INFRASTRUCTURE PROJECTS
HIRE-LEASE-RENTAL
EMPOWERING GROWTH
NITYANAND INFRASTRUCTURE LIMITED
COMPANY
MACHINERY, EQUIPMENT & PROJECTS
WORK DONE CERTIFICATES
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
NITYANAND INFRASTRUCTURE LIMITED
ABOUT US
GENERAL DETAILS
CERTIFICATES - GENERAL
ROCISO CERTIFICATE- 9001:2008Quality PolicyService Tax CertificatePF Registration Certificates PF Registration CertificatesProfession Tax Registration Certificate PWD Registration - Maharashtra PRED Registration - KarnatakaPWD Registration - Karnataka VAT Registration Certificate - Karnataka CST Registration Certificate - Karnataka Trademark Registry CertificateMVAT - MaharashtraCSTDIRECTORATE of INDUSTRIES - MaharashtraNSIC-CRISIL Performance and Credit Rating for Small Scale Industries
INFRASTRUCTURE – CIVIL PROJECTS
i) Mangalore Refinery and Petrochemical Limitedii) Madhucon Projects Limitediii) Pratik Enterprisesiv) K. Raheja Corp Pvt Ltd.v) Antilia Commercial Pvt Ltdvi) Nagarjuna Construction Company Ltdvii) Powai Developers-1viii) Shapoorji Pallonji & Co Ltd.ix) Reliance Engineering Associates (P) Limited x) Unity Infra Projects Limitedxi) UP State Bridge Corporation Ltdxii) YATES – DESBUILD JOINT VENTURExiii) Atlanta Limitedxiv) Powai Developers -2
INDEX
DG SETS - MACHINERY, EQUIPMENT & PROJECTS
LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA
GENSETS - CLIENTS & PROJECTS
INFRASTRUCTURE - MACHINERY, EQUIPMENT & PROJECTS
LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES
INFRASTRUCTURE - CLIENTS & PROJECTS
ONGOING PROJECTS – CIVIL PROJECTS
i) MANGALORE REFINERY AND PETROCHEMICALS LTDii) TECHNIMONT ICBiii) MANGALORE SEZ LIMITEDiv) TOYO ENGINEERING INDIA LIMITED
FINANCIALS
2008 - 2009
AUDIT REPORT - 2008- 09 – PAGE 1AUDIT REPORT - 2008- 09 – PAGE 2AUDIT REPORT - 2008- 09 – PAGE 3BALANCE SHEET - 2008-09PROFIT & LOSS – 2008-09IT – RETURN VERIFICATION FORM – 2008-09
2009 – 2010
AUDIT REPORT - 2009- 10 – PAGE 1AUDIT REPORT - 2009- 10 – PAGE 2AUDIT REPORT - 2009- 10 – PAGE 3BALANCE SHEET - 2009-10PROFIT & LOSS – 2009-10IT – RETURN VERIFICATION FORM – 2009-10
NITYANAND INFRASTRUCTURE LIMITED
INDEX
ABOUT US
Since 1976, we have been at the forefront of major infrastructure development in the areas of Road Work Contracts, Excavations and Equipment supplies for large-scale projects around the country.
Nityanand Infrastructure Ltd. understands that the success and development of Infrastructure of a country is one of its most essential Underpinning And innovation in infrastructure is a means for building assets that support the economy. Investments in equipment and personnel training have ensured a track record that has associated us with many renowned projects. We also have a Construction Equipment Bank that provides machinery and support, on rental basis for large-scale projects across the country.
Our company stems from a vision that the boundaries between products and services fade rapidly too. As a market leader today, we must be able to integrate in a balanced way different types of know-how that would transform stand-alone processes, products and services into a seamless, value-rich solution. These challenges have been overcome by our experience, which today stands as our core strength:
CONTRACTS: Taking this ideology we have developed a competence that today extends to handle consultation, design, installation Fabrication. Excavation, Building Roads, dams, canals and other related Civil Works.
Equipment Bank: which is the backbone to the construction contract business provides Rental Solution for all type Machinery to projects regardless of the application, size, duration, industry and location.
Our ancillary businesses have developed from an expertise to meet every need in the Infrastructure scenario. Where innovative thought has led to a cross-functional diversification in providing the following services: Resource Consultancy Services: Our manpower services, establishes communication and mobilizes personnel in project implementation as per client requirements. This support encompasses operational & maintenance support for construction machines, mainly D.G sets for supporting construction Power.
Nityanand Automobiles: State of the Art workshop for Repair equipments through the use of modern technology, we have set up a workshop at Navi Mumbai and Panvel, dedicated to the maintenance Repair Refurbish and supply of spares through an authorized dealership agreement with MICO Bosch for next generation Fuel pumps.
Nityanand Multitrade Pvt Ltd: This Company is engaged in Banking and Non Banking Finance facility for Construction Equipments and other Management guidance, and ensured that the documentation and procedures are adequately in place for all policies and activities.
NITYANAND INFRASTRUCTURE LIMITED
About Us
NITYANAND INFRASTRUCTURE LIMITED
General Details
INCORPORATION CERTIFICATE NO. & DATE 11- 84676 DT. 16.01.1995
ISO 9001 : 2008 REG. NO. MAH/ Q - 1079/C1 dt. 08.09.2011 valid till 07.09.2014
PERMANENT ACCOUNT NO. AAACN1981E DATED 16/01/1995
TAN NO. MUMN05238C
SERVICE TAX NO. AAACN1981EST001 Dated 16/09/2008
Provident Fund No. MH/PF/Circle V/42827/361Dated 23-10-2007
PROFESSION TAX NO. PT/R/ VI / 25/ 8055 Dated 05/05/05
BOMBAY SHOP ESTABLISHMENT REG. NO. 760014732/ Commercial II/ PS Dated 19.07.2007
MAHARASHTRA PWD REG. NO. 2/ 2008-09 Class-1 (A) Dated 05/04/2008.
KARNATAKA PWD REG. NO. . CBS 8403 CEVIL 2005 DT. 31.01.2009
VAT TIN – MAHARASHTRA 27230544719 V W.E.F. 19.06.2006
CST TIN – MAHARASHTRA 27230544719 C W.E.F. 19.06.2006
VAT TIN - KARNATAKA 29880820245 W.E.F. 22.10.2008
NITYANAND INFRASTRUCTURE LIMITED
General Details
CST TIN - KARNATAKA 29880820245 W.E.F. 22.10.2008
CERTIFICATE OF REGISTRATION OF TRADE MARKS
Trade Mark No:1366172 - Dated 22-06-2005
DIRECTORATE of INDUSTRIES - Maharashtra
Enterpreneur Memorandum no.27222200649 dt 24.08.2011
NSIC-CRISIL Performance and Credit Rating for Small Scale Industries
Rating SE 2BDated 17-11-2011 valid 16-11-2012
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
NITYANAND
NITYANAND
NITYANAND
NITYANAND
NITYANAND
Resources & Projects
DG Sets - Machinery, Equipment & Projects
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA
GENSETS - CLIENTS & PROJECTS
Infrastructure - Machinery, Equipment & ProjectsLIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES
INFRASTRUCTURE - CLIENTS & PROJECTS
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
1 5
2 38
3 28
4 180 kva:180KVA/150KW NT –743 G (NA) or 6CTA (250(Amps) 415Volts, 3 Phase (4 Wire), 0.8 PF (LAG) 1500 Rpm, 50HZ AC Stamford Alternators, coupled to kirloskar Cummins NT 743 G, 23 BHP, 6 Cylinders, Radiator cooled Engine, Mounted on common Base Frame complete with 2 Nos Starting Batteries, Fuel Tank, Standard Control Panel along with standard Accessories like battery lead, Connection cables etc.
22
5 250 kva:A250 KVA50HZ AC Stamford Alternators, coupled to kirloskar Cummins engines NTA 855 G 2,306 BHP, 6 Cylinders, Radiator cooled Engine, Mounted on common Base Frame complete with 2 No s Starting Batteries, Fuel Tank, Standard Control Panel along with standard Accessories like battery lead, Connection cables etc
/200KW NT 855 G (NA) or 6CTB (348 Amps) 415 Volts, 3 Phase (4 Wire), 0.8 PF (LAG) 1500 Rpm, 50
6 500 kva:500 KVA / 400 KW VTA 28G NA or KT19 G (AC) D.G.Set compromising of Cummins VTA 28G Engine developing 614 BHP coupled to Stamford make Alternator 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG) 1500 Rpm 50 HZ Ac. Both mounted on a common base frame through a pair of flexible coupling complete with standard Control panel, 990Ltr.Fuel Tank, 12 cylinders, 2 Nos. Starting Batteries of 12 Volts each, Connection from alternator to panel board and all other standard Accessories.
25
7 625 kva:625 KVA / 500 KW, Diesel Gen Set, Water cooled Engine make kirloskar Cummins, Model KTA 2300 – G 750 BHP Amps 869 coupled to suitable Alternator of Stamford make 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG) 1500 Rpm 50 Hz AC with suitable Base Frame along with AVM Pads, Diesel Tank, Battery, Standard Panel Board, Connection up to the panel Board from Alternator with ace Maintenance Kits like Filters etc.
2
8 750 kva:750 KVA / 600KW, Diesel Gen Set, Water cooled Engine make Kirloskar Cummins, Model KTA 2300-G, 890 BHP, Amps 1042, Coupled to suitable Alternator of Stamford make 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG) 1500 Rpm 50HZ AC with suitable base Frame along with AVM Pads, Diesel Tank, Battery, Standard Panel board, Connection up to the panel Board from Alternator with ace Maintenance Kits like Filters etc.
5
9 1000 kva:1000 KVA/800 KW ,Cummins Engine Model KTA –3067,1180- BHP, Radiator cooled Engine, 415 Volts, 3 Phase (4 wire) 0.8 P.F (Lag) 1500 Rpm, 60 HZ, Stamford Alternator Mounted on sturdy Base Frame, 16 Cylinders, with
5
10 1250 kva:1250 KVA/ 1000 KW, water-cooled Cummins Engines model 38.50 G3, 1475 Amps/ 1470 Bhp
5
LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA
SL No Description Units
30 Kva30KVA 25KW (Kirloskar/Oil Engine) RB33/RA33, 48BHP Radiator/Air cooled coupled to kirloskar/Stan ford Alternator, 415Volts, 3Pharse (4Wire), 0.8PF (LAG) 1500RPM, Mounted on common base frame. INOS starting battery fuel tank standard control panel 415 Volts,3 Phase(4 Wire),0.8 PF (LAG) 1500 Rpm, starting Batteries, Fuel Tank, Standard Control Panel along with standard accessories like battery leads, connection from Alternator up to panel board etc
62.5 kva:62.5 KVA,50KW82AmpsLeyland Engine model (370/400/402) Cummins Engine model 38G7,+80BHP,water cooled coupled to kirlosker/stamford ALTERNATOR 415 Volts,3 Phase(4 Wire),0.8 PF (LAG) 1500 Rpm, starting Batteries, Fuel Tank, Standard Control Panel along with standard accessories like battery leads, connection from Alternator up to panel board etc
125 kva: 125KVA/100KW Kirloskar Cummins NTC 495 G, 154 BHP, 6 Cylinders, Radiator Cooled Engine (174 Amps) coupled to KEC / Stamford Alternator 415 Volts, 3 Phase (4 wire), 0.8 PF (LAG) 1500 Rpm, 50 HZ AC mounted on common Base Frame Complete with 2 No s Starting Batteries, Fuel Tank, Standard Control Panel along with Standard Accessories like Battery leads, Connection from Alternator up to Panel Board etc.
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
Sr. No. Name of the Client Nature/ Description of Work Duration No of D.G Sets hired
1 Reliance Engineering Associates Pvt Ltd Deployment of D.G Set capacity from 62.5 KVA to 1000 KVA at Reliance Jamnagar Site, Gujarat
2006-2009 100 nos
2 Punjlloyd Ltd Hiring Of 500 KVA & 250 KVA & 125 KVA at Heera Redevelopment Project - Offshore Site.
2008- Till Date 10 Nos
3 Om Sai Infrastructure Ltd Hiring of 625 KVA & 750 KVA- for crusher plant at Bhawadi - Wagoli, Pune
2008- Till Date 5 Nos
4 Uttam Galva Steels Ltd Hiring of 62.5 KVA to 1000 KVA Capacity D.G at Wardha Steel Project, Nagpur and Khopoli Steel Project
2008- Till Date 20 Nos
5 Zydus Nycomed Care Pvt Ltd Hiring of 125KVA & 250 KVA for emergency backup in Plant at MIDC, Pawane, Navi Mumbai
2008- Till Date 5 Nos
6 Larsen & Toubro Ltd Hiring of 62.5 KVA to 500 KVA Capacity D.G Set at L&T MONORAIL PROJECT at Wadala and SEZ Arshiya Project at Panvel
2009- Till Date 20 Nos
7 Runwal Developers Pvt Ltd Hiring of 500 KVA & 250 KVA Capacity D.G Set in RMALL Project at Mulund & Thane
2009- Till Date 5 Nos
8 Tulip Telecom Ltd Hiring of 250 KVA D.G Set for Emergency backup power at Mahape Plant, Navi Mumbai
2007- Till Date 2 Nos
9 Nagarguna Construction Ltd Deployment of 125 KVA D.G Set at Construction Site at Chakan,Pune & Mazagon Dock, Mumbai
2008- Till Date 3 Nos
10 Seto Technolog Pvt Ltd Hiring of 62.5 KVA at Mahape site ,Navi Mumbai
2007- Till Date 2 Nos
...and Many more !
Are you setting up a new enterprise and the sanction of grid power for construction activities takes time? We have the solution of rental power generators, as temporary stopgap arrangement to speed up construction activities and the timely completion of your projects. Many businesses are re-evaluating their plans and procedures for business continuity in the event of major power shortfalls. Our emergency power solutions come into rescue, to fulfil your production load by adding more power to the existing sanctioned capacity.
Save on Capital Costs with a negotiated long-term rental to back up a manufacturing operation in the event of:
a) Seasonal Requirement of additional powerb) A large order to be executed and the need for additional power. Would you like to outsource your Power now! Call on us 24x7 for support and ready stock delivery.
GENSETS - CLIENTS & PROJECTS
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
Sr no 1 Details of Plant & Machinery Model/Capacity Make/Nos
1 Dumpers & Tippers
35 nos 25 Ton ASHOK LEYLAND
5 nos 15.5 Ton TATA
2 Water Tanker
2 No LEYLAND
3 JCB- 3D
4 No 3DX Escorts
2 No 3D Escorts
4 EX - 60
2 Nos TATA
5 EX-100
1 No TATA
6 EX- 300
1 No TATA
7 EX- 200LC
1 No TATA
8 EX- 210 IES
8 Nos TATA
9 Roller
1 No Vibro soil compactor 1107D L & T
1 No Tandom IDD 90 Ingersoll Rand
10 PC- 300
1 No Komatsu
LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
11 PC - 200-6
1 No Komatsu
12 Hyraulic Excavator 320
2 No Caterpillar
13 Dozer - D4
2 No Komatsu
14 Dozer - D3
1 No Komatsu
15 Dozer - D6
2 Nos Komatsu
16 Hydra 14 Ton
4 No 14SB-3P Escort
17 Hydra 16 Ton
2 Nos HP 216 Escort
18 Motor Grader
1 No GD 511A Komatsu
1 No GD-405 Komatsu
19 BOBCAT
2 No S 130 Ingersoll Rand
20 Hydraulic Piling Rig HR -
1 No HR 180 Mait
21 Hydraulic Piling Rig HR -
1 No HR 130 Mait
LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
Other Equipment & Vehicles
1 Other Utility Vehicles
Mahindra Bolero - Camper
8 Nos Mahindra
2 Other Equipments
Form Work ,Shuttering & Enabling Material For 2000 Sq Mtr Area
1 Set
3 Shuttering & Scaffolding Materials 500 Nos
4 20m3 Batching Plant Univeral-20M3/Hr
5 Transit Mixer Stetter Transit Mixer Model AM 6 SHN
6 Concrete Mixer
1 Workshop Facilities Univeral-20M3/Hr
Lab Facilities 1
Cuplock Vertical 4 Cups-3.0 Mtrs
Cuplock Vertical 4 Cups-2.5 Mtrs
Cuplock Vertical 4 Cups-1.5 Mtrs
Cuplock Vertical 4 Cups-1.2 Mtrs
Cuplock Horizontal 4 Cups-1.0 Mtrs
U-head Jacks 450 mm
Flat head Jacks 500 mm
Shuttering plat
Channel Soldier
Single Clip
400 nos
1500 nos
1800 nos
500 nos
2000 nos
700 nos
300 nos
400 nos
1 No
1200 nos
2 Nos
2 Nos
2600 Sqf Workshop equipped with Overhead Crane facilities
Sand replacement Appartus
Core Cutter app
Electronic Weighing Balance
Slump Cone
Leveling Instrument
Cube Mould
Manually Operated Compression Testing machine
Standard Test Sieve - Sethi
Total Station - Topcon
Rapid Moisture Metre
2 Set
2 Set
1 Set
1 Set
1 Set
12 Nos
1 No
1 Set
1 Set
1 Set
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
Sr. No. Name of work Name of Organisation Date of Start / Date of Completion
AMOUN T OF WORK In Lacs 2009-2012
1 Construction of New Road For Mangalore SEZ Limited
Mangalore SEZ Ltd. 2009 to 2010 1908.00 WORK COMPLETED
2 Construction of RCC Structure for Control Room; Civil & Structural Work for Sulphur Pastilation unit at MRPL.
Mangalore Refineries & Petrochemicals Ltd Ven Code: SN425
2009 to 2010 259.00WORK COMPLETED
3 Construction for Foundation of Cooling Tower at MRPL Site
Mangalore Refineries & Petrochemicals Ltd
2009 to 2010 55.49WORK COMPLETED
4 Construction Works of Temporary Site Facilities For MRPL CHTU Project at Mangalore
TECHNIMONT ICB Pvt LTD, MUMBAI
2009 to 2010 275.00WORK COMPLETED
5 Piling Work at Guideway in 2B Series, Monorail Project for 1000mm dia
Larsen & Toubro Limited, Mumbai
2009 to 2010 111.67WORK COMPLETED
6 Excavation Work at Ambika Mills Compound. Kamala Group Of Companies, Mumbai
2009 to 2010 417.00WORK COMPLETED
7 Excavation Works From Versova to Ghatkoper Stretch in Mumbai Metro Rail Project.
Simplex Infrastructure Ltd, Mumbai
2009 to 2010 29.6WORK COMPLETED
8 Work Order for carrying out Earthwork for Foundation of proposed residential building & Allied structures at Metal Box Worli, Mumbai.
K. Raheja Corp P.L. Mumbai
2008 to 2009 87.05WORK COMPLETED
Work Order for carrying out earthwork for foundations of proposed residential building No. B3 and its ancillary structures at Hindustan Mills, Mahalaxmi, Mumbai.
2006 to 2007 124.18WORK COMPLETED
9 Piling work and Road work & allied work of New American Consulate Complex,US Embassy @ BKC.
Yates Desbuild JV 2008 to 2009 382.06WORK COMPLETED
Filling of soil borrowed from the quarry / borrow area designated by the sub contractor and apporoved by YDJV from Pali Hill. Includs Spreading & grading by by 8/10 metric ton vibro pneumatic tired roller to achieve inclusive of royalty charges.
2006 to 2007 212.72WORK COMPLETED
10 The Civil work for MLV -28, Kadav Site, Karjat EWPL Project, MH State
Reliance Industries.Ltd 2008 to 2009 64.57WORK COMPLETED
The Civil & Structural work of welder Traning center (WTC) Central Maintenance workshop (CMW) & Store P & M Building at Project, MH State Ghosalwadi, Mumbai EWPL.
2007 to 2008 140.66WORK COMPLETED
The Scope of work under this Contract is backfilling works on all sides of Bldg. excavation and back filling.
2006 to 2007 26.70WORK COMPLETED
INFRASTRUCTURE - CLIENTS & PROJECTS
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
11 Earth work and ground improvement works such as excavation in road way by mechanical means rocky soils by blasting / controlled blasting, removal and disposal of unsuitable soils earth work.
Madhucon Projects Ltd 2007 to 2010 2106.00WORK COMPLETED
12 Earthwork excavation in basement in all Types of soil, such as Murrum Soft/Hard Rock by Manual/ Mechanical/ Pnemautic wedging chiseling including carting away excavated material to approved dumping ground Excavtion Work at Plot No.21 MIDC Andheri (E) Mumbai.
Annakoot Properties Pvt. Ltd
2008 to 2009 33.44WORK COMPLETED
13 Work order for carrying out excavation and disposal of soil and Rabit from Nursery plot, Raheja Vihar, Powai Mumbai
Powai developers 2006 to 2007 133.4WORK COMPLETED
14 Work Order for carrying out earthwork for foundations of proposed residential building and its alliedstructures at bldg. No. 15, wing "E" Raheja Vihar, Near Chandivali Village: Tunga, Powai, Mumbai
Hill Crest Developers 2006 to 2007 116.56WORK COMPLETED
15 Work order for execution of earthwork as per the details given in our tender specifications for on labour basis for proposed construction of Swan Mills (||Primal) Ashok Gardens Residential Bldg Site.
Unity Infra Projects Ltd 2006 to 2007 24.32WORK COMPLETED
16 Work order for Transportation and back filling of Soil / Murum at New Consulate Complex, US Embassy, Site BKC Mumbai
Shapoorji Pallonji & Co. Ltd 2006 to 2007 96.9WORK COMPLETED
17 The Scope of work under this Contract for work of training of Mithi river.(widening & Deepening from C ST Road to Powai (Gr. No. 5)
M/s. Pratik Enterprises 2006 to 2007 144.98WORK COMPLETED
18 Work Order for Excavation and Earth Works at our CSPL Vasai Site
Nagarjuna Construction Co. Ltd
2004 to 2005 97.58WORK COMPLETED
19 Widening and Construction of Western Express Highway from Times of India Flyover north end to Asha Nagar, Subway & Kulupwadi Pedestrian Subway (Km. 510.35 to 504.00)
Atlanta Ltd 2004 to 2005 650.26WORK COMPLETED
20 Widening & strengthening of Kalanagar - Vakola Road, Project Mumbai Dismantlng Work.
U.P. State Bridge Corporation Ltd.
2004 to 2005 112.7WORK COMPLETED
21 LOI for Rock Excavation & Removal of Over Burden Earthwork in th plot at Atlamont road, Mumbai
Antilia Commercial P.L 2004 to 2005 35.71WORK COMPLETED
INFRASTRUCTURE - CLIENTS & PROJECTS
projects
Infrastructure Civil Projects
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
Hire-Lease-Rental
Projects
NITYANAND INFRASTRUCTURE LIMITED
projects
Ongoing Projects
NITYANAND INFRASTRUCTURE LIMITEDNITYANAND
Corporate Office (Correspondence):
NITYANAND INFRASTRUCTURE LTD.711, Highway Commerce Centre,Off Western Express Highway,I.B. Patel Road,Goregaon (East), Mumbai - 400063,Maharashtra, India.Telephone : (+91) (22) 4088 4444Email: [email protected]
Registered Office:
NITYANAND INFRASTRUCTURE LTD.G.D. Ambekar Marg,Opp. Abhyudaya Nagar Post Office,Cottongreen (West), Mumbai - 400033,Maharashtra, India.Telefaxno : (+91) (22) 4088 4444Fax : (+91) (22) 2686 6812Email:
Works:
OM NITYANANDNear Old Mumbai - Pune toll naka,Near Raigad Petrol Pump, Thombre Wadi,Post - Poinge, Dist - Raigad,Panvel - 410206Telephone - (02143) 239108 / 107<Email:
NITYANAND INFRASTRUCTURE LTD.Plot No - A/132, MIDC,T.T.C. Industrial Area,Pawane Village,Navi Mumbai - 400705Telephone - (022) 27685195, 27689146Email: [email protected]
NITYANAND INFRASTRUCTURE LIMITED
Contact Us
General [email protected]