OCP Adoption in Datacenter, Legacy Facility, and Telco
Hancock Chang , OCP Technical and System Lead
RegionalAggregate Edge
OCP Solution – From Edge to Cloud
• Open Rack
OCP ESA for EIA 19’’ rack
• EIA 19’’ rack
• OCP ESA for EIA 19’’ rack
OCP openEdge
• EIA 19’’ rack
Core
• High Density
• High Capacity
• Long-Term Data Analysis
OCP openEdge
Far Edge
Far EdgeOCP openEdge
• Low Latency
• Compact
• Ruggedized
• High Throughput
OCP Open Rack or
EIA 19’’ rack
Legacy Facilities
with 19’’ Racks
Consideration of Building Up a Green DC
Why OCP Solution For DC
How to Migrate Legacy Facility to OCP
OCP ESA – Enclosure Sub Assembly
OCP ESA Kit Specification
STORAGE
Key Features of New OCP JBOF
OCP Solution in EIA 19’’ Rack
Requirement of The Edge Computing
High Throughput
IO optimization +
Cost of Performance (no need 2 CPU)
Environmental
Ruggedized
(Temperature, Dust, Humidity, etc..)
Dimension
Compact
(Depth, Height, Weight)
Response
Time
Low Latency
NEBS (for Telco)
Safety
OCP openEDGE for Telco
Source: OCP openEDGE spec https://www.opencompute.org/wiki/Telcos/openEDGE
Optional Sled in future?
OLT
Fabric/TOR
Or
Storage
Or
The openEdge for Outdoor
Telco Solution Integration with OCP
Multi-access Edge Computing
SOURCE: AKRAINO WIKI
Central Office Re-architected as Datacenetr
Operator Traction Worldwide
Collaboration Between OCP and ONF
VCO – Virtual Central Office (by OPNFV)
VCO 2.0 with OCP platform
Virtual Branch Demo Set for Telco on OCP
Visit OCP Marketplace https://www.opencompute.org/products?refinementList%5Bsolution_provider%5D%5B0%5D=MiTAC&page=1
Visit MiTAC web
http://www.mitacmct.com/
Come see us @ Booth L0631, TWTC NangGang Exhibition Center,
Hall 1 (4F)
Call to Action
Thank you
Top Related