New North Secondary School
HWDSB’s new North Secondary School will be located at 1055 King Street East (former Scott Park Secondary School site). This beautifully designed secondary school will be constructed to meet the needs of students, while complementing in the adjacent Tim Hortons Field, Jimmy Thompson pool and the new City of Hamilton Bernie Morelli Recreation Centre.
The downtown location allows for a flexible design. It will accommodate 1,250 pupils in approximately 160,000 square foot secondary school with surrounding amenities. The preliminary site design includes a three-storey secondary school, green space and a unique partnership with the City of Hamilton that provides state-of-the-art physical education opportunities for our students.
The future secondary school of those living in the Sir John A. Macdonald and Delta catchment areas will be a state of the art facility to meet every student’s needs.
Features: § Approximately 160,000 square foot three-storey school
§ Capacity for 1,250 students
§ Houses students in grades 9 to 12
§ Two-storey cafeteria and drama room
§ Shared open space with community centre
"New North Secondary
MAIN STREET EAST
KING STREET EAST
BARTON STREET EAST
DUNSMURE ROAD
LAWRENCE ROAD
WILSON STREET
BRUCEDALE AVENUE EAST
CONCESSION STREET
CENTRAL AVENUE
ROXBOROUGH AVENUE
FENNELL AVENUE EAST
SHERMAN ACCESS
CANNON STREET EAST
INDUSTRIAL DRIVE
BIRC
H AV
ENUE
JOHN
STR
EET
NORT
H
OTT
AWA
STRE
ET N
ORT
H
EASTPORT DRIVEW
EST
5TH
STRE
ET
BAY
STRE
ET N
ORTH
KING STREET WEST BEACH ROAD
VICT
ORI
A AV
ENUE
NO
RTH
PARK
DALE
AVE
NUE
NORT
H
WEN
TWO
RTH
STRE
ET N
ORT
H
ABERDEEN AVENUE
DUKE STREET
PRIV
ATE
ROAD
YOUNG STREET
MONTEREY AVENUE
YORK BO
ULEVARD
STRA
THEA
RNE
AVEN
UE
TERR
ACE
DRIV
E
FAIR
FIEL
D AV
ENUE
DAVI
D AV
ENUE
EAST
43R
D ST
REET
GAG
E AV
ENUE
SO
UTH
WIL
COX
STRE
ET
MUNN STREET
EDGEWOOD AVENUE
TAYL
OR
AVEN
UE
TOM STREET
PRIV
ATE
ROAD
North Secondary School (New Site)
Hamilton- Wentworth District School BoardPlanning and Accommodation 2015
±
0 1 2 3 40.5Kilometers
Grades 9 to 12
" Secondary School
ApprovalsDesign
Development Municipal Approvals(Site Plans &
Building Permits)
Construction(12 - 16 months)
Move in
School opening for staff and
students
Overview of Project Phases:
New North Secondary School
Top Related