NEXT STEPS IN VIEW OF THE FINAL REPORTING PERIOD Rome, 8-10 July, 2013
WP10:Administrative tasks
By: Giovanni Addamo - Orietta Casali - Stefano Rinaldi
http://www.climrun.eu
CLIMRUN Meeting. Rome 8-9-10-July
CLIM-RUN’s relevant administrative dates
Starting date: March 1°, 2011Duration: three yearsEnd of the project: February 28, 2014
- First reporting period: COMPLETED and PAID -
CLIMRUN Meeting. Rome 8-9-10-July
PARTNER INTERIM ACCEPTED CONTRIBUTION SECOND PAYMENT MAX 85% CONTR. U.E.
ENEA 222.271,06 93.553,30
EEWRC 81.185,60 69.803,36
CNRM 209.058,38 61.003,28
ICTP 59.674,49 58.604,96
IC3 223.283,79 71.273,15
NOA 95.430,24 49.062,99
CMCC 86.748,92 72.334,67
TEC 0,00 50.000,00
PLAN BLEU 80.921,51 58.138,36
PIK 73.741,88 52.399,65
UEA 76.309,39 61.124,60
GRAVECHOT 33.304,59 16.552,64
DHMZ 15.880,16 20.997,00
USMD 0,00 0,00
UC 60.284,24 20.997,00
1.318.094,25 755.844,95
JRC 147.745,68 44.000,73
1.465.839,93
DIRECT PAYMENT U.E.
ONLY € 50.000,00 - U.E. NON ACCEPTED FORM C
SUBMIT REVISED COST IN FINAL REPORT
CLIMRUN Meeting. Rome 8-9-10-July 2°
PA
YM
EN
T (
IN P
RO
GE
SS
)
Second reporting period: from month 19 to the last month of the project (September 1st, 2012 - February 28, 2014).
DATES OF THE SECOND REPORTING PERIOD
Partners have to complete their reporting activity within March 31st, 2014.
The Coordinator will have to prepare the comprehensive report within April 30, 2014.
CLIMRUN Meeting. Rome 8-9-10-July
What to report
ELIGIBLE COSTS IDENTIFICATION OF DIRECT AND INDIRECT COSTS OTHERS
FOR OTHER INFORMATIONS SEE THE FOLLOWING DOCUMENTS:
Guide to Financial Issues relating to FP7 Indirect Actions;
Article II.14 of General Condition GA;
Article II.15 of General Condition GA
CLIMRUN Meeting. Rome 8-9-10-July
ANALITICAL REPORT
In addition, BEFORE the last financial report Parties shall have to prepare an analytical report of the costs incurred in next period in a predetermined electronic worksheet made available by the Coordinator, with the following time schedule:
30 September 2013
CLIMRUN Meeting. Rome 8-9-10-July
How to fill the analytical report form
point your browser to https://docs.google.com sign as email "[email protected]" and password
"nostroclimrun1" select the spreadsheet named "analitycal report of
past and future costs 2“
CLIMRUN Meeting. Rome 8-9-10-July
Analytical Report Form
CLIMRUN Meeting. Rome 8-9-10-July
General Rules to compile FORM C
Remember:
• compile FORM C Details • indicate the exact Work package • indicate actual cost for personnel costs
ATTENTION!!!!!!! MANAGEMENT OR RTD Scientific coordination of the project cannot be charged under "other activities" (they are not management). Costs related to project meetings (kick-off, periodic, final) should in principle be charged under RTD activities, since they are deemed to address scientific/research aspects of the project.
For Management costs see Financial guide Pag. 11, 78-79
CLIMRUN Meeting. Rome 8-9-10-July
REMARKS TO THE FIRST REPORTING PERIOD – General questions
MANAGEMENT: General criteria
The expenses can never include what is commonly known as «scientific coordination…from Guidelines version 28/02/2011, »
Examples, IT IS EXCLUDED:• costs related to project meetings such as: kick off, periodic and final
meetings• Preparing executing and post-processing of major project meetings as
steering committee meetings, general assemblies and meetings with the Advisory Board (art. II.16, of ECGA – para 4
CLIMRUN Meeting. Rome 8-9-10-July
European Commission’s remarks to the first reporting periodManagement/RTD activities
About management some inconsistencies between CLIM-RUN Dow (wp10) and the EC FP7 general rules exist.
The question is: do we want to enter in endless controversy or just accept the new general rules?
CLIMRUN Meeting. Rome 8-9-10-July
The case of TEC
According to the EU Officers, TEC’s costs claimed in the first period are estimated and not actual
«Costs have to be real, not estimated, budgted or imputed»
CLIMRUN Meeting. Rome 8-9-10-July
SME’s owner: the case of TEC
• Lump sum: the option between lump sum or flat rate can be made (and changed) up to the moment of the signature of the GA. It is not possible to change this decision.
• The decision made by TEC on the GA was the flat rate. The calculation method of the flat rate for owner is described in the guidelines.
CLIMRUN Meeting. Rome 8-9-10-July
Deviations from DoW
Considerable deviations from DOW (more PM needed than initially planned, subcontracting not indicated in DOW) have to be discussed with the project officer Claus Bruening BEFOREHAND.
CLIMRUN Meeting. Rome 8-9-10-July
For any other question, today Giovanni, Orietta and Stefano are at your disposal to examine specific indivual problems, collect questions to pose to the EU Officers.
CLIMRUN Meeting. Rome 8-9-10-July
Thank you very much for your attention!