Environmental Monitoring Report
Semi-Annual Report No. 1
Loan: 3124 NEP May 2016
Nepal: Community-Managed Irrigated Agriculture
Sector Project- Additional Financing
Prepared by the Government of Nepal for the Asian Development Bank.
This environmental Monitoring Report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in
nature. Your attention is directed to the “terms of use” section of this website.
In preparing any country program or strategy, financing any project, or by making any designation of or
reference to a particular territory or geographic area in this document, the Asian Development Bank does
not intend to make any judgments as to the legal or other status of any territory or area.
Environmental Monitoring Report
_ First Semi-Annual Report
May,2016
.)
Nepal: Community-Managed lrrigated Agriculture Sector
Project-Add itional Fi nanci ngADB Loan No. 3142 NEP
Prepared by Community-Managed lrrigated Agriculture Sector Project-Additional Financing for theGovernment of Nepaland the Asian Development Bank.
n
Il
l.l
n
rl
FI
rl
Il
r1
|l
Fl
ll
rl
rl
rl
tl
[l
il
|l
n
n
t]
|'l
Table Gontent
A. BACKGROUND ......... ...............1
B. A.ENVIRONMENTAL SAFEGUARDS STATUS IN CMIASP-AF............... .......,1
C. COMPLIANCE WITH ENVIRONMENTAL SAFEGUARD MEASURES IN SAMPLE SUB-PROJECTS ..............2
I. SLOPE STABILIATION AND BIOENGINEERING ACTIVITIES ....,..........2
il. occupATtoNAt HEALTH AND SAFETY ...1,.,.......,,.,. .......3
ilt. GRTEVANCES RECETVED AND ADDRESSED................ ..................3
IV. TRAINING AND AWARENESS RAISING ........................3
v. SAFEGUARD DESK MEETTNG .......................3
D. SAFEGUARD ISSUES AND CORRECTIVE MEASURES............... ..................3
A. BACKGROUND
1. The Community-Managed lrrigated Agriculture Sector Project-Additional Financing(CMIASP-AF) is a project being implemented by loan from the Asian Development Bank (ADB)and OFID, counterpart funding from Government of Nepal (GoN). Department of lrrigation(DOl), in cooperation with the Department of Agriculture (DOA), is the main executing agencyfor the CMIASP-AF. The proposed project aims to rehabilitate 150 traditionally farmer managedirrigation systems (FMIS) in 35 districts of the central and eastern development regions indsupport the rehabilitation and partial management transfer of 5 agency-managed irrigationsystems (AMIS).
2. Department of lrrigation has established a Central Project Management Office (CPMO)to coordinate all Project activities. DOA has established a project implementation unit (PlU) tooversee implementation of irrigation sub-projects, agriculture development plans and extension-related activities. The project implementation and management support (PIMS) consultants willbe responsible for supporting the CPMO and the regional consultant team will support the lDDsoffice for monitoring the construction work and implementation of the sub projects during theproject period. Subproject Management Units (SMU) has been established in each district tocoordinate the day-to-day subproject implementation. The chief of the concerned IDD will headthe SMU and serve as subproject manager. WUAs will select a community organizer (CO) tosupport them in their proper functioning.
3. The project purpose will be achieved through the following outputs: (i) lmprove theirrigation infrastructure in subproject areas; (ii) WUAs independently manage irrigation systemsin a socially inclusive and equitable manner; (iii) farmers to adopt improved agriculturalpractices; and (iv) strengthen the national institutions for the effective irrigation service delivery.The expected outcome is that participating farmers increase agricultural production. Productivitywill be measured through (i) yields of major crops increased by at least 30% in subproject areas,and (ii) cropping intensity in irrigated areas increased by at least 30% in terai subprojects and45o/o in hill subprojects.
Table 1: Project Status of CMIASP- AF
B. ENVIRONMENTAL SAFEGUARDS STATUS IN CMIASP.AF
4, Environmental assessment is the primary administrative tool to integrate environmentalconsiderations into decision-making to ensure that proposed development inlervention will haveminimal environmental impacts. CMIASP-AF irrigation sub-project falls in "8" category accordingto ADB Safeguard Policy Statement, 2009. Therefore, lnitial Environmental Examination (lEE'i
for the sub-projects under CMIASP-AF is mandatory in order to assess the environmentalconsequences of the rehabilitation and construction activities and suggest appropriate, practicaland site specific mitigation and enhancement measures. All the irrigation subprojects arerehabilitated one and the potential environmental impacts are less and impacts can be mitigatedreadily during implementation phase. During the construction and rehabilitation of the irrigationsub-projects, environmental monitoring is an important tool to ensure the compliance ofmitigation measures and implementation of environmental management plan (EMP).
5. The principal responsibility of safeguard categorization, preparing lEE, compliancemonitoring and reporting responsibility lies with lDDs. The Environment Specialist of the PIMSof DOI is supporting the lDDs engineer in preparing of lEE, compliance monitoring and reportingof lrrigation Sub Projects (lSP). Safeguard performance has to be reviewed in each SMUmeeting by mandatorily keeping a session to discuss safeguards compliance and agree with thetechnical team on adopting corrective measures for any gaps.
6. The construction and rehabilitation work of the Batch I projects have been started and atotal of 73 sub projects have undertaken IEE during the SPPR preparation. Till date none of theIEE projects have been approved. ADB will approve all the IEE reports of the subproject.Presently the environmental specialist is updating the EMP and safeguard compliancemonitoring of the sample sub projects. The safeguard compliance monitoring in eachsubprojects will be carried out through a social mobilizer. A monthly compliance checklist is tobe filled up by the mobilizer and submit it to the PIMS Consultant. The monthly compliancechecklist will be reviewed by the consultant and the semi-annual report will be prepared duringthe project period. The safeguard compliance monitoring checklist is presented in (Appendix l).The checklist has been translated in Nepali format, so that the social mobilizer can easilyunderstand the issues related to the environment and fill it easily (Appendix ll).
C. COMPLIANCE WITH ENVIRONMENTAL SAFEGUARD MEASURES IN
SAMPLE SUB.PROJECTS
7. In Batch | 56 FMIS lSPs and 2 AMIS lSPs the construction activities is ongoing.Safeguard compliance monitoring is highly recommended for the sustainable management ofthe lSPs during the construction and rehabilitation stage. The safeguard compliance monitoringwas checked in the six lSPs; Attrauli Puttar lSP, Chapakot lSP, Keshaliya Majhi Gaun lSP,Bhaluwa lSP, Siran Kulo Siku Khola Kangel ISP and Dospu Khola Birauta lSP. The safeguardactivities like camp site management, construction work in the canal, slope stabilization andbioengineering activities, occupational health and safety, safe desk meetings in the project areawere checked by filling the compliance monitoring checklist (Appendix lll). Overallenvironmental safeguard compliance and implementation of EMP during construction andrehabilitation works of the lrrigation Sub Projects are summarized below:
I. SLOPE STABILIATION AND BIOENGINEERING ACTIVITIES
8. During the field visit to the six lSPs numbers of unstable slopes were identified along thecanal alignment. Bioengineering activities are necessary for the stabilization of the erodingslopes.
II. OCCUPATIONAL HEALTH AND SAFEW
9. Occupational health and safety measures have been partially followed and needs to beenhanced. In Attrauli.Puttar and Chapakot lSPs the drinking water, sanitary facilities (toilets) areprovided in the working camps wheie as the use of the gioves and boott during the concreteworking were not complied. In camps, workers use fuef wood for cooking purpose which isobtained from the nearby forest.
III. GRIEVANCES RECEIVED AND ADDRESSED
10. GRC has been formed in 29 FMIS projects and 2 AMIS projects. So far, no anygrievances have been reported from the lSps.
IV. TRAINING AND AWARENESS RAISING
11- After resuming the project the Environmental Consultant task was to train the IDD staffsfor the preparation of lnitial Environmental Examination (lEE) in SPPR report for Batch I andBatch ll projects. On the first week of the March, 4 days training on SPpR preparation wasprovided to the IDD Engineer of eastern region at Biratnagar. The necessary safeguardactivities to be performed during the construction and rehabilitaiion work were discussed i-n thetllllg Similarly t!re9 days lraining to the central region WUA members was organized byCPMO at Dhulikhel. The safeguard policy and its importance in the irrigation constructionactivities were highlighted. The three days training was organized by PIMS from 3'd-5th May inRampur, Palpa for Community organizer, social mobilizei and Agriculture Extensionists of 2AMIS project. Social mobilizers were trained to fill the safeguard compliance monitoringchecklist of two AMIS project update the issues identified during the project implementatioiperiod.
V. SAFEGUARD DESK MEETING
12. Till date no any safeguard desk has been established in the lrrigation sub-projects. lt isrecommended to establish the safeguard desk in each division officeJ so that the iafeguardissues will be identified with its proper mitigation measures on time.
D. SAFEGUARD ISSUES AND CORRECTIVE MEASURES
13. Table 2 describes the environmental issues and way forward for the effectiveimplementation of environmental safeguard measures, their monitoring and reporting.
Table 2: Safeguard lssues and Corrective Measures
SN Topic lssues Corrective measures1 Institutional
arrangementSafeguard desk is not active inthe IDD which is lagging theregular safeguard meeting. GRCis not proactive in the lsps toaddress the grievance on timelymanner.
The lDDs office should establishthe safeguard desk so that thesafeguard issues will beaddressed with proper mitigationmeasures. Orientation training hasto be organized for GRC
SN Topic lssues Corrective measures
members.2 Occupational
health & safetymeasures
lmplementation of the safetymeasures for the worker in theconstruction work of lSps arevery weak and given less priority.
Sufficient personal protectiveequipment (PPE) has not beenprovided to workers and evenworkers are reluctant to use themspecially helmets, gloves andboots. First aid boxes are notprovided in the labor camp.
Safety gears and first aid kit withmedicines should be provided inadequate number. Contractorshould be responsible to complythe safety measures of the worker
3 Slopestabilizationbioengineering
Numbers of unstable slopes havebeen identified along theirrigation canal. Landslides andwaterlogging problems identified.
It is urgently needed to stable theslope applying properbioengineering techniques.
4 Safeguardcompliancemonitoring
No any safeguard desk has beenestablished in the IDD office
IDD has to take initiation for theestablishment of the safeguarddesk so that the impacts identifiedduring the project implementationperiod will be complied.Social mobilizer will beresponsible for filling thecompliance monitoring checklistof each ISP and submit to the IDDoffice
5 lnitialEnvironmentalExaminationReportinq
The site specific adverse impactsare not identified in the EMp ofIEE of Batch I irrigation projects
IDD engineer should identify thesite specific impacts with propermitigation measures and actualcost
APPENDIX I
llttt)t)tttttttttl))l
community.Managed krigated Agriculture sector Project.Additional Financing (cMlAsP-AF)
Safeguards Compliance Monitoring Checklist
Potentiallmpact EflllP recommended Mitigation MeasureCompliance
Explanation / Actual Field Status
Yes No
)utting of Trees Comoensatory Plantation for lost trees
labitat disturbance (Project location -Conservation
buffer areas)
Crient workers on strict prohibition to damage forest habitat/distrurb
ltildlife
)isturbance to aquatic life o maintain the spawning ground for the aquatic life in the river
fuater Right lssues (Water abstraction at 500 m U/S
lnd D/S of the intake site)Consent made for water sharing
:looding and Drainage HazardProvide gabion protection on both banks of source river upstream
lnd downstream of intake
rosion and landslide along canal alignment Stabilize slopes through structural protection/bio-engineering work
ixcessive water inflows from adiacent slope and
Alafer loooinoProvide proper drainage outlet and protection measures
mpediments to Movements of Wildlife, Livestock and
lpnnleProvide new passage; Culverts, Foot Bridges, VRB Crossings
xcavation workSpoil not be disposed downhill or block natural drain, farmland, forest
trea
Stockpiling of Construction Materials
loverinq the construction material
Storage on private property will be allowed only with permission fron
lhc nwnpr
itockpiled material shall be slightly wetted before loading particularly
n windy condition
Cover vehicles transporting sand and soil
Safety at work site
Norkers use safetv hat, belt and mask
:irst Aid Box is kept at site
ioilet is constructed at work areas
lnsure all workers
Schedule work during day time
Child labor Reshict child labor in construction works
(V ) Complied (Yes/Nol (A ) Partially Complied (-) No lmpact (*) Necessary
't
Community-Managed lrrigated Agriculture Sectot Project-Additional Financing (CMIASP.AF)
Compliance Monitoring Checklist
EMP recommended Mitigation Mearure Explanation / Actual Field Statur
have natural lighl and ventilation
waste is buried in a waste oil
Kerosene or LPG is supplied to camps
Work area and camp sites are reinstated in original condition before
work to WUA in accordance with their capability
hiring of local labors in conlractor's work
of man and women in WUA Committee
Training on gender issues and women empowerment
opportunities to women in the construction activities
of indigenous and dalit in WUA Committee
of indigenous and dalit on Trainings
Agriculture dev. And increase income in the project
dt ud
in the production getting the inigation facility in the project
training to farmers and support them through DADO
institutional development plan (lDP),
(V ) Complied lYes/No) (A ) Partially Complied (-) No lmpact (*) Necessary
APPENDIX II
F
F
C#YK
3E
FF
sE
36
E;
;
frF5Ev
E
E
F
E
E.lr.
EE
tsE
F'
F
F
E
E
F
E
IFr19
IFvt&
Y
p
FE
.t;F
t:|...'
atr
.Fcl-r
E
*
F,Flq
FIT
,EI+-"
Et:+
F
Ei;ts.F
tr
R
Ff,
.F
liFFt:
h:tr,tr
t:,fr
.trEE
,E
F
.EE
F
EE
Itr
trF
El-r
Eb-
Fhr,F
-c;trp
t:Lle
rkt?
+t"El$
trIFGEF
'i' €FF
FF.F
,rFrt
'ts'F
i- tpFlrtf,F
EE
ts
F'trtr
LF
F
5lv
btiE
.ncF
E"
.lg
.[:
.ltF
o.E;1
,+itt"
E
'1.'J!-t:
F
f&" ls-F
FTF,5rtr'gFls
Irr
,fir
'b l5
lie" F .l:,F E.rEF"
Ptrtsr,: n
FLle
h9
lc4F
F
't;
t;
F
F
e#
H.-EI
tF
FtrEli
):FL
.Ftr
*rtr
,IE
li rltpts
FE
F
[.PFFlyF
tr
'l+ F.ts9t!.lp
,IE
FF
FItE
F
E
l-Hc
l-1.
df.Ep
NE
P.
tr,t?rt:E
-:E
)i.
*€
Fg
n,F
l-E
F,
F€FtrLEi,-rE
LE
E
l*
Itr
.ts
F,frg
FHF
b-
F
lrF
E
,FF
|;F
E
F
F
E
E Fb
'rF
P
Fl'
f.
E
F
l-
F
t:ts
:t
FItr
E
TtrFF
lP
E
15F:ilF
'E
F
Pecc
ti;
E
,E,l:F"
FE
trE
rd
.Et:
t:r
F
F,F.F.t:,,
E,F,b'
F/5
ls
,E)zj
i$
ft
p
eF
..t6 F
Eb',:{ lq
t5
vFTEF
FN
,EtiEE
E
b
F
PEs
FF
F.h:.F
FF
.rE
,h:
.lvE
EtrF,
.F*
F.5
El:'E
Ll:It
p
g
trFF
trFrc
trF
U c U
FEvE
EV,E-l&IF 4F
EvBEnirBEEEEwE,EYEEEV,&lsFF
vEFEv,tftv
vFF
FeH
lrEF
Frlv
E
Fp
.E
EElrF
E
HE
44a.g5'4ll4,a!E4g
I.l54
A
I4+{2ddl.a44
dg
A#44g4Nq4
z4EXA"x4'o,s{4e1?4'At
4444l4,
J n c ff f,
ol
c.q5=
rl6.1g
a
I
s.sl
:{c5al
i
"d
!4
4ld
at
lrt
a:l4
=Tt
=3
3t
-l=q
!-i,.]
a
:4;t::{s'
4
,l1l
?
n
il
+l?
q,
+nl
f_
g.
,E
=u!
3JJ
i
4g
sA
ul -
=dl]? =d
4tcd!.^49
"t f
g4{
fl
4
3n
'3I.g
i
=;1
i=g
fl lc:1. d.:1 I
,dEq
!4
fl
ol
r'l
{s|
Aa,
!
;Tn=
{d
sol
i
illn+t,
.41
6t
fll{iJ .1iq
;l r.l
=ql
l4
5:a?
,.!atl
=4
=l
=^lr'l
- .l3;I
lrr4'
l
q
rU
=q
q
Af
-g'g
llli
-?a^l
n
_n3q4
4443
ET!tdaY4ld
-i
_
Tl'
31"
7
nq
qA;1.l
f
.lt6l
al
E
.l
;t
-
t{ajlil, q
-t4
5s
+1?
;1,
1,a2+
4ai
al
?'
5.F
+l?
A,J
d.4
g,
f,l
E]
='!i
!
,4";l?
4
II
g,
!;r
$lI
3"d":
+-llqlJtd.
i!
!=-!fl
?=rl
=*
1Id
,ol
A'
gI
=i
f,
t;4
4r]d.,$dIl
o:{
ad.l,i=
+q!
+l
ia41
!t.o]?
c=3],
4:1
Te=ilal
,f,q
4l{
5all
f,
ar
=++1
Iaas'!lE
=
i
E
1_
=ai
!l4
d;
q
q{':
+!l?
3+tq
Trl-
i.
s.ss]I
i
a
ai
+t,
f4;l
.E
{aiaA3
2
*
{
3
{3
il+
gl
ans
a.lt'A
A
{g
f,4qA
4
:*a
Itr:3
asni3I
ry
i4l
APPENDIX III
Community.ilanaged lrrigated Agriculture Sector Project Additional Financing (CMIASP-AF)
EllP recommended Sitig|tion lieasure
Siran Kulo Siku
Khola Kangcl ISPExplanation t Aclual Field $l,atue
All the sub projects are rehabilated one thus there is n0 any cutting 0l
fees in the ProJect Area
workers on strict prohibition to damage f0resl There is n0 any prolected areas nearby the project area leasl
disturbance to the wild animals
maintarn the spawning ground for the aquatic life in theThere is n0 srgnrficdnt rmpact to the aqudtiu lde In all lhe sub projecls
Right lssues (Water abstraction al 500 m
and D/S ol the intake site)Consent made for water sharing
Water abstraction f0r the frigation purposes are seen within the 1 km
sfetch 0f the intake site in three ISP; consenl has t0 be made for shanng
Provide gabion pr0tection 0n both banks of source riverfour ISP gabon protectnn work 0l lhu Intahe srle rs n0l stdrted
Stabilize slopes lhrough structural pr0tection/bio{ngineeringwork is necessary in most ol the ISP
Excessive waler inflows from adjacent slooe andProvide pr0per drainage 0ullet and protection measures
actNfies is going on drainage ou{ets are partially complied
two lS0 but necessarv in 0ther three ISP
Movements of Wldlife Luestock Provide new passage: Culverb. F00t 8fldges. VRB activities E going 0n, passage lor the movenents are
nOt be disposed downhill or block natural drain,wolk is leasl in all lSPs
=
O
The stock piled construction materilas lrke sand and gravel are nOl
he cement are stored In ttle tenp0rary shed durirrg theStorage on private property will be allowed on}y with
of construction equiomenl and vehicles
material shall be slightly wetted before loading
in windy condition 0f sand and s0il lransportation is low n the pr0Ject atea hence
effects 0bseryed, Covering vehioles transpo(ing sand and s0il
C0ver vehicles transporting sand and soil
use safety hat. belt and mask
ol the safety measures n the Oonstruclion work of ISP
very weak and gMen less pfloqty. contract0r sh0ul be responsrble lo
the safety measures of the worker
Aid Box is kept at site
is constructed at work areas
Schedule work duflng day time
Restrict child labor in construction works labor not used in the c0nstruction w0rks 0f lSPs
(v ) Complied (Yes/No) (A ) Partially Complied (-) No tmpact (*) Necessary
Community'ilanaged lrrigated Agricultule Sector Project'Additional Financing (CilllASP'AF)
ExDtanation I Aclud Field Status
Siran Kulo $iku
Khola Kangel ISP
EnP recommended Sitlgdion S€rlute
lmDlementation 0f the safety measures In the wotk camp ls also p00l
shoul be responsible to comply the satley measules of the
6
=
=
have natural lbht and ventilahon
waste is buried in a waste Pil
Kerosene or LPG is supplied to camps
area and camp sites are reinstated in
formed in two AMIS project only
any Greivances recelved to date
people not engaged in the constructi0n aclvltles 0l c0ntacto{ patt
wete brought lrom othet dstlct
work to WUA in accordance with their capability
Promote hiring 0f local labors in c0nlractols work
of man and women in WUA Committee
on gender issues and somen empowermenl
oDDortunities t0 women in the construction
of women 0n Tlainrngs (I rigalion Agncultule,
pe0ple pa(icrpation in WUA c0trrmitteeof indigenous and dalit in WUA Committee
indbenous and dalit on Trainings
lraining to farmers and support them through DADOdev. And increase Income in the Droiecl
institutional developm€nt plan (lDP), Construclion
and 0EM tlainrng to WUA
(v ) Complied (Yes/Nol (A ) Partially complied (-) No lmpact (*) NecessarY
APPENDIX IV
Intake site of Siran Kulo Siku Khola ISP (No progress
work), Kangel, Solukhumbhu
Temporary camp for the workers in Bhaluwa lSP,
Morang
Interaction of the PIMS and CPMO team with WUAmember, Bhaluwa lSP, Morang
Trees fell down nearby the canal destroying thecanal. Dospu Khola Birauta lSP, Solukhumbhu
Training of SPPR preparation to the IDD Engineer ofEastern Region held at Biratnagar
t*CPMO and PIMS team monitoring the quality ofConstruction materials
Temporary work camp in Attarauliputar lSP. Tanahu
PlfVkS team making interaction with communnymobilizer and Agriculture extensronists in Chapakot.Syanja
Training provrded to community organizer, mobilizerand Agriculture extensionists of 2AMIS Proiect