The existing timber culvert (Structure No. 2) in the Falcon Lake Dam is deteriorated and requires replacement.Manitoba Infrastructure is considering replacement options which may reduce flood impacts and gain better control over water levels on Falcon Lake.

Structure No.1 will remain and may be modified depending on the alternative.

Three options have been developed for your consideration and feedback.

Structure No. 1 Original timber culvert replaced in

2007

No means of controlling flow

Rockfill weir and bed

provide fish connectivity

and spawning habitat.

Structure No. 2Double timber

box culvert built in 1963

Timber stoplogs provide a

measure of control for lake levels

Structure is at the

end of its service

life

BACKGROUND

Falcon Lake Dam Outlet Replacement AlternativesOpen House