!(
CHRI
STCHUR
CHSTR
EET
CAVE
RSHA
MSTRE
ET
ROYALH
OSPIT
ALRO
AD
CHRIST
CHU
RCH
EMBA
NKMENT
GARD
ENS
WES
TRO A
D
CLO
VERM EWS
PHYS
ICPL
ACE
CHELSE
AEMBA
NKMENT
NS
TERRACE
TITES
TREET
SWAN W
ALK
PARADISE
WALK
DILKE ST
REET
THEP AR
AD E
CARRIA
GE
DRIVE
NORTH
CARRIAGEDRIVEW
EST
TerraceWalk
WOODFALL
STRE
ET
TEDW
ORTH
DURH
AMPLAC
E
SMITHS
TREET
SMITH
FRANKLIN'SR
OW
SQUA
RE
TERR
ACE
ELYT A
LACE
TERR
ACE
AND
ERSO
NSTR
EET
T RYO
N
RAL
STO
NSTREE
T
CHR
ISTC
HUR
CH
STRE
ET
WELLIN
GTO
N
STLEO
NARD
'STERRA
CE
WA L
POLE
STR EET
SQU A R E
CHELTENH
AM
B Y W A T E R S T R E E T
OR MON D
EGA TE
ST REET
ROYA
LA VEN U
E
TEDW
ORTH
SQUA
RE
KIN
G'S ROAD
ROYA
LHO
SPITAL
ROA
D
TEDW
ORTH
GARDENS
OR M
ON D EGA TE
TITESTR
EET
GROSV ENOR ROAD
PAXTON TERRACE
CHELSE
AEMB
ANKME
NT
CARR
IAGED
RIVE
NORTH
PRI E F LERIE
C A R R I A G E D R I V E E A S T
SOPWITH
WAY
BATTER
SEAP
ARKRO
AD
PL
ER
CIRCUS
BRA
DMEAD
Q U E E N S T O WN R O A D
QUEEN'S
CARRIA
GED
RIVEEA
ST
CLAREND
ONSTREET
SUTHERLANDSTREET
WARWIC
KWAY
SUSSEX
STREET
SUTHE
RL AND
T U R P E N T I N E L A N
E
S U S S E X S T R E E T
P E A B O D Y A V
E N U E
ALD
ERNEYSTREET
CUMBERLA
NDSTREET
GATLIFFROAD
EBUR
YB
RID
GE
ROA
D
CAMB
RIDGESTREE
T
LUPUS S
TREET
CHURCHILL GARDEN S ROAD
ROW
W E S T M O R E L A N D T E
R R A C E
WESTMO
RELANDPLA
CE
WINCHESTE
RSTREET
STREET
CHELSEABRIDG
EROAD
SLOA N E
C OU R T
EA S
T
LOWER
P
R E S T R E E T
E B U R Y
B R I D
G E
R O A D
ROYALH
OSPIT
ALRO
AD
RANELA
GHGRO
VE
SLOA N E
C OU R T
WES
T
STB A
R N A
B A S
BLOOM
FIELD TE
RRACE
HOL
BEIN
PLACE
SLOANE STRE
ET
GATLIFF
BUH
EPL
E
TURK
S RO
W
HOLBEIN
MEWS
PIMLICO
ROA
D
GARDENS ROAD
G VE
CHURCHIL L
WARWICKSQUARE
LUPUSST
REET
GLOU
CESTER
STREET
WINCH
ESTER STREET
CUMBERLA
ND STREET
WARWICKSQUARE
WARW
ICKSQUAR
GLASGOWTERRACE
GLOU
CESTER
STR
EET
CAMBR
IDGESTREET
ALDERNEYSTR
EET
DENBIG
HPLA
CE
J H
'
L
E
STGEORGE' SDRI VE
BATTE
RSEA
PARKR
OAD
CRINGLE STREET
KIRT LI NG
S TREET
L
REE
STEWART' S
ROAD
SAVONA STRE
ET
THESSA
LYROAD
EA ST
R OA D
STBA RNABASM EWS
KENSINGTON & CHELSEA
WANDSWORTH
CITY OF WESTMINSTER
Vol 16 Figure 11.4.2for PEIR
Chelsea Embankment ForeshoreTownscape and Visual
Pattern and Extentof Vegetation
Title:
Map Ref : ........................ .... 1PL03-TS-40039Date : ............. ................. .... 2011/10/05Projection : ................. ......... British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Legend
Draft Limit of Land to
be Acquired or Used
Local Authority Boundary
!(
Known TreePreservation Orders
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
13/27
Ci
KENSINGTON & CHELSEA
WANDSWORTH
City of Westminster
Battersea Park
Ranelagh Gardens
Burtons Court
Chelsea Hospital Gardens
Chelsea Physic Garden
Vol 16 Figure 11.4.3for PEIR
Chelsea Embankment ForeshoreTownscape and Visual
Open SpaceDistribution and Type
Title:
Map Ref : ........................ .... 1PL03-TS-40132Date : ............................. ..... 2011/10/06Projection : .................. ........ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Legend
Draft Limit of Land tobe Acquired or Used
Local Authority Boundary
Metropolitan Open Land
Historic Parksand Gardens
Designated Open Space
(RBKC UDP)
Public Open Space
Private Open Space
ROYA
LHOSP
ITALROAD
EBURYBR
IDGE
ROAD
LUPUSSTREE
T
BATT
ERSE
APAR
KROA
D
QUEENSTOWNROAD
CHELSEAEMBA
NKMENT
CHELSEAEM
B
ANKMENT
GROSVENORROAD
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
14/27
KENSINGTON & CHELSEA
WANDSWORTH
CITY OF WESTMINSTER
Vol 16 Figure 11.4.4for PEIR
Chelsea Embankment ForeshoreTownscape and Visual
Transport Network
Title:
Map Ref : ........................ .... 1PL03-TS-40075Date : ............................. ..... 2011/10/05Projection : .................. ........ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Legend
Draft Limit of Land to
be Acquired or Used
Local Authority Boundary
Rail
Thames Path
London Cycle Routes
A Road
ROYA
LHOSP
ITALROAD
EBURYBR
IDGE
ROAD
LUPUSSTREE
T
BATT
ERSE
APAR
KROA
D
QUEENSTOW
NROAD
CHELSEAEMBA
NKMENT
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
15/27
WANDSWORTH
KENSINGTON & CHELSEA CITY OF WESTMINSTER
Battersea Park Conservation Area
Pimlico Residential
Battersea Industrial
Royal Hospital Conservation Area Residential
Royal Hospital Conservation Area - Grounds
Chelsea Residential
Belgravia Industrial
Belgravia Residential
Battersea Residential
Belgravia Residential
Grosvenor Bridge Rail
Royal Hospital Conservation Area - Ran elagh Gardens
Battersea Park ConservationArea Residential Area
Vauxhall commercial
River Thames - Royal Hospital & Battersea Park Reach
River Thames - Nine Elms Reach
Vol 16 Figure 11.4.5foe PEIR
Chelsea Embankment ForeshoreTownscape and VisualTownscape Character
Areas
Title:
Map Ref : ......................... ... 1PL03-TS-40158Date : ............................. ..... 2011/10/06Projection : .................. ........ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey on
behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Legend
Draft Limit of Land tobe Acquired or Used
Local Authority Boundary
Townscape CharacterArea Boundary
Conservation Areas
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
16/27
.
.
.
.
.
.
.
.
Kennsington and Chelsea
City of Westminster
KENSINGTON & CHELSEA
WANDSWORTH
CITY OF WESTMINSTER
9A.1
1.2
1.1
2.4
2.6
2.3
2.1
2.8
1.3
Vol 16 Figure 11.4.6for PEIR
Chelsea Embankment ForeshoreTownscape and VisualViewpoint Locations
Title:
Map Ref : ......................... ... 1PL03-TS-40105Date : .............................. .... 2011/10/06Projection : ................ .......... British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey on
behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
Legend
Draft Limit of Land to
be Acquired or Used
Local Authority Boundary
. Viewpoints
Zone of TheoreticalVisibility
LVMF Linear Views
Verifiablephotomontage locations
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
LVMF Linear Views:
9A.1 - King Henry VIII's Mound,Richmond to St Paul's Cathedral
Viewpoint Locations:
1.X - Residential receptors2.X - Rereational receptors
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
17/27
kk
kk
kk
kk
Chelsea Embankment Foreshore
A3212
A3212
A3216
Chelsea Embankment
Chelsea Bridge Road
WANDSWORTH
CITY OF WESTMINSTER
KENSINGTON & CHELSEA
Title:
Map Ref : ........................ .... 1PL03-TT-50143Date : .......................... ........ 2011/10/05Projection : ............... ........... British National Grid
0 30 60 90 12015
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
Legendkk Site Access
Construction Traffic Routes
Primary Route
Secondary Route
Transport for London Road Network
Strategic Road Network (SRN)
London Cycle Routes
Thames Path
Draft Limit of Land to be Acquired or Used
Local Authority Boundary
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Volume 16 Figure 12.2.1for PEIR
Chelsea Embankment ForeshoreTransport - Construction
Traffic Routes
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
18/27
#*
Chelsea Embankment Foreshore
Western Pumping Station
A3212
A3212
A3216
44,137,360,452
360
44
360
44,137,452
C10
137,360,452
Chelsea Embankment
CITY OF WESTMINSTER
KENSINGTON & CHELSEA
WANDSWORTH
Title:
Map Ref : ........................ .... 1PL03-TT-50121Date : .......................... ........ 2011/10/05Projection : ............... ........... British National Grid
0 30 60 90 12015
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
Legend#* Pumping Station
Bus Stop
Bus Route
Transport for London Road Network
Strategic Road Network (SRN)
London Cycle Routes
Thames Path
Draft Limit of Land to be Acquired or Used
Local Authority Boundary
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Volume 16 Figure 12.4.1for PEIR
Chelsea Embankment ForeshoreTransport - Local Site Plan
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
19/27
!
!2.29
2.28
Vol 16 Figure 15.4.1for PEIR
Chelsea Embankment ForeshoreFlood Risk
EA Flood Zones
Title:
Map Ref : ........................ .... 1PL03-FL-20005Date : ............. ................. .... 2011/09/30Projection : .................. ........ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Thames Tidal Defences
! Water Level Node
EA Flood Zone 3
EA Flood Zone 2
Note: Water Level Node - Thames TidalJoint Probability Extreme Water Levels 2008
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
20/27
Lodge
(private)
El SubSta
EMBA
NKMEN
TGARDE
NS
10
4.8m
5
Chapel
Chap
el
(priv
ate)
6.8m
College Court
Great
Hall
se
19
18
20
TCB
Dock
MP
GROS
Viaduct
Dolphin
Mud
SL
MP
TCBs
MeanHighWater
Mud
SL
5.4m
SL
8.5m
123a
Monument
9.5m
SL
Bridge
11.9m
MHW
ChelseaReach
7.1m
MHW
SL
Viaduct
SL
Pumping Station
8.2m
MP
Shingle
Hard
GP
Western
RiverTha
MHW
FB
MP
Bridge
MPs
Chy
Viaduct
MHW
Chelsea12.4m
MP
11.0m
Grosvenor
SGantry
9.3m
Shingle
MHW
Dolphin
SL
Shingle
T u n n e l
GrosvenorCanal
MPs
8.5m
SL
124
Subway
PC
Shing le
MHW
Shingle
CHELSE
AEMB
ANKME
NT
4.3m
4.9m
Shingle
4.9m
23
17to2
0
4.8m
Tennis Courts
Festival PleasureGardens
22
6.6m
RiverTh
ames
5.4m
MeanHigh
Water
(Army Pensioners)
ChelseaR
each
ChelseaCo
urt
11to12
7.5m
21
Sluice
4.3m
Slopingm
asonry
War Memorial
Hard
MeanHigh
Water
CarPark
RoyalHospital
4.8m
5.2m
Shingle
CARR
IAGED
RIVEN
ORTH
5.1m
Lister Hospital
Gatliff
t16
Close
to
British T
1to20
164
R
S
Police Station
152
141
3
Transport1to120
177
Depot
PEABODYAV
153
1to16
1to20
58to73
GATLIFFROAD
PumpingStation
to
to
Chy
1to20
188
1to20
U
78
LB
DFn
CHELSE
ABRIDG
ERO
AD
FS
Figure
to
5.1m
38
to
Ranelagh
5.4m
117
5.1m
266
Royal Hospital
EBURYBRIDGE
ROAD
53
1to
42
Chelsea Gate
DFn
Statue
to
WellingtonBuildings
to
260
39
Stone
105
4.3m
5.8m
(siteof)
90
to
Stone
43to57
to
Court
Light Horse
237
52
66
79
116
249
261to
74
House
4.7m
21291to1
04
27
GATLIFF
7.2m
Ranelagh Gardens
Stone
Court
to
to
248
26
67
128
to
201
15
to
6.5m
C
helseaGardens to
MLW
MLW
MH&M
LW
MH&M
LW
EASTROA
D
1
to
1 4 2
WarwickBuildi n
g
Os wa ld
Bu i ld
in g
Centurion Building
HowardBuilding
1
to
159
1 to101
1to242
GrosvenorP
avilio
nC
ourt
Waterside
1to
5
15
Hirst Court
30
1t o48
10
Cubitt Building
1t o151
Grosvenor Waterside
HepworthCourt
1to97
20
Eus ta c e Bui l
in
1
to
1 7 0
P
Playground
Sw
ing
Br
idge
Bram
ah
Woods
House
1to198
WentworthCourt
4
House
9
BoroConst, GLAsly Con t
CR
Bor o
Cons t&
LB
Bdy
CCLW
BoroConst,
GLAslyCon
st &LBBdy
CCLW
CR
CR
"/
"/"/
"/Noise 3
Noise 2Noise 1
Noise 4
WANDSWORTH
KENSINGTON & CHELSEA
CITY OF WESTMINSTER
Vol 16 Figure C.1for PEIR
Chelsea Embankment ForeshoreNoise and Vibration -
Noise Measurement Locations
Title:
Map Ref : ....................... ..... 1PL03-NV-40019Date : ............................. ..... 2011/09/30Projection : .................. ........ British National Grid
0 25 50 75 10012.5
Metres
Mapping reproduced by permission of Ordnance Survey on
behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
LegendDraft Limit of Land tobe Acquired or Used
Local Authority Boundary
"/ Noise Survey Locations
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
21/27
!.!.
!.
!.
!.
!H
!H
!H!H
!H
!H
!H!H!H
!H
!H
!H!H
!H!H
!H!H!H
!H
!H!H
!H
!H
!H
!H
!H
!H!H
!H
!H
!H
Chelsea Embankment Foreshore
SR1095
SR1092SR1091
SR1087
SR1086
SR1083
SA1096SA1084
SA1082
PR1094
PR1088
PR1085
PR1081
SR1087A
PR1088A
SR2076
SR2075
SR2074
SR2073 SR2072
SR2071
SR2070
SR2069
SR2068SR2067
SR2066 SR2065
SA2064
SA2063
WANDSWORTH
KENSINGTON & CHELSEA
CITY OF WESTMINSTER
LAMBETHHAMMERSMITH & FULHAM
Title:
Map Ref : ......................... ... 1PL03-WR-20004Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or UsedThames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
LTT 2009 GI Drilled Boreholes
!H Land
!H Marine
LTT 2011 GI Proposed Boreholes
!. Land
!. Water
Superficial Geology
Alluvium
Kempton Park Gravel Member
Langley Silt Member
Taplow Gravel Formation
Vol 16 Figure E.1for PEIR
Chelsea Embankment ForeshoreGroundwater
Superficial GeologyThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
22/27
!.!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.!.!.
!.
!.
!.!.
!.!.
!.!.!.
!.
!.!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
Chelsea Embankment Foreshore
WANDSWORTH
KENSINGTON & CHELSEA
CITY OF WESTMINSTER
LAMBETHHAMMERSMITH & FULHAM
60
70
SR1095
SR1092
SR1089
SR1087
SR1086SR1083SA1096
SA1084
SA1082
PR1094
PR1090
PR1088
PR1085
PR1081
SR1087APR1088A
SR2075
SR2074
SR2073
SR2071
SR2070
SR2069SR2068
SR2067
SR2066 SR2065
SA2064
SA2063
Title:
Map Ref : ......................... ... 1PL03-WR-20059Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Thames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
LTT 2009 GI Drilled Boreholes
!. Land
!. Marine
LTT 2011 GI Proposed Boreholes
!. Land
!. Water
EA Chalk Piezometric Level(mATD) - January 2008
Solid Geology
London Clay Formation
Vol 16 Figure E.2for PEIR
Chelsea Embankment ForeshoreGroundwater - Solid Geology
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
23/27
AAA
A
A
D
D
Chelsea Embankment Foreshore
WANDSWORTH
KENSINGTON & CHELSEA
CITY OF WESTMINSTER
LAMBETHHAMMERSMITH & FULHAM
PGWU1414
PGWU2139
TQ27-284A
TQ27-284BU
60
70
TQ27-88
TQ27-334
Title:
Map Ref : ......................... ... 1PL03-WR-20060Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or UsedThames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
D EA Water Quality Monitoring Locations
EA Groundwater Level Monitoring Locations
A Historical Data Available
A Recent Data AvailableEA Chalk Piezometric Level(mATD) - January 2008
Superficial Geology
Alluvium
Kempton Park Gravel Member
Langley Silt Member
Taplow Gravel Formation
Solid Geology
London Clay Formation
Vol 16 Figure E.3for PEIR
Chelsea Embankment ForeshoreGroundwater
EA Monitoring LocationsThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
24/27
")
:
:
::
::
:
:
:
:
:
Chelsea Embankment Foreshore
WANDSWORTH
KENSINGTON & CHELSEA
CITY OF WESTMINSTER
LAMBETHHAMMERSMITH & FULHAM
W1
60
70
90
82 87
72
250
210
205
162
107
193
8
130
Title:
Map Ref : ......................... ... 1PL03-WR-20061Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Thames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
GSHP Scheme: Chalk: Thanet Sands
LA Groundwater Unlicensed Abstractions
") Chalk
EA Chalk Piezometric Level
(mATD) - January 2008
Superficial Geology
Alluvium
Kempton Park Gravel Member
Langley Silt Member
Taplow Gravel Formation
Solid Geology
London Clay Formation
Vol 16 Figure E.6for PEIR
Chelsea Embankment ForeshoreGroundwater - GSHP
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
25/27
Chelsea Embankment Foreshore
WANDSWORTH
KENSINGTON & CHELSEA
CITY OF WESTMINSTER
LAMBETHHAMMERSMITH & FULHAM
60
70
Title:
Map Ref : ......................... ... 1PL03-WR-20005Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Thames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
EA Chalk Piezometric Level(mATD) - January 2008
Source Protection Zones
Zone I (Inner Protection Zone)
Zone II (Outer Protection Zone)
Superficial Geology
Alluvium
Kempton Park Gravel Member
Langley Silt Member
Taplow Gravel Formation
Vol 16 Figure E.7for PEIR
Chelsea Embankment ForeshoreGroundwater - SPZThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
26/27
110-RG-ENV-PKC4X-000110
8/3/2019 PEIR_Vs Chelsea Embankment Foreshore Part 2
27/27
Phase two consultation (Autumn 2011)
For further information see our website:www.thamestunnelconsultation.co.uk
or call us on 0800 0721 086