Nottingham/Kirkwood Area Reconstruction MeetingCarol Haddock, P.E., Senior Asst. & Interim Deputy Director
1 OVERVIEW OF THE PROJECT
2 NEXT STEPS
3 CONTACT INFORMATION
AGENDA
2
Pavement /Mobility
Nottingham/Kirkwood Area ReconstructionExamples of Current Conditions
3Drainage & MobilityPavement /Drainage
Improve water and wastewater as needed
Nottingham/Kirkwood Area ReconstructionIdentified Improvement Needs
Pedestrian safety and accessibility
Improve storm drainage
4
Improve pavement conditions and mobility
Improve existing bike lanes
Nottingham/Kirkwood Area ReconstructionM-000247 Project Area : Memorial to Britoak (just south of Katy Fwy)
5
LEGEND
TREE TO REMAIN EXISTING RIGHT-OF-WAY (ROW) 5’ SIDEWALK
TREE TO BE REMOVED NEW MEDIAN
EXISTING MEDIAN PAVEMENT
KIRKWOODMemorial BritoakKimberley
(Intersection)
PresenterPresentation NotesThis project was delayed from 2012 to 2018 due to the updated Buffalo Bayou Mitigation.The Memorial Reconstruction project going on in this area is progressing as scheduled. A few of the changes that you can expect are:Increasing the lane width from 10’ to 11’ - �adding dedicated left turn lanesSidewalks will be widened from 4’ to 5’Underground storm sewer will be added and upsized Roadway will be reconstructed Waterline and sanitary sewer will be replaced as needed�
Nottingham/Kirkwood Area ReconstructionIntersection: Kimberley at Kirkwood
6
LEGEND
TREE TO REMAIN EXISTING RIGHT-OF-WAY (ROW) 5’ SIDEWALK
TREE TO BE REMOVED NEW MEDIAN REPLACED SIGNAL
EXISTING MEDIAN PAVEMENT
PresenterPresentation NotesAll work will be done within the existing right-of-way
Nottingham/Kirkwood Area ReconstructionProposed Cross Section: Kirkwood North of Memorial
7
Nottingham/Kirkwood Area ReconstructionProposed Cross Section: Woodthorpe from Carlingford to West Forest
8
CURRENT CIPPART I / IN DESIGNPANEL REPLACEMENT PROJECT
Nottingham/Kirkwood Area ReconstructionImprovements to Existing Bike Lanes
9M
EMO
RIAL DRIVE
BUFFALO
BAYOU
BRIAR FOREST DRIVE
WESTHEIM
ER ROAD
NOTTINGHAM/KIRKWOOD CIP PROJECT CURRENT CIP PART II
• Existing bike lane is 2’ in width and considered substandard
• Increase comfort level by introducing a 5’ bike lane and a 3’ buffer
• Striped/painted bike lane and buffer allows for street sweeping and maintenance
• Striped/painted bike lane and buffer allows for street sweeping and maintenance
• Substandard facilities are not considered safe, and will not be restriped along portions of the corridor not programmed with the CIP project we are discussing today. To learn more, please visit the Houston Bike Plan.
• When funding is received, PWE will need to move the curb in this area to update the bike facility
KIRKWOOD ROAD
• 6’ bike lane or 5’bike lane with a 2’ painted buffer
• 6’ bike lane or 5’ bike lane with a 2’ painted buffer
PresenterPresentation NotesProposing a 5’ bike lane with a 3’ buffer given corridor speeds, traffic and area context(To achieve this, the median will be decreased in width from 31’ to 19’) Bike configuration will be consistent throughout the corridor and within the context of the segment
Nottingham/Kirkwood Area Summary
Improve pavement conditions and mobility
Improve storm drainage
10
Sidewalks and ramps to meet ADA Standards
Improve existing bike lanes
Improve water and wastewater as needed
PresenterPresentation NotesTo recap..
2013 Planning
(Complete)
2016Design
(Ongoing)
2018Scheduled
Construction
2020Anticipated Completion
11
Timeline subject to change
Next Steps:Nottingham/Kirkwood Area – Phase I
ReBuild Houston Goals
Reduce impact of flooding
Improve mobility
Quality of life
12
Future ConstructionCompleted Construction
Current Construction
www.RebuildHouston.org
13
We Want Your Input
14
Or email us your comments at: [email protected]
Fill out a comment card tonight
We Want Your Input
Or email us your comments at:
Fill out a comment card tonight
YOUR INPUT BYJuly 19, 2016 WILL HELP US STAY ON SCHEDULE
THANK YOUPlease find your nearest breakout group and leave your comment cards at the sign-in table.
Nottingham/Kirkwood Area Reconstruction�Proposed Cross Section: Kirkwood North of Memorial