PBN - What’s new from ICAO?
Session 1 – PBN from 35,000’
Erwin Lassooij ICAO PBN Programme Manager,
16 October 2012
Outline
Formal training courses
ICAO Actions
B
E
C
D
A PBN guidance material, workshops,
symposia
PBN computer-based learning packages
Support for the ASBU provisions enabled
by PBN
Continuing PBN standards
development and amendment
3 PBN Symposium and Workshops, 16-19 October, 2012
Guidance material framework
• RNP AR Procedure Design Manual
(Doc 9905) • PBN Ops Approval Manual (Doc 9997)* • Manual on PBN Use in Airspace Design
(Doc 9992)* • CDO Manual (Doc 9931) • CCO Manual (Doc 9993)* • GNSS Manual (Doc 9849) • Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906)
* New
Annexes and PANS
4 PBN Symposium and Workshops, 16-19 October 2012
PBN iKIT
Provides the main stakeholders with essential information, practical documentation and guidance material on PBN in relation to their area.
Int’l Airport Approach Type – All Regions Monitoring and Measurement
Heading in the right direction, but are we on target?
6
PBN Symposium and Workshops, 16-19 October 2012
Implementation plans
104 out of 191 States submitted plan
7
PBN Symposium and Workshops, 16-19 October 2012
Actual implementation of PBN approaches (LNAV, LNAV/VNAV, LPV, RNP AR)
30% PBN implementation on intl rwys
WWW.ICAO.INT/PBN
A – Symposia and Workshops
PBN Symposium and Workshops, 16-19 October 2012 8
FAA/Eurocontrol Introductory Seminars ICAO Regional Seminars Airspace Concept Workshops –CDO/CCO IATA/ICAO GO Team Visits
9 PBN Symposium and Workshops, 16-19 October 2012
B- Computer Based Learning Packages
PBN Overview
• Module 1 & 2
Operational Approval Airspace Design
10
• Operational Approval
• Airspace Concept
PBN Symposium and Workshops, 16-19 October, 2012
C – Formal Training Courses
In development
11
• Improve Block 0
– Better flight procedures
– Better separation/route spacing
– Improve connections with industry Standards
– Improve guidance
PBN Symposium and Workshops, 16-18 October 2012
D- Continuing PBN Standards Development and Amendment
12
• Block 0 procedures and guidance is there
• Momentum is there……. …….but we need to speed up.
• Focus on implementation
– PBN Task forces – Direct assistance stakeholders – Education – Expansion on FPP concept
PBN Symposium and Workshops, 16-19 October 2012
D - Continuing PBN Standards Development, Amendment and Support
80% 20%
13
• Endorsement of Instrument procedure design organizations
• To assist States with Implementation
PBN Symposium and Workshops, 16-19 October 2012
Endorsement
Name of Organization
Efficient Flight Path
Through Trajectory-based Operations
Approach with vertical
guidance
Improved Flexibility & Efficiency in Descent/Climb Profiles (CDO/CCOs)
Block 0
Block 2
Optimised Arrivals in
Dense Airspace
Block 3
Full 4D Trajectory
based Operations
Block 1
Further improved
Flexibility & Efficiency in
Descent/climb Profiles
(CDO/CCO’s)
E – Support for ASBU Provisions enabled by PBN
14
15
• PBN highest priority
• Block 0 is ready
• We all need to
expedite implementation together
PBN Symposium and Workshops, 16-19 October, 2012
Summary
What we think, or what we know, or what we believe is, in the end, of little consequence. The only consequence is what we do.
—John Ruskin
Erwin Lassooij ICAO PBN Programme Manager