post base shown with optional 2-3/8" Star (56623)
OZCO Project #301 - Deck Pergola with 6x6 Posts
OZCO Project #301 - Deck Pergola with 6x6 Posts
1V2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
One Page Process #:
Printing Documents from ISSUU
Unfortunately, there is currently no way to print content directly through issuu. To print a publication, you will need to download it and print it from your computer.
4002
One of Two Access Points for ISSUU
You MUST create an account with Issuu or log in with Facebook or Google+
Select the “Download” Option & Save the File to an easily accessed location.
“Open” the downloaded file, View and/or Print as you want.
Below the publication is a word “Share” click it Below the publication is an icon click it
WEBSITE DIRECT
245696.69
= =
4877
192.00
4121
162.25
2853
112.31
Overview-FrontOZCO Project #301 - Deck Pergola with 6x6 Posts
2V2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
37014.56 typ
CL
CL
4877
192.00
3658
144.00
Overview-TopOZCO Project #301 - Deck Pergola with 6x6 Posts
3V2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
= =
2902
114.25
220586.81
Overview-RightOZCO Project #301 - Deck Pergola with 6x6 Posts
4V2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
73 12 4 5 6 10 118912
Bill of MaterialOZCO Project #301 - Deck Pergola with 6x6 Posts
5V2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
ITEM NO. QTY. PART
NUMBER DESCRIPTION
1 4 6x6 Cedar Post 6x6x96.00
2 42x10
Cedar Board
2x12x144.00
3 12 2x6 Cedar Board 2x6x144.00
4 22x10
Cedar Board
2x10x192.00
5 4 6x6 Cedar Support 6x6x36.00
6 4 6x6 Cedar Support 6x6x48.00
7 3.2 517172" Standard
Rafter Clip (RC-IW-2)
8 4 51737Post to Beam
Bolt Inline (P2B-BI-IW)
9 4 51708 6x6 Post Base (6x6-PB-IW)
10 0.96 56628Screw, OWT 5-3/4" (145mm) Timber with
HCN0.1 56621 1 1/2" Hex Cap
Nut (HCN)11 4 56652 OWT Timber
Bolt 10-12"
12 0.64 56625Screw, OWT 1-3/4" (45mm) Timber with
HCN0.1 56621 1 1/2" Hex Cap
Nut (HCN)
Suggested Tools(others may be required)OZCO Project #301 - Deck Pergola with 6x6 Posts
6V2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
56621
OZCO14OZCO Project #301 - Deck Pergola with 6x6
PostsV2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
56625
optional56623
51737
51708
51717 56628
56652
2x10 Cedar Board16 with 45 deg cuts
1024.00 X 45°
4877
192.00
Cutlist14OZCO Project #301 - Deck Pergola with 6x6
PostsV2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
2x6 Cedar Board12 with Chamfer 2" ends
51
2.00 X 45°
3658
144.00
6x6 Cedar Support4
45°
121948.00
6x6 Cedar Support3
45°
914
36.00
6x6 Cedar Post8
243896.00
2x10 Cedar Board12 with 45 deg cuts
1024.00 X 45°
3658
144.00
4067
160.13
4965
195.48
2848
112.13
if site is not level,see Ozco Site Leveling instruction
Locate desiredcenter of structure
Site Plan14OZCO Project #301 - Deck Pergola with 6x6
PostsV2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
step 114OZCO Project #301 - Deck Pergola with 6x6
PostsV2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
Tool Required3/8" Driver
(Hex Cap Nut)provided
(OWT Screw)provided
Beam
see "Overview-Right" page forBeam spacing
= =
step 214OZCO Project #301 - Deck Pergola with 6x6
PostsV2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
Tool Required3/8" Driver
(Hex Cap Nut)provided
(OWT Screw)provided
Beam =
=
step 314OZCO Project #301 - Deck Pergola with 6x6
PostsV2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
Tool Required3/8" Driver
(Hex Cap Nut)provided
(OWT Screw)provided
step 414OZCO Project #301 - Deck Pergola with 6x6
PostsV2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
install in decorative (4"x4") pattern centered on post and beam
4 4
Tool Required3/8" Driver
(Hex Cap Nut)provided
(OWT Screw)provided
see "Overview-Top" page forPurlin spacing
Purlin
step 514OZCO Project #301 - Deck Pergola with 6x6
PostsV2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
Tool Required3/8" Driver
(Hex Cap Nut)provided
(OWT Screw)provided
Top Related