Our company
4877e
Voith Hydro
Sarajevo, 21.09.2010
Presentation | YYYY-MM-DD | 2
4011e
History: Voith and Voith Hydro
Presentation | YYYY-MM-DD | 3
The first steps
Johann Matthäus Voith started as repair mechanic, initially with five employees, servicing paper mills in southern Germany.
1867 January 1st is the official day of the formation of J.M. Voith. Johann Matthäus Voith hands over the business to his son Friedrich.1870 Start of manufacture of hydraulic turbines.
4012e
Johann Matthäus Voith Friedrich Voith
Presentation | YYYY-MM-DD | 4
Internationalization and growth
1903 Founding of J.M. Voith in St. Pölten, Austria.1903 First Voith Francis turbine for Niagara Falls.1913 Voith supports Viktor Kaplan in the development of the Kaplan turbine, with testing in the “Brunnenmühle“.1927 Voith grants S. Morgan Smith of York, USA, a licence for the manufacture of Kaplan turbines.
4013e
1903 Voith Niagara turbine Walther Voith Hermann Voith Hanns Voith
Presentation | YYYY-MM-DD | 5
Internationalization and growth
1945 At the end of World War II Voith‘s employment had shrunk from 4,000 to merely 600.
1963 Voith Tolosa / Spain established.1964 Voith S.A. in São Paulo / Brazil established.
4013e
Hanns Voith and Konrad Adenauer
Presentation | YYYY-MM-DD | 6
Growth as a result of joint ventures and acquisitions
1983 Take-over of the hydro business of the US market leader Allis Chalmers in York.1997 The establishment of Voith AG, replacing J.M. Voith GmbH as the
Corporate Operative Holding.2000 Formation of the joint venture Voith Siemens Hydro Power Generation: Voith AG 65%, Siemens AG 35%.
4822e
Presentation | YYYY-MM-DD | 7
Milestones
4018e
RaccoonNiagara
1873 First Voith hydraulic turbine.
1903 First Pelton turbine.
1912 Niagara Falls, Canada: Voith twin
Francis turbines with a rating of
12 MW – the largest at the time.
1934 Pedreira, Brazil: First reversible
pump-turbine in the world with an
output of 5.3 MW.
1938 Sungari, China: The worldwide first
100 MVA generators.
1964 Roenkhausen, Germany: First
reversible motor and generator unit
in a German pumped storage station.
1969 El Chocon, Argentina: First generator
with a stator bore diameter of 16 m.
1970 Raccoon, USA: Largest pumped
storage machines in the world at the
time, with four 425 MVA units and
directly water-cooled stator and rotor.
Presentation | YYYY-MM-DD | 84019e
Milestones
Itaipu Itaipu
1974 Grand Coulee III, USA:
The world’s largest and most
powerful Francis turbines, with a
runner diameter of 9.1 m for
an output of 716 MW.
1976 Bath County, USA:
The world’s most powerful pump
turbines with an output of 458 MW.
1978 Itaipu, Brazil/Paraguay:
Complete mechanical design for the
world’s most powerful hydroelectric
plant (13,300 MW).
1988 Yacyretá, Argentina:
The largest and most powerful
Kaplan turbines in the Western world
rated at 154 MW and featuring a
runner diameter of 9.5 m.
Presentation | YYYY-MM-DD | 9
Milestones1992 Grand Coulee, USA: New water-
cooled stators for the largest hydro-electric generator in the world ratedat 826 MVA per unit (diameter: 23 m).
1995 First “fish-friendly“ turbine design in the hydro power industry.
1997 Three Gorges, China: Participation in the supply of turbines, generators
and electrical equipment for the most
powerful hydropower plant in the world currently under construction.
1998 Variable-speed pump turbine tech-nology for Goldisthal.
2000 Guangzhou II, China: Commissioning of the world’s largest pumped storage
plant (2,400 MW output). Four pump-turbines and motor-generator units from Voith Siemens Hydro.
4020e
Sanxia stator frame Grand Coulee GuangzhouII
Presentation | YYYY-MM-DD | 10
2002 Tai´an, China: the pumped storage plant has a total output of 1,000 MW and is a major contract in the Asian market.
2003 Omkareshwar, India: supply of eight Francis turbines andgenerators. This hydropower station is one of the largest in India with a total output of 520 MW.
2003 Longtan, China: supply of five of the seven Francis turbines.
With a total output of 4,900 MW it is among the world´s largest hydro power plants. 2004 Laxiwa, China: award for supplying five
711 MW Francis turbines for the biggest hydro project along the Yellow River with over 3 GW capacity.
4911e
Milestones
Presentation | YYYY-MM-DD | 11
2004 Kops II, Austria: Three sets of three-stage storage pumps with a rated output of 450 MW – one of the most important pumped- storage plants in Europe.2004 Goldisthal, Germany: the first variable-speed unit out of a total of four turbines in the most modern European pumped storage plant was going in commercial operation.
2005 Gilgel Gibe II, Ethiopia: award for supplying four 105 MW vertical Pelton turbines and four generators, rated at 125 MVA per unit.2005 Xiaowan, China: Award for supplying
six 714 MW Francis turbines in a consortium.
4043e
Milestones
Presentation | YYYY-MM-DD | 12
2006 Caojie, China: Supply of four vertical Kaplan turbines, each with an output of 128 MW and a runner diameter of 9.5 m.2006 Limberg II, Austria: Pump-turbines for a further new pumped storage plant with a total output of 480 MW.2006 Rheinfelden, Germany: with four Kaplan bulb turbines (total output of 100 MW) and related generators,
the largest investment in renewable energies in Germany.
2007 Jingping II, China: the largest-ever order for Voith Siemens Hydro Shanghai;
eight Francis turbines, each rated at600 MW.
2008 Ohio River, USA: largest order for Voith Siemens Hydro York: supply of the complete electro-mechanical equipment for three run-of-the-river hydroelectric plants.
4834e
Milestones
Caojie Limberg II
Presentation | YYYY-MM-DD | 13
4048d
Voith Group
Presentation | YYYY-MM-DD | 14
Conowingo
Voith – A company with 39,000 employees
A strong workforce, able to meet big challenges.
Team spirit and professionalism for our customers.
Reliable cooperation spanning all continents.
Presentation | YYYY-MM-DD | 154031e
Voith AG
Voith – Sales and employees by division
Voith Paper Voith Turbo Voith Hydro Voith IndustrialServices
GroupGroup Divisions
1 743 mio. EUR 1 232 mio. EUR 1 085 mio. EUR 1 018 mio. EUR 5 078 mio. EURSales
9 500 5 428 4 681 19 118 38 727Employees
Fiscal year 2008/2009
Presentation | YYYY-MM-DD | 16
Voith – Worldwide presence to the customer
More than 280 own production, service and sales locations.
Worldwide Research and Development network.
Presentation | YYYY-MM-DD | 17
Voith is innovative
Voith – where smart people like to work.
11,000 active patents. 400 new patents every year. Preference based on innovation. Investments for Research &
Development lie above industry average, with 5% of sales.
Presentation | YYYY-MM-DD | 18
40
22
d
The Division Voith Hydro
4022d
Presentation | YYYY-MM-DD | 19
4024e
Asia– Ankara / Turkey– Kawasaki / Japan– Shanghai / China– New Delhi (Noida) / India– Wando / Korea
Europe– Heidenheim / Germany– St. Pölten / Austria– St. Georgen / Austria– Oslo / Norway– Sarpsborg / Norway– Trondheim / Norway– Milan / Italy– Tolosa (Ibarra) / Spain– Inverness / Scotland / UK– Västerås / Sweden
North America– York / PA / USA– Chattanooga / TN / USA– Montreal (Brossard) / QC / Canada – Mississauga / ON / Canada
Latin America– São Paulo / Brazil
Europe– Pilsen / Czech Republic– Bucharest / Romania– Podgorica / Montenegro
Locations
Presentation | YYYY-MM-DD | 20
Growth as a result of acquisitions and joint ventures
4021e
SHEC
Wavegen
VG Power
Vo
ith
Hyd
ro
Kössler
S. Morgan Smith
Valley Iron WorksAllis Chalmers
Ansaldo
Tosi
Riva Hydro-Art Riva-Hydroart
Fuji Electric / Hydro
Siemens / Hydro
Westinghouse
2007
2007
1928
1850
1867
1877
1881
1900
1901
1950
1923
1958
1973
1980
1986
1990
1992
1996
2000
1994
2002
2005
2006
2007
1928
Voith
Presentation | YYYY-MM-DD | 21
Total solution capabilities – tailored to the owner’s needs
New hydro power plants
Enhancement / modernization
Model testing
Engineering services
Supply of hydro power plants and components
Installation / commissioning
Operations / maintenance
Financial support
4046d
Presentation | YYYY-MM-DD | 22
Voith is fair
Long-term partnerships instead of quick deals.
We commit only what we can deliver.
The customer-relationship is based on the joint performance of Voith’s and the customer’s employees.
Presentation | YYYY-MM-DD | 23
1929 1930 1932 1950 1955 1955 1960 1970 1983
E.ON(Hydro)
Fendt(Turbo)
Deutsche Stein-kohle AG (Turbo)
Renault(Turbo)
MAN(Turbo)
Krauss Maffei(Turbo)
Voest(Turbo)
VEAG(Hydro)
Bodensee-Schiffsbetriebe(Turbo)
1888 1904 1904 1905 1905 1907 1907 1911 1928
Zanders(Paper)
Haindl(Paper)
Duke Power(Hydro)
Yunnan Power(Hydro)
Scheufelen(Paper)
Stora Enso(Paper)
UPM-Kymmene(Paper)
Palm(Paper)
EnBW(Hydro)
406
2d
Our partnerships last for generations
Presentation | YYYY-MM-DD | 24
Customer relationships and long lasting partnerships
40
45
d
Two 15.6 MW Francis turbines for Bridgewater
2007
Four Kaplan bulb turbines with 25 MW each, as well as generators
2007
Modernization and new 74 MW- pump turbine/motor-generator
2004-2007
New radial pumps2007
New Kaplan turbines and generator2008
Five 400 MVA-generators for Longkaikou
2008
Omata Dam, Japan
Great Falls,USA
Rheinfelden, Germany
Waldeck, Germany
Dietro la Torre, Italien
Shilongba,China
1959
1907
1928
1929
1930
1904
Hokuriku Elecric Power Co.
Duke Power
EnBW
E.on
ENEL
Client
Yunnan Province Power
Project Firstorder
Current orders
Two 269 MW-pump turbines as well as automation for Goldisthal
1997Bleiloch,Germany
1932VEAG
Presentation | YYYY-MM-DD | 25
China:Three GorgesLaxiwa, Tai AnCao Jie, Si LinLongtanZhang He WanJingPing IILongkaikou
India:OmkareshwarBaglihar
Georgia: Enguri
Afghanistan:SarobiKajakai
Ethiopia:Gilgel Gibe II
Brazil:ItaipuPeixe AngicalIrapeFurnasCorumba IVJauruCapim Branco IEstreito
USA:J. Strom, ThurmondBath CountyOhio FallsWanapumCastaicConowingoBonnevilleNoxon RapidsOhio River
Malaysia:Cameron Highlands
Europe:PaalsbuStrivenWaldeckKops IIDychowMeseLimberg IIRheinfeldenEglisauWehr
Pakistan:Ghazi Barotha
Iran:Siah Bishe
Canada:La TuqueMercierEastmainRevelstoke
Ägypten:Assuan
Australia:Gordon River
Japan:ToyomiKaminojiri
Lower OltAkköprüAkköySagnfossen BussolengoMequinenzaLa Muela II
4855d
Global projects
Russia:Uglich
Chile:La Confluencia
South Africa:PalmietIngula
Thank you for your
attention!
Krunić Predrag
Sarajevo, 21.09.2010
Presentation | YYYY-MM-DD | 27