Innovation in Ground Support Solutions
The Future
The Journey
THE JOURNEY
The Coates Hire business started in 1885 as a small
engineering company based in Melbourne. The “hire” business
had its origins in the development of the vibratory roller,
which occurred just after WW2. The roller was so innovative
that to attract customers the company introduced a “try
before you buy” policy which led to the formation of a hire
company.
Today Coates Hire is the market leader in the Australian hire
equipment industry and is the 5th largest Hire Equipment
company globally. Today we look at ground breaking
innovations in the grounds and shoring business arm.
The Future
The Journey
Innovation in Ground Support Solutions
Traditional Methods needing ideas
Tie Back Concrete Walls
Internally Braced Steel
Cofferdams
Anchored Street Piled Walls
Steel Bracing
Traditional Methods needing ideas
• Perimeter frame (complete or
partial)
• Hydraulic and fixed
extensions
• Components preassembled
• Compatible with all types of
soil retention wall (auger
pile, sheet pile, D-wall, etc.)
• Compatible with propping
systems to increase load
capacity
MEGA BRACE
• High span capabilities (150Tonne
at 18m clear span)
• Hydraulic & fixed extensions
• Components can be pre assembled
prior to delivery to site
• Up to 25m clear span capability
• Articulating connections allows for
+/- 70°
• Suitable for raking prop
applications
• Retaining Wall Propping
MP150 PROPPING
HYDRAULIC SHORING
APPLICATIONS• Basement structures
• Pumping stations & wet
wells
• Pipes, culverts, water
management
• Large scale trenching
applications
• Underground storage tanks
• Launch & reception pits
• Tunnelling applications
• Mining applications
• 24/7 monitoring in real time
• Ambient temperature recording
• Suited to All Hydraulic Prop Types
WIRELESS DIRECT LOAD
MONITORING
• Remote reporting via web link
• Data logging
• Over-load alarms (sent via SMS)
LOAD MONITORING
Traditional Methods needing ideas
Traditional Methods needing ideas
Traditional Methods needing ideas
• Lightweight construction
• Bridge Version with stairwell
aperture
• Hook On excavation stairwell
version
SAFE ACCESS STAIRWELL
• Only intrudes 1.2m into excavation
space.
• Conforms to all latest AS standards
• Delivered pre assembled & Installed
in just a few minutes
• No skilled labour to install
Traditional Methods needing ideas
• Safer (limited ground loss)
• Stronger (up to 81kPa)
• Wider (Up to 10m)
• Deeper (Up to 9m)
• Ideal in poor ground
conditions
DOUBLE SLIDE RAIL
• Easily installed and
extracted by 30t excavator
• 2.5m under strut clearance
• 57 kPa panel ratings
• Up to 7m wide struts
• Up to 4m Deep
• Modular System
HEAVY DUTY SOLUTIONS
7.4m ROLLING STRUT BOX
• Light weight
• Aluminium construction
• 7.4m & 4.5m long panels
• High strength, High Clearance
strutting available
• Hi-load construction, built to
last, 42kPa capacity
LIGHTWEIGHT SOLUTIONS
Traditional Methods needing ideas
• Fully Qualified Civil Engineering technical team
• Face to face consultation to ensure the most suitable
solution is provided
• Support from project planning to completion
• On site installation / operational assistance
• Supported by central design department & local sales
engineer in each state
• Design certification (in house or outsourced)
• System installation (supported/outsourced)
ENGINEERING SUPPORT
Conceptual Design
Site Support to Job Completion
FULL TEMPORARY
WORKS PACKAGE
Technical Drawings
Design Analysis
Certification
PROJECT SOLUTIONS
CERTIFICATION
The Future
The Journey
Innovation in Ground Solutions RECENT PROJECTS
“To build a 16m diameter, 4m deep tank on a very small
footprint, close to woodland and ‘live’ pump station”
RECENT PROJECTS
• Water holding tank
Nowra
• 16m diameter tank
• 4m deep excavation
• Mega Brace frame
• Six (6) sided solution
NOWRA
“To construct a large, deep pumping station in water charged
ground, very close to an existing pump station and public dwellings”
• Queensbury pumping
station for SA Water
• 38m x 20m x 9m deep
• Concrete piled wall 14m
long piles
• High strength twin frame
design
• Mega Brace + MP150 struts
• Equipment install <2 days
QUEENSBURY
“To construct a 50m long bridge pier base structure, close to live
traffic lanes with limited access and small site footprint”
• Gateway Road Project WA
• Bridge Pier Base Foundation
• 50m x 6m x 4.5m Deep
• Live Traffic Loads
• 1 day Shoring Install
GATEWAY
TANK INSTALLATIONS.
• FUEL STATIONS
• GROSS POLUTANT TRAPS
• WATER STORAGE
• SUPER MEGA BRACE
BASEMENT CONSTRUCTION
The Future
The Journey
Innovation in Ground Support Solutions
• 250t & 500t capacity
Props c/w 1.2m Diameter
Super Tubes
• 49m Span Capabilities
• No Vertical Support
• Multi Level Basement
Construction
• $m cost savings
THE FUTURE
TRANSPORT AND
INFRASTRUCTURE
Traditional Methods needing ideas
Traditional Methods needing ideas
Nigel Robbins
m. 0429 195 853
Rafi Tchopourian
m. 0408 885 784
Rex Turner
m. 0417 663 328
Top Related