REPORT INDICATING STATUS OF CONSTRUCTION OF TRANSMISSION LINES (220 kV & ABOVE) VIS-A-VISPROGRAMME DURING 2014-2015
As on 30-NOV-2014
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
DAMODAR VALLEY CORPORATION (DVC)
Commissioned 05/14.74Gola - Ramgarh 741 D/C MAY-14220
1st stage FOREST clearance obtained from MOEF,GoI in May'12.Compliancemade and file moved for 2nd stage clearance.Severe ROW problem in 1 locationnear Giridih end.Matter is being sorted out.Railway Crossing- Clearanceobtained.PTCC obtained.
212Kodarma-Giridih 325 311 310 982 D/C MAR-15220
Severe ROW problem in most of the locations.Work inside ISP resumedsoon.Railway crossing at 1nos.Proposal submitted.In principle approval ofrailway for line crossing has been obtained.Severe ROW problem in almost alllocations outside ISP.Line is being diverted again between location no. 29 to 54due to severe ROW problem.
37LILO of Mejia-Kalyaneswari at Burnpur S/S 79 55 0 03 D/C JUN-15220
Working clearance obtained on 6-3-2013 from Dy. Secretary,GoJ,Ranchi.PTCCstill awaited.Rectification work of the theft portion of the line is in progress (80ckm out of 100 ckm has been completed.
DEC-08344Mejia TPS - Gola 552 541 507 1324 D/C JAN-15220
Forest: Working clearance obtained on 26-12-2012.Aviation Clearance:Obtained.PTCC Clearance: PTCC clearance obtained.
AUG-10311Raghunathpur TPS -Ranchi (PG) 439 439 431 2715 D/C DEC-14400
Trasmission Lines: Page 1 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
NTPC LIMITED. (NTPC Ltd.)
Commissioned 09/14.DEC-10108Dadr-Loni (Harsh Vihar) 162 162 162 1081 S/C SEP-14400
.LILO of Satna - Gwalior at Barethi TPS2 D/C 765
.Lara-I TPS - Raigarh Pooling Station (Kotra)3 D/C 765
.Muzaffarpur TPS - Kanti4 D/C OCT-14220
Trasmission Lines: Page 2 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
National Hydro Power Corp.Ltd (NHPC)
.Kishanganga - New Wanpow via Alistang1 D/C APR-15220
Kishanpur-Amargarh2 D/C APR-15220
Trasmission Lines: Page 3 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
POWER GRID CORPORATION OF INDIA LIMITED (PGCIL)
Matching with HVDC converter,Expected by Mar'15. efforts shall be made tocomplete earlier.
AUG-133483+/- 800KV HVDC Biswanath Chariyali - Agra Bi-poleline
4334 4257 3855 22571 BIPOLE
MAR-15±800
.120Alusteng(Srinagar) - Drass 0 0 0 02 S/C MAR-16220
Angul - Dhenkanal3 D/C 765
ROW being faced.DEC-15570Angul - Jharsauguda line 792 194 554 D/C DEC-15765
Forest clearance received. Severe ROW problem faced.MAY-14274Angul Pooling Station - Jharsuguda Pooling Stationline-I
743 728 710 2095 S/C DEC-14765
Forest clearance received. Severe ROW problem. Tree cutting expedited.MAY-14270Angul Pooling Station - Jharsuguda Pooling Stationline-II
510 487 423 1326 S/C DEC-14765
Commissioned 08/14.492Anuppur (Moser Baer) - Jabalpur Pooling Station 600 600 600 4927 D/C AUG-14400
Forest clearance awaited. Stringing commenced from Nov'14MAY-15560Aurangabad (PG) - Padghe (PG) 764 542 364 138 D/C MAY-15765
Commissioned 04/14.OCT-12118Aurangabad (PG)-Aurangabad (MSETCL) 1189 D/C APR-14400
Stage-I Forest clearance (138ha.) awaited. Proposal at PCCF office Nagpur,Severe ROW problem.
MAY-15672Aurangabad - Boisar line 896 618 511 12810 D/C JUN-15400
Aurangabad - III - Aurangabad (PG)11 2xS/C 765
MAR-16560Aurangabad - Solapur line 774 380 165 3912 D/C MAR-16765
Implementation affected due to severe ROW problem.SEP-1320Bachau - Varasna (GETCO) line 32 32 31 613 D/C DEC-14400
80Bairasuil HEP - Sarna14 D/C 220
Completion matching with varansai S/stn.SEP-14165Balia - Varanasi 463 280 146 815 S/C JUN-15765
Ready for commissioning 10/14.FEB-13609Balipara - Bongaigaon 835 835 835 60916 D/C OCT-14400
Site works affected due to disturbance in Assam.Completion matching withB.charly S/S.
AUG-13130Balipara - Biswanath Chariyali 165 165 163 11317 D/C MAR-15400
Completion matching with Bareilly sub station.APR-13200Bareilly - Kashipur line (Quad) 278 272 242 9918 D/C MAR-15400
Forest clearance awaited.AUG-12697Barh-II - Gorakhpur 923 870 516 22419 D/C MAR-15400
MAY-15340Betul - Khandwa (Quad) line 440 68 1520 D/C MAY-16400
MAY-16110Bhiwani - Hissar line 152 40 2621 D/C MAR-15400
Completion matching Varanasi Sub station.133Biharshariff - Sasaram line 344 204 110 1722 D/C MAY-15400
Commissioned 05/14.DEC-14231Bina - Gwalior line (3rd Ckt) 625 625 625 23123 S/C MAY-14765
Trasmission Lines: Page 4 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Gen. project (Bokaro STPP) delayed. Bokara GIS (DVC scope) also delayed.Matching with gen. proj. Final forest clearance received in Aug'13.Tree cuttingpermission progressively being received.
AUG-12198Bokaro TPS Extn.- Koderma TPS 276 272 271 18424 D/C DEC-14400
NOV-112Bypassing of Bhatapara - Raipur as Bhatapara - Bhilai 425 S/C OCT-13400
Commissioned 05/14.MAY-1462Champa Pooling Station - Dharamjaygarh / NearKorba Switching Station line
153 153 153 6226 S/C MAY-14765
Stg-I clearance (191 Ha) awaited. Proposal under process in State Govt. (MP).DEC-152573Champa Pooling Station - Kurukshetra (HVDC) 3474 1795 950 2127 BIPOLE
DEC-15±800
Commissioned 05/14.MAY-14298Champa Pooling Station - Raipur Pooling Station line 387 387 387 29828 D/C MAY-14765
Stringing commenced from Nov'14.NOV-14144Dehradun - Abdullapur 247 159 133 129 D/C MAR-15400
*Completion uncertain. Severe ROW problem in western UP.Progress very slow.NOV-11249Dehradun - Bagpat 444 391 326 5630 D/C MAR-15400
Stage-I Forest clearance for Chattishgarh portion(298Hac.) received in Oct'14.JUL-14868Dharamjaygarh - Jabalpur Pooling Station line 1132 907 804 26031 D/C JUN-15765
Severe ROW problem faced in Karnataka end.AUG-14240Dharmapuri (Salem New) - Somanahalli 318 308 262 9032 D/C FEB-15400
60Drass - Kargil33 S/C MAR-16220
Forest proposal under approval of Cabinet. FAC meeting earlier pospond due toflood in J&K now held. to be put up in Cabniet.
NOV-14242Dulhasti - Kishenpur 338 264 123 2334 D/C MAR-15400
Aportion of line (279 Ckm) commissioned in April'12. balance portion under holddue to ECL.
314Durgapur-Jamshedpur (Balance Portion) 434 434 434 31435 D/C JUL-13400
Completion uncertain due to severe ROW problemNOV-08297Edamon (KSEB) - Muvattupuzha (PG) 438 159 105 2936 D/C MAR-15400
Severe ROW problem . CriticalMAY-14500Essar Gujarat TPS - Bachau 602 544 445 18237 D/C JUN-15400
Varansi sub station critical due to land acquisation.SEP-14246Gaya - Varanasi 738 602 296 5838 S/C JUN-15765
ROW being faced towards Karnataka end.Critical
JUN-14418Gooty - Madhugiri 575 559 487 26039 D/C FEB-15400
Wild life sanctuary clearance by NBWL awaited.NOV-12304Gwalior - Jaipur (Ckt 1) 834 767 762 28740 S/C MAR-15765
Wild life sanctuary clearance by NBWL awaited. Thereafter forest clearance tobe accorded by MoEF. Critical.
DEC-14311Gwalior - Jaipur line (Ckt 2) 656 653 650 22041 S/C JUN-15765
Commissioned 05/14.DEC-13320Indore - Vadodara 909 909 909 32042 S/C MAY-14765
Trasmission Lines: Page 5 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Award placed in Nov'13272Jaipur (RVPNL) - Bhiwani (IInd Ckt) line 685 115 3543 S/C MAR-16765
MAR-16272Jaipur - Bhiwani line 741 734 717 19944 S/C FEB-15765
Involvement in forest. Critical.NOV-13372Jharkhand Pool - Gaya (Quad) line 332 176 9045 D/C MAR-15400
Tower erection commenced from Nov'14.312Jharsuguda - Dharamjaygarh line 315 22 146 D/C DEC-15765
Commissisoned 07/14.300Jharsuguda Pooling Station Dharamjaygarh line. 410 410 410 30047 D/C JUL-14765
Matching with Gen. of Kameng. * Gen. proj. delayed. Revised schedule yet to beconfirmed by NEEPCO.
FEB-13110Kameng - Balipara 148 99 76 048 D/C MAR-16400
NOV-1441Kanpur (new) - Kanpur (exit) 62 61 5349 D/C JUN-15400
Matching wit Kanpur 765KV S/Stn.NOV-14483Kanpur - Jhatikara 1266 915 565 8550 S/C JUN-15765
90Kargil-Khalsti51 S/C MAR-16220
Completion matching with Bareilly S/S.(Delayed due to late handover land)APR-13330Kashipur - Roorkee line (Quad) 416 401 368 14452 D/C MAR-15400
74Khalsti - Leh53 S/C MAR-16220
292Khamam - Nagarjunasagar line (Vzag TCL) 400 4 0 054 D/C SEP-15400
MAY-16360Khandwa - Indore line 490 110 30 255 D/C MAY-16400
Khargone TPP-Indore56 D/C DEC-15400
Completion matching with Kishanganj s/stn. Land acquired in Aug'13.NOV-13692Kishanganj - Patna line (Quad) 915 755 550 24557 D/C JUN-15400
Wildlife encountred in (Peer Panjal area)forwarded to NBWL in Jan'14.NBWLhearing awaited.
JUL-13278Kishenpur - New Wanpoh line (132 KM D/C + 7 KMMulti Ckt)
394 341 265 11458 MC+D/C
MAR-15400
Kishenpur - Ratle, (Dulhasti- Kishenpur Second Cktstringing extending up to Ratle HP)
59 S/C 400
Ckt-I (76 Ckm) Commissioned 09/14. Ckt -II (76 Ckm) Ready for commissioning9/14.
152Koderma - Gaya (Balance part) 15260 D/C SEP-14400
400KV D/C Nellor-Gooty line commissioned in Mar'13. (early K'patnam UMPP -Gooty line)
632Krishnapatnam UMPP - Gooty line (Quad) 788 788 788 57861 D/C MAR-13400
Commissioned 10/14.602Kurnool - Nellore 60262 D/C OCT-14765
Commissioned 06/14.118Kurnool - Raichur (IInd Ckt) 299 299 299 11863 S/C JUN-14765
Commissioned 11/14.NOV-14710Kurnool - Thiruvalam line 934 934 934 71064 D/C NOV-14765
Efforts being made to complete in 2014-15 matching with readiness ofDEC-15516Kurukshetra - Jallandhar 722 415 175 3565 D/C JUN-15400
Trasmission Lines: Page 6 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
AC yard at Kurukshetra.
Severe ROW being faced.Stringing commenced from Nov'14.AUG-1430LILO of Dehar - Panipat at Panchkula 40 19 16 166 S/C DEC-14400
Progress affected due to ROW problem & forest clearance.NOV-1234LILO of One Ckt of Baripada - Mendhasal line at Dubri(OPTCL)
48 43 38 367 D/C DEC-14400
Commissioned 07/14.25LILO of 2nd Ckt of Lucknow - Bareliiy line (PG) atShahjahanpur
90 90 90 2568 D/C JUN-14400
DEC-1530LILO of Abdullapur - Sonepat at Kurukshetra (Tripal) 44 42 3569 D/C JUN-15400
30LILO of Aizwol (PG) - Zemabawk at Melriat (PG) 45 0 0 070 D/C DEC-14132
Award placed in Mar'14. Completion matching with Sub station. Severe ROWproblem being faced.
54LILO of Baripada - Mendhasal at Pindiabil 106 971 D/C JUN-15400
Award placed in May'14.NOV-128LILO of Birpara - Salakati at Alipurduar 2072 D/C SEP-15220
Award placed in May'14.JAN-1524LILO of Bishwanath Chariali - Agra at Alipurduar 3673 HVDC DEC-15±800
Award placed in Aug'13. Survey in Progress.16LILO of Bongaigaon - Siliguri at Alipurduar 2474 D/C SEP-15400
Commissioned 10/14.NOV-1256LILO of Both Ckt Jamshedpur - Rourkela line atChaibasa
90 90 90 5675 D/C OCT-14400
Severe ROW problem in western UP. Completion UncertainNOV-1458LILO of Both Ckt of Dehradun - Bagpat line (QUAD) atSaharanpur
78 35 0 076 D/C MAR-15400
Loop out charged in Dec'13. Loop in held up due to non-availability of forestclearance (9Locs). Stage - I received in Oct'14.
15LILO of Ckt-II Jullandhur - Hamirpur at Hamirpur (PG) 65 57 52 2477 D/C DEC-14220
Severe ROW being faced.Completion likely to be delayed.AUG-1440LILO of Dehar - Bhiwani at Rajpura (PSTCL) 43 31 1978 S/C DEC-14400
Award placed in Aug/11. Engg. in progress.19LILO of Gangtok - Melli at Rangpo 3479 S/C 132
Commissioned 11/14.7LILO of Gangtok - Rangit at Rangpo 21 21 21 680 S/C NOV-14132
MAY-1512LILO of Gaya - Fatehpur at Varanasi line81 S/C 765
Scheme under review in view of CERC direction.JUL-1438LILO of Gazuwaka - Vijayawada at Vemagiri 9582 D/C JUN-14400
LILO of Jiribam - Aizawl at Turial83 D/C 132
Commissioned 03/13.DEC-121LILO of Loktak - Imphal at Imphal (New) line 5 5 5 184 D/C MAR-13132
Completion uncertain.Severe ROW problem in Maharastra.Efforts being made to complete the balance protion of line using under groundcable. Award placed in Sep'13.
SEP-1018LILO of Lonikhand (MSETCL)- Kalwa at Navi Mumbai 25 22 19 1385 D/C MAR-15400
Trasmission Lines: Page 7 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Completion matching with Bagpat S/Stn. (delay in land acquisation). evereROW problem. Progress is very slow.
FEB-12124LILO of Meerut - Kaithal at Bagpat 177 144 96 586 D/C MAR-15400
Award placed in Nov'13.MAR-164LILO of Moga - Bhiwani at Hissar line87 D/C 400
Commissioned 10/14.2LILO of Nathpa Jhakri - Nalagarh at Rampur (2nd Cktbalance)
288 D/C OCT-14400
Commissioned 11/14.JAN-1416LILO of Navsai - Boisar at Magarwada 52 52 52 1689 D/C NOV-14400
ROW problem. Critical.Petition filed in Karnataka High Court for now resolved on31.07.13.
JUL-1234LILO of Neelamangla - Hoddy line and LILO ofSomanhally - Hoddy at Yelahanka
25 25 25 2590 D/C JUN-14400
Commissioned 06/14.OCT-1446LILO of Neyveli - Trichy at Nagapattnam Poolingstation
63 63 63 4691 S/C JUN-14400
Severe ROW problem. Critical.OCT-1410LILO of Parli-Pune - Pune Aurangabad at Pune (GIS) 94 51 31 2192 D/C JAN-15400
30LILO of Patiala - Kaithal at Patran93 D/C 400
APR-16878LILO of Rajarhat - Purnea at Gokarana 549 76 894 D/C APR-16400
Site works defarred due to disturbance in Assam.AUG-1354LILO of Ranganadi - Balipara 400KV D/C line atBiswanath Chariyali (Pooling Point)
77 77 75 4695 D/C MAR-15400
Completion matching with Varansai S/stn.NOV-14230LILO of Sasaram - Allabhadad at Varanasi (Q) 343 286 10596 D/C JUN-15400
Completion matching with kishenganj S/S.8LILO of Siliguri (Existing) - Purnea at Kishanganj 23 6 197 D/C JUN-15400
Completion matching with S/stn. (land yet to be acquired).MAY-138LILO of Siliguri (Existing) - Purnea line (Q) at NewPooling Station at Kishanganj
70 12 2 098 D/C JUN-15400
Award placed in Aug'11.Foundation commenced from May'14. completionmatching with Kishenganj S/S.
MAY-1324LILO of Siliguri - Dalkhola line at New Pooling StationKishanganj
67 7 2 099 D/C JUN-15220
ROW problem. Critical.State Govt. help required for resolution of compensationissue.
25LILO of Somanhally - Hoddy line at Yelahanka 25 25 25 25100 D/C SEP-14400
APR-168LILO of Subhashgram - Jeerat at Rajarhat101 S/C 400
Scope deleted.JAN-15174LILO of Tala - Siliguri at Alipurduar 435102 D/C JAN-15400
Award placed in Sep'11. Works was held up. Severe ROW problem issue.Nowstarted.
NOV-1341LILO of Teesta-III - Kishanganj 400 KV D/C (Q) atRangpo (21 D/C+1.5 M/C)
84 4 0 0103 MC+D/C
DEC-14400
Commissioned 04/14.NOV-137LILO of Teesta-V Siliguri line at Rangpo (1 D/C & 1.5M/C)
26 26 26 7104 D/C APR-14400
Commissioned 10/14.5LILO of Teesta-V Siliguri line at Rangpo (2nd cktbalance)
5105 D/C OCT-14400
LILO of Tilaiya - Balia line at Gaya106 D/C DEC-16765
Trasmission Lines: Page 8 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
AwCourt case at 01 loc. Matter reffered to DC. Order awaited.9LILO of Tuticorin JV - Maduri at Tuticorin 16 15 14107 D/C DEC-14400
Investment approval pending.LILO of Vishnu Prayag - Muzaffarnagar at TapovanVishnugarh HEP
108 D/C MAR-15400
(01 ckt. LILO connecting to Mahandragarh- Bhiwani of M/s. Adani of 27 ckm bypassing Bhiwani S/Stn. commissioned on 18.08.11). 2nd commissioned in Jul'12.
35LILO of both ckt of Bawana /Bahadurgarh -Hissar atBhiwani
86 86 86 60109 D/C JUL-12400
Award placed.APR-15172LILO of both ckt of Kolhapur - Mapusa at Kolhapur(new)
167 38 12110 D/C DEC-15400
Court case at 01` loc. Matter reffered to DC. Order awaited.JUL-1420LILO of both ckts of Tuticorin JV - Maduri at TuticorinPooling station
16 15 14111 D/C DEC-14400
.LILO of one circuit of Dulhasti - Kishenpur at RatleHEP.
112 D/C 400
Completion uncertain. Works stand still on a/c of localm disturbance /agitationagainst big dam. Generation uncertain.
FEB-13334Lower Subhansiri - Biswanath Chariyali line -I 444 329 228 64113 D/C MAR-15400
Completion uncertaion.Works stand still on a/c of local disturbancec /agitationagainst big dam. Gen. schedule uncertain.
FEB-13340Lower Subhansiri - Biswanath Chariyali line -II 465 327 196 35114 D/C MAR-15400
Line completed & commissioned in Aug'14.OCT-13480MB TPS (Anuppur) - Jabalpur Pooling Station 600 600 600 492115 D/C AUG-14400
Madhugiri - Bidadi (Quad)116 D/C 400
ROW being faced at Madugiri end.Critical.JUN-14154Madhugiri - Yelhanka 177 105 36117 D/C FEB-15400
Ckt-I (65 Ckm) Commissioned 09/14. Ckt-II (65 Ckm) Ready for commissioning.130Maithon -Gaya line (Balance part) 130118 D/C SEP-14400
Contigency connecting Maithon-Gaya with Koderma-Gaya by-passing multi-cktportion in forest,to rorm Maithon-Koderma line 400KV Maithon-Koderma line(422Ckm)commissioned in Jan'13.Implementation of balance portion affecteddue to Moist problem in jharkhand/Bihar.
AUG-14193Maithon -Gaya line (Q) 742 742 742 552119 D/C DEC-14400
ROW problem is being faced in Nagaland.DEC-1256Mariani (New) - Mokikchung (PG) 163 161 147 54120 D/C DEC-14220
Mauda STPS - Betul 555 96 22121 D/C MAY-16400
Tower erection commenced from Mar'14.MAY-16418Mauda-II - Betul (Quad) line 555 96 22122 D/C MAY-16400
ROW being faced in UP.MAR-15324Meerut - Moga line 922 667 347 120123 S/C MAR-15765
70Meja - Allahabad line 81 56 20124 D/C JUL-15400
Stage-I forest clearance awaited.DEC-1212Melriat (New) - Sihmui line 30 0 0 0125 D/C DEC-15132
Award placed in Mar'11.74Mendhasal - Uttra line 135 0 0 0126 D/C JUN-15400
Trasmission Lines: Page 9 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Scope changed, LILO of 400KV D/C baripada-Mendhasal at Pindiabil in place ofUttra-Mendhasal line. (alternative land acquired at Pindiabil)
DEC-122Mokokchung (PG) - Mokokchung (Nagaland) line 11 6 3 0127 D/C NOV-14132
* Completion uncertain as work completely held-up in stretch of 50 Kms sincemore than 05 year due to severe ROW problem in Karnataka portion of lineforest clearance in Karnataka. Work re-started from Dec'13.
DEC-07418Mysore - Kozhikode 609 463 448 307128 D/C MAR-15400
534Nagapattinam Pooling Station - Salem (NMTCL)129 D/C SEP-14765
Efforts being made to complete earlier by Jun'15.APR-15376Narendra (New, Kudgi) - Kolhapur (new) 492 362 267 90130 D/C DEC-15765
Completion matching with Kudgi S/stn.APR-15354Narendra (New, Kudgi) - Narendra (Existing) 470 273 125 10131 D/C DEC-15400
Line is now proposed to be terminated at Boisor S/Stn in place of Mumbai newloc. Forest clearance awaited.Contigrncy arrangement to connect Navsari-Boisarwith Vapi-Navi Mumbai line by passing forest area to form Vapi-Navsari line (212Ckm) commissioned in Mar'13.FC proposal submitted to MoEF on 28.07.14 (57Hac.)
OCT-12432Navsari - Boisor 575 480 445 287132 D/C MAR-15400
Commissioned 04/14.352Nellor - Thiruvalam (Quad) line 480 480 480 352133 D/C APR-14400
Line commissioned in Oct'14.SEP-14602Nellore Pooling Station - Kurnool 738 738 738 604134 D/C OCT-14765
Commissioning of Kuddus S/S/by MSETCL critical.MAY-1534Padghe (PG) - Kudus line 46 22 17 5135 D/C MAY-15400
Completion of Kudus S/S by MSETCL critical.50Padghe (PG) - Padhe (PG) 46 22 17 5136 D/C MAY-15400
progress affected due to ROW problem (geogrephical condition)DEC-1270Pasighat - Roing line. 345 271 208 18137 S/C onD/C
SEP-15132
Wildlife involved. Case under process.142Punatsangchu - Alipurduar line 183 88 37138 D/C SEP-15400
Wild life involved. Case under process.to be put up to state Board WLBoard.Critical for completion of line.
JAN-15142Punatsangchu-I - Alipurduar 178 88 37139 D/C SEP-15400
MAR-15104RAPP - Kota line 130 30140 D/C MAR-15400
2000Ragarh (Kotra) - Dhule141 HVDC MAR-17±600
Line contract terminated due to poor performance. pkg under re-tender.MAY-1496Raigarh Pooling Station (Near Kotra) - ChampaPooling Station line
247 222 200 32142 S/C MAR-15765
Commissioned 11/14.MAY-14736Raipur Pooling Station - Wardha line 908 908 908 736143 D/C NOV-14765
Stage-I Forest clearance awaited. Proposal with MoEF, Delhi awaiting FAC.DEC-15713Raipur Pooling station - Wardha line -II 968 602 286 25144 D/C DEC-14765
Trasmission Lines: Page 10 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Forest clearance awaited. Critical. Stage-I received in Sep'14.SEP-14341Ranchi (New) - Dharamjaygarh /Near Korba 922 758 390 76145 S/C MAR-15765
Involment of forest,critical. Completion matching with Jharkhand Pooling station.NOV-13136Ranchi - Jharkhand Pool line (Quad) 195 188 140 88146 D/C MAR-15400
Completion matching with Melli S/stn. (re-award in Sep'13).NOV-1352Rangpo - New Melli line (Twin Moose) (20.5 D/C & 1.5M/C)
115 99 86 13147 MC+D/C
FEB-15220
Commissioned 06/14.NOV-1231Rihand - Vindhyachal Pooling Station line-I 91 91 91 31148 S/C JUN-14765
Vindhyachal PS critical.Line being planned for completion by-passingVindhyachal PS. Erection completed.
NOV-1231Rihand - Vindhyachal Pooling Station line-II 91 91 91 62149 S/C MAR-15765
Progress affected due to severe ROW problem.APR-1160Roing - Tezu line 246 148 123 18150 S/C onD/C
DEC-15132
Completion uncertain.Severe ROW problem in western UP.
APR-1376Roorkee - Saharanpur line (Quad) 103 76 24 0151 D/C MAR-15400
Efforts being made to complete in FY2014-15.DEC-1552Sagardighi - Baharampur 78 76 69 5152 D/C DEC-14400
Severe ROW being faced in Karnataka.DEC-14244Salem Pooling Station - Madhugiri Pooling Station line 647 538 356 51153 S/C DEC-14765
Line completed. Testing under progress.120Salem Pooling Station - Salem 165 165 165 120154 D/C DEC-14400
Line comleted & commissioned in Dec'12.NOV-1212Sasan - Vindhyachal Pooling Station line 19 19 19 12155 S/C MAY-13765
MAR-154Sasaram - Allahabad line 11 10156 D/C MAY-15400
Completion matchung with Daltanganj S/S delayed due to non-availibility of S/Ssite .
NOV-12340Sasaram - Deltonganj line 522 490 370 185157 D/C DEC-15400
Commissioned 08/14.NOV-12300Satna - Gwalior line (60 Km D/C Portion) Ckt-II 782 782 782 300158 D/C+S/C
AUG-14765
Severe RoW problem being encountered.OCT-14268Sholapur - Pune 750 742 738 248159 S/C JAN-15765
Contract reviewed through assisment to JV.AUG-12336Sikar - Jaipur line 478 448 325 79160 D/C MAR-15400
Contract reviewed through assisment to JV partner..AUG-12154Sikar - Ratnagarh line 209 202 201 96161 D/C DEC-14400
Line test charged in Jun'12.50Silchar - Hailakandi (Contingency arrangement) 65 65 65 39162 D/C JUN-12132
Severe ROW problem in noney area of Mainpuri.Site progress affecetd.DEC-12332Silchar - Imphal (New) line (to be charged at 132KV) 471 470 418 181163 D/C FEB-15400
Major portion of line in forest. severe ROW in vicinity of Aizwl town due to stiffresistance from influential local owner.
DEC-12286Silchar - Melriat (New) line (charged at 132KV) 436 300 179 95164 D/C DEC-15400
Tripura portion completed, Severe ROW problem in Assam portion. WorksDEC-12256Silchar - Purba Kanchan Bari line (charged at 373 373 373 237165 D/C DEC-14400
Trasmission Lines: Page 11 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
being executed under police protection.132KV)
Siliguri - Purnea 10166 D/C SEP-13400
Severe ROW problem.OCT-1524Solapur STPP - Solapur line 37 31 28 2167 D/C DEC-14400
668Srikakulam PP - Vemagiri - II Pooling Station (VizagTCL)
868 122 2 0168 D/C AUG-16765
Forest clearance Processing of forest case very slow at astate GOVT. level.Critical
JUN-15552Srikakulam Pooling Station - Angul line 729 525 270 0169 D/C JUN-15765
Investment approval pending.Tapovan Vishnugadh - Kunwari Pass170 D/C MAR-17400
Progress affecetd due to severe ROW problem. Stage-I Forest clearancereceived on 01/08/2013.
DEC-1290Tezu - Namsai line. 331 134 114 21171 S/C onD/C
DEC-15132
Commissisoned 07/14.NOV-12228Thiruvalam - Sholinganallur line 328 328 328 228172 D/C JUL-14400
Tilaiya - Baliya173 D/C DEC-16765
Tilaiya - Gaya line174 S/C DEC-16765
DEC-14735Tuticorin Pooling Station - Salem Pooling Station 1000 868 352 40175 D/C MAR-15765
60Unchahar - Fatehpur176 D/C 400
Due to severe ROW portion at Navi-Mumbai end,Line now decided to theterminated at Kudus S/stn. of MSETCL. Contigency arrangement to connectVapi-Navi Mumbai with Navsari-Boisar line by passing ROW area to form Vapi-Navsari line (24 Ckm) commissioned in Mar'13.40KV D/C Vapi-Kala portion (61Ckm0 commissioned in Mar'14. Balance matching with readiness of Kudus S/Sby MSETCL.
SEP-10258Vapi (PG) - Navi Mumbai 346 205 185 86177 D/C DEC-15400
Severe ROW problem being faced in Maharastra & DNH on almost all locations.* Completion uncertain.
258Vapi-Boisar 388 149 99 27178 D/C 400
Readiness sub station critical. Balance land for varansai GIS acquired in Jun'14NOV-14652Varanasi - Kanpur 885 655 406 72179 D/C JUN-15765
ROW problem being faced at Krishna Distt (49Loc.) & Guntur Distt. (39Loc.).NOV-14686Vijayawada - Nellore line 922 848 823 588180 D/C FEB-15400
Completion delay due to forest clearance (Stage-I received in Jul'14).Vindhyachal PS critical.
NOV-11211Vindhyachal Pooling Station - Satna line (2 Km D/CPortion) Ckt-II
586 571 550 194181 D/C+S/C
JAN-15765
Completion delay due to forest clearance(Stage-I, 204Hac.July'14). VindhyachalPS critical.Likely to be further delayed due to involvement of
NOV-14253Vindhyachal Pooling Station Satna line (Ckt-I) 706 645 625 187182 S/C JAN-15765
Trasmission Lines: Page 12 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Tiger reserve issue.
Commissisoned 07/14.MAY-15690Wardha - Aurangabad 928 928 928 690183 D/C JUL-14765
Contract terminated due to unsatisfactory performanc and fresh tender beingtaken up for 01 pkg.
OCT-12700Wardha - Aurangabad (on 1200 kV) 962 762 456 60184 D/C MAR-161200
DEC-15701Wardha - Aurangabad -2 928 815 510 274185 D/C FEB-15765
Trasmission Lines: Page 13 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
ASSAM ELECTRICITY GRID CORP. LIMITED (AEGCL)
Work in progress.24Agia - Matia (Dudhnoi) line 87 86 86 211 S/C onD/C
MAY-15132
10BTPS - Kokrajhar line 39 17 1 02 S/C onD/C
MAR-15132
commissioned 9/1465BTPS-Agia-Sarusajai (2nd Circuit, Balance portion) 195 195 195 653 S/C SEP-14220
RoW problems322Bongaigaon TPS - Rangia 516 431 317 114 D/C DEC-14220
61Kokrajhar - Bilashipara - Gauripur 199 137 14 05 S/C onD/C
MAY-15132
Re-tendering of the work has been done5Kukurmara - Azara line 26 3 0 06 S/C onD/C
DEC-14132
Project has been abandoned25Kukurmara - Boko line 162 0 0 07 S/C onD/C
DEC-14132
Balance stringing work held due to non-availability of 132kV line shut-down.10LILO of Jorhat - Bokakhat at Jorhat (West) S/S 9 9 8 28 D/C MAY-15132
Work in progress.12LILO of Namrup - Tinsukia at Bordubi S/S 9 7 0 09 D/C MAY-15132
Completed7LILO of Palatana - Bongaigaon line at Kukurmara(Azara) S/S
14 14 14 710 D/C JUL-14400
Due to water logging issues, erection of towers couldnot be carried out.14LILO of both ckt of Balipara (PG) Samaguri at Sonabil 6 6 0 011 2xD/C DEC-14220
Compensation issue, RoW problems, Forest Clearance and Railway crossing89LILO of both ckt of Chandrapur - Kahilipara/Narengi atSonapur
137 64 31 012 2xD/C MAY-15132
Compensation issue, RoW problems and Railway crossing8LILO of both ckt of Depota - Gohapur at Sonabil S/S 6 6 0 013 2xD/C MAY-15132
RoW & Water logging problems adversely affected foundation works55LILO of both ckt of Samaguri - Sarusajai line atSonapur S/S
41 17 0 014 2xD/C DEC-14220
Right of way issues31LILO of one ckt of Tinsukia - Margherita at Rupai(Doomdooma) S/S
109 108 107 2915 D/C NOV-14132
Work in progress.160Namrup - Mariani line 448 446 420 7616 S/C on DEC-14220
Trasmission Lines: Page 14 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
D/C
Project has been completed.34Nazira - Mariani (Garmur) line 117 117 117 3417 S/C APR-13132
Project has been completed61Samaguri - Lanka line (2nd Ckt) 205 205 205 6018 S/C NOV-13132
Project completed.42Samaguri - Nagaon line 142 142 142 4219 S/C onD/C
DEC-13132
Trasmission Lines: Page 15 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
BEAS VALLEY POWER CORPORATION LIMITED (BVPCL)
.Uhl-III - Hamir Pur1 S/C onD/C
132
Trasmission Lines: Page 16 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
BIHAR STATE ELECTRICITY BOARD (BSEB)
SEP-03366Begusarai-Purnea 564 551 172 161 D/C DEC-14220
Ready for commissioing 09/14.Bay is not ready in Darbhanga S/S.
68Kanti - Darbhanga (2nd Ckt) 682 S/C SEP-14220
There are no ROW issues at present in this line.The are no ROW issues atpresent in this line. The work is under progress.
101Kanti - Gopalganj (2nd Ckt.)3 S/C DEC-14220
Trasmission Lines: Page 17 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
CHHATTISGARH STATE POWER TRANSMISSION CO. LTD. (CSPTCL)
Work Under progress189Chhur - Mopka (bilaspur) 345 336 327 1021 D/C MAR-15220
Commissioned 08/14.MAR-12153Korba -Vishrampur 505 505 505 1532 S/C AUG-14220
work in progress.MAR-13116LILO of One ckt of Korba (W) - Khedamara at Marwa 161 156 154 883 D/C DEC-14400
work u/p30LILO of Korba (E) - Bishrampur at Churri 30 20 94 D/C DEC-14220
Work under progress.19LILO of Raigarh - Budipadar line at Raigarh (PG) 34 14 15 D/C MAR-15220
Commissioned 08/14.15LILO of Raigarh - Jindal (Tamnar) at Girwani 27 27 27 156 D/C AUG-14220
Work in progress662Raita - Jagadalpur 950 555 508 1737 D/C MAR-15400
Trasmission Lines: Page 18 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
DELHI TRANSCO LIMITED (DTL)
Case for extension of time upto 28.02.15 was processed and approval of same isawaited.
12Bawana-Rohini -II (Sec -29) 38 30 19 01 D/C MAR-15220
Commissioned 9/14.6LILO of Bawana-Najafgarh at Kanjhawla 33 33 33 62 D/C SEP-14220
Case for extension of time upto 28.02.15 was processed and approval of same isawaited.
11LILO of Kanjhawala - Najafgarh at Mundka 400 kV S/S 35 30 19 03 D/C MAR-15220
Commissioned 9/14.19Maharani Bagh- Gazipur (0.5kM cable on MaharaniBagh side & 8.5kM OH line)
42 42 42 194 D/C SEP-14220
.Cable laid in 23 Sections out of 24 Sections and 114 St. through joints madeout of 138 joints. .Delay in RBI permission to M/s TBEA to openINR account in India received in Nov,13.Erection of Supporting structure for outdoor terminations has been completed
MAY-1126Mundka -Peeragarhi U/G 200 mm, 250 MW5 D/C FEB-15220
.Cable laid in 13 Sections out of 19 Sections. 42 Joints made out of 108 Joints.
.Delay in RBI permission to M/s TBEA to open INR account in India received inNov,13..ROW charges amounting to Rs. 7.6 Crore deposited to Railways . Thepermission is expected within a week.Work has been stopped by TBEA and their sub-contractor for approx. last 4months on account of pending INR payments. Finance deptt. is not releasingpayments amounting to Rs. 2.7 Crore citing WCT/Taxation issues.
17Peeragarhi-Wazirpur U/G 1000 mm, 200 MW6 D/C MAR-15220
Commissioned 08/14.MAY-118Shalimar bagh - Wazirpur, U/G,1000 mm, 200 MW 87 D/C AUG-14220
Trasmission Lines: Page 19 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
DEPARTMENT OF POWER ARUNACHAL PRADESH ()
.LILO of Ranganadi - Nirjuli at Pare HEP1 D/C 132
.LILO of one ckt of Ranganadi HEP - Itanagar at PareHEP
2 D/C 132
Trasmission Lines: Page 20 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
GOA ELECTRICITY DEPARTMENT (ED- GOA)
Under planning Stage.30Colvale-Cuncolim1 D/C APR-17220
Administration and expenditure approval has been accorded and placing ofaward likely by March 2015.
90Ponda - Verna 0 0 02 D/C APR-17220
Trasmission Lines: Page 21 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
GUJARAT ENERGY TRANSMISSION CORP. LIMITED (GETCO)
Yet to award110Amerli-Jasdan 0 0 01 D/C MAR-16220
W I P / Severe RoW problems470Amreli - Kasor line 676 552 339 02 D/C APR-15400
WIP188BECL (Padva) - Botad line 292 131 53 03 D/C MAR-15220
Yetto award340Bhachau - Radhanpur 0 0 04 D/C JUN-15220
W I P / Severe RoW problems238Bhatiya-Kalwad line 373 101 59 05 D/C APR-14220
Yet to award240Bhogat-Kalavad 0 0 06 D/C MAR-16400
Yet to award200Chhara -Keshod 0 0 07 D/C MAR-17400
Yet to award40Chhatral - Dhanaj 0 0 08 D/C MAR-16220
Yet to award170Chikhli - Bhilad 0 0 09 D/C MAR-15220
WIP160Chorania - Botad 196 36 0 010 D/C OCT-15220
Yet to award71Choraniya - Viramgam 0 0 011 D/C MAR-15220
Yet to award120Fedra - Botad 0 0 012 D/C MAR-15220
Severe ROW Problem.MAR-1294GPPC (Pipavav)- Dhokadva 152 149 136 4913 D/C MAR-15220
wip194Gavasad - Salejada line 313 244 96 014 D/C JUN-15220
Yet to award50Hadala - Rajkot-II 0 0 015 D/C MAR-15220
Yet to award60Halvad - Charadva 0 0 016 D/C MAR-17220
W I P / Severe RoW problems76Halvad-Sadla line 124 97 78 2517 D/C MAR-15220
W I P/Row problems111Hazaira (GSEC) - Mota 182 107 93 2018 D/C MAR-15220
Yet to award100Jasdan - Gondal 0 0 019 D/C MAR-17220
Yet to award220Kalavad- Keshod 0 0 020 D/C MAR-17400
WIP160Kalavad-Kangasiali 185 93 32 021 D/C MAR-15220
W I P / Severe RoW problems112Kalawad-Kangasiyali 191 141 106 3422 D/C DEC-15220
Trasmission Lines: Page 22 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Yet to award10Keshod - Keshod 0 0 023 D/C MAR-15220
Yet to award140Keshod - Timbdi 0 0 024 D/C MAR-16220
Yet toaward120Keshod - Visavadar 0 0 025 D/C MAR-15220
Yet to award140Kosamba- Achhalia 0 0 026 D/C MAR-17400
Commissioned 08/14.JUL-11460Kosamba-Chorania line 641 641 641 46027 D/C AUG-14400
Yetto award80LILO of SSP- Asoj & SSP -Kasor lines at AchhaliaS/S
0 0 028 D/C MAR-16400
Yet to award40LILO of Bhatia - Kalav ad - Kangasiyali at Khambhalia 0 0 029 D/C MAR-15220
Yet to award50LILO of Chorania - Gondal at Rajkot-II 0 0 030 D/C MAR-15220
Yet to award40LILO of Chorania - Gondal at Shapar 0 0 031 D/C MAR-17220
Yet to award100LILO of Essar-Hadala line at Kalavad S/S 0 0 032 D/C MAR-16400
Commissioned 08/14.23LILO of GAVASAD - SLPP at Karjan 38 38 38 2333 D/C AUG-14220
5LILO of Godhra -Kadana line at Lunawada34 D/C MAR-15220
Yet to award50LILO of Hadala - Sartanpar - Halvad at Tankara 0 0 035 D/C MAR-17220
Yet to award2LILO of Jambuva - Karamsad at Asodar 0 0 036 D/C MAR-17220
Yet to be awarded.116LILO of Jamnagar - Jetpur line-I at Sikka 178 0 0 037 D/C APR-15220
WIP120LILO of Jamnagar - Jetpur line-II at Sikka 187 112 83 038 D/C APR-15220
WIPLILO of Jamnagar - jetpur at Sikka 187 137 115 1039 D/C DEC-15220
yet to award10LILO of Jetpur - Rajkot at Metoda 0 0 040 D/C MAR-15220
WIP50LILO of Kadana - Dhansura at Modasa 23 17 14 041 D/C DEC-15220
WIP34LILO of Kangasiyali - Nyara at Hadala 67 45 25 042 D/C MAY-15220
Yet to award20LILO of Karamsad - Vartej at Fedra 0 0 043 D/C MAR-15220
Commissioned 08/14.78LILO of Karamsad-Vartej at Dhuvaran CCPP-III 152 152 152 7844 D/C AUG-14220
WIP60LILO of Karmsad -Vartej at Dhuvaran 152 143 94 1845 D/C APR-15220
Yet to award20LILO of Kasor - Vertej at Fedra 0 0 046 D/C MAR-15220
80LILO of Kasor-Amerli line at Fedra47 D/C MAR-16400
Trasmission Lines: Page 23 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
WIP82LILO of Kasor-Boated at Dhuvaran CCPP-III 148 127 96 648 D/C DEC-15220
Commissioned60LILO of Kasor-Vartej line at Dhuvaran 152 152 152 7849 D/C APR-14220
Yet to award24LILO of Morbi - Hadala at Tankara 0 0 050 D/C MAR-16220
WIP200LILO of Mundra (Adani)- Zerda line at Sankhari 45 0 0 051 D/C MAR-16400
WIP4LILO of Mundra - Chorania at Halvad S/S 6 6 6 252 D/C JAN-15400
W I P / Severe RoW problems89LILO of Mundra - Hadala at Halvad. 126 124 67 053 D/C AUG-15400
17LILO of Navsari - Vav at Popada54 D/C 220
WIP60LILO of Navsari -Bhilad at Atul S/s 16 16 14 555 D/C JAN-15220
Yet to awardLILO of Navsari-Talangpore line at Utran 0 0 056 D/C APR-15220
Commissioned50LILO of Navsari-Vav line at Bhestan S/S 38 38 38 1757 D/C JUN-14220
Yet to award50LILO of Radhanpur - Mehsana at Sankhari 0 0 058 D/C MAR-15220
Yet to award1LILO of Ranasan - Karamsad at Gatrad 0 0 059 D/C MAR-15220
Yet to award10LILO of Salejada - Bhat at Kerala 0 0 060 D/C MAR-16220
WIP50LILO of Sankhari - Jangral at Sankhar 53 13 0 061 D/C MAR-16220
Yet to award50LILO of Savarkundla - Visavadar at Bagasara 0 0 062 D/C MAR-15220
Sever ROW problem. Tender reinvited for remaining portionAPR-0934LILO of Shivalkha - Nanikhakhar at Kukma 54 40 40 1863 D/C APR-15220
Yet to award10LILO of Tappar - Hadala at Navlakhi 0 0 064 D/C MAR-17220
Yet to award20LILO of Ukat (Th) - Achhalia at Achhalia 0 0 065 D/C MAR-15220
WIP100LILO of Vadavi-Zerda at Sankhari 45 266 D/C DEC-15400
Yet to award28LILO of Wanakbori -Soja line at Dehgam (PG) S/S 0 0 067 D/C MAR-15400
WIP10LILO of one ckt Halvad - Morbi line to Bhimasar (PG)at Charadava S/S
6 0 0 068 D/C MAR-17220
Yet to award80LILO of one ckt Kosamba-Chorania line at Fedra 0 0 069 D/C MAR-16400
WIP113LILO of one ckt Kosamba-Mobha line at Suva 192 183 167 9070 D/C JAN-15220
Yet to award80LILO of one ckt Wanakbori -Soja line at Prantji S/S 0 0 071 D/C MAR-17400
Trasmission Lines: Page 24 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
28LILO of one ckt of Wanakbori - Asoj at Vyankatpura(Jarod)
72 D/C 220
WIP/Severe RoW Issue and Forest Clearance pending, waiting for SBWLmeeting
664Mundra (Adani) - Zerda line 1 997 451 275 073 D/C APR-15400
WIP.Severe RoW issues and Forest Clearance pending for Regional CommitteeMeeting
664Mundra (Adani) - Zerda line 2 956 896 860 52274 D/C MAR-15400
Yet to award290Nanikhakhar - Varsana - Chitrod 0 0 075 D/C MAR-16220
yet to award90Palitana - Talaja 0 0 076 D/C MAR-15220
Yet to award150Pipavav-Amreli 0 0 077 D/C MAR-17400
Yet to award50Pirana (PG) - Gatrad 0 0 078 D/C MAR-15220
WIP218Pooling station -Sankhari 275 155 130 079 D/C DEC-15400
Yet to award60Prantij - Agiyol 0 0 080 D/C MAR-16220
Yet to award70Prantij - Dhansura 0 0 081 D/C MAR-16220
Yet to award350Salaya (EPGCL generating station )-Halvad 0 0 082 D/C MAR-16400
Yet to award200Sankhari-Prantij 0 0 083 D/C MAR-17400
Yet to award220Shapoorji Pallonji generating station 0 0 084 D/C MAR-16400
W I P156Sikka - Moti Paneli line 259 154 139 2085 D/C APR-14220
Yet to award280Soja-Zerda 0 0 086 D/C MAR-16400
Yet to award140Suva - Achhalia 0 0 087 D/C MAR-15220
Yet to award90Termination of GPEC - Haldarva at Achhalia 0 0 088 D/C MAR-16220
WIP60Termination of one Achhalia- Jambuva line at Jarod 115 56 189 D/C DEC-15220
DEC-0986Utran - Kosamba Line-II90 D/C 220
WIP13Vadavi - Chhatral 88 20 4 091 D/C JUN-14220
Yet to award38Vadavi - Dhanaj 0 0 092 D/C MAR-16220
Yet to award53Vadavi - Viramgam 0 0 093 D/C MAR-14220
WIP240Vadavi-Halvad 394 66 38 094 D/C DEC-15400
W I PNOV-09239Vadinar(Essar)- Amreli (Balance) 531 450 369 13395 D/C MAR-15400
Trasmission Lines: Page 25 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
WIP (For stop gap arrangement, 220 KV Nakhatrana-Akrimota S/C line madeLILO to Jamanwada on date 29.03.2012
346Varsana - Jamanwada line 561 515 508 27096 D/C APR-15220
W I P,Severe RoW Issue110Varsana - Mokha 204 91 86 1697 D/C OCT-15220
Yet to award60Varsana-Bhachau 0 0 098 D/C APR-16220
WIP220Varsana-halvad 378 28 1 099 D/C MAR-16400
WIP120Visavadar - Timbdi 295 218 182 0100 D/C DEC-15220
Yet to award2Wanakbori S/y -Wanakbori S/y (existing) 0 0 0101 D/C APR-16400
.Yet to award200Wanakbori TPS-Soja 0 0 0102 D/C MAR-15400
Trasmission Lines: Page 26 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
HARYANA VIDYUT PRASARAN NIGAM LIMITED (HVPNL)
Work awarded.The nomenclature of work is Const. of multi-circuit line emantingfrom 400 kV Sub station Deepalpur enrouting 220 kV RGEC Sonepat, 220 kVHSIIDC Rai & 132 kV HSIIDC Rai
MAY-1344Deepalpur-Sonepat HSIIDC Rai 113 44 10 01 M/C MAR-15220
work is in progressAPR-11152Gurgaon Sector 72 - Nuh - Rangla Raipur 322 300 297 612 S/C MAR-15220
Work awarded to M/s K.Ramachandra Rao Transmission & Project Pvt. Ltd. dt.31.01.2014
Gurgaon Sector 72 -Gurgaon Sector 33 22 193 D/C APR-15220
Work in progress.24Gurgaon Sector-72- Gurgaon Sector-20 108 109 108 244 D/C JUL-15220
Work is in progress.JUL-1342LILO of Chormar - Fathebad line at Hukmawali 165 83 05 D/C MAR-15220
Work yet not awarded.5LILO of Madnpur - Kunihar line at Panchkula sector-326 D/C 220
JAN-112LILO of Moga-Hisar line at RGTPS Khedar7 D/C 400
JUL-1380LILO of both Ckt of Cheeka - Durala at Sonta 64 10 0 08 D/C JUL-15220
Work yet not awarded.And nomenclature has been changed now it become LILO of one circuit of 220KV D/C Sector 72 to Sector 52A, Gurgaon line (on multi circuit towers) at 220 KVsub-station Sector-57, Gurgaon
1LILO of gurgaon Sec -72 - Sector 52 (A) at Sector 579 D/C JUN-14220
220 kV A-4 to A-5 line is under construction(13.5 kM)whereas section of A-3 to A-4 is under review.
1LILO of one circuit A-3 Palla (Faridabad) - A5(Faridabad) at A4 (Faridabad)
59 31 29 310 D/C SEP-14220
Ready for commissioning .36LILO of one ckt of Badshahpur - Bhiwadi at HSIIDCBawal
64 64 64 3611 D/C NOV-14220
The line was charged partly on no load from Masudpur to TL No. 109 on dated16.06.2014 and from Samain to TL No-112 (Single Phase) on dated 01.07.2014to avoid theft of conductor.
91Masudpur-Samain line 182 182 182 4412 D/C SEP-14220
The Nomenclature of work is LILO of one circuit of Mau Bhiwadi D/C section of220 kV D/C Badshahpur Bhiwadi line at 220 kV substation HSIIDC BawalLine test charge on 19.10.2014
Mau - Bawal 64 64 64 1813 D/C OCT-14220
Work in progress.DEC-1027Palla (Faridabad) - A 5 (Faridabad) 59 31 31 314 D/C DEC-15220
WORK IN PROGRESS52Palwal (Meghpur) - Meerpur Kurali 106 99 90 1415 D/C DEC-14220
Work awarded M/s Varrsana Ispat on dt 01.07.2014.15Panchkula (PGCIL)- Panchkula Sector 3216 D/C AUG-15220
Trasmission Lines: Page 27 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
HIMACHAL PRADESH POWER TRANSMISSION CORP. LTD. (HPPTCL)
100Barsaini -Banala1 D/C MAR-17220
110Dehan-Hamirpur2 D/C MAR-15220
54Hatkoti-Pragati Nagar3 D/C MAR-14220
4Kairan-Chamera II (PG)4 D/C SEP-14220
2 nos. damaged .39Kashang - Bhaba (2nd Ckt) 100 100 100 235 S/C SEP-14220
.Kashang - Jangi Pooling Station6 D/C 220
35Koti-Karian7 S/C MAR-17220
.6LILO Jhakri A/Pur8 D/C MAR-14400
8LILO of Nalagarh-Baddi at Mandhala S/S9 D/C SEP-14220
12LILO of AD Hydro-Nalagarh at Fozal10 D/C SEP-14220
.LILO of Kasang - Bhbaba at Tidong-I11 D/C APR-15220
.LILO of Parbati III - Parbati Pooling station at Sainj12 D/C APR-14400
.LILO of one ckt of Nathpa Jhakri - Abdullapur at SwaraKuddu
13 D/C 400
.3Lahal -Budhil HEP14 D/C MAR-15220
72Lahal-Chamera15 D/C MAR-17400
.33Nalagarh -Kunihar16 S/C APR-14400
28Rauri-Kunihar17 D/C APR-14220
24Snail -Hatkoti (Swara Kudu)18 D/C MAR-14220
54Sunda-Hatkoti19 D/C MAR-15220
Trasmission Lines: Page 28 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
J&K POWER DEVELOPMENT DEPARTMENT (JKPDD)
Commissioned.31Alachi - Khalsi S/S 140 140 140 311 S/C JUN-1466
Commissioned.5Chutak HEP-Gramthong -II 29 29 29 52 S/C SEP-1266
Commissioned.10Chutak HEP-Kargil-I 55 55 55 103 S/C OCT-1266
Fund yet to be tied up.80Delina - Wahipora-Kishanganga4 D/C 220
Rerouting of line and ganglas s/s droped. Leh Army S/S shall be connected withLeh S/S.
9Ganglas - Leh Army base 46 22 0 05 S/C DEC-1466
Completedd & will be charge after tree cutting in Gramthang - SankooTransmission Line. Compensation of the trees are pending with DistrictAdministration. Sub-staton has been successfully back-charged on 09/10/2013.
27Gramthong -II - Sankoo 154 154 154 276 S/C SEP-1466
Completed & will be charge after completion of Mulbek S/s. Testing is underprogress.
23Khangral - Mulbek -II 117 117 117 237 S/C SEP-1466
Slow progress.51Kharu S/S - Himya S/S 242 239 204 368 S/C SEP-1466
Fund yet to be tied up.12LILO of Wagoora - Mirbazar at Lassipora9 D/C 220
Work yet to start.LILO of one ckt of Kishanpur - New wanpoh atBaglihar HEP
10 D/C SEP-14400
Commissioned.25Leh (C.P.) - Kharu S/S 107 107 107 2511 S/C SEP-1466
Rerouting of line and ganglas s/s droped. Leh Army S/S shall be connected withLeh S/S.
10Leh III - Ganglas 53 29 8 212 S/C SEP-1466
Completed & will be charge after completion of Mulbek S/s. Testing is underprogress
28Mulbek-II - Kargil -I 124 124 124 2813 S/C SEP-1466
Stringing completed.The line could not be charged due to dipute betweenPSTCL and JKPDD on sharing of cost of bay at Shahpur Khadi.
MAR-0840Thein (RSD)-Hiranagar (2nd ckt) 117 117 117 4014 S/C SEP-14220
Severe RoW and Court case.APR-0848Udhampur- Gladni 165 165 165 4815 S/C SEP-14220
ROW issue at Dangarpora.Original Project provision exhausted.MAR-0960Wagoora-Budgam- Zainkote 118 103 82 1716 D/C SEP-14220
ROW issues and slow pace of execution of work by contractor due to paddycultivation.
104Wagoora-Mirbazar 177 175 170 4917 D/C SEP-14220
Slow pace of execution of work in Zainkote-Alusteng section. Original Projectcost provision exhausted, For Alusteng - Miarbazar section contract case sent toGovt for approval.
MAR-10254Zainkote-Alusteng-Mirbazar 441 410 68 018 D/C SEP-14220
Trasmission Lines: Page 29 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
JHARKHAND STATE ELECTRICITY BOARD (JSEB)
Due to poor progress of working agency, the work order is cancelled.APR-0980Chaibasa -Ramchandrapur1 D/C 220
Trasmission Lines: Page 30 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
KARNATAKA POWER TRANSMISSION CORP. LIMITED (KPTCL)
Work under progress.SEP-0670Chikkodi-Kudachi 120 120 90 401 D/C DEC-15220
21/21 sections laid. 20/20 joints completed. Cable testing to be taken up by theagency for which opening of link boxes is required. BBMP permission is requiredto open link boxes.
11HSR Layout - Nimhans S/S 0 0 0 92 UGCable
NOV-14220
Location 41 comes in forest area and hence it was proposed to divert the forestland and the proposal has been submitted to additional principal chiefconservator of forests, Bangalore on 09.10.2013.APCCF made observationsregarding survey which was attended and resubmitted for approval on28.12.2013.The RFO, Hiriyur has inspected the spot on 01.05.2013 andinformed to resubmit the forest boundary details. The location has beenresurveyed and the forest map has been submitted to RFO, Hiriyur on23.05.2014.From RFO, Hiriyur to DCF, Chitradurga, then to CCF, Bellary, then toAPCCF, Bengaluru and then to ACS, GoK on 09.10.2014.To prevent theft, line charged on 03.10.2012 from location 102 to 431 fromGowribidanur end (route length 93 km) and from loc. 102 to 47 on 06.09.2014(route length 14.5 km)by obtaining provisional approval from electricalinspectorate. Total route length idle charged is 107.5 km (route length).02 TBs at Gowribidanur commissioned on 09.11.11 & 20.12.12.
AUG-08244Hiriyur - Gowribidanur 436 432 424 2223 D/C DEC-14220
Work under progress.65Ittagi - Kudligi line 119 47 414 D/C MAR-15220
Work under progress.ROW problem for entire line of Gijihally to Kanthenahally limits,case filed in DCcourt, Hassan on 20.03.2013. Being pursued.
8LILO of Arasikere -Kanthenahalli at Arasikere S/S 21 9 25 D/C FEB-15220
220kV loop in tower stub concreting done.Excavation for 220kV loop out tower iscompleted
1LILO of Gadag - Lingapur at Koppal 2 16 D/C MAR-15220
Work under progress.(1) ROW problems at corridor between 4 & 5 pending inJMFC, Hoskote, Additional Civil Judge(Junior division) since 9.12.10.(2)Loc 4 & 5: Case filed by party at High court vide Writ Petition: 46532-533/2012 dtd: 19.11.2012 seeking injunction.(3) Loc 4 : The petitioner has obtained stay order vide WP 32606-32607/2013from the Hon'ble High Court against the proceedings in the OS No: 253/2010 on02.09.13.
SEP-0726LILO of Hoody-Kolar at Hoskote 55 35 31 07 D/C DEC-15220
Trasmission Lines: Page 31 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
(4) Loc 36 : Case No: MAG(CR)/1/13-14 at DC Court, B'lore Rural. Posted forOrders. Being pursued.Work under progress.6LILO of RTPS - Lingasugur S/C line at Mallat (Manvi) 13 12 118 D/C MAR-15220
Forest clearance required for 3.836 hectares in locations 25,34 &35. Stage-Iapproval received on 20.04.11.NPV & compensatory afforestation charges of Rs.28,01,923/- paid on June-2011.Additional NPV & compensatory afforestation charges of Rs.4,04,973/-paid on 01.10.2011.Demarkation of the line corridor in the forest land done on01.04.2013.Letter addressed on 01.04.2013 to forest authorities to process forstage-II. Stage-II clearance approval awaited.
FEB-0835LILO of Shimoga - Mysore at Dandiganahally 70 62 61 229 D/C MAR-15220
Work under progress. (1) Local ROW problems atlocations: (i)9,10,14,16,17,19 - being pursued.(2) Forest approval at Loc 17 to 21 : Stage-I clearance pending. Revised routeproposal through forest area submitted for approval to Aranya Bhavan on9.10.12, Approval awaited.Regarding condition No.4 : Compensatory afforestration charges of Rs.6,08,000/- and condition no.5 : Net present valur (NPV) amount of Rs.15,89,504/- totalingof Rs.21,41,623/- payment made on 06.05.14.DC COURT:For corridor 8-9 & 10-11: Case filed in DC court on 27.05.2013. Being pursued.
9LILO of Somanahalli - Malur at Vikas Tech Park 39 15 0 010 D/C DEC-14220
Work under progress.120Madhugiri - Pavagada line 214 149 12211 D/C MAR-15220
Work under progress.
Constraints : (i) ROW problem at loc 15 & 16 being pursued.(ii) Case filed in DC Court, Hassan for ROW problems at loc. 15,16,28,29,30,31& 32 during March 2013. Being pursued.Case cleared at locations: 30, 31 & 32on 15.07.2014.
SEP-0915Shanthigrama - B4 line ( near Hedanahalli limits) 34 33 30 912 D/C MAR-15220
Kolar_Malur line charged. Malur Somanahalli line partially charged.
Case pending in High Court: (i) At Loc 59 (for stub concreting) : Case pending inHigh Court since 31.08.2013. Being pursued.
180Somanahalli - Malur - Kolar 271 266 265 10413 D/C DEC-15220
Trasmission Lines: Page 32 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
(ii)Loc 84,85,86,88 & 89: Case filed by KPTCL in DC Court on 27.01.2014. Beingpursued.(iii) Loc 84,85,86,88 & 89 : Case filed by party in Court of Junior Civil Judge ,Bangalore Rural district on 11.02.2014. Being pursued.(iv) Loc 135,135A,135B, 135C & 136 : case filed in High Court by party (IndiaInternational School) on 19.06.2013. Being pursued.
LOCAL ROW : Loc 137 -147: Row problem for stringing , farmers aredemanding higher compensation.
Work stopped due to severe ROW problems.(1)ROW problem at Loc. No.6 Case pending at JMFC, Anekal since 04.10.2010.Being pursued.(2) Loc Nos. 29-33: Tree cutting permission awaited from forest Department.Being pursued. ACF Malleshwaram orally approved on 12.07.2013 to carry outthe stub work without cutting trees.(3) Local ROW issues at Loc no. 22 24 : Residential Layouts Celebrity Housingproperty. Being pursued locally.
23Somananahalli Malur I & II lines - Jigani 34 6 4 014 D/C DEC-15220
Commissioned 07/14.3Terminating tower point - HSR Layout (Cable work) 0 0 0 315 UGCable
JUL-14220
220 kV DC line from 220 kV Tubinakere S/s to Kothipura S/s :(1) (i) ROWproblems pending in JMFC Ramanagara for- (a) Loc 81 since 2009(ii) ROW problems pending in JMFC Channapatna for - (a) Loc 129-130 since2009(2)ROW problems pending in DC Court Ramanagar for (a) Loc 133: Case filedon 24-08-2011.Reserved for orders.(3)ROW problems at locations 208: being pursued locally.
220-66 kV MC line from 220 kV Kothipura to Bidadi S/s:(1) ROW problems pending in DC Court Ramanagar for Loc 15 : Case filed on19-07-2012.(2) ROW problems to be solved locally at 8 locations 2,3,4,4A,5,6,33 & 77
JUN-09137Tubinakere- Kothipura 277 271 244 8716 D/C DEC-15220
Work under progress.39Vajamangala - Kadakola 53 49 35 017 D/C AUG-15220
Varahi-Khemar 150 Ckm (75 km route length) charged on 22.07.2010. BalanceWork under progress.
JUL-0870Varahi -Khemar- Kavoor in the existing 110 kVcorridor(balance portion)
420 419 419 24318 D/C MAR-15220
Trasmission Lines: Page 33 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
ROW problem pending at Civil courts and DC court :(i) For Corridor between 20& 21, case pending in Jr. Division, Mangalore since 2010, Being pursued.(ii) ForCorridor between 2-3A-2A, case filed in Civil Judge ( Jr. Division) Mangalore,Interim order received against KPTCL on 28.05.2012. An appeal is filed in theCourt of Civil Judge (Sr. Division), Mangalore. Being pursued.
Trasmission Lines: Page 34 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
KERALA STATE ELECTRICITY BOARD (KSEB)
ATS of Pallivasal HEPLILO of Idukki-Udumalpet at Pallivasal HEP1 D/C 220
ATS of Thottiar HEPLILO of Ldukki - Kozikode at Kodakpara2 D/C 220
Commissioned 09/14.36LILO of New Pallom- Kayamkulam at Punnapra 66 66 66 363 D/C SEP-14220
2 cases pending before High Court.57Pothencode - Kattakkada 108 100 70 04 D/C FEB-15220
ATS of Thottiar HEPThottiyar - Kodakpara5 D/C 220
Trasmission Lines: Page 35 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
M.P. POWER TRANSMISSION CORPORATION LIMITED (MPPTCL)
Work under progress.About68% work completed.200Ashta - Indore - II (Jetpura) 317 297 266 811 S/C onD/C
DEC-14220
Work under progress.About 12% work completed.95Ashta - Shajapur 72 17 13 322 D/C MAR-16220
40Berchha - Shajapur3 D/C MAR-15220
Commissioned 11/14.225Chhegaon - Julwania 340 339 305 594 D/C NOV-14400
80Dada Dhuniwale TPP - Moondi Pooling Point5 D/C 400
Commissioned 11/14.14Daloda - Mandsaur 48 48 48 146 D/C NOV-14220
Work under progress.About 30% work completed.152Damoh - Tikamgarh (2nd Ckt) 457 S/C JAN-15220
Work under progress.About 60% work completed. Tender opened for remainingworks on 17.04.13 .Case under process.
5Gwalior (PGCIL) - Gwalior-II 13 10 5 08 D/C MAR-14220
180Handia - Ashta(2nd stage)9 D/C 400
160Julwania - Kukshi10 D/C 220
220Katni - Damoh11 D/C 220
Commissioned 11/14.7LILO of Jabalpur (Sukha) - Birsinghpur/Amarkantak atPanagar
21 21 21 712 D/C NOV-14220
30LILO of Bhilai - Seoni at Balaghat / Kirnapur13 D/C 400
40LILO of Both ckt of Badod - Ujjain at Ujjain14 D/C 220
40LILO of Damoh - Bhopal at Sagar15 D/C 400
40LILO of Handia - Barwaha at Handia16 D/C 220
40LILO of Indira Sagar - Satpura at Handia17 D/C 400
40LILO of Indore - Itarsi at Handia18 D/C 400
20LILO of Indore-II - Ashta at Shankargarh19 D/C 220
7LILO of Jabalpur (Sukha) - Birsinghpur / Amarkantakat Panagar
20 D/C DEC-14220
4LILO of Jabalpur - Amarkantak at Gorabazar21 D/C 220
.20LILO of Khandwa (PGCIL) - Rajgarh at Chhegaon22 D/C 400
40LILO of Nagda - Rajgarh at Badnawar23 D/C 400
Trasmission Lines: Page 36 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
40LILO of Nagda - Ujjain at Ujjain24 D/C 220
Work under progress.About 8% work completed.10LILO of Narsinghpur - Itarsi at Pipariya 18 4 2 025 D/C MAR-15220
40LILO of Ratlam - Badnagar at Badnawar26 D/C 220
20LILO of both ckt Bina - Guna at Ashoknagar27 D/C 220
8LILO of both ckt Indore - Pithampur at Indore28 D/C 220
40LILO of both ckt Nagda - Ujjain at Ujjain29 D/C 220
40LILO of both ckt of Ratlam - Badnagar at Badnawar30 D/C 220
Work under progress.About 45% work completed.10LILO of one ckt of Bina - Gwalior at Datia 7 6 5 031 D/C MAR-16220
40LILO of one ckt Bhopal - Ashta at Mugalia Chhap.32 D/C 220
2LILO of one ckt of Bansagar (Tons) - Satna at Sirmour33 D/C 220
20LILO of one ckt of Bhopal - Bina at Ganjbasoda34 D/C 220
10LILO of one ckt of Bina - Sagar at Bina35 D/C 220
13LILO of one ckt of Indore - Barwaha at Simrol36 D/C 220
20LILO of one ckt of Khandwa (PGCIL) - Rajgarh(PGCIL) at Chhegaon
37 D/C 400
4LILO of one ckt of Pithampur - Rajgarh (PGCIL) atDhar
38 D/C 220
.LILO of one ckt of Vindhychal - Satna at Nigrie39 D/C 400
6LILO of second ckt of Auraiya - Malanpur at Mehgaon40 D/C 220
10LILO of second ckt of Damoh - Tikamgarh at Damoh41 D/C 220
230Maheshwar (HEP) - Rajgarh (Dhar)42 D/C 220
240Moondi Pooling Point - Handia43 D/C 400
80Morena - Malapur44 D/C 220
150Nagda - Ujjain line45 D/C 400
150Pithampur - Badnawar DCDS46 D/C 400
60Pithampur - Gandhinagar47 D/C 220
Trasmission Lines: Page 37 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
280Pithampur - Moondi Pooling Point48 D/C 400
70REVA TPP - Moondi Pooling Point49 D/C 400
160Satna - Chhatarpur50 S/C 220
Work proposed under PPP Scheme .About 14% work completed.492Satpura - Ashta 651 251 98 051 D/C MAR-15400
.40Shri Singaji TPP - Moondi Pooling Point52 D/C 400
90Ujjain - Dewas53 D/C 220
Trasmission Lines: Page 38 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
MAHARASHTRA STATE ELEC. TRANSMISSION COMPANY LTD. (MSETCL)
Agency has already given a letter on Dt. 14.04.2012 for cancellation of work.44Ambazari - Mankapur 37 0 0 01 M/C MAR-16220
line is to be deleted. As line is not possible due to major ROW problem as linepasseing through N.A. and defence land only.
184Ambazari - New Buttibori-II 0 0 0 02 M/C APR-16220
3 Nos railway crossing involved.Out of which for Loc nos 71-72 stringingis done on Dt.10.04.2014.Permission for Loc No.27-27A is received onDt.10.09.2014.RevisedDemand of 87-88 received fron CR,Nagpur.
DEC-1030Amravati - Badnera line (2 Ckt) 1 1 1 303 S/C MAR-15220
Arbitral award- Group C. Tender being processed for balance work.104Apatapa - Anjangaon 172 77 63 04 D/C MAR-16220
Commissioned 07/14.254Babhaleshwar - Aurangabad II 373 373 373 2545 D/C JUL-14400
After GMRT objection line route diverted from Loc. No.:-242 to 298 hence casted28 Nos fundations anderected 15 Nos. towers are not in use. ROW cases filed at Collector Thane &Collector Pune .Forest involved 114+36.243 , forest proposal being submitted toforest office.Work in progress.
400Babhaleshwar - Kudus 708 545 468 1546 D/C SEP-15400
Court cases-2 nos. Next hearing on 21.12.13. Contract of M/s. M.M.Ghatge isclosed at Zone office & that of M/s. B. N. Chaudhari closed at C.O. After closureof contract, fresh tenderisation will be done for balance work the estimate ofwhich was already submitted.
MAR-0753Boisar (PG)-Wada 211 173 165 287 S/C onD/C
MAR-16220
work in progress.Total ckm:329.DEC-11179Boisar II-Borivali 259 252 231 2858 M/C MAR-15220
Forest - NOC for non- involvement of forest receivedHighway Crossing - NAROW - 39 Nos cases -.CKM is 41.26.
40Chandrapur II - MIDC - Ballarshah 66 66 36 09 D/C APR-15220
Line reapeted, hence to be deleted.40Chandrapur II - Chandrapur (MIDC) 79 28 11 010 D/C APR-15220
work in progress.40Chandrapur II - Tadali 79 33 18 011 D/C SEP-15220
Commissioned on dtd. 07.01.20141Chandrapur TPS - Chandrapur S/S 11 11 11 412 D/C JAN-14400
Trasmission Lines: Page 39 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
collector order received for balance 22 foundations,3 cases orderawaited, 2 kept for alignment(total 27). police protection letter issued toconcerned police station forbalance works.
87Eklahare - Pimpalgaon 153 157 119 1213 D/C MAR-15220
Work in Progress. Forest- 0.94 Ha- NOC received.MAR-1185Ghatodi - Hingoli line 268 268 268 6414 S/C JAN-15220
line name is Kalmeshwar -Warud. Work is slow by agency. Forest , PTCC,Railway proposals yet not submitted by agency.
170Kaleshwar - Warud 276 159 72 015 D/C DEC-15220
Work in progress68Kalwa-Borivali 53 52 5 116 M/C DEC-15220
Commissioned 09/14.126Khaperkheda - Butibori -I 12617 D/C SEP-14220
Work will be after completion of 220KV Koradi - Butibori line.42Koradi II - Ambazari 27 0 0 018 D/C onM/C
MAR-16220
Forest involved 10.36Ha.Proposal pending at Forest Nodal Officer Nagpur.MAR-11106Koradi II - Butibori 189 133 117 2219 D/C onM/C
DEC-15220
Forest: 16.9392 Ha (Wardha :3.85 & Nagpur:13.0892 )1st stage approvalreceived.FRA certificate awaited from Collector office Nagpur.3 nos of ROW loc pending at Nagpur.1 no of loc pending at High Court Nagpur.
APR-11239Koradi TPS - Wardha 336 325 322 19920 D/C FEB-15400
2 no of ROW cases pending at Collector Office, Nagpur.1 NO ROW casepending at Nagpur & for 1 no police protection required.Forest involved4.122Ha.FRA certificate is awaited from collector office.
DEC-1329Koradi TPS-New Khaparhkeda 72 65 62 521 D/C MAR-15220
"Work in progress.CKM-238.9 6.625CKm line (ie from Gantry of Koradi-II S/Stn to Loc no-07 of Koradi WardhaD/C line ) of 400 KV Koradi II to Wardha (PG) S/S with Quad Conductorlinecomissined on dt.23.03.2013 for giving start-up power to Koradi-II S/Stn..Name of the Line 400 kVKoradi Wardha Line "
239Koradi-II - Koradi-III 336 325 320 19922 D/C MAR-15400
1 nos of railway crossing involved- Loc. 31-32- Proposal submitted. Approvalawaited.
62LILO of Amravati - Badnera line at Nandgaon Peth. 101 65 52 023 D/C SEP-15220
Line to be deleted.LILO of Bhadravati - Parli at Chandrapur TPS24 D/C 400
Work stopped due to ROW cases.14LILO of Bhugaon - Pusad at Wardha (PG) 33 13 12 025 D/C JUN-15220
Trasmission Lines: Page 40 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Arbitral award- Group B. LOA issued to S P Power.9LILO of Dhule - Malegaon at Sayne 18 10 10 026 D/C MAR-15220
Line to be deleted.LILO of Ekherla - Babhaleshwar at Nasik TPP27 D/C 220
National Highway NH6 (Dhule-Surat) at loc No 62-63proposal is submitted to NHAI ofiice on 22.01.14.The GM(T) & Project Director PIU Dhule, submitted the proposal to CGM(T),NHAI Mumbai forseeking the permission for crossing.
56LILO of Gangapur - Malegaon (Satana) at Sakri(Shivajinagar)
97 97 97 2828 D/C MAR-15220
Commissioned 11/14.5LILO of Jeur - Karkambh at Shinde SKS 529 D/C NOV-14220
since now not required. This line is to be deleted.10LILO of Kalwa - Padghe at Bhiwandi-IV 0 0 0 030 D/C APR-15220
Arbitral award- Group B. Work order is placed on M/s. Anand Electical on02.09.2013.
8LILO of Kandalgaon - Lonand at Lonand MIDC 10 11 11 031 D/C MAR-15220
ROW issues pending for 2, 39, 42 locations.26LILO of Kolhapur - Sawantwadi at Mudhaltitta 44 40 36 432 D/C MAR-15220
LILO of Parvati - Phursungi at Kondhwa 5 5 5 033 D/C MAR-16220
Arbitral award- Group B. Work order for balance works of line are awarded toM/S Vishwas Elect, Nanded on 26.02.14.
12LILO of Sawangi - Bhokardan at Phulambri 20 8 0 034 D/C MAR-15220
Forest land involved in the route at Loc. No. 16A, proposal yet to be approved.The proposal is returned by Nodal Officer, Nagpur to Dahanu forest dn. forcompliances of Dwellers Act. Obtaining of NOC under Dwellers Act is in processfrom concerned Grampanchayats.
MAR-0716LILO of Tarapur-Borivli at Boisar II 15 15 12 1135 D/C MAR-16220
Commissioned 05/14.154LILO of Waluj - Bhusawal at Thaptitanda 15436 D/C MAY-14400
For 18 nos of ROW loc order received from Collector, C'pur . Police protectionrequired. For 13 nos of ROW locations cases pending at Collector C'pur.
50LILO of Warora - Wardha at Warora 42 11 6 037 D/C MAR-15220
Work in progress.MAY-12154LILO of both ckt 400 kV Bhusawal II - Aurangabad I atAurangabad-II
250 127 52 038 D/C JUN-15400
.LILO of both ckt Parli (GCR) - Beed at Parli39 D/C 220
Work in Progress.97Malegaon - Kalwan 170 153 124 040 D/C SEP-15220
Contract of M/s. R&C is closed. Fresh tenderisation is held up due to non receiptof assurance payment from ISPAT.
30Nagothane - Wadkhal 93 56 44 041 D/C MAR-16220
Work in Progress. Forest NOC received.73Nanded - Bhokar 122 120 111 1442 D/C MAR-15220
Arbitral award- Group C. Tender for balance work to be refloated136Nanded - Krishnoor 51 28 0 043 M/C MAR-16220
Trasmission Lines: Page 41 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Arbitral award- Group C. Tender for balance work to be refloated.32Nanded - Narsi 50 22 0 044 D/C MAR-16220
2 nos ROW locations pending at Nanded.1 no pending due to valuation of fruitbearing tree not received from krushi Adhikari.
20Nanded - Waghala 52 50 49 1145 D/C MAR-15220
Nasik TPP - Nasik (MSETCL)46 D/C MAR-15400
Work in progress.MAR-11247New Bhusawal - Chalisgaon 428 428 422 22747 D/C FEB-15220
ROW for remaining 10 location.30Padghe - Tarapur 13 3 0 048 D/C MAR-15400
Commissioned 09/14.78Purti - Butibori - III 7849 D/C SEP-14220
Work in progress . Forest approval received.133Sawangi - Bhokardhan 226 220 220 5650 D/C JUN-15220
Commissioned 05/14.9Thaptitanda (Aurangabad -II) - Ektuni 951 D/C MAY-14400
Work not started since land not available.32Uppalwadi - Mankapur 28 0 0 052 M/C MAR-15220
Work not started. Shifting of U/G cable involved o start work.54Uppalwadi - New Pardi 46 0 0 053 M/C MAR-16220
322Wardha (PGCIL) - Ghatodi 510 312 197 054 D/C MAR-16220
Order received from Collector Office Wardha & Chandrapur.Police protection isrequired.
165Warora - Wardha 280 229 215 5855 D/C MAR-15220
Trasmission Lines: Page 42 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
MEGHALAYA ENERGY CORP. LTD. (MeECL)
No issues of forest clearance and no court cases. Work held up due to nonpayment of compensation to the land owners.At the present the assessment isprepared and likely to be cleared within this year.
17Killing (Byrnihat)-EPIP-I 19 19 19 61 M/C MAR-15132
Work completed and line charged on 28.01.2014.5LILO of Agia - Nangal at Mendipathar 9 9 9 52 D/C JAN-14132
No issue on forest clearance and no court cases.Work held up due to ROWproblem. The PHED,GOMe has complained and filed and FIR against Loc No. 3to 8. Overall status is 90% completed.
10LILO of Mawlai - Cherra at Mawngap. 16 15 15 43 D/C MAR-15132
No issues on forest clearance. Tower materials has been received. Procurementof other line materials is in process.
4LILO of NEHU - Khliehriat line at Mustem 4 0 0 04 D/C MAR-15132
No issues on forest clearance. Materials procurement is in process.6LILO of NEIGRIHMS - Khliehriat at Lad Nongkrem 9 0 0 05 D/C JUL-16132
Land for the substation has been identified and procurement of the same is inprogress.
20LILO of Rongkhon - Ampati at Praharinagar 34 0 0 06 D/C DEC-16132
Work executed by Power Grid. The LILO of the 400 kV Palatana- Bongaigaonline was energised w.e.f. 03.03.2013 through the completed dead-end loop-outtower. Dead end tower falling in the additional land required could not becompleted due to ROW problem. ROW has been resolved and the work for the400 kV Loop out bay has been resumed on the 07.11.2014.
4LILO of one ckt Palatana - Bongaigaon line 10 9 9 47 D/C MAR-15400
Work completed and line charged on 21.12.2011.66Mawngap - Sumer 102 102 102 668 D/C DEC-11132
Work Completed and line charged on 06.08.2013.92Nangalbibra - Agia 316 316 316 929 S/C AUG-13132
No issues on forest clearance and no court cases. Jungle cutting in Meghalayaportion of the line is under progress. Stringing Work is in progress, howeverthere is ROW problem in Loc No. 297 to 300 due to claim of compensation forthe house constructed along the corridor of the line.Matter has been taken upwith the concerned authorities.
92Nangalbibra - Agia line 0 0 0 5210 S/C MAR-15132
No issues of forest clearance. Survey completed. Materials procurement is inprocess.
6New Umtru HEP - Norbong (EPIP-II) 7 0 0 011 D/C DEC-15132
No issues on forest clearance and no court cases. ROW problem resolved. Workheld up presently due to fund constraint.
33Rongkhon S/S - Ampati 103 91 83 012 D/C DEC-15132
Trasmission Lines: Page 43 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
ORISSA POWER TRANSMISSION CORPORATION LTD. (OPTCL)
Work for river bed piling is in held up due to flood in the river.DEC-0920Bidanasi -Cuttack 43 12 6 01 D/C JUN-13220
158Bolangir - Kesinga2 D/C JUN-15220
60Brkote - Deogarh.3 D/C MAR-17220
Techno commercial evaluation is over.64Cuttack (OPTCL) - Pratapsasan4 D/C MAR-16220
As informed by SLDC Odisha, 50 KM. OPGW work is in progress. Line is readyand has been test charged.
470Ib-Meramundali 625 625 625 4705 D/C DEC-14220
104Jatni (Urrata) - Puri (PGCIL)6 D/C MAR-15220
Work awarded on 27.7.12 .17Jayanagar (OPTCL) - Jayanagar (PGCIL) 37 0 0 07 D/C MAR-15220
16LILO of (Existing) Budhipadar-Burla at Lapanga8 D/C APR-15220
Tender floated & will be opened on 29.08.12.8LILO of (Existing) Bhanjanagar - Meramundali atNarasinghpur
9 D/C MAR-14220
29LILO of (Existing) Budhipadar - Tarkera atKuanrmunda.
10 D/C SEP-13220
Drilling, blasting & site levelling og S/S site is in progress.9LILO of (Existing) KV TPPS - Joda atGopinathpur,Keonjhar
1611 D/C SEP-13220
Work progress of contractor is very slow.5LILO of (Existing) Rengali - Tarkera at Bonai. 1812 D/C JUN-13220
79LILO of Duburi - Balasore at Dhamara13 D/C SEP-15220
11LILO of IB- Thermal-Meramandali at Lapanga14 D/C JUN-13400
4LILO of Indravati - Theruvali at Kasipur15 D/C MAR-15220
10LILO of Katapalli - Bolangir at Bargarh (New)16 D/C MAR-17220
10LILO of Meramundali - Duburi at Dhenkanal (New)17 D/C MAR-17220
20LILO of Meramundali - Ib at Nisa (Near Angul)18 D/C MAR-16400
7LILO of Narendrapur - Mendhasal at Attri (OldKaradagadia)
19 D/C MAR-15220
200LILO of Pratapsasan - Cuttack at Jagatsinghpur20 D/C MAR-17220
36LILO of Rengali - TTPS at Chendipada21 D/C MAR-16220
Substation, structure foundation work, boundary wall & residential quarter workin progress.
6LILO of Rengali - Tarkera at Bonai 8 0 0 022 D/C MAR-13220
Trasmission Lines: Page 44 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
44Lapanga (PGCIL) - Sundergarh.23 D/C MAR-15400
.Malibrahmani - Angul For evacuation of power24 D/C 400
Line is completed and charged.62Mendhasal-Bidanasi 117 117 117 6225 D/C DEC-14220
Work is being executed by PGCIL. Delayed due to ROW problem. Work hasbeen restarted at 7 tower locations.
192Meramundali-Duburi (1st Ckt) 282 278 275 17726 D/C MAR-15400
28Mukhiguda (OHPC) - Jaypatna.27 D/C MAR-15220
Trasmission Lines: Page 45 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
POWER AND ELECTRICITY DEPARTMENT, MIZORAM (P&ED Mizo)
5LILO of Zemabawk - W.Phaileng at Sihhmui 0 0 01 S/C DEC-13132
Turial HEP - Aizawl2 S/C MAR-14132
Trasmission Lines: Page 46 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
POWER TRANSMISSION CORP. OF UTTARAKHAND LTD. (PTCUL)
DPR prepared .sending of DPR to funding agency is in progress146Almora-Pithoragarh 0 0 0 01 D/C JUN-16220
Construction of line as per Connectivity Schedule of Generators in YamunaValley.
94Arakot -Mori and LILO of Arakot -Mori at Hanol Tuni 0 0 0 02 D/C MAR-18220
Construction of line as per Connectivity Schedule of Generatiors in YamunaValley.
52Devsari-Karanprayag 0 0 0 03 D/C NOV-17220
Construction of line as per Connectivity Schedule of Generators in YamunaValley.
76Jakhol -Sankri -Mori and LILO of Jakhol -Sankri -Moriat Natwar Mori
0 0 0 04 D/C MAR-18220
Contract has been awarded on 06.05.11 to M/s TATA Project Ltd., contracteffective date is 14.10.11 and GMVN has not given the permission to cross theAuli Ropeway, hence crossing by underground cable is proposed at Joshimath.Land sliding zone being encountered at village Malli Tangri and Talli Tangri thesurvey and forest case yet to be completed. Forest Case of 51.3 Hect. is underpreparation. Total Progress 6%.
40Joshimath - Kunwari Pass (Pipalkoti)5 D/C JUN-18220
34Kashipur - Mahuakheraganj6 D/C SEP-14220
Retendering is under Process.184Kuwari Pass (Pipalkoti)-Karanprayag -Srinagar 0 0 0 07 D/C JUN-16400
Contract has been awarded on 06.05.11 to M/s TATA Project Ltd. contracteffective date is 03.09.11 and will be taken after award of 400 KV Pipalkoti S/s.Total Progress 11%.
2LILO of Muzaffarnagar - Vishnu Prayag at KuwariPass (Pipalkoti)
6 0 0 08 D/C DEC-15400
Construction of line as per Schedule of construction of Singoli HEP and to beconstructed by L&T.
5LILO of Baramwari - Srinagar at Singoli Bhatwari 0 0 0 09 D/C OCT-16220
Tendering is under process.12LILO of Kashipur - Pantnagar line at Jaffarpur10 D/C JUN-15220
Commissioned 06/14.5LILO of Khodri - Rishikesh at Dehradun 10 10 10 511 D/C JUN-14220
The work at Pala Maneri HEP stopped as per GOI order.10LILO of Loharinagpala - Koteshwar at Pala - Maneri 0 0 0 012 D/C 400
Construction of line as per connectivity schedule of generatiors in Yamuna Valley10LILO of Mori - Dehradun line at Nogaon13 D/C MAR-18220
Construction of line as per Schedule of construction of Langrasu.16LILO of Nandprayag -Karanprayag at Langrasu 0 0 0 014 D/C NOV-17220
Tendering is under process.1LILO of Rishikesh-Dehradun at Harrawala 0 0 0 015 D/C MAR-15220
LoA is to be issued.10LILO of Roshnabad -Puhana at Pirankaliyar S/S 0 0 0 016 D/C JUN-15220
Trasmission Lines: Page 47 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Tender has been floated.70LILO of Vyasi HEP - Dehradun at Dehradun (PG) S/S 0 0 0 017 D/C APR-16220
Regarding Forest land Transfer proposal nodal officer Dehradun raised queriesvide letter no 3042 dated 01-06-2013. Reply of the same is being done. Totalprogress 10%
24Lata Tapovan- Joshimath 36 0 0 018 D/C DEC-15220
The work at Loharinagpala HEP stopped as per GOI order.180Loharinagpala-Koteshwar line 0 0 0 019 D/C 400
Commissioned 08/14.34Mahuakheraganj-Kashipur S/S 61 61 61 3420 D/C AUG-14220
Construction of line as per Connectivity Schedule of Generators in YamunaValley.
200Mori -Dehradun 0 0 0 021 D/C MAR-18220
Forest approval granted on 02.04.2013.At present Revenue Dept. is beingperused for land transfer. Total progress 15 %
182Rudrapur(Brahmwani) - Ghansali-Srinagar line 248 0 0 022 D/C DEC-16220
excavation and benching is in progress at tower no. 15,19 and 39 Total Progress12%.
28Srinagar HEP - Sringar 400 kV S/S. 39 0 0 023 D/C DEC-15400
Tendering completed, contract signed with M/s Cobra on 24-12-2013. Workstarted date 24-02-2014. Survey work is in progress. Route alignment 138 Km.detailed survey 127 Km. Location contouring 112 Nos.alternative routealignment through Kotdwar in progress
304Sringar - Kashipur 0 0 0 024 D/C DEC-18400
Contract has been awarded on 06.05.11 to M/s TATA Project Ltd. contracteffective date is 03.09.11 Forest case prepared for 43.694 Hect. and submittedto DFO Joshimath/ DM Chamoli. NOC from 04 Nos. village panchyat NaurakhAgthalla, Tangri Talli and Tangri Malli is pending. Matter is being pursuedGOU/District Administration.
40Vishnugad - Kuwari Pass (Pipalkoti) 62 0 0 025 D/C DEC-15400
Trasmission Lines: Page 48 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
PUNJAB STATE TRANSMISSION CORPORATION LIMITED (PSTCL)
Commissioned 05/14.75Dhuri (Bhalwan) - Dhanaula 751 D/C MAY-14400
Line energised on 21.05.1438Dhuri - Dhanaula 129 129 129 752 D/C JUL-14220
Work is in progress.130Goindwal Sahib - Bottianwala 201 147 16 03 D/C DEC-15220
Work in progress.55Goindwal Sahib - Chola Sahib 92 92 92 404 D/C DEC-14220
Commissioned 07/14.3LILO of Baja khana - Mukatsar at Kotkapura 7 7 7 35 D/C JUL-14220
Commissioned 05/14.27LILO of Dhuri - Bangan at Chhajali (Loop out) 276 S/C MAY-14220
Work is in progress.48LILO of Ferozepur - Talwandi Bhai line at Sadiq 78 71 70 367 D/C DEC-14220
Commissioned 04/14.4LILO of Moga - Ferozepur at Talwandi Bhai 48 D/C APR-14220
Work is in progress.Work stopped by agitating farmers of Rajpura area.68LILO of Patial - Mondi Gobindgarh at Rajpura 111 109 109 309 D/C MAR-15220
Work is in progress. Shut down / ROW problem at Doraha end.28Ludhiana - Doraha 95 95 78 1010 D/C MAR-15220
Work in progress. Forest and railway cases pending.101Makhu - Algaon 159 47 0 011 D/C DEC-15220
Commissioned 06/14.42Makhu - Dharam kot 4212 D/C JUN-14220
Work is in progress. Forest and railway cases pending.60Makhu - Taran |Tarn 146 106 7013 D/C JUN-15220
Commissioned 04/14.128Moga- Nakodar 178 178 178 12814 D/C APR-14400
Work is in progress.85Mukatsar - Abohar 134 134 131 5415 D/C MAR-15220
Work is in progress.40Mukatsar - Ghubaya 126 126 125 6516 D/C DEC-14220
Forest and railway cases pending. Court case also pending in High Court76Mukatsar - Kotkapura 126 12 10 017 D/C SEP-15220
Commissioned 07/14.191Mukatsar -Makhu 262 262 262 19118 D/C JUL-14400
Work is in progress. Forest case pending.90Nakodar - Kartarpur 90 88 81 4819 D/C JAN-15220
Commissioned 05/14.105Nakodar - Makhu line 150 150 150 10520 D/C MAY-14400
Commissioned 05/14.30Nakodar - Nurmehal 54 54 54 3021 D/C MAY-14220
Work is in progress. Forest case pending.Railway case cleared. Court case alsoby DAV college near Phagwara.
70Nakodar - Rehana 120 114 2 022 D/C JUN-15220
Commissioned 06/14.20Patti - Algon (2nd Ckt) 2023 S/C JUN-14220
Work in progress. Forest case pending. Work stopped by agitating farmers fromTL no 1 to 25 & 44 to 60.
37Rajpura - Devigarh 114 79 0 024 D/C JUN-14220
Trasmission Lines: Page 49 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Work is in progress.Work stopped by agitating farmers of Rajpura Area from TL-1 to 44.
59Rajpura - Lalru 97 64 50 825 D/C JUN-14220
Commissioned 05/14.279Rajpura Thermal - Nakodar 381 381 381 27926 D/C MAY-14400
Work deferred for the time being62Sarana- Kotli Surat Malli line 185 70 0 027 S/C onD/C
APR-13220
Ready for commisisoing 09/14.201Talwandi Sabo-Mukatsar 277 277 277 20128 D/C SEP-14400
Trasmission Lines: Page 50 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
RAJASTHAN VIDYUT PRASARAN NIGAM LIMITED (RVPNL)
Ready for commissioning.93Aau-Baithwasia 155 155 155 931 D/C NOV-14220
Commissioned 05/14.48Ajari - Bhadla line 78 78 78 482 D/C MAY-14220
50Akal (1)- Jaisalmer -23 D/C MAR-15400
480Akal -Jodhpur (New)4 D/C MAR-17400
.45Anta -Kota (PG) (Extension) 137 225 D/C MAR-15400
100Badisid-Aau 196 192 646 D/C MAR-15220
30Badisid-Bap7 D/C MAR-15220
140Banswara (Switching Station) - Pratapgarh 3138 D/C MAR-15220
20Banswara TPS -Banswara9 D/C MAR-17220
360Banswara TPS- Chittorgarh10 D/C MAR-17400
320Banswara TPS- Udaipur11 D/C MAR-17400
Commissined 05/14.57Bap-Ajari line 91 91 91 5712 D/C MAY-14220
280Barmer-Bhinmal (PG)13 D/C MAR-15400
360Bhadla-Bikaner 512 481 349 10914 D/C MAR-15400
50Bhadla-Kanasar15 D/C MAR-15220
Commissioned 09/14.93Bhawad - Bhopalgarh 9316 D/C SEP-14220
Ready for commissioning.66Bhawad-Baithwasia 107 107 107 6617 D/C NOV-14220
300Bhilwara TPS -Ajmer 480 314 10418 D/C MAR-15400
420Bikaner -Sikar (PG)19 D/C MAR-17400
Out of two Railway crossing, one no. approval received200Bikaner- Merta 465 465 465 17120 S/C MAR-15400
6Chambal- Bungalow (Cable)21 D/C MAR-15220
Electrical inspector clearence is in process203Chandan - Dechu 322 322 322 20322 D/C DEC-14220
Turnkey project & order placed.120Chatrail-Ramgarh 212 3523 D/C MAR-15220
Work completed & bay at chabra end not ready till date.200Chhabra TPS - Anta (Baran) 244 244 244 17924 D/C MAR-15400
turnkey project, work progress slow100Chittorgarh-Bhilwara 134 133 11225 D/C DEC-14400
Trasmission Lines: Page 51 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
.Dahanu - Degchu GSS26 D/C 132
Line work completed & charged on 23.11.14 upto dead end tower butmodification of 2 nos. towers is pending between dead end & gantry
DEC-1377Debari - Salumber (2nd Ckt) 0 0 0 6427 S/C NOV-14220
35Dhod-Danta Ramgarh 9928 S/C MAR-15220
Stringing completed.APR-093Extension of Bikaner- Barsinghsar at Barsinghsar TPS 10 10 10 329 S/C APR-14220
30Gajner -Kolayat30 D/C MAR-15220
14Heerapura -Chambal (Cable)31 D/C MAR-15220
9Heerapura -Nallah Power House (Upgradation)32 D/C MAR-15220
110Hindaun -Chonkarwada 122 122 12233 D/C MAR-15220
work started, tower erection will be possible after charging of 220kV GSSSitapura so that supply be arranged for 132kV GSS Sitapura
18Indira Gandhi Nagar -Sitapur (Upgradation) 30 1034 D/C MAR-15220
Ready for commissioning.56Jaipur (South -PG) - Vatika line 95 95 95 5635 D/C NOV-14220
260Jaisalmer -2 -Barmer36 D/C MAR-15400
22Jodhpur -Bhadwasia37 D/C MAR-15220
93.23 CKM line charged on 25.09.2014.DEC-1393Karwad/Bhawad-Bhopalgarh 152 152 152 9338 D/C OCT-14220
.40Kotputli (PG) - Bansur 141 139 131 4639 D/C DEC-14220
14Kunda ki dhani-Purana Ghat (upgradation)40 D/C MAR-15220
20LILO of Kolayat -Bajju at Kolayat41 D/C MAR-15220
6LILO of 2nd Ckt Sikar (RVPN), Ratnagarh at Sikar42 D/C MAR-14220
10LILO of Aau -Phalodi at Aau43 D/C MAR-15220
Commissioned 11/14.38LILO of Ajmer -Beawer line at Ajmer 65 65 65 3844 D/C NOV-14220
existing contract short closed and revised w/o issued to M/s IMBIBE EnercomJaipur.
MAR-149LILO of Ajmer -Kishangarh line at Ajmer 15 15 1545 D/C DEC-14220
4LILO of Alwar -Kotputli at Bansur 5 5 446 D/C DEC-14220
Commissioned 11/14.26LILO of Bhilwara -Bali at Bamantukda 44 44 44 2647 D/C NOV-14220
2LILO of Chabra TPS -Dahra at Anta (2nd ckt) 4 448 D/C DEC-14400
20LILO of Chandan- Pokaran at Pokaran49 D/C MAR-15220
Trasmission Lines: Page 52 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Commissioned 08/14.9LILO of Dausa -Alwar at Alwar 16 16 16 950 D/C AUG-14220
Commissioned 04/14.34LILO of Debari ¿ Banswara at Madri (Udaipur) 63 63 63 3451 D/C APR-14220
Commissioned 11/14.55LILO of Duni - SEZ(220 KV GSS) line at Jaipur(south)(PG)
98 98 98 5552 D/C NOV-14220
work stopped due to court stay6LILO of Jodhpur (GSS) - Jodhpur at Barli 6 6 453 D/C MAR-15220
2LILO of Jodhpur -Jodhpur interconnector I atJhalamand
54 D/C MAR-15220
.320LILO of Jodhpur -Merta at Pooling station Badla55 D/C MAR-15400
work not restarted by the contractor.11LILO of KTPS - Sanganer line at Vatika 21 21 20 356 D/C DEC-14220
30LILO of Kankroli (PG) -Debari at Amberi 60 58 5557 D/C MAR-15220
36LILO of Kota (PG) -Bhilwara at Mandalgarh 76 74 7258 D/C MAR-15220
W.O. issued to four different firms on CLRC, ROW problem at one location bylocal villagers
80LILO of Kuchamancity -Dhod at Deedwana 146 145 143 4859 D/C MAR-15220
Electrical Inspector clearence awaited6LILO of Mandawar -Nadbai- Bharatpur atChonkarwada
10 10 10 560 D/C MAR-15220
Commissioned 08/14.1LILO of Mandawar-Alwar (MIA) at Alwar 2 2 2 161 D/C AUG-14220
24LILO of Nagaur -Merta at Kuchera62 D/C MAR-14220
20LILO of PS 1- Bajju at PS 1/Bajju63 D/C MAR-15220
Commissioned 05/14.42LILO of Ratangarh -Bikaner at Bandnu 74 74 74 4264 D/C MAY-14220
40LILO of both ckt Bassi-Kukas line at Lakhesara65 D/C MAR-14220
4LILO of both ckts Ramgarh GTPS -Dechu at Ramgarh 1 1 1 166 D/C MAR-15220
20LILO of both ckts Ramgarh GTPP -Dechu line atPokaran
67 D/C MAR-15220
Scheme dropped10LILO of one ckt Dechu-Phalodi at Ramdev Nagar68 D/C MAR-15220
12LILO of one ckt Kotputli -Manoharpur at Kotputli (PG) 26 26 26 1169 D/C DEC-14220
turnkey project20LILO of one ckt Neemrana -Kotputli at Behror 53 53 52 2070 D/C DEC-14220
200LILO of one ckt Raj west -Jodhpur at Jodhpur (New) 138 137 122 3471 D/C MAR-17400
12Lakhesara -Indira Gandhi Nagar72 D/C MAR-14220
Trasmission Lines: Page 53 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
40Neemrana-(PG)-Behror 100 100 94 1573 D/C DEC-14220
40PS 1 /Bajju -Bhadla 65 1274 D/C MAR-15220
One no. NHAI crossing approval awaited86Phagi GSS (Jaipur) - Heerpura 123 119 92 075 D/C MAR-15400
Two nos. NHAI crossing approval awaited, one no. Railway crossing caseapproval recd & NOC from forest deptt.recd. from DFO, Jaipur. The firm has notturn up to execute the work and required material is not available with the firm.
DEC-11213Phagi(Jaipur south-765 kV)-Ajmer line 284 257 184 076 D/C JAN-15400
240Pratapgarh- Chittorgarh 45077 D/C MAR-15220
40Purana Ghat -Bassi (Upgradation)78 D/C MAR-15220
14Purana Ghat -Jawahar Nagar (Upgradation)79 D/C MAR-14220
Ready for commissioning.194Ramgarh (GTPP) - Chandan 309 309 309 19480 D/C NOV-14220
200Ramgarh (Jaisalmer)-Akal (Jaisalmer )81 D/C MAR-15400
360Ramgarh -Bhadla 543 274 12482 D/C MAR-15400
28Renwal -Danta Ramgarh83 S/C OCT-14220
court stay on loc. no. 37 vacated on 02.12.14,work shall be completed shortlyMAR-1421Sanganer- Sitapura (Upgradation) 38 38 37 1984 D/C JAN-15220
balance work under progress.220 KV D/C line one portion of 7.955 Km from 400KV PGCIL-Chaksu to 220 KV GSS Chaksu is completed on 24.10.2013.
MAR-1484Sanganer-Chaksu (Upgradation) 144 144 144 7585 D/C DEC-14220
25Sirohi-Pindwara86 S/C MAR-15220
shifting of 11kV & 33kV lines required for further execution of work.Pursuance isbeing made with Jaipur discom.
1Sitapura- Sitapura (Existing) (Upgradation) 3 387 D/C MAR-15220
50Sujangarh - Tehendesar (GSS) 182 180 180 5488 S/C JAN-15220
case for diverting route due to air force is under process480Suratgarh TPS - Babai ( Jhunjhunu) 640 493 456 4789 D/C MAR-15400
340Suratgarh TPS- Bikaner90 D/C MAR-17400
previously placed work order has been withdrawn & now reordered.40Tehandesar(proposed)-Bandnu 111 67 1591 S/C JAN-15220
15VKIA- Bungalow (Cable)92 D/C MAR-15220
Trasmission Lines: Page 54 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
SIKKIM POWER DEVELOPMENT CORPORATION LTD. (SIKKIM)
.Dikchu - Gangtok1 D/C 132
Dikchu - Mangan2 D/C 132
Trasmission Lines: Page 55 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
TAMILNADU TRANSMISSION CORPORATION LTD. (TANTRANSCO)
Koladi - PH Road: OH Line work under progress. Stub: 47/76, TE:29/76completed. Stringing: 3/23.For cable laying from PH road to Koyambedu,administrative approval is under process.
Alamathy - Koyembedu1 D/C 400
Work under progress.Issues involved in line work at Loc.62 & 63 and 163.It isbeing followed up.
JUN-1239Arasur 400 kV S/S - Karamadai 230 kV S/S 169 166 166 372 S/C DEC-14220
Cable laying 6/6 Sections completed and Joints 18/30 completed. Joint bay : 5/5completed.Balance works are under progress.
3Avadi-Ayappakkam line 0 0 0 03 S/C DEC-14220
Estimate is under preparation.23Basin Bridge - TNEB HQ (UG Cable) 0 0 0 04 S/C DEC-15220
28/28 sections cable laying completed. 23/27 nos. joints bay completed. 41/81joints completed.
14Kadapperi - Guindy (UG Cable) 0 0 0 05 S/C DEC-14220
Works are nearing completion.34Kalivanthapattu - Kadapperi 111 111 110 336 S/C DEC-14220
Commissioned 07/14.390Karaikudi - Kayathar 535 535 535 3907 D/C JUL-14400
Stub setting pending at 6 locations due to ROW issues and it is being followedup. As the contractor M/s.GET has not turned up for work, it is proposed to shortclose the contractor.
DEC-11137Karaikudi - Sembatty 554 548 491 848 S/C JUN-15220
Work under Progress. ROW issues involved and is being shorted out.326Karaikudi-Pugalur 460 459 459 2449 D/C DEC-14400
work under progress for 2 reaches and work is awarded on 21.11.14 for 3rdreach.
23Koladi - PH Road 76 47 30 310 D/C MAR-15220
Commissioned 04/14.5LILO of Arasur-Ingur at Karamadai S/S 511 D/C APR-14220
Works are under progress. Objections at Loc.41.For Loc. 6 to 7, NHAI approvalawaited.
32LILO of K.R. Thoppur - Ingur at Thingalur 99 97 97 2112 D/C JAN-15220
Line work completed. Tree cutting to be done for energisation of the line.16LILO of K.R.Thoppur-Deviakurichi at Singapuram 27 27 27 1613 D/C MAR-15220
Commissioned 07/14.4LILO of Kayathar - Anuppankulam at Kayathar 414 D/C JUL-14220
Commissioned 07/14.4LILO of Kayathar - Pasumalai at Kayathar 415 D/C JUL-14220
All works completed. Line will be erergised on completition of SS works.1LILO of Manali - Basin Bridge (BBGTP) at Vyasarpadi 6 6 6 116 D/C DEC-14220
Work awarded and stub setting work commenced.2LILO of Siruseri - Tharamani at Sholinganallur 14 13 0 017 D/C MAR-15220
Due to long penging Court case, approval for revised route is under scrutiny.DEC-1012LILO of Sriperumbadur- Arni at Sunguvarchatram 28 10 3 018 D/C MAR-15220
Work awarded and to be commenced.Road cut advice received from High ways.18LILO of Sriperumbudur - Koyambedu at Guindy (UGCable)
0 0 0 019 D/C MAR-15220
Trasmission Lines: Page 56 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Commissioned 08/14.10LILO of Thiruvalam - Kanchipuram SP Koil atThiruvalam
20 20 20 1020 D/C AUG-14220
Commissioned 10/14.20LILO of Thiruvalam - Singarapet at Thiruvalam 20 20 20 2021 D/C OCT-14220
Commissioned 07/14.10LILO of Thudiyalur - Othakalmandapam at Coimbatore 1022 D/C JUL-14220
Cable already laid.1LILO of Tonidapet - Mylapore at TNEB HQ (UG Cable) 0 0 0 023 D/C DEC-15220
Dharmapuri 400 KV SS has been sanctioned. Hence, work will be taken upaccording to that BP.
200MTPS St.III - Singarpet 0 0 0 024 D/C JUN-16400
Work completed90MTPS Stage-III - Thingalur common point25 S/C +D/C
JUL-13220
Reach-I:Total Location:314, Stub:313 completed. Tower erection 313 nos.completed. Stringing 189.72 ckms completed. Reach-II : Total Location:484Nos. Stub:479 completed, Tower erection 476 nos completed. Stringing :286.196Ckt Kms completed.
560MTPS Stage-III - Thiruvalam 798 793 789 47626 D/C DEC-14400
Work completed.39MTPS-Malco 50th tower-New common point towardsThingalur
0 0 0 3827 D/C SEP-14220
Work under progress. cable laying work completed at 6/26 sections. For section5 to 7, road cut amount paid and work to be taken up.
25Mylapore - Tharamani (UG Cable) 0 0 0 028 D/C JAN-15220
Work under progress. Railway crossing approval awaited for one location.31Nevveli Zero unit - Ulundurpet 230 kV S/S 90 87 74 1429 S/C MAR-15220
Estimate under scrutiny6PH Road - Koyambedu (UG Cable) 0 0 0 030 D/C APR-14220
Works are under progress.Objection by land owners involved at locations 160 to190.Issues are being followed up. Multi Circuit tower involved at Loc.236 to 249.
62Palladam - Ingur 249 223 14031 S/C onD/C
DEC-15220
Commissioned 07/14.727Pugalur - Ottiyambakkam - Kalivanthapattu(Melakottaiyur)
1165 1165 1165 72732 D/C JUL-14400
Work under progress.86Rasipalayam - Anaikadavu 114 114 112 6133 D/C MAR-15400
Works are under progress.344Rasipalayam - Salem 556 494 410 4334 D/C JUN-15765
work under progress.1Sholinganallur - KITS 56 33 0 035 D/C MAR-15220
Line work is under modification. Revised administrative approval is underprocess.
SEP-0620Sriperumbudur -Korattur (Changing of conductor) 70 0 0 1236 S/C MAY-13220
works are under progress.358Thappakundu - Anaikadavu 499 451 411 11537 D/C MAR-15400
Line work completed.17Thingalur Common point - MTPS & MALCO line 39 39 39 938 D/C NOV-14220
Trasmission Lines: Page 57 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Work completed40Thingalur Common Point-Gobi39 S/C MAR-14220
work under progress.150Thiruvalam - Alamathy (Propsoed) 198 194 185 6440 D/C DEC-14400
Work under progress. Progress of the contractor is very slow and instructed tospeed up the work.
55Villupuram - Ulundurpet 183 164 8 041 S/C DEC-14220
Trasmission Lines: Page 58 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED. (APTRANSCO)
Works Under Progress for 2 lots. 1 lot works terminated due to poor progress.Tenders called for balance works(1 lot).
163Appannadorapalem - Bobbili 269 252 194 41 D/C AUG-15220
Works under progress.196Bonapally - Chittoor (Quad) 281 281 281 1452 D/C JUL-14400
130Chittoor 400 kV SS-Mananapalli3 D/C MAR-15220
Works under progressDEC-109Gaddamvaripalli- Goddumari 31 31 214 D/C APR-13220
70Garividi - Garividi5 D/C 220
100Garividi - Pydibhimavaram6 D/C 220
Works terminated due to poor progress. Tenders to be called for balance works.75Garividi-Bobbili 125 86 0 07 D/C MAR-15220
Evaluation under progress.600Hinduja Vizag TPP - Kamavarapukota8 D/C MAR-15400
136Jammalamadugu - Betamacherla9 D/C 220
Works are under progressJAN-15172Jammalamadugu - Chakrayapet 291 229 191 010 D/C APR-15220
JUL-15210Jammalamadugu - Narnur Kurnool Dist11 D/C 400
Works are under progressJAN-15198Jammalamadugu - Porumamilla 330 287 24612 D/C MAR-15220
JUL-1454Jammalamadugu - Tirumalayapalli13 D/C 220
JUL-15264Jammalamadugu - Uravakonda14 D/C 400
The pre-qualification bids are due for opening on 12.08.2013.300Kalpaka - Proposed Garividi S/S 0 0 0 015 D/C MAR-15400
24Kalwakurthy-Dindi 3rd line16 S/C MAR-14220
61Kalyandurg-Anantapur17 S/C MAR-14220
15Kamareddy-Bhumpally18 S/C MAR-15220
30Kamavarapukota - Kamavarapukota19 D/C 220
90Kamavarapukota - Nuziveedu20 D/C 220
LOI issued on 15.07.2013.Detailed survey is under progress.424Kamavarapukota - Surypet21 D/C MAR-15400
Evacuation no problem180Krishnapatnam TPS- Bonapally (Quad) 272 246 238 8022 D/C JUN-14400
Commissioned 09/2014.14LILO of Budidampad - Bhongiri at Weddekothapally 1423 D/C SEP-14220
Work to be commencedDEC-14200LILO of Both ckt Pulivendula - Hindupur at 122 0 0 024 D/C 220
Trasmission Lines: Page 59 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Gollapuram
140LILO of Pendurthy - Garividi at Garividi25 D/C 220
80LILO of Podili - Nellore at Atmakur26 D/C 220
Shadnagar - Yeddumailaram line commissioned on 07.03.201412LILO of Shadnagar - Yeddumailaram atYeddumailaram
19 19 19 1227 D/C MAR-14220
22LILO of Uravakonda - Kalyandurga at Borampalli28 D/C 220
Commissioned 11/14.136Manubolu - Sullurpeta 220 220 220 13629 D/C NOV-14220
200Muddanur (RTPP) - Dharmavaram30 D/C 220
100Muddanur-Anantapur (3rd line)31 S/C onD/C
MAR-14220
Commissioned 06/14.106Narasaraopet - Parchur 189 189 189 10632 D/C JUN-14220
60Narketpally_Suryapet33 S/C onD/C
MAR-14220
15Narsapur-Doultabad34 S/C MAR-15220
15Narsapur-Manoharabad35 S/C MAR-15220
20Nirmal-Nandipeta36 S/C MAR-15220
10Nizamabad-Janakampeta37 S/C MAR-15220
20Oddugudem-Koyagudem38 D/C MAR-15220
36Oglapur(Warangal 400 kV SS)-Warangal 220 kV SS39 D/C MAR-15220
.Pulichintala HEP - Chillakallu40 D/C 132
Works are under progressJUN-11250Pulivendula-Hindupur 393 365 341 6641 D/C JUN-15220
The contract was terminated.Fresh tenders were opened and P.O is issued on29.04.2013.Works under progress.
112Purushottapatnam (Nunna) Jujjuru 165 102 20 042 D/C DEC-14400
Scheme formulated.Tenders to be called for.420Rayalaseema Stage-IV - Chittoor 0 0 0 043 D/C MAR-15400
Line Charged on 27-03-2013.17Rentachintala - Macherla S/S 58 58 58 1544 S/C MAR-13132
All works completed.Commissioned on 04.08.2014.
16Rentachintala - Nagarjuna Sagar Plant 34 34 34 1645 S/C JUL-14132
Trasmission Lines: Page 60 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Commissioned 03/14.40Sattenapalli (Narsaraopet) - Narsaraopet 68 68 68 4046 D/C MAR-14220
110Sattenapalli - Guntur47 D/C 220
Sub station works are under progressNOV-108Thimmapuram- Yellanur 27 27 27 848 D/C APR-13220
JUL-1543Tungabhadra river - Yemmiganur49 D/C 400
MAR-1572Uravakonda - Borampalli 111 0 0 050 D/C 220
Line route modified through proposed 220 KV Borampally SS.NOV-1486Uravakonda - Kalyanduring 134 50 16 051 D/C MAR-15220
Works are in progress.DEC-1432Uravakonda - Vajrakarur 52 29 18 052 D/C MAR-15220
Scheme to be formulated.240Vadarevu - Amangal 0 0 0 053 S/C MAR-15765
Vemagiri - Kamavarapukota54 D/C 400
JUL-15205Yemmiganur - Uravakonda55 D/C 400
Works under progress.134a) Jujjuru - Sattenapalli (b) LILO of VTS - Srisailamline at Sattenapalli
178 174 168 11856 D/C OCT-13400
Trasmission Lines: Page 61 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
TRIPURA STATE ELECTRICITY CORPORATION LIMITED (TSECL)
ROW problems affected the work31Gamai Tilla - Dhalabil 107 101 78 171 S/C SEP-13132
20LILO of Rokia - Udaipur at Melaghat for connection toMonoarchak
40 0 0 02 D/C JUN-15132
Work in progress.42Monarchak - Surajmani Nagar 150 49 38 63 D/C MAR-15132
All works completed in non forest land. Stage- I clearance received andcompliance for conditions completed.
47P.K. Bari - Kanchanpur 113 109 99 174 S/C MAR-15132
Completed 9/1318Surajmani Nagar - Agartala 79 Tilla Grid S/S 71 71 71 185 D/C SEP-13132
Fund proposed in World Bank.6Surajmani Nagar - Badarghat 0 0 06 D/C MAR-15132
Completed 9/133Surajmani Nagar - Rabindra nagar 13 13 13 37 D/C SEP-13132
3.598 KM line in forest land for which TSECL will apply for forest clearance. LOAissued
20Surajmani Nagar - Rokhia 80 32 5 08 D/C DEC-14132
Proposed under NEC.50Surajmani Nagar - Udaipur 50 0 0 09 D/C JUN-15132
Fund not yet tied up. Proposed under World Bank Financing /SPA/NEC.260Surajmani nagar-P.K.Bari 0 0 0 010 D/C MAR-15400
Trasmission Lines: Page 62 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
U.P. POWER TRANSMISSION CORPORATION LTD. (UPPTCL)
.Agra(UP) - Agra (PG)1 D/C 765
New tender opened under finalization. The proposed date of complition31.12.14.
69Aligarh - Atrauli 125 70 27 02 D/C NOV-14220
Line energised date not issued due to incomplition of Aligarh substation.Expected date of complition 30.11.14 .
190Aligarh - Sikandarabad 258 254 254 1663 D/C NOV-14400
.Allahabad (PG) - Reewa Road (Allahabad)4 D/C 400
LOI Issued to M/s MPTL on 11.10.10.Contract of the firm M/s MaharashtraPower Transmission Structures Ltd. has been terminated on 20.05.2014 andinform to the concern field officer for the balanced work after getting theapproval of CMD.
10Anpara B-Anpara D 23 23 21 45 D/C NOV-14400
Commissioned 06/14.JAN-123Anpara C - Anpara D 11 11 11 36 S/C JUN-14765
(a) Anpara D - Jhusi section:170 nos. tower foundations out of 541 nos. are heldup as,(i) 45.132 Ha wild life sanctuary is involved. Matter is pending with MoEF sinceDecember 2013, and(ii) 315.716 ha forest land. Proposal was submittd in June 2013.(b) Jhusi - Unnao section: 5 nos tower foundations out of 673 nos. are held updue to pending forest clearance. Proposal for clearance submitted to MoE&F inAugust 2013. Regional office of MoE&F has recommended for stage - Iclearance.
JAN-12416Anpara D - Unnao 1214 1029 944 2557 S/C DEC-14765
Termination point at 400kv s/s Aurai not yet decided. DFCC line crossingbetween loc. 43/0-65/2. River crossing approval pending. 37 no. cropcompensation cases pending. ROW at 15 loc's.
43Aurai - Mizapur 147 126 81 08 S/C NOV-14220
Termination point at 400kV s/s Aurai(PPP) not yet decided. Last 2 Sectionswork held up due to this. ROW at loc. 2/1 , 3/0, 4/0, 5/0, 12/0, 12/1,12/2,17/5,39/3,53/0,53/1, 53/2. The proposed date of complition 28.02.15.
68Aurai - Phoolpur 216 209 194 419 S/C DEC-14220
Gantry at Badaun end yet to be cleared by UPPTCL. Work inturuted due to rain.90Badaun - Sambhal 250 250 242 6610 S/C NOV-14220
Balance 12 No. Fdn hand Seren ROW. The proposed date of complition31.01.15.
13Baghpat (400) - Baghpat (220) 49 37 20 011 S/C NOV-14220
Energised 31.10.11Balrampur - Utraula 56 56 56 1812 S/C 132
Tenders for balance work has been invited on 'as is where isbasis'.and tenders open on 08.09.14 for tender part-1. Bid tender open
350Banda - Allahabad (Reewa Road) DCQ 470 318 50 013 D/C NOV-14400
Trasmission Lines: Page 63 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
for balance work has been on 'as is where is basis' and as recommended theapproval is send to CSPC on 13.10.14.Contract of the firm M/s Maharashtra Power Transmission Structures Ltd. hasbeen terminated on 20.05.2014 and tenders for balance work has been invitedon 'as is where is basis'.
216Banda - Orai DCQ 295 211 130 014 D/C NOV-14400
.Bara - Karchanna15 D/C 400
64Bara - Meza line 83 83 81 5616 D/C DEC-14400
750Bara TPS - Mainpuri17 2xS/C MAR-15765
Line energised on 26.05.14. Barkhera-pilibhit Section,I ckt. Energisedon10.02.12.II ckt. On 14.2.12
Barkhera (Bajaj) - Dohna 203 203 203 12918 D/C NOV-14132
Bayas - Dohna19 D/C 132
Bayas - Pilibhit20 D/C 132
.Bhognipur - Gatampur21 S/C 765
Bhognipur - Jawarharpur22 S/C 765
Bhognipur - Moradabad/Rampur23 S/C 765
.Bhognipur - Orai (PG)24 2xS/C 765
Bilhaur - Sandila25 S/C 765
Bilhaur - Kanpur (PG)26 D/C 400
Survey work is under progress.The proposed date of complition 31.10.1560Chhatta - Mathura27 D/C 220
LOI issued to M/s R.S. Infra projects Pvt. Ltd. Remarks Survey completed40Dasna (400) - Faridnagar28 S/C DEC-14220
ROW at Loc No. 18/2, 19A/0, 61/0, 61A/2, 62/0, 63/0,43/1 & 43/2. Rly xingapproval awaited and 116 crop comp. cases not yet paid. River Crossing pilefoundation remaining. The proposed date of complition 31.03.15.
82Deoria - Rasra 250 241 238 7229 S/C NOV-14220
Rly crossing Approval pending for Loc. no 26-27. ROW at Loc No- 31. CropCompensation pending for 55nos com. The proposed date of complition31.01.15.
23Dohna - C.B. Ganj 92 91 61 430 S/C NOV-14220
.Dopaha - Anpara31 D/C 765
Dopaha - Ghazipur32 D/C 765
Dopaha - Varanasi / Jaunpur33 D/C 765
Trasmission Lines: Page 64 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
3 No. Loc 23,32 &75 are in water logged area.The proposed date of complitionis 31.3.15.
Dumariaganj- - Utraula 114 106 104 3034 S/C NOV-14132
Rly block applied for. The proposed date of complition is 30.11.14.AUG-0937Gajokhar-Jaunpur 132 132 132 2835 S/C onD/C
NOV-14220
.Ghatampur - Moradabad / Rampur36 2xS/C 765
Ghatampur - Kanpur (PG)37 D/C 400
Commissioned 09/14.FEB-1159Ghazipur - Rasra 186 186 186 5938 S/C SEP-14220
Ghazipur - Varanasi / Jaunpur39 S/C 400
Line withdrwan from the scope of the firm, Tender floted for New Agency. BGencached.
41Gokul-Mitai(Hathras) 135 128 79 040 S/C NOV-14220
Line completed. Tree cutting under progress. Elec. Clearance applied for.105Gonda - Basti 298 298 298 10341 S/C NOV-14220
.460Gonda - Shahjehanpur (PG)42 D/C 400
23Gr. Noida - JPSK 0 0 0 043 S/C 220
Commissioned 11/14.AUG-0999Harduaganj - Jahangirabad 151 151 151 9944 D/C NOV-14220
16Indirapuram - Pratap Vihar 0 0 0 045 D/C 220
Jawaharpur - G Noida46 D/C 765
Jawaharpur - Agra (UP)47 D/C 765
Jawarpur - Mainpuri48 D/C 765
Khurja - Hapur49 S/C 765
LILO Mainpuri (PG) - Harduaganj at Jwrpur50 D/C 220
Commissioned 11/14.7LILO of Muzaffarnagar -Vishnuprayag at Srinagar 20 20 20 751 D/C NOV-14400
Line with drwan from M/s Hythro and allotted to M/s Jyoti Engineering Works ondate 08.09.14.
67LILO of 1st Ckt Bhogaon-Mainpuri at Sirsaganj 111 97 46 052 D/C NOV-14400
60LILO of Agra - Muradnagar at Mathura53 D/C 400
LILO of Agra - Muradnagar at Kurja54 D/C 4.4
LILO of Aligarh - Sikandarabad55 D/C 400
LILO of Anpara - Mau at Ghazipur56 D/C 400
Trasmission Lines: Page 65 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Work not Started.120LILO of Azamgarh - Sultanpur at Tanda57 D/C 400
90LILO of Bhauti - Orai at Sikandara58 D/C 220
LILO of Bhognipur - Mbd at Bilhaur59 D/C 765
LILO of Ghatampur - Mbd at Sandila60 D/C 765
LOI issued to M/s Archon Engicon (P) Ltd.Water logging area,ROW at loc-40The proposed date of complition is 31.03.15.
40LILO of Gorakhpur - Basti at Bansi 155 17 0 061 S/C DEC-14220
ROW at 3 Loc. The proposed date of complition 31.01.15.48LILO of Harduagani - Hathras at Aligarh 65 64 49 1062 D/C NOV-14220
Commissioned 08/14.75LILO of Harduagani - Hathras at Khair 115 115 115 7563 D/C AUG-14220
30LILO of Hathras - Gokul at Mathura64 D/C 220
Work not Started.6LILO of Lucknow (PG) Bareilly (PG) at Rosa65 D/C 400
LILO of Mainpur (765) Aligarh (400) at Jwrpur66 D/C 400
LILO of Mainpur - Etah at Jwrpur67 D/C 220
LILO of Mainpuri - Gr Noida at Khurja68 D/C 765
Muzaffarngar is replaced by mohannagar.Please check the serial no.73.40LILO of Mohannagar - Nara II Ckt at Jansath 81 81 81 3269 D/C SEP-14220
.104LILO of Mohanpur - Behat line70 S/C 220
Commissioned 10/14.AUG-0924LILO of Moradabad - CB Ganj at Rampur 29 29 29 2471 D/C OCT-14220
LOI issued to M/s R.S. Infra projects Pvt. Ltd. Land not Final. Work not Started.30LILO of Muradnagar - Loni at Ataur 0 0 0 072 S/C OCT-14220
Commissioned 04/14.APR-1231LILO of Muradnagar - Modipuram at Faridnagar 49 49 49 3173 S/C APR-14220
ROW at 5 loc (17,18,19,20 & 02) 17 & 18 is in single field. The proposed date ofcomplition 31.12.14.
9LILO of Muradnagar - Shamli at Baghpat 20 15 12 074 S/C NOV-14220
Commissioned 10/14.20LILO of Muzaffarngr - Nara -II ckt at Jansath 81 81 81 2075 D/C OCT-14220
Commissioned 09/14.8LILO of Obra - Allahabad II Ckt at Mizrapur 15 15 15 876 D/C SEP-14220
2LILO of Obra - Panki at Reewa 2 2 2 277 D/C DEC-14400
Rly Xing Case at Loc. 17 - 18. submitted to DRM jhansi. The proposed date ofcomplition 31.12.14.
6LILO of Orai - Bhauti at Orai 15 13 7 078 S/C DEC-14220
Line charged on 14.02.14100LILO of Orai - Mainpuri at Bah 258 258 258 15479 S/C MAY-14220
Line energised date not declaired due to incomplition of Aligarh substation.66LILO of Panki - Muradnagar at Aligarh 97 97 97 6480 D/C NOV-14400
Trasmission Lines: Page 66 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
.LILO of Panki - Muradnagar at Jwrpur81 D/C 400
Commissioned 08/14.6LILO of Rewan Road - Fatehpur at Sirathu 16 16 16 682 S/C AUG-14220
WIP.Work slowed down due to rain and water logged area. The proposed date ofcomplition 31.01.15
44LILO of Sarnath (400) - Azamgarh at Harhua 75 72 59 883 S/C JAN-15220
Work not Started.LILO of Sarnath - Azamgarh at Varanasi / Jaunpur84 D/C 400
Rly xing submitted to DRM(MBD) crop completed for 17 case to bedisburcese.The proposed date of complition 31.01.15.
MAR-1118LILO of Shajahanpur - Hardoi line at Rosa 52 51 43 085 S/C NOV-14220
Erection & Stringing work under progress.ROW in rect. Of Dhupiyamau. Theproposed date of complition is 31.12.14.
48LILO of Sultanpur - Phoolpur at Pratapgarh 80 80 76 2486 D/C NOV-14220
Ready for commissioning.8LILO of Tanda - Sultanpur at Tanda(New) 13 13 13 887 D/C NOV-14220
12LILO of Unnao - Bareilly at Shahjahanpur88 D/C 400
.LILO of Unnao - Mainpur at Bilhaur89 D/C 765
.400Lalitpur - Agra (UP)90 S/C 765
Work in progress.The proposed date of complition 31.03.1536Lalitpur TP - Lalitpur S/S 57 54 46 091 D/C DEC-14220
Commissioned 06/14.185Lalitpur TPS - Jhansi 301 301 301 18592 D/C JUN-14220
Line withdrawn from M/s Hythro and allotted to M/s Jyoti Engineering Works ondate 08.09.14.
50Lucknow PG (400) - Kursi Road 59 22 0 093 D/C SEP-15220
186Mainpuri - Aligarh line 218 136 116 094 D/C DEC-14400
220Mathura - Jawaharpuram95 D/C 400
.Meja - Bara96 D/C 765
Meja - Bargarh97 D/C 765
36Morti - Pratap Vihar 0 0 0 098 D/C 220
Commissioned 10/14.14Puricha - Jhansi 1499 D/C OCT-14220
68Reewa Road - Meza line 91 91 91 64100 D/C DEC-14400
Line is completed except ROW at loc. 317 & 318 for want of forest clearance. InSevere storm tower collapsed being charged.
214Rosa - Dohna 340 340 340 216101 D/C OCT-14220
.Rosa - Shahjehanpur (PG)102 D/C 400
LOI issued to M/s PNC on 27.4.10.Work in progress. Profile Submitted.104Saharanpur (PG)-Behat 158 0 0 0103 D/C NOV-14220
Withdrawn from M/s Teracom & Being completed locally.18Sahupuri-Bhelupur 37 37 35 12104 D/C NOV-14220
Trasmission Lines: Page 67 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Sandila - Farrukhabad105 S/C 400
Sandila - Lucknow Hardoi Road106 S/C 400
ROW in Foundation at 9 locations . 7 ROW in single field crop completely.Theproposed date of complition 28.02.15.
123Shahjahanpur - Nighasan 369 360 342 66107 S/C NOV-14220
Row in Foundation at 5 loc 74/0,84/0,85/0,85/3,86/2. 2 Nos. Rly xing blockopplied for + Highway xing.The proposed date of complition 28.02.15.
110Sitapur - Nighasan 335 329 299 59108 S/C NOV-14220
6No. Rly xing Drg submitted OPGW under despatch 113 Km OPGWstringing willtake about year. The proposed date of complition is 15.11.15.
185Sohawal - Tanda 331 314 177 4109 D/C NOV-14220
200Tanda - Gonda110 D/C 400
Varanasi / Jaunpur - Gorakhpur111 D/C 400
Varanasi/Jaunpur - Aurai112 D/C 400
Varanasi/Jaunpur - Azamgarh113 D/C 400
Varanasi/Jaunpur - Meja114 D/C 765
Trasmission Lines: Page 68 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
WEST BENGAL STATE ELECTRICITY TRANSMISSION CO. LIMITED (WBSETCL)
Commissioned 08/14.67Hura - Raghunathpur 671 D/C AUG-14220
Work under progress. Progress delayed due to ROW problem and court cases.92Kharagpur - Vidyasagar Park 131 111 77 702 D/C DEC-14220
Work stalled due to poor performance of the vendor.AUG-0820LILO of Arambagh -Rishra at Singur 37 10 2 03 D/C MAY-15220
PGCIL is executing the work as a deposit work of WBPDCL.The work is stalled due to repeated theft. WBPDCL asked PGCIL to take up withthe present vendor for resumption of work or deploy a new vendor by cancellingthe existing contract.
OCT-08224Santaldhi TPS-Bishnupur 347 347 325 1934 D/C 220
Line commissioned on 02/12/2014.MAR-1025Sushasgram- Saintala 51 51 51 255 D/C NOV-14220
Status shown for TLDP-IV - NJP 220 KV D/C line only.The progress suffered dueto contractual and ROW problem.
SEP-08166Teesta LDP III -Teesta LD IV - New Jalpaiguri 250 248 238 1096 D/C MAR-15220
Trasmission Lines: Page 69 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
XYZ ()
60Athena Singhitarai - Raigarh Pooling Station (nearKotra)
75 63 31 01 D/C JAN-14400
.Bhavanapaddu TPP - Sri Kakulam2 D/C 400
.CSPL TPS - Raigarh Pooling Station (Near Kotra)3 D/C 400
.Chitrangi TPS - Vindhyachal Pooling Station4 D/C 765
Dwarkesh Energy TPP - Indore5 D/C 765
Ellora TPP - Seoni6 D/C 765
110HEGCL TPP - Pune (AIS) (PG)7 D/C 400
Karchanna - Reewa Road Allahabad8 D/C 400
For startup power12LILO at TRN TPP9 D/C MAR-14400
LILO of Gazuwaka - Behrampue at BhavanapadduTPP
10 D/C 400
LILO of Lonikhand - Kalwa at HEGCL TPP11 D/C 400
.LILO of Tuticorin - Madurai at Ind Barath TPP(madras)
12 D/C 400
.LILO of one ckt of MSCTL - Chandrapur at Singhitrai13 D/C 400
.NCC Power TPP - Nellore Pooling Station (PG)14 D/C 400
.Orrisa UMPP - Jharsuguda Pooling Station15 D/C 765
.PLNGL TPP - Vadodra16 D/C 400
Radial mode - Orrisa17 D/C 400
.Raigarh TPS - Raigarh Pooling Station (Near Tamnar)18 D/C 400
.Reliable TPP - Vindhyachal Pooling Station19 D/C 765
.107SJK TPS - Jabalpur Pooling Station 339 330 292 5920 D/C 400
.Suzlon wind farm - Bhachau (PG)21 D/C 220
30TRN TPP - Raighar (near Tamnar) Pooling Station22 D/C JUN-14400
Welspun Anuppur TPS - Vindhyachal Pooling Station23 D/C 400
Trasmission Lines: Page 70 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
ADANI POWER LTD. (APL)
Commissioned 08/14.219Akola - Aurangabad line ckt-I 596 596 596 2191 S/C AUG-14765
.LILO of Korba-Mopka at Swastic TPP2 D/C 132
.AUG-12575Tiroda - Koradi - Akola - Aurangabad line ckt-II 1582 1369 726 143 S/C JUL-14765
Trasmission Lines: Page 71 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
BAJAJ ENERGY PVT. LTD. (BEPL)
Existing line.Balrampur-Utraula line1 D/C 132
Trasmission Lines: Page 72 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
BHARAT ALUMINIUM CO. LTD. (BALCO)
.Balco (CPP) - Korba (E)1 D/C 220
Balco - Champa Pooling station2 D/C 400
Trasmission Lines: Page 73 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
CORPORATE POWER LTD. (CPL)
6Corporate TPP - Jharkhand Pooling Station 111 D/C DEC-12400
.216Latehar - Namkum 320 293 274 1322 D/C DEC-12400
Trasmission Lines: Page 74 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
D.B.POWER CORP. LTD. (DBPCL)
Commissioned 08/14.36DB Power (Baradarha) - Raigarh (Kotra) PoolingStation
54 54 54 361 D/C AUG-14400
Line completed.30LILO of Raigarh - Raipur (3rd Ckt) at Baradhara TPP (Interim arrangement)
44 44 44 302 D/C MAY-13400
Trasmission Lines: Page 75 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
DANS ENERGY PVT. LTD. (DEPL)
21Jorethang - New Melli (Tokal) via Tashiding 33 6 0 01 S/C OCT-14220
Trasmission Lines: Page 76 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
DHARIWAL INFRASTRUCTURE PVT. LTD. (DIPL)
6Dhariwal TPS -Channdrapur II (2nd Ckt)1 S/C 400
Commissioned 08/14.31LILO of one ckt of Bhadravati (PG) - Parli at Dhariwal 51 51 51 312 D/C AUG-14400
Trasmission Lines: Page 77 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Darbhanga Motihari Transmission Company Limited ()
278Kurukshetra - Malerkotla (NRSS XXXI (B) Project1 D/C SEP-16400
152LILO of both ckt Barh - Gorakhpur at Motihar2 D/C JUN-14400
300Malerkotla - Amritsar (NRSS XXXI (B) Project3 D/C SEP-16400
129Muzaffarpur - Darbhanga line4 D/C APR-16400
Trasmission Lines: Page 78 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
ESSAR POWER TRANSMISSION CO. LTD. (EPTCL)
78 KM forest involved. Second Stage forest clearance obtained in March'2013.However getting working permission also tree cutting by Forest Departmenthave taken long time. In dec 2013 tree cutting is started,in monsoon work of treecutting was stopped. Now Balance tree cutting is under progress.
670Mahan -Sipat 942 911 796 1641 D/C MAR-15400
.Navbharat TPP - Angul P.S. (PG)2 D/C 400
.Tori - Jhharkhand Pooling Station3 D/C 400
Trasmission Lines: Page 79 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
GATI INFRASTRUCTURE LTD. (GATI)
Commissioned 04/1347LILO of Melli - Gantok at Chuzachen (LILO point atnamthang)
91 91 91 471 D/C APR-13132
.LILO of one circuit of Rongnichu - Randpo at Bhasmay2 S/C APR-13220
Trasmission Lines: Page 80 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
GHODAWAT ENERGY PVT. LTD. (GEPL)
Commissioned 9/1420GEPL -MIDC S/S 201 D/C SEP-14220
Trasmission Lines: Page 81 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
GMR ENERGY LIMITED (GMR ENERG)
.Alaknanda HEP - Joshimath1 D/C 220
Critical.62Kamalanga (GMR) - Angul pooling station 103 66 56 02 D/C OCT-13400
For start up power,work completed 5/12.1LILO of Talchar -Meramundli at Kamalanga TPP 3 3 3 13 D/C MAY-12400
.25Ranikheda (GMR) - Raipur Pooling Station4 D/C 400
Trasmission Lines: Page 82 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
GUPTA ENERGY PVT. LTD. (GEPL)
.LILO of one ckt of Bhadrawati -Parli at GEPL TPS1 D/C 400
Trasmission Lines: Page 83 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
HIMACHAL SORANG POWERGEN PVT. LIMITED (HSPPL)
6LILO of one ckt Karcham wangto - Abdullapur atSorang
11 7 1 01 D/C SEP-13400
Trasmission Lines: Page 84 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
IDEAL ENERGY PROJECTS LTD. (IEPL)
The progress of Koradi-Wardha line is slow . Forest clearence awaited.50LILO of Koradi II- Wardh(PG) at Bela TPP 75 73 72 441 D/C DEC-12400
Completed0LILO of Mouda - Wardha at Bela 2 2 2 02 D/C NOV-12400
Trasmission Lines: Page 85 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
IND BHARATH POWER INFRA LIMITED (IBPIL)
84Ind Barath - Jharsuguda pooling Station 125 72 9 01 D/C AUG-14400
47LILO of Rouekila - Raigarh at Ind Barath 72 72 71 432 D/C JUL-14400
Trasmission Lines: Page 86 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
INDIABULLS POWER LTD. (IBPL)
1 bay test charged at Amravati, Akola - I206Amravati - Akola - I 279 279 278 1621 D/C JUL-14400
57Nasik - Bobleshwar (2nd Ckt) 152 152 152 572 S/C MAY-14400
Trasmission Lines: Page 87 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
JAIN ENERGY TRADING LTD (JAIN ETL)
.Jain Energy TPS - Dharamjaygarh Korba Poolingstation
1 D/C 400
Trasmission Lines: Page 88 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
JHABUA POWER LTD. (JHAPL)
Forect Clearance required for 4.4 Ha (4 no. foundation) stage-I approvalreceived. Money for aforestation has been depostied and Stage-II approval, tobe issued from Bhopal is being expecdited. Railway and Highway crossingapprovals received
131Jhabua Power TPS - Jabalpur Pooling Station, (Highcapacity line).
207 150 135 101 D/C DEC-13400
.Termination of Jhabua Power TPS ¿ Jabalpur PoolingStation, at Jablpur (PG) as Interim arragement
2 D/C 400
Trasmission Lines: Page 89 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
JINDAL POWER LTD. (JPL)
Commissioned 08/14.154Derang - Angul Pooling Station 231 231 231 1541 MC+D/C
AUG-14400
.Derang - Meramundali2 D/C 400
Work completed.110LILO of Meramundali - Jaypore at Derang 163 163 163 1103 D/C JUN-14400
Work completed for 3 Ckt and for 1 ckt Gantray location work at Tamnar ispending.
44Tamnar TPP - Raigarh (Tamnar) Pooling Station 67 67 67 444 2xD/C MAY-14400
Trasmission Lines: Page 90 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
JOINT VENTURE OF PGCIL & JAYPEE (JV(PG&JP))
D/C line upto common point on D/C tower (14 km). work for common point toBina (PG) s/C completed (6km)and work for common point to Bina(MPPTCL) isin progress(6km).
40Bina TPS - Suitable location (along Bina (PG) - Bina(MPPTCL)
1 D/C JUL-12400
.Termination of Ckt of above at Bina (PG) & otuer ckt atBina (MPTCL)
2 D/C 400
Trasmission Lines: Page 91 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
KORBA WEST POWER COMPANY LIMITED (KWPCL)
46Avantha Bhandar TPS (Korba West) - Raigarh (Kotra) 64 42 38 121 D/C APR-14400
Work Completed10LILO of on Ckt of Raigarh - Raipur at AvanthaBhandar (Korba west ) TPS
22 22 22 102 D/C DEC-13400
Trasmission Lines: Page 92 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
KSK ENERGY VENTURE LTD. (KSK LTD.)
52KSK Mahanadi (Warda Power) - Champa PoolingStation
100 98 84 401 2xD/C JUN-13400
One Ckt completed & charged on 26.08.2012, the work of 2nd LILO progress.LILO of both ckt, of Raigarh - Raipur at Akaltara TPP2 D/C 400
Trasmission Lines: Page 93 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
KVK ENERGY PVT. LTD. (KVK)
.14LILO of both ckts of Baripada - Mandhsal at NilachalTPP
241 2xD/C 400
Trasmission Lines: Page 94 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Kudgi Transmission Company Limited (KTCL)
Survey activity is stopped by villagers of Honnudike and Hobli Gulur villagefalling under Tumkur (Taluk & District) (Effected span: Approx. 2 KMs.)Matter is brought to the notice of District Administration.
36Kudgi TPS - Narendra 46 7 5 01 2xD/C SEP-15400
The villagers are not allowing for any construction work at the respectivelocations and asking for huge compensation.Matter is brought to the notice of District Administration. These locations arenearer to 400/220 kV POWERGRID Bidadi substation. Being terminating point,no alternatives available for re-routing the line.
190Madhugiri - Bidadi 235 93 49 02 D/C SEP-16400
760Narendra (New) - Madhugiri 867 204 3 03 D/C SEP-16765
Trasmission Lines: Page 95 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
LANCO ENERGY (P) LTD,. (LEPP)
15LILO of Seoni - Wardha at Lanco Vidarbha TPS 161 D/C DEC-13765
.Lanco Amarkantak - Champa Pooling Station2 D/C 400
.50Lanco Babandh - Angul Pooling Station 803 D/C SEP-13400
8Phata HEP-Baramwari (Rudrpur) 20 0 0 04 D/C DEC-13220
.Routing of one circuit of Jorthong - New Melli viaRangit - IV
5 D/C DEC-13220
Teesta VI - New Melli6 D/C 220
Trasmission Lines: Page 96 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
MALANA POWER COMPANY (MPCL)
Chango Yangthang - Ka Dogri Pooling Station1 D/C 220
.Ka Dogri - Jangi Pooling Station2 D/C 400
Trasmission Lines: Page 97 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
MARUTI CLEAN COAL & POWER LTD. (MCCPL)
Commissioned 06/14.6LILO of ACBIL-Baraari (Bilaspur) PS at Bandakhar(Maruti Clean Coal)
14 14 14 61 D/C JUN-14400
Trasmission Lines: Page 98 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
NORTH EAST TRANSMISSION CO. LTD. (NETC)
2 tower locations handed over in Aie- Valley by Assam Forest Deptt. after cuttingof 44no of trees on 05.07.2014. Construction of one foundation completed andtower erected.Construction of 2nd foundation commenced and expected by15.11.2014.Completion of 2nd tower erection and stringing expected to becompleted by 30.11.2014.1st stage forest clearance for 2 tower locatons received on 04.09.2014.Necessary payments towards NPV, CA,etc submitted to DFO,GoalparaDivision,Assam on 29.09.2014. Completion of 2 foundations, tower erection andstringing shall take 2 months after 2nd stage forest clearance and handing overof the land by Assam Forest Deptt.
DEC-14318Azara - Bongaigaon 442 441 439 3161 D/C DEC-14400
Stringing Completed but cannot be commissioned since loop out arrangement byMeghalaya State Electricity Board is not ready at Byrnihat 400 kV S/S.
42Byrnihat - Azara (1st ckt) 124 124 124 422 D/C JUL-14400
Commissioned 07/14.42Byrnihat - Azara (2nd Ckt) (Part of Silchar - Azara) 423 S/C JUL-14400
Trasmission Lines: Page 99 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
NORTH KARANPURA TRANSMISSION CO. LTD. (NKTCL)
220Agra - Gurgaon1 D/C SEP-13400
240Bareilly - Meerut2 S/C SEP-13765
20Gurgaon - Gurgaon (PG)3 D/C SEP-13400
220Lucknow - Bareilly4 S/C SEP-13765
334Seoni - Sipat / Korba (Pooling).5 S/C SEP-13765
Trasmission Lines: Page 100 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
PATRAN TRANSMISSION COMPANY LIMITED (PATRANTCL)
LILO of both ckt of Patiala - Kaithal at Patran1 D/C MAR-16400
Trasmission Lines: Page 101 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
RAICHUR SHOLAPUR TRANSMISSION CO. LTD. (RSTCL)
Commissioned 06/14.208Raichur - Sholapur line 544 544 544 2081 S/C JUN-14765
Trasmission Lines: Page 102 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
RELIANCE POWER TRANSMISSION LTD. (RPTL)
.Moti Khavdi TPP - Jam Nagar1 D/C 400
Progress stalled due to non-availability of Forest Clearance (Stage-II) in MP &Wildife Clearance in MP.
JUN-11486Rajgarh (PG) - Karamsad (GETCO) 654 632 632 4582 D/C DEC-14400
Trasmission Lines: Page 103 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
RKM POWERGEN PVT. LIMITED (RKMPPL)
ROW issues for tree cuting & Stringing.58Uchpinda - Raigarh line with LILO of Raigarh (Kotra)-Raipur at Uchpinda TPP (Interim Arrangement)
95 94 67 101 D/C JUL-14400
Trasmission Lines: Page 104 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
SHIGA ENERGY PVT. LTD. ()
.Tashiding - New Melli1 S/C 220
Trasmission Lines: Page 105 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
SKS POWER GENERATION LTD. (SKS)
.50Binjkote - Raigarh (Kotra) Pooling Station1 D/C 400
.LILO of one ckt of Raigarh - Raipur at Binjkote TPP2 D/C 400
Trasmission Lines: Page 106 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
SPECTRUM COAL & POWER LTD. (SCPL)
Line is ready and to be inspected for electrical clearence.24Ratija-Kasiapalli 241 D/C 132
Trasmission Lines: Page 107 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
STERLITE GRID LTD. (SGL)
Commissioned 10/14.192Aurangabad - Dhule (BDTCL) 509 509 509 1921 S/C OCT-14765
Commissioned 07/14.17Bhopal - Bhopal (BDTCL) 27 27 27 172 D/C JUL-14400
Commissioned 10/14.176Bhopal - Indore (BDTCL) 455 455 455 1763 S/C OCT-14765
Commissioned 11/14.MAR-13443Bongaigoan - Siliguri Line (ENICL) 610 610 610 4434 D/C NOV-14400
398hec.of forest involved covering 400locs. and 125kMs of route length. FACapproved for both the proposals (M.P. & Chattisgarh) and proposals are pendingwith Minister (MoEF) New Delhi.The element is affected by Force MajeureEvent.Petition No. 73/MP/2014 has been filed in CERC for force majeure &change in law.
760Dhramjaygarh - Jabalpur (JTCL) 985 715 688 2775 D/C APR-15765
Commissioned 09/14.35Dhule (IPTC) - Dhule (MSETCL) (BDTCL) 56 56 56 356 D/C SEP-14400
39hec.of forest involved in Gujarat and 17hec.in Maharastra.Stage -I clearanceobtained for Maharashtra & Gujarat forest.The element is affected by Force Majeure event vide our letter dated 03.02.2014.1)Excise duty has been increased from 8% to 12% as intimated earlier report.2)Our Dhule Substation has been declared deemed commissioned from 07 thOctober 2014.3)Dhule Dhule transmission line has been declared deemed commissioned from07th Oct2014 as MSTCL bay is not ready for connecting the line.
263Dhule - Vadodara (BDTCL) 680 680 671 2487 S/C NOV-14765
The Element is affected due to force majeuere for delay in section 164 & forestclearance vide our letter dated 03.02.2014 to all LTTC's.1)Our Bhopal- Bhopal line has been declared deemed commissioned from 29thJune 2014 & Bhopal Substation has been charged on 29th June 2014.2)Bhopal Indore is intent to charge on 19th Nov2014.3)Excise duty has been increased from 8% to 12% as intimated earlier report.
260Jabalpur - Bhopal (BDTCL) 664 626 618 2108 S/C FEB-15765
Severe RoW problem in 4locs.& 140hec.forest land in MP involved.Forest proposal with MOEF Delhi & FAC cleared .The element is affected byForce Majeure event.Excise duty has been increased from 8 % to 12%.PetitionNo. 73/MP/2014 has been filed in CERC for force majeure &
237Jabalpur - Bina (JTCL) 610 551 548 1879 S/C FEB-15765
Trasmission Lines: Page 108 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
change in law.
Force Majeure event: Delay in forest clearance.Transmission licensee grantedby CERC.Tariff adoption granted by CERC.Project execution plan submitted to CEA & lead LTTC.Kharagpur S/s &Chaibasa S/s bays orientation has been shifted & project has been delayed dueto shifting of bays.Resurvey has to be done for route & forest identification .
Khaigapur (WBSETCL) - Chaibasa (PG)10 D/C 400
Force Majeure event: Delay in forest clearance.Transmission licensee grantedby CERC.Tariff adoption granted by CERC.Project execution plan Project execution plan submitted to CEA & leadLTTC.Purulia S/s & Ranchi S/s bays has been shifted & project has beendelayed due to shifting of bays.Resurvey has to be done for route & forestidentification .
370Purulia PSP (WB) - Ranchi (PG)11 D/C APR-16400
.Force Majeure event: Delay in forest clearance.Transmission licensee grantedby CERC.Tariff adoption granted by CERC.Liberty for extension of COD and additional tariff granted by CERC. TSP hasstarted the work.Project execution plan submitted to CEA & lead LTTC.
310RAPP - Shujalpur 514 4512 D/C FEB-16400
Trasmission Lines: Page 109 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Shekhawati Transmission Service Company Limited (SKHWTTSCL)
40Jhunjhunu - Nawalgarh line 107 0 0 01 S/C SEP-15220
20Sikar - Nawalgarh line 78 0 0 02 S/C SEP-15220
Trasmission Lines: Page 110 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
South East UP Power Transmission Company Limited (SEUPPTCL)
80Bara - Karchana 1241 D/C AUG-15400
64Bara - Meza 832 D/C AUG-15400
442Gonda - Shahjanpur 5423 D/C AUG-15400
92LILO 400 Orai - Mainpur 1354 D/C AUG-15400
1LILO of Obra - Sultanpur at Aurai 55 S/C AUG-15400
1LILO of Panki - Obra at Rewa Road 26 S/C AUG-15400
14LILO of Sarojini Nagar - Kursi RD at Sultanpur RD 187 D/C AUG-15400
186Mainpuri - Alighar 2188 D/C AUG-15400
375Mainpuri - Bara Ckt-I 8899 S/C AUG-15765
375Mainpuri - Bara Ckt-II 88310 S/C AUG-15765
188Mainpuri - Unnao (Quad) 44911 S/C AUG-15765
58Rewa Road - Karchana 10212 D/C AUG-15400
68Rewa Road - Meza 9113 D/C AUG-15400
188Tanda - Gonda line 9114 D/C AUG-15400
Trasmission Lines: Page 111 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
TALCHER TRANSMISSION CO. LTD. (TTCL)
290Behrampur - Gazuwaka1 D/C SEP-13400
220Talcher II - Behrampur2 D/C SEP-13400
161Talcher II - Rourkela3 D/C SEP-13400
Trasmission Lines: Page 112 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
TEESTA URJA LTD. (TUL)
Work in progress.Work is on hold in Bihar due to substation. 47.49 Hac forest-"in principle approval" stage-1 received.
420Teesta III - Kishanganj 580 396 361 1511 D/C DEC-14400
Trasmission Lines: Page 113 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
TORRENT POWER LTD (TOR. POW. (UNOSUGEN))
Bidding is Process, RFQ has been issuedDGEN - Vadodara1 D/C 400
.DGEN TPS - Bharuch/Dahej Pooling Station2 D/C 400
Bidding is Process, RFQ has been issuedNavseri - Bhasten3 D/C 220
Sandila TPP - ATS not defind4 D/C 400
.500Solapur NTPC - Pune (PG), Quad5 D/C 400
40Solapur NTPC - Solapur (PG)6 D/C 400
Trasmission Lines: Page 114 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Transmission Corporation of Telangana Limited (TCTL)
14Budidampadu - Bhongiri (2nd Ckt) 24 24 24 141 D/C DEC-14220
25Chilakallu - Narketpally2 D/C 220
170Chinnakorukondi - Suryapet 234 12 0 03 D/C OCT-15400
Preliminary survey completed. Detailed survey to be awarded.Estimates under scrutiny.
200Gajwel - Narsapur 0 0 0 04 D/C MAR-15400
36Ghanapur - Marripally5 D/C 220
145Jagityal - Nirmal 216 0 0 06 D/C MAY-15400
Work awarded on 06.02.2013.Works commenced.328Jaipur TPP - Gajwel (Quad) 458 81 0 07 D/C FEB-15400
144Jaipuram - Jagityal 233 0 0 08 D/C MAY-15400
2LILO of Bhoothpur - Kalwakurthy at Thimmajipet9 D/C 220
2LILO of Bhoothpur - Kalwakurthy at Thimmajipet (Ckt-II)
10 D/C 220
DEC-1314LILO of Budidampadu - Bhongiri at Waddekothapally11 D/C 220
18LILO of Ghanapur - Malkaram at Moulali12 D/C 220
34LILO of Kalpaka - Khammam at Asupaka13 D/C SEP-14400
60LILO of RSS - Warangal at Manthani14 D/C 220
All works completed. Connected SS works are under progress19LILO of Shapur Nagar - Gachilbowli feeder at GISErragadda SS
1915 DC UGcable
JUL-14220
OCT-14160LILO of Srisailam - Hyderabad atYeddumailaram(Shankarapally)
221 219 106 016 D/C DEC-14400
P.O.issued on 18.05.2013.34LILO of Vizag - Khammam (Ckt-I) at Asupaka 0 0 0 017 D/C DEC-13400
Works are under progress.11LILO of Wanaparthy - Ragimanagadda at Singotam XRoad SS
17 15 1418 D/C OCT-14220
2LILO of both ckt Dindi - Chandrayangutta at Bonguloor19 D/C 220
Works are under progress. JC foundation works are under progress.22Lower Jurala HEP - Upper Jurala 36 29 25 320 D/C AUG-14220
Stringing works completed. OPGW work to be taken up.11Mamidipally S/S M/s K.S.K. Photo Voltaic near FabcityRavirala (V)
37 37 37 1121 D/C JUL-14220
Works are under progress.7/14 Nos Cable joints completed and14Marripally common point- Hayatnagar S/S XLPE 1122 DC UG MAR-15220
Trasmission Lines: Page 115 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
remaining works are under progresscable cable
Works are under progress.Cable laying work completed. Joint works to be takenup.
18Moulali - Osmania University (Chilakalaguda) SS 1823 DC UGcable
AUG-14220
36Nagole - Ghanapur24 M/C 220
112Pulichintala - Huzurnagar25 D/C 220
462Suryapet - Yeddumailaram (Shankarpalli) 659 346 173 026 D/C MAR-15400
147Veltoor - Thungabhadra 202 6 0 027 D/C JUN-15400
84Veltur-Thimmajipet 129 52 0 028 S/C MAY-15220
135Yeddumailram - Pargi29 D/C 220
Trasmission Lines: Page 116 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
VANDANA VIDYUT LTD. (VVL)
64Dharmajay-Korba Polling Station1 D/C APR-13220
Trasmission Lines: Page 117 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
VEMAGIRI TRANSMISSION SYSTEM LIMITED (VTSL)
Bidding process to be taken up410Khammam - Hyderabad line -I1 D/C 765
Bidding process to be taken up455Vemagiri Pooling Station - Khammam line -I2 D/C 765
Trasmission Lines: Page 118 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
VISA POWER LTD (VISA)
.Visa Power TPP - Raigarh Pooling Station (Kotra)1 D/C 400
.Visa TPP - Raigarh Pooling Station (kotra)2 D/C 400
Trasmission Lines: Page 119 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
WESTERN U.P. POWER TRANSMISSION CO. LTD. (WUPPTCL)
Approval u/s 164 received25Ataur-Indirapuram 431 D/C MAR-15400
Approval u/s 164 received30Greater Noida-Noida (Sec -148) 119 272 D/C MAR-15400
Approval u/s 164 received40Greater Noida-Sikandrabad 58 293 D/C MAR-15400
Approval u/s 164 received65Hapur-Ataur 156 504 D/C MAR-15400
Approval u/s 164 received50Hapur-Greater Noida 198 535 S/C MAR-15765
Approval u/s 164 received23Hapur-dasna 696 D/C MAR-15400
Approval u/s 164 received40LILO of Meerut -Agra at Greater Noida 207 S/C MAR-15765
Approval u/s 164 received20LILO of Moradabad-Muradnagar at Hapur 58 D/C MAR-15400
Approval u/s 164 received40LILO of Muradnagar -Muzzafarnagar at Ataur 629 D/C MAR-15400
Approval u/s 164 yet received10LILO of Rishikesh -Kashipur at Nehtaur (Bijnor) 4410 D/C MAR-15400
Approval u/s 164 received270Mainpuri-Greater Noida 483 405 5111 S/C MAR-15765
Approval u/s 164 received250Mainpuri-Hapur 583 48712 S/C MAR-15765
Trasmission Lines: Page 120 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Schedule
1. 2. 5. 6. 7. 8. 9. 10. 12.3.
Revised/Anticipate
d
11.
Construction progress StatusTarget Date Remark
(Status of all statutory clearences particularly forest clearence and ROWproblem, if any needs to be mentioned here.)
Towers
TL(Nos)
STC(Nos)
TE(Nos)
STG(cKM)
VoltageLevel
4.
SlNo
Name ofTransmission
Lines
TotalLengt
hCKM
Ckts(S/C)
&(D/C)
Pabati KoldamTransmission Company Ltd (PKTCL)
Commissioned 09/14.SEP-08301Koldam - Ludhinana (JV Portion) 423 423 423 3011 D/C SEP-14400
Ready for commissioning 9/14.76Parbati -II- Koldam line -II 157 157 157 762 S/C SEP-14400
Commissioned 10/14.81Parbati- II - Koldam line-I 173 173 173 813 S/C OCT-14400
Trasmission Lines: Page 121 of 121
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed
Top Related