NATIONAL HIGHWAYS AUTHORITY OF INDIA
(Ministry of Shipping, Road Transport & Highways)
NATIONAL HIGHWAY PROJECT PHASE – II
CONSULTANCY CONTRACT NO: IE
Independent Engineer Services for four Lining of Chenani to Nashri (New Alignment) of NH 1A including 9 KM Long Tunnel (2 Lane) with Parallel Escape Tunnel on BOT (Annuity) basis in the State of Jammu & Kashmir
(Package no. IE/NHDP-Phase-II/BOT/V/J&K)
QUARTERLY PROGRESS REPORT NO: 22
SEPTEMBER 2016 TO NOVEMBER 2016
Euroestudios S. L. Spain
in Association with
Segmental Consulting & Infrastructure Advisory (P) Ltd.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 1
TABLE OF CONTENTS
1. PROJECT OVERVIEW ...................................................................................................................................... 3
1.1. INTRODUCTION ...................................................................................................................................... 3
1.2. THE PROJECT ROAD ............................................................................................................................. 3
1.3. THE PROJECT ROAD CONSTRAINTS .................................................................................................. 3
1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT .................................................................................... 4
1.5. PROJECT MAP ........................................................................................................................................ 5
2. PROJECT ASSIGNMENT .................................................................................................................................. 6
2.1. BACKGROUND ........................................................................................................................................ 6
3. MOBILIZATION OF AGENCIES ........................................................................................................................ 6
3.1. INDEPENDENT ENGINEER .................................................................................................................... 6
3.2. ROLE AND FUNCTIONS OF IE .............................................................................................................. 6
3.3. ORGANISATION CHART AND STAFF LIST........................................................................................... 7
3.4. DRAWL OF AGREEMENT WITH C0NCESSIONAIRE ........................................................................... 9
3.5. PIU............................................................................................................................................................ 9
4. PRE-CONSTRUCTION ACTIVITIES ................................................................................................................. 9
4.1. SHIFTING OF UTILITIES ......................................................................................................................... 9
4.2. UTILITIES SHIFTING & OTHER HINDRANCES ................................................................................... 10
4.2.1 STATUS OF UTILITY SHIFTING ........................................................................................................... 10
4.2.2 HINDRANCES ........................................................................................................................................ 10
5. CONSTRUCTION SCHEDULE ........................................................................................................................ 11
5.1. CONSTRUCTION SHEDULE AS PER MILESTONE TARGET ............................................................ 11
5.2. INAUGURATION .................................................................................................................................... 11
5.3. TUNNEL BREAKTHROUGH’S .............................................................................................................. 11
6. CONTRACTOR´S RESOURCES .................................................................................................................... 12
7. MEETINGS/SITE VISIT/REVIEW OF DOCUMENTS ...................................................................................... 13
7.1. MEETINGS ............................................................................................................................................. 13
7.2. SITE VISITS ........................................................................................................................................... 13
7.3. REVIEW OF DOCUMENTS/DRAWINGS ............................................................................................. 15
8. INVOICES PAYMENT & REIMBURSEMENT ................................................................................................. 23
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 2
9. EXECUTING AGENCIES AND CONTRACT DATA ....................................................................................... 23
9.1 AGENCIES ........................................................................................................................................ 23
9.2 CONTRACT DATA ............................................................................................................................ 23
9.2.1 PROJECT COST .............................................................................................................................. 23
9.2.2. CIVIL WORKS CONTRACT DETAILS ............................................................................................. 24
9.2.3 SCOPE OF WORK ........................................................................................................................... 24
10. WEATHER REPORT ....................................................................................................................................... 25
11. PROGRESS OF THE PROJECT ..................................................................................................................... 28
11.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBAILITY ........................................................... 28
11.2 TUNNEL WORKS MONITORING ..................................................................................................... 29
11.3 PHYSICAL PROGRESS CHART .................................................................................................... 31
12 QUALITY CONTROL AND TESTING OF MATERIALS ................................................................................ 38
12.1 UP TO DATE STATUS OF TEST ..................................................................................................... 38
12.2 TEST RESULT OF CONCRETE CORE & CUBES .......................................................................... 39
13 SAFETY REPORT ........................................................................................................................................... 69
14 MINUTES OF MONTHLY PROGRESS MEETING......................................................................................... 70
15 PHOTOGRAPHIC REPORT ............................................................................................................................ 71
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 3
1. PROJECT OVERVIEW
1.1. INTRODUCTION
The Ministry of Road Transport and Highway (MORT&H) has taken a strategic decision to develop the
North-South corridor connecting Srinagar (J&K) to Kanya Kumari (Tamilnadu). The National Highways
Authority of India (NHAI) has been appointed by MORT&H, to implement this development.
NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Ventures with LRP Consultants,
India and in association with L&T Ramboll, India, and D2 Consultant for Tunnel as consultants to carry
out the detailed design, for the Patnitop Tunnel of the NH-1A, between Udhampur and Banihal (Km 66
to Km. 188) in the state of Jammu and Kashmir.
1.2. THE PROJECT ROAD
The NH-1A National Highway will be upgraded from its present two-lane layout, to a four-lane divided
carriageway configuration. The design of the road between Udhampur and Banihal, Km 67 to Km. 188
is being carried out in five separate packages. The project will require the construction of numerous
structures, including one approx. 9 Km. long Tunnel (Patnitop Tunnel) and six short Tunnels (Tunnels
with length below 1 km).
1.3. THE PROJECT ROAD CONSTRAINTS
The existing road alignment of the NH-1A between Km 67 and Km 188 is typified by sub-standard, and
often steep curves and gradients, in the horizontal and vertical planes. The proposed improvement will
entail widening towards the valley side along most of the road, which will also involve the construction
of many new structures, including viaducts, bridges, retaining walls and Tunnels.
The project road area is within a region that is prone to frequent earthquakes of sizeable magnitude.
Much of the rock in the area is well jointed and highly fragmented. Combining seismic activity, with the
extreme prevailing weather conditions, also means the area experiences constant landslides.
The Kashmir region, with its exceptional scenic landscapes, abundant wildlife, culture diversity and
profuse number of historic and religion building, is a ‘Mecca’ for tourists from every corner of the globe.
The NH-1A being the main route between the principal cities of Jammu and Srinagar carries most of
the tourist for the entire area. Tourism peaks during the summer months of July and August, but spring
and autumn, can also be busy.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 4
1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT
In previous design stages different alternatives have been investigated for Tunnel, crossing of the
Patnitop range in approx. station Km 90 to Km 130 of the existing NH-1A. Five Tunnel alternatives
varying from 1.2 Km length have been assessed and presented in earlier design stages. As the
optimum alternative, the longest one, a base Tunnel at elevation of approx. 1220 m a.s.l. was
approved for further investigation and elaboration of the Tunnel civil tender design documents.
Concerned section Km. 67 to Km. 188 is being carried out in five separate packages 1 – 5.
Patnitop Tunnel is designed as a base Tunnel. Passing under the Patnitop mountain range with
overburden more than 1 Km and belongs to NHDP Phase- II. This contract package start at existing
road starts from Km 89 and ends at Km 130 of existing road. Tunnel mined portals are located at
approx. start of Km 90 (southern portal) close to village of Chenani and Km 130 (northern portal) close
to township of Batote of existing road at elevations 1230 m and 1210 m respectively. Tunnel profile
grade is of a roof character with 0.5 % longitudinal profile grade. Tunnel horizontal alignment starts
and ends with curves of 300 m radius, and the rest of mid-section is straight. Main Tunnel direction is
South to North. Travel distance will be reduced for more than 30 Km and climbing and descending of
approx. 1000 m shall be avoided. Tunnel shall be 2-lane, bidirectional tunnel with parallel escape
Tunnel and cross connections into escape Tunnel for emergency exit.
The Existing road (2-lane, bidirectional) will be utilized to accommodate the local traffic in the area as
well as over-sized and other vehicles non-suitable for tunnel operation. The existing carriageway will
be upgraded with minor improvement to both the horizontal and vertical alignment.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 5
1.5. PROJECT MAP
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 6
2. PROJECT ASSIGNMENT
2.1. BACKGROUND
NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Venture with LRP Consultants, India
and in association with L&T Ramboll, India, as consultant to carry out the Feasibility Study and DPR
for 4-Laning of the section Udhampur to Banihal, Km. 66 to Km 188 of NH-1A in the State of Jammu
and Kashmir. The Complete project length is divided into 5 packages.
3. MOBILIZATION OF AGENCIES
3.1 INDEPENDENT ENGINEER
It was decided that Independent Engineer may be invited to participate for project management so as
to have proper management and quality assurance. Accordingly Bids were invited from pre-qualified
and shortly listed consultants and the work was allotted to M/s Euroestudios.S.L. In Association with
M/s Segmental Consulting and Infrastructure Advisory (Pvt.) Ltd. In an agreement for Independent
Engineer, services were entered into between National Highways Authority of India, Plot No. G-5 and
G-6, Sector No.10, Dwarka, New Delhi- 110045 and M/s M/S Euroestudios.S.L., Castelló 128, E-
28006 MADRID, ESPAÑA in Association with M/s Segmental Consulting and Infrastructure Advisory
(P) Ltd., Unit No. 419A-421, Spaze I Tech Park, Tower B-4.Sector 49, Sohna Road Gurgaon-122002–
India, by Letter No. NHAI/12015/GM (N-1)/CS-88-92/JK/2010/512 dated 05th April 2011 for
commencement of service and accordingly mobilization of Key/ Sub Key Personnel was done. M/S
Euroestudios, S.L. in Association with M/s Segmental Consulting and Infrastructure Advisory (P) Ltd.,
as Independent Engineer in accordance with the terms of the agreement in MOU, have deployed
personnel to look after the project.
Office Building for Team has been hired at Ekta Vihar, Near M.H. Hospital, Udhampur (J&K) and office
is fully operational.
3.2 ROLE AND FUNCTIONS of IE
The role of IE has been described in schedule “Q” of Concession Agreement between NHAI and CNTL
(SPV created by IL&FS) the main points are described below.
Review of Drawings & Documents.
Review, Inspection and Monitoring of construction work.
Conducting testing on completion of construction & issuing completion/ provisional certificate.
Review, Inspection & Monitoring of Divestment requirements.
Determining as required under the Agreement, the costs of any works or services and / or their
reasonableness.
Determining, as required under the Agreement, the period or any extension thereof, for
performing any duty or obligation.
Assisting the parties in resolution of disputes.
Undertaking all other duties and functions in accordance with Agreement.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 7
3.3 ORGANIZATION CHART AND STAFF LIST
Key Staff S.No Position Name Date of Joining Remarks
1 Team Leader cum Sr. Tunnel Expert Mr. Valentín Salcedo 25.05.2011
2 Tunnel Design Engineer 31.05.2011 Completed
3 Sr. Geologist 01.06.2011 Completed 4 Sr. Geotechnical Engineer Mr. Cesar Andia 11.08.2011 5 Sr. E & M Expert Mr. José Manuel Pineda 28.04.2012 6 Tunnel Safety Expert Mr. Sanjay Kr. Sharma 02.06.2011 7 Tunnel Ventilation Expert Mr. Ajit Kumar Swain 18.02.2015 8 9
10 11 12 13 14 15
Tunnel Excavation Expert Tunnel Lining Expert Tunnel Lighting Expert Senior Quality Cum Material Expert Bridge / Structural Engineer Financial Expert Legal Expert
Mr. Subash Chander Mr. Mihir Kumar Sahu Mr. Manish Kr. Sharma
01.06.2011 13.08.2015 30.06.2011 03.06.2011 03.06.2011 30.03.2016 28.06.2011
Completed
Completed Completed Completed
Tunnel Engineer-1 25.05.2011 Completed 16 Tunnel Engineer-2 Mr. Neeraj Singh Datta 01.06.2011
Sub-Professional Staff S.No Position Name Date of Joining Remarks
1 Tunnel Fire Fighting Expert Mr. Z.K. Khaishagi 04.04.2016
2 Environmental Expert 01.09.2011 Completed
3 4
Hydrologist/Drainage Expert Hydrologist/Drainage Expert
01.09.2011 15.09.2011
Completed Completed
5 Geologist 12.09.2011 Completed 6 Geo-technical Engineer 13.07.2011 Completed
7 Material Engineer 08.07.2011 Completed 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23
Material Engineer Quantity Surveyor Highway Engineer Bridge Engineer Traffic & Transportation Expert Survey Engineer Survey Engineer Assist. Tunnel Excavation Expert Assist. Tunnel Excavation Expert Assist. Tunnel Lining Expert Assist. Tunnel Lining Expert Horticulturalist Lab. Technician Lab. Technician HTMS/Toll Expert CAD Expert
Mr. Vikas Gupta Mr. Rajesh Mishra Mr. Bharat Goel
03.10.2011 02.01.2012 01.10.2013 03.01.2014 15.07.2013 02.04.2012 01.08.2011 01.11.2014 13.06.2011 17.06.2011 20.06.2011 14.07.2014 01.01.2013 24.06.2011 21.09.2015 02.01.2012
Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed
Completed
Support Staff S.No Position Name Date of Joining Remarks
1 Office Manager Ms. Kameshwar Verma 16.09.2016
2 Accountant Mr. Pankaj Gupta 01.10.2013
3 Cashier Mr. J.S. Jaswal 12.04.2012
4 Steno Mr. Akash Anand 01.08.2016
5 Computer Operator Mr. Sahil Gupta 01.08.2016
6 Photocopier Mr. Sanat Kr. Mishra 25.05.2011
7 Office Boy Mr. Subash Chander 01.07.2011
8 9
Security Guard Security Guard
Mr. Kewal Singh Mr. Jeevan Lal
01.02.2015 01.07.2016
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 8
ORGANISATION CHART
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 9
3.4 DRAWL OF AGREEMENT WITH CONCESSIONAIRE
Agreement was drawn by NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI) with Chenani
Nashri Tunnel way Limited. (CNTL) on 28th July 2010. For this project IL&FS Transportation
Networks Ltd has formed a Special Purpose Vehicle (SPV) by the name of Chenani Nashri Tunnel
way Limited (CNTL) (hereinafter referred as the “Concessionaire”).
3.5 PIU
PROJECT DIRECTOR.
National Highway Authority of India – PIU
315/1, 2nd Floor, Channi Himmat
Jammu (J&K) 180015
4. PRE-CONSTRUCTION ACTIVITIES
4.1. SHIFTING OF UTILITIES
Km.89.00 to 90.20
(0.00-1.20)
Hilly Section
Revenue Land /Private Land
Km 00.00 to Km 00.300
Land Handed over, however
compensation for trees
pending payment by ADC.
Km 00.300 to 1.20
Compensation for Land,
Structures & Trees pending
payments by ADC.
Km. 90.20 to 130 Hilly Section
Forest Land
Km 1.20-10.70
Land Handed Over. Forest
Diversion Cost Deposited.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 10
4.2. UTILIES SHIFTING & OTHER HINDRANCES
4.2.1. STATUS OF UTILITY SHIFTING
North Portal
S. No. List of Utilities Chainage Unit Total Status
1 OFC Pillar 129.100-129.500 & 129.500- 130.00 Nos. 11 Completed
2 Electrical Pole 129.100-129.500 & 129.500-130.00 Nos. 41 Completed
3 Transformer 129.100-129.500 Nos. 2 Completed
4 Hand Pump 129.500- 130.00 Nos. 2 Completed
5 Shops 129.500- 130.00 Nos. 6 Completed
South Portal
S. No. List of Utilities Chainage Unit Total Status
1 OFC Pillar 89.000-90.000 Nos. 8 Completed
2 Electrical Pole 89.050-90.00 Nos. 15 Completed
3 Transformer 89.950 Nos. 1 Completed
4 33KVA ELECTRICAL POLE at Km 89.500 Nos. 18 Completed
5 HT Tower 89.680 Nos. 1 Completed
6 440 VA line near Toll Plaza 89+850 Completed
7 Electrical Pole Line 89.600-90.000 Nos. 5 Completed
8 Water Line 89.900-90.000 Nos. 2 Completed
9 House 89.650-89.700, 89.900-90.000 Nos. 6 Completed
10 Shops 89.000-89.300,89.350- 89.400,89.950-90.000
Nos. 17 Completed
11 Religious Structure 89.100,89.400,89.800 Nos. 3 Completed
12 Telephone Pole 89.050-89.200,89.750- 89.900,89.950-90.000
Nos. 7 Completed
13 Hand Pump 89.100 Nos. 1 Completed
14 PMGSY/Public Path Nos. 1 Completed
15 House beyond Km 89.0 Nos. 1 Completed
15 Telephone Tower 89.100 Nos. 1 Completed
4.2.2. HINDRANCES
NIL
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 11
5. CONSTRUCTION SCHEDULE
5.1 CONSTRUCTION SHEDULE AS PER MILESTONE TARGETS.
Milestone Financial Percentage
Date of Achievement of Milestone as envisaged
in Concession Agreement
Remarks
Appointed Date (As per Agreement)
0% 23-05-11 Appointed Date of the Project
Project Milestone 1 10% 23-11-11 Achieved
Project Milestone 2 20% 23-05-12 Achieved
Project Milestone 3 30% 23-11-12 Achieved
Project Milestone 4 40% 23-05-13 Achieved
Project Milestone 5 50% 23-11-13 Achieved
Project Milestone 6 60% 23-05-14 Achieved
Project Milestone 7 70% 23-11-14 Achieved
Project Milestone 8 80% 23-05-15 Achieved
Project Milestone 9 90% 23-11-15 Achieved
Project Milestone 10 100% 23-05-16
5.2 INAUGURATION
Escape Tunnel (South Portal) First blast taken on 8th August 2011
Main Tunnel (South Portal) First blast taken on 18th August 2011
Escape Tunnel (North Portal) First blast taken on 8th October 2011
Main Tunnel (North Portal) First blast taken on 22nd October 2011
5.3 TUNNEL´S BREAK THROUGHS
Escape Tunnel 2nd June 2014
Main Tunnel 13th July 2015
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 12
6. CONTRACTOR´S RESOURCES
Description Model
Quantity
Brought From South Portal
North Portal
Boomer Drill E2C with Protection Roof(ROPS) 02 01 IMPORTED-SWEDEN
Boomer Drill XE3C with Protection Roof(ROPS) 02 01 IMPORTED-SWEDEN
Shotcrete Machine Aliva 263/Aliva 265 01/01 00/00 LOCAL-INDIA
Shotcrete Machine Spraymec 7110 / Spraymec 8100 00/01 02/00 IMPORTED-FINLAND
Shotcrete Machine Aliva 264 01 00 LOCAL-INDIA
Concrete Spraying Machine SIKA PM 500PC 01 01 LOCAL-INDIA
Plat Form Ashok Leyland 01 00 LOCAL-INDIA
Wheel Loader 2021Z 01 01 LOCAL-INDIA
Wheel Loader 500 Mega with 4.8 Bucket 00 01 IMPORTED
Wheel Loader 980H 01 01 IMPORTED
Tunnel Trucks 05 05 IMPORTED-GERMANY
Rock Header / Cutting Machine TC-E Hydraulic (140 KW max) 02 00 IMPORTED-USA
Crane-Truck Mounted HB120E3M 01 01 LOCAL-INDIA
Fuel Bowser Tanker 12000 Ltr. / 8000 Ltr/ 950 Ltr. 00/01/01 01/01/00 LOCAL-INDIA
Transit Mixers 13 00 LOCAL-INDIA
Air Compressor 05 07 LOCAL-INDIA
Generator Set 11 10 LOCAL-INDIA
Concrete Static Pump SP 1400 with Leaf Spring & 100 Mtr 01 01 LOCAL-INDIA
Batching Plant 03 03 LOCAL-INDIA
Main Tunnel Form-Gantry 02 02 LOCAL-INDIA
Main Tunnel Membrane Carrier Platform
02 02 LOCAL-INDIA
Main Tunnel Layby Form 01 01 LOCAL-INDIA
Main Tunnel Layby Membrane Carrier Platform
01 01 LOCAL-INDIA
Escape Tunnel Form-Gantry 01 01 LOCAL-INDIA
Escape Tunnel Membrane Carrier Platform
02 02 LOCAL-INDIA
Cross Passages Form-Gantry 01 01 LOCAL-INDIA
Cross Passage-Membrane Carrier Platform
02 02 LOCAL-INDIA
Ventilation Slab Platform 03 03 LOCAL-INDIA
Ventilation Slab Carrier 01 01 LOCAL-INDIA
Partion Walls Form Work 01 01 LOCAL-INDIA
LV Separation Walls Form Work 01 01 LOCAL-INDIA
LV Niches Form 01 01 LOCAL-INDIA
Niches Single 01 01 LOCAL-INDIA
Niches-Double 02 02 LOCAL-INDIA
Collar Form-ET 01 01 LOCAL-INDIA
Collar Form-MT 01 01 LOCAL-INDIA
Side Wall Member Form-MT 01 01 LOCAL-INDIA
Side Wall Panel-MT 01 01 LOCAL-INDIA
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 13
7. MEETINGS /SITE VISITS / REVIEW OF DOCUMENTS
7.1 MEETINGS
Team Leader attended meeting with PD NHAI at PD office Jammu on dated: 12.09.2016
regarding extension of IE, progress and PQC works.
Team Leader attending meeting at Conference Hall CNTL South Portal on dated 20-09-2016
and 27-09-2016 regarding pending issues on ground and compliances.
Team Leader held meeting with PD NHAI at PD office Jammu on dated: 03.10.2016 and
21.10.2016 regarding progress of Construction, PQC works, pending activities and Agenda for
Visit of NHAI Officers and meetings.
Team Leader attended meeting at Conference Hall CNTL South Portal on dated 27.10.2016
regarding compliances for pending issues on ground and progress (PQC North Portal and
others).
Team Leader attended meeting at South Portal CNTL Conference Hall with Honorable Chief
Secretary of J & K Gov. and other J & K Government Officers regarding support required from
local Authorities and Project Completion date, after Project presentation from CNTL Team dated
on 28.10.2016.
Team Leader attended meeting led by CGM Tech NHAI HQ at PIU Jammu, RO room along with
the PD NHAI, RO NHAI and Concessionaire, on 5.11.2016
IE Team held meeting with CNTL MEP Team at South Portal Office on dated: 07.11.2016
regarding Permanent Power Supply estimate
Team Leader attended meeting along MEP staff at Conference Hall CNTL South Portal on
dated 08.11.2016 regarding compliances for pending issues. Minutes registered
Team Leader attended meeting at PIU Jammu office with PD NHAI regarding User Fee Display
Boards, MEP Program for pending activities, on date 25.11.2016
7.2 SITE VISITS
IE Team visited South side Main and Escape Tunnels at night shift on dated: 02.09.2016
Team Leader visited Main Tunnel & Ventilation Buildings South and North Portal, also North
dumping yard on dated: 07.09.2016.
Team Leader visited Main Tunnel, Ventilation ducts South and Ventilation Building NP, North
Toll Plaza slopes on dated: 10.09.2016.
Team Leader visit to SAR Landslide, PQC and MEP works, Main Tunnel and North Ventilation
Bldg. on dated: 16.09.2016.
Team Leader visited South Toll Plaza, Main Tunnel drainage, North Approach road and
Dumping Yard on dated: 22.09.2016.
Team Leader visit to South Approach Road Rotary, Toll Plaza and Tunnels on dated:
30.09.2016.
IE Team visited Main Tunnels for drainage, cable trenches and status of Wirtgen paver, also
NAR & N Toll Plaza Area for rotary marking of location, culverts on dated: 04.10.2016
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 14
Acting Team Leader visited to supervise the PQC and other activities at South Portal on dated
06.10.2016.
Acting Team Leader visited to check the arrangements of BridgeB1 load test at South Portal on
dated 14.10.2016.
Acting Team Leader visited monitoring, ultrasonic test on Bridge B1 at South Portal on dated
15.10.2016.
Acting Team Leader visited to check the monitoring load test of Bridge B1 at South portal on
dated 17.10.2016.
Team Leader visited North Approach Road and North Toll Plaza slopes in the stretch of
landslide along with CNTL Geologists on dated: 20.10.2016.
Team Leader visit to SAR PQC and Tunnels (Wirtgen paver), before visit of Honorable Chief
Secretary of J & K Government starting North Portal dated on 28.10.2016.
Team Leader visited NAR to check progress and supervise works on dated: 03.11.2016
Team Leader visited South Portal along with CGM HQ, PD & Officer on Special Duty NHAI, and
the Concessionaire on dated 04.11.2016
Team Leader visited North Approach Road through Main Tunnel and North Dumping yard on
dated 09.11.2016
Team Leader visited South Toll Plaza, Portal and Main Tunnels (PQC) on dated 11.11.2016.
Team Leader visited SAR marking and Main Tunnel PQC, MEP works and North MEP Buildings
on dated 15.11.2016 and 16.11.2016
Team Leader visited SAR signage/marking, Toll Plazas work progress and NAR on 24.11.2016.
Team Leader developed visit to SAR-South Toll Plaza to see pending works and feasible
locations for User Fee Display Boards on 29.11.2016 along with H&S road CNTL representative
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 15
7.3 REVIEW OF DOCUMENTS / DRAWINGS:
Concessionaire has submitted documents regarding Firefighting System (MCC and pumps),
EOT Crane in Ventilation Building, MEP Project Program, NCR for tunnel drainage, for C0
sections, for F5 finish, for QAP & for edge PQC on surface drain, Environmental Monitoring,
Drain Culverts NP, NAR & SAR Rotaries, ITCS and Subsystems, Toll Collection System, Load
Test on Bridges and Wearing coat South Bridge B1, Documents required to process Provisional
Certificate, Power Supply System, MPR from CNTL for August, Drainage System, Concrete Mix
designs, WMS for Semi-mechanized PQC (Screed-fixed form), Bus Bay and shelter, crash
barrier and antiglare.
Most of these documents have been reviewed and sent back to the Concessionaire after
reviewing. Below it can be found the documents which have been reviewed and inspection
reports after visits, along with some reminders
Concessionaire has submitted documents and replies to our observations (marked with R)
which have been reviewed by IE, regarding: Compliance Reports for earlier visits developed by
IE Team, Details for Metal Beam crash Barrier and Antiglare, User Fee Display Boards, NOC to
be obtained by Local Authorities having jurisdiction (R), Emergency Response Plan, EOT Crane
Material Test Certificates and documents (R), Fire Doors, Load Test and Wearing Coat (R) at
Bridge B1 & B2, North & South Rotary Drawings and Typical Section of Rotary Wall, Plan and
Profile NAR, Use of Semi-mechanized Technology for PQC at SAR (R), FFS (R) (MCC,
expansion bellows and arrangements for lateral movement, Drawings authentication, Notes &
Legends), PSS Technical study for fault level discrimination (R) and Fire Rated Isolators (R),
RFI of 132 KV Transmission, ITCS System (ACS, EFS and ECS Drawings (R), Reaction Matrix
and Signaling Plans) Toll Collection System (R) and Equipment Layout North Toll Plaza, North
Toll Plaza Building foundations, Toll Plaza Lighting Drawings, Main Tunnel Sidewalk Lights,
Inspection & Test Plan (EFS, TCS, ECS and VSS), QAP (MEP). IE reviewed also in first
instance, Force Majeure proposal from CNTL due to Landslides, and MPR from CNTL for
September 2016, as it has been stipulated in CA.
Additionally, IE have replied observations regarding submission of documents, compliances and
procedures after intimation from CNTL, and before Issuance of “Provisional Certificate” in some
letters, like MEP works pending design compliances, submission of Contractual documents like
Emergency response plan, Updated procurement and shop drawing schedule, Safety manual,
etc.
From the Authority side, IE have reviewed documents concerning to Audited Accounts for FY
2015-2016, also regarding Change of Scope for Resurfacing of existing Highway, and submitted
to the Authority a proposal for replacement of our E&M Expert, vide letters S-PD-AD.EM-3801
dated on 04.10.2016 and S-PD-AD.EM-3796 dated on 30.09.2016, which has been responded
by the Authority vide letter PD/JMU/F&A/2015-16/12015/2609 dated on 21.10.2016. IE are in
process to prepare reply to the PD NHAI regarding this subject. Concessionaire has submitted
documents and replies to our observations (marked with R) which have been reviewed by IE,
regarding: Technical submission of MEP documents for ITCS system and related subsystems
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 16
(R), MEP components like Fire Rated Isolators (R), Stainless Steel Expansion Bellows (R), FFS
Arrangements for linear expansion and lateral movement of the firefighting piping (R), MEP
works Emergency Response Plan, NOC to be obtained from Competent Authorities for MEP
systems and equipment (R), MPR from Concessionaire for October’16, Minutes of MEP meeting
on 8th November regarding pending compliances, Environmental Monitoring Report for
September’16, Tunnels Drainage layout between S Portal entrance and Nallah, Toll Collection
System, GSB Test reports, Plan and Profile of NAR, User Fee Display Boards, Reminder for
Pending Inspection for Civil Works inside Tunnels, and Plan of Road Signs and Marking.
IE have submitted to the Concessionaire also some reminders regarding pending compliances,
like: pending submission of technical study/proposal to achieve the discrimination in case of
current fault level (MCC FFS), pending Inspection for rectification of Concrete Lining Surface,
concluding discussion on Toll Collection System, and pending Inspection for Civil Works inside
Tunnels. Concessionaire still has not submitted a clear schedule for inspections related to
finishing of activities like surface lining cable trench walls, adjustment of covers, thickness of
edge PQC above surface drain and surface drainage performance as per level/gradient and
through pipe. It is pending also the submission of a clear MEP Test Schedule, which has been
solicited several times.
In this sense, IE have replied observations regarding submission of documents, compliances
and procedures after intimation from CNTL, and before Issuance of “Provisional Certificate” in
some letters, like MEP works pending design compliances, submission of Contractual
documents like Emergency response plan, Updated procurement and shop drawing schedule,
Safety manual among others, whose reply is still awaited from the Concessionaire.
It has to be kept in mind that there are still pending compliances and acceptances by IE Team
regarding works executed and design details or technical justifications in several subjects,
almost all concerning to MEP Works. ANNEXURE-1 shows status of compliances.
From the Authority side, IE have attended also some letters from PIU NHAI Jammu, regarding
Change of Scope Notice for Pups and Additional Culverts, which is in process of compilation,
CTE Observations regarding Use of Shyam Steel, which is in process of compilation also, reply
regarding Replacement of E&M Expert, Non Compliance of instructions regarding North Site
muck dumping and provision of Protection Works, ROW Permission for Laying of OFC, Entry
Tax Exemption for Earth moving Equipment 59th list, Visit of Safety Auditors, Stoppage of all
works at NAR, Proposal for Alternate Solution in LIEU of Concrete Lining at Cross Passages,
and Details in respect of Bituminous/Rigid concrete Pavement in Projects.
In the table of following page it is provided the relation of main letters submitted by the Independent Engineer:
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 17
Letter Date Subject
S-CO-TE.EM-3726 01.09.2016 FFS Technical Submission of Fire Pumps.
S-CO-TE.EM-3727 01.09.2016 Fire Fighting System MCC Drawings.
S-CO-TE.SF-3731 02.09.2016 Environmental Monitoring report for the month of July 2016
S-CO-TE.VT-3732 03.09.2016 EOT Crane Material Test Certificate
S-CO-TE.TU-3733 03.09.2016 NCR regarding blockade of transverse PVC pipe outlet (right side) in Manhole P1 Main Tunnel and Manhole P2 in CP & ET junction
S-CO-TE.TU-3735 03.09.2016 Non Confirmatory Report No. 6.
S-CO-TE.TU-3736 03.09.2016 NCR-09, regarding invert lining for C0 section, RD 449.5-487 Main tunnel south Portal
S-CO-TE.EM-3738 05.09.2016 Toll Plaza CNTL- Toll Collection System & Equipment Layout- North Portal
S-CO-TE.TW-3740 05.09.2016 Drain Culverts North Portal
S-CO-TE.TW-3741 05.09.2016 North and South Rotary Drawings
S-CO-TE.EM-3742 05.09.2016 Submission of ITCS, TCS, ECS, EFS, VSS & ACS Drawings
S-CO-TE.QL-3743 05.09.2016 Mix Design of Contact Grouting.
S-CO-TE.QL-3744 05.09.2016 Failure of Gradation of GSB
S-CO-TE.QL-3745 05.09.2016 Reminder for Accuracy of the measuring devices of batching Plant.
S-CO-TE.QL-3748 06.09.2016 NCR Regarding Non submission of Quality Assurance plan
S-CO-TE.PC-3749 06.09.2016 Intimation for Issuance of "Provisional completion certificate"
S-CO-TE.EM-3750 08.09.2016 Submission of ITCS, TCS, ECS, EFS, VSS & ACS Drawings
S-CO-TE.EM-3751 06.09.2016 Technical submission of Sidewalk Lights
S-CO-TE.BG-3752 06.09.2016 Review of Load test of bridge B1 & B2
S-CO-TE.EM-3754 08.09.2016 Technical Submission of Toll Collection System (Reminder).
S-CO-TE.VT-3758 13.09.2016 Drawings for AC & DC boards, yard illumination and battery charger
S-CO-TE.RW-3759 14.09.2016 Use of Semi-mechanised and Labour-oriented construction technique for PQC in SAR and limited patches in Main tunnel
S-CO-TE.TW-3761 14.09.2016 Arrangement of Drain Outlet –South Portal
S-CO-TE.BG-3762 14.09.2016 Wearing Coat of Bridge B1 & B2.
S-CO-TE.EM-3763 15.09.2016 Submission of ITCS, TCS, ECS, EFS, VSS & ACS Drawings
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 18
Letter Date Subject
S-CO-TE.EM-3766 16.09.2016 Submission of ITCS, TCS, ECS, EFS, VSS & ACS Drawings (Approval of drawings-part III, i.e. EFS & Traffic Signage)
S-CO-TE.BG-3767 16.09.2016 Wearing Coat of Bridge B1.
S-CO-TE.QL-3771 19.09.2016 28 Days compressive strength of mix design with Ultratech/ Ambuja OPC 53 Grade of Cement
S-CO-TE.QL-3772
19.09.2016 Dry lean concrete mix design with ultratech OPC 53 grade of cement.
S-CO-TE.QL-3773 19.09.2016 Accuracy of the measuring devices of batching plant.
S-CO-TE.BG-3774 19.09.2016 WMS for Load Test
S-CO-TE.PC-3777 21.09.2016 Documents to be submitted before processing your application of “Provisional Completion Certificate"
S-CO-TE.PC-3778 23.09.2016 Intimation for Issuance of “Provisional Completion Certificate"
S-CO-TE.RW-3779 24.09.2016 Use of Semi-mechanized and Labor-oriented construction technique for PQC in SAR and limited patches in Main tunnel.
S-CO-TE.TU-3781 24.09.2016 NCR regarding blockade of transverse PVC pipe outlet (right side in Manhole P1 in Main tunnel & Manhole P2 in CP & ET junction
S-CO-TE.TU-3784 26.09.2016 NCR regarding placing in PQC in 925mm wide edge (left side) in Main tunnel
S-CO-TE.BG-3785 26.09.2016 Wearing coat of Bridge B1 & B2
S-CO-TE.SF-3789 28.09.2016 Review of Monthly Environmental monitoring Report for the month of August 2016
S-CO-TE.SF-3790 28.09.2016 CNTL, Bus Bay, Passenger Shelter & road Marking details.
S-CO-TE.QL-3791 28.09.2016 NCR regarding Non Submission of Quality Assurance Plan
S-CO-TE.TU-3799 03.10.2016 Filling of Invert concrete in CO Section for 7 numbers of steel ribs RD 933-964 left side
S-CO-TE.OT-3800 04.10.2016 Typical detail of Crash barrier & Antiglare
S-CO-TE.OT-3803 06.10.2016 The NOCs to be obtained from the local Authorities having the jurisdiction of process your application of “Provisional Completion Certificate”.
S-CO-TE.TW-3805 06.10.2016 Site Visit Main Tunnel North portal dated, 29.12.2015.
S-CO-TE.PC-3806 06.10.2016 Emergency Response plan
S-CO-TE.TU-3810 07.10.2016 Pouring of Concrete in Main Tunnel C0 section TM 1846 (South Portal)
S-CO-TE.VT-3813 07.10.2016 EOT Crane Material Test Certificate
S-PD-AD.FN-3815 08.10.2016 Audited Accounts for FY 2015-2016
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 19
Letter Date Subject
S-CO-TE.PC-3816 08.10.2016 Documents to be submitted before processing your application of “Provisional Completion Certificate”
S-CO-TE.BG-3817 08.10.2016 Load test at Bridge B1 & B2
S-CO-TE.TU-3818 10.10.2016 Site Visit North Portal.
S-CO-TE.BG-3819 10.10.2016 Wearing coat of bridge B1 and B2
S-CO-TE.TW-3820 10.10.2016 North and South Rotary Drawings
S-CO-TE.TU-3822 12.10.2016 Site Visit report for South & North Portal regarding ET Lining
S-CO-TE.RW-3824 12.10.2016 Use of Semi Mechanized & Labour oriented construction technique for PQC in SAR and Ltd patches in Main Tunnel
S-CO-TE.PC-3826 13.10.2016 MEP Works-Pending Compliance and reply of our letter for MEP works
S-CO-TE.EM-3827 13.10.2016 Fire Fighting System: MCC Drawings and submission of technical study/proposal to achieve the discrimination in break operations to clear the fault
S-CO-TE.EM-3829 14.10.2016 MEP Works Technical submission of Stainless steel Expansion bellows
S-CO-TE.EM-3830 14.10.2016 MEP Works-FFS Technical Submission of Toll collection System
S-CO-TE.EM-3831 14.10.2016 MEP Works Submission of ACS, EFS & ECS drawings.
S-CO-TE.EM-3832 14.10.2016 FFS-Arrangement of linear expansion and lateral movement of the firefighting piping
S-CO-TE.EW-3833 14.10.2016 Toll Plaza Drawings
S-CO-TE.EM-3834 14.10.2016 MEP Works Technical submission of Sidewalk Lights
S-PD-TE.RO-3835 14.10.2016 Change of Scope for Resurfacing of existing Highway from km 89 to km 130
S-CO-TE.VT-3836 15.10.2016 Toll Plaza Lighting Drawings
S-CO-TE.EM-3837 15.10.2016 MEP Works PSS Approval of fire Rated isolators
S-CO-TE.EM-3838 15.10.2016 MEP Works- Submission of Updated material
S-CO-TE.TU-3840 15.10.2016 Plan and Profile of NAR
S-CO-TE.TU-3841 15.10.2016 Site inspection Report- Main tunnel (South portal)
S-CO-TE.VT-3843 18.10.2016 Technical submission of Inspection and Test Plans (EFS, TCS, ECS & VSS)
S-CO-TE.EM-3844 18.10.2016 MEP Works Toll Collection system
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 20
Letter Date Subject
S-CO-TE.EM-3845 18.10.2016 MEP Works Fire Fighting System Drawings
S-CO-TE.EM-3846 18.10.2016 MEP Works PSS Approval of Fire rated isolators
S-CO-TE.TU-3848 18.10.2016 Main Tunnel Central Drain (South portal)
S-CO-TE.EM-3849 18.10.2016 MEP Works – Fire Fighting System Notes & legends
S-CO-TE.EM-3850 21.10.2016 MEP Works Technical submission of ITCS,TCS,ECS,EFS,VSS & ACS Drawings
S-CO-TE.QL-3851 21.10.2016 MEP works – Quality Assurance Plan
S-CO-TE.EM-3854 21.10.2016 Toll Plaza CNTL- Toll Collection system &Equipment Layout-North Portal
S-CO-TE.SF-3855 22.10.2016 Reminder for not Compliance HSE shortcomings inside tunnel
S-CO-TE.SF-3856 22.10.2016 Site visit at South and North Portal on dated 02.02.2016 regarding HSE
S-CO-TE.SF-3857 22.10.2016 Site visit at South Portal &North Portal on dated 11.02.2016 &12.02.2016 Regarding HSE
S-CO-TE.RO-3859 22.10.2016 Typical Section of Rotary wall of South & North Approach Road
S-CO-TE.EM-3860 22.10.2016 Documents to be submitted before processing your application of “Provisional Completion Certificate”
S-CO-TE.PC-3862 24.10.2016 Intimation for Issuance of “Provisional Completion Certificate”
S-CO-LE.FM.3864 24.10.2016 Force Majeure- Due to landslides
S-CO-TE.EM-3866 24.10.2016 Technical submission of ITCS Documents
S-CO-TE.EM-3868 25.10.2016 MEP Works – Fire Doors
S-CO-TE.EM-3869 25.10.2016 MEP Works- Site Visit
S-CO-TE.EM-3870 25.10.2016 MEP Works RFI of 132 KV Transmission
S-CO-TE.MR-3871 25.10.2016 Review of MPR’s from the Concessionaire for April’ 16 and September’16 also
S-CO-TE.RW-3872 25.10.2016 User Fee Display Boards
S-CO-TE.BG-3872 25.10.2016 Wearing coat of Bridge B1 & B2
S-CO-TE.EM-3878 01.11.2016
MEP Works Technical submission of ITCS, ECS, TCS, EFS, VSS & ACS Drawings
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 21
Letter Date Subject
S-CO-TE.EM-3879 01.11.2016
MEP Works Technical submission of Toll Collection System
S-CO-TE.EM-3880 01.11.2016 MEP Work PSS approvals of Fire rated Isolators
S-CO-TE.TU-3883 02.11.2016 Site Inspection south Portal & North Portal dated 15.06.2016.
S-CO-TE.EM-3886
07.11.2016
MEP Works- FFS Technical submission of Stainless steel Expansion bellow
S-CO-TE.EM-3887
07.11.2016
Fire Fighting System: MCC Drawings and submission of technical study/proposal to achieve the discrimination
S-CO-TE.EM-3888
07.11.2016
MEP Works Emergency Response Plan
S-CO-TE.EM-3889
07.11.2016
FFS- Arrangement of linear expansion and lateral movement of the firefighting piping
S-CO-TE.EM-3890
07.11.2016
MEP Works - Submission of ACS, EFS & ECS Drawings
S-CO-TE.EM-3891
07.11.2016
MEP Works The NOC's to be obtained from the local Authorities having the Jurisdiction to process your application of Provisional Completion certificate
S-CO-TE.QL-3892
08.11.2016
Regarding CTE Observations
S-CO-TE.OT-3893 08.11.2016
Delay in laying of PQC inside Main Tunnel
S-CO-TE.EM-3897 10.11.2016 MEP Works- Firefighting System Drawings- (NOCs to be obtained from the Authorities having the jurisdiction)
S-CO-TE.DW-3901
12.11.2016
Issues to be complied with as per monitoring on ground before issuance of ''Provisional Certificate''
S-CO-TE.MR-3902
15.11.2016
Review of MPR from the Concessionaire for the month of October 2016
S-CO-TE.EM-3903
16.11.2016
MEP Works- Pending compliances and replies after Meeting on 8th November 2016. .
S-CO-TE.SF-3904
17.11.2016
Environmental monitoring report for the month of September 2016
S-CO-TE.TU-3905
17.11.2016
Tunnel Drainage Layout
S-CO-TE.EM-3906
17.11.2016
MEP Works- Pending compliances and replies after Meeting on 8th November 2016.
S-CO-TE.TU-3909 19.11.2016 Reminder- Inspection for rectification of Concrete Lining Surface.
S-CO-TE.EM-3911
21.11.2016
MEP Works- Toll Collection System
S-CO-TE.QL-3912
22.11.2016
Submission of GSB Material Test Reports- Verma Crusher Udhampur.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 22
Letter Date Subject
S-CO-TE.EM-3913
24.11.2016
MEP Works- Toll Collection System
S-CO-TE.MR-3914
24.11.2016
Plan and Profile of North Approach Road: Preliminary observations
S-CO-TE.EM-3915
25.11.2016
MEP Works- Submission of ACS, ECS & ECS Drawings
S-CO-TE.OT-3916
26.11.2016
CTE Observations
S-CO-TE.OT-3917
26.11.2016
Change of Scope notice for PUPS and Additional Culverts
S-CO-TE.RO-3918
26.11.2016
User Fee Display Board
S-CO-TE.TU-3919
28.11.2016
Pending Inspection for Civil Works inside Tunnels.
S-CO-TE.RO-3922 29.11.2016 Plan of Road Signs and Marking SAR & NAR and Toll Plaza
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 23
8. INVOICES PAYMENT & REIMBURSEMENT
Invoice for the month of September 2016 has been submitted to Project Director NHAI (PIU Jammu) on
01.10.2016.
Invoice for the month of October 2016 has been submitted to Project Director NHAI (PIU Jammu) on
02.11.2016.
Invoice for the month of November 2016 has been submitted to Project Director NHAI (PIU Jammu) on
01.12.2016
9. EXECUTING AGENCIES AND CONTRACT DATA
9.1 AGENCIES
9.1.1 Developer:
M/s IL & FS Transportation Networks Ltd is the Developer.
9.1.2 Concessionaire:
They have created SPV in the name of M/s CNTL for this Project. CNTL is the Concessionaire
for this project; they have mobilized staff and established its office C/o Lower Mada Village
Gujjard Tehsil Chenani Distt. Udhampur. M/s CNTL is represented by Mr. J.S. Rathore Project
Director.
9.1.3 EPC Contractor:
M/s ITNL has demobilized M/s Leighton and Project highway and tunnel activities is divided into
three section and contractor has deployed the separate construction for following sections.
Section 1: Excavation Works From North Portal-M/s AIMPL-BCC(JV).
Excavation Works From South Portal-M/s Nagyan Construction.
Section 2: Lining Works South Portal: M/s New India Infra Build tech Pvt. Ltd.
Lining Works North Portal: M/s Savronik- BCC (JV).
Section 3 Surface Works:
M/s Vinay Construction
M/s Chudhary Construction
M/s Kamlashi Construction.
9.2 CONTRACT DATA
9.2.1 PROJECT COST Project Cost (As per Concession Agreement) – Rs. 2519 Crore.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 24
9.2.2 CIVIL WORKS CONTRACT DETAILS
a) Concessionaire Chenani Nashri Tunnel way Ltd.
b) Contract Section Chenani to Nashri Section of NH 1A From Km. 89.00 to 130.00
c) Contract Length 10.800 Km
d) Agreement /MOU Date 28th July 2010
e) Agreement Amount Rs. 2519 Crs.
f) Commencement Date 23rd May 2011
g) Intended date of Completion 20th May 2016
h) Performance Security Released
i) Mobilization Advance and Date of payment (s) Nil
j) Equipment Advance and Date of Payment (s) Nil
k) Net Material Advance Nil
l) Retention Money upto date Nil
m) Liquidated damages, if any -
n) Defect Liability Period Nil
9.2.3 SCOPE OF WORK
Main Tunnel: 9.00 km (As per CA)
Escape Tunnel: 9.00 Km
Cross Passage: 29 nos.
Rigid Pavement: 18.000 km (including Main Tunnel, Escape Tunnel and Bridges)
Flexible Pavement: 1.800 km (four lane)
Rotary Junction: 02 Nos.
Minor Bridge: 02 nos.
Culvert: 07 Nos. Box Culvert
Toll Plaza: 02 Nos.
Drainage pipe in Main Tunnel: 9.0 km (3 nos.)
Drainage pipe in Escape Tunnel: 9.0 km (2 nos.)
Drainage pipe in Cross passages: 29 Nos. (On both the ends)
Slope Protection works at Valley Side: 1520 m
Slope Protection works at Hill Side: 1750 m
Lay bays: 14 nos.
Firefighting Niches: 58 nos.
Vehicular emergency exit: 07 nos.
Ventilation Building: 02 nos.
Tunnel Control Centre (Building): 02 nos
Traffic, Medical Aid Post: (01 No. Per Side)
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 25
10. WEATHER REPORT
WEATHER REPORT FOR THE MONTH OF SEPTEMBER 2016
Max.
Temp.
(°C)
Min.
Temp.
(°C)
Max.
Humidity
(%)
Min.
Humidity
(%)
Rainfall
Max.
Temp.
(°C)
Min.
Temp.
(°C)
Max.
Humidity
(%)
Min.
Humidity
(%)
Rainfall
1 01.09.2016 37.4 22.8 86.0 45.0 NIL 30.1 20.3 87.0 51.0 NIL
2 02.09.2016 36.6 21.8 87.0 38.0 NIL 29.7 19.7 89.0 53.0 NIL
3 03.09.2016 37.1 22.4 88.0 36.0 NIL 30.2 19.9 92.0 61.0 NIL
4 04.09.2016 36.9 22.0 86.0 37.0 NIL 31.1 20.1 85.0 52.0 NIL
5 05.09.2016 36.7 21.8 88.0 38.0 NIL 31 20 88.0 57.0 NIL
6 06.09.2016 36.8 21.6 87.0 39.0 NIL 29.7 19.9 86.0 53.0 NIL
7 07.09.2016 37 22.2 89.0 37.0 NIL 29.3 19.8 81.0 50.0 NIL
8 08.09.2016 37.1 22.4 90.0 38.0 NIL 29.6 19.7 82.0 52.0 NIL
9 09.09.2016 36.5 21.8 87.0 36.0 NIL 29.9 19.9 79.0 49.0 NIL
10 10.09.2016 36.9 21.7 84.0 36.0 NIL 29.5 19.6 77.0 46.0 NIL
11 11.09.2016 36.4 20.9 89.0 38.0 4 29.7 19.7 73.0 49.0 0.2
12 12.09.2016 37.1 20.8 88.0 37.0 NIL 27.6 19.1 71.0 43.0 1.2
13 13.09.2016 37.6 20.4 88.0 39.0 6 29.6 19.2 75.0 47.0 NIL
14 14.09.2016 37.4 21.2 86.0 38.0 NIL 29.3 19 72.0 44.0 NIL
15 15.09.2016 37.2 22.5 88.0 37.0 NIL 30.7 19.3 77.0 52.0 NIL
16 16.09.2016 37 21.8 85.0 36.0 NIL 30.5 18.7 76.0 50.0 NIL
17 17.09.2016 37.4 22 86.0 37.0 NIL 29.7 18.1 73.0 47.0 NIL
18 18.09.2016 37.2 21.7 86.0 36.0 NIL 30.2 18.3 61.0 43.0 NIL
19 19.09.2016 38 22.1 88.0 35.0 NIL 30 17.6 71.0 45.0 NIL
20 20.09.2016 37.7 21.9 89.0 37.0 NIL 30.3 17.3 66.0 43.0 NIL
21 21.09.2016 38.4 22 88.0 36.0 NIL 30.1 17.1 70.0 44.0 NIL
22 22.09.2016 38.1 21.7 88.0 38.0 NIL 29.7 16.9 67.0 46.0 0.2
23 23.09.2016 37.8 22.4 89.0 378.0 NIL 29.3 16.7 69.0 43.0 NIL
24 24.09.2016 37.7 21.9 89.0 37.0 NIL 29.1 16.5 70.0 45.0 NIL
25 25.09.2016 38.4 22 88.0 36.0 NIL 29.3 16.3 69.0 47.0 NIL
26 26.09.2016 37.4 22.5 89.0 36.0 NIL 28.9 15.2 72.0 48.0 NIL
27 27.09.2016 36.6 21.8 88.0 35.0 NIL 29.2 15.8 86.0 53.0 NIL
28 28.09.2016 37.1 22 88.0 37.0 NIL 28.7 15.7 69.0 44.0 NIL
29 29.09.2016 36.9 21.7 86.0 36.0 NIL 28.6 15.5 67.0 42.0 NIL
30 30.09.2016 36.4 22.1 88.0 35.0 NIL 28.9 15.7 65.0 47.0 NIL
South Portal North Portal
DateSr.
No.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 26
WEATHER REPORT FOR THE MONTH OF OCTOBER 2016
Max.
Temp.
(°C)
Min.
Temp.
(°C)
Max.
Humidity
(%)
Min.
Humidity
(%)
Rainfall
Max.
Temp.
(°C)
Min.
Temp.
(°C)
Max.
Humidity
(%)
Min.
Humidity
(%)
Rainfall
1 01.10.2016 36.2 21.4 87.0 37.0 NIL 29.3 15.3 76.0 51.0 NIL
2 02.10.2016 37.1 21.8 89.0 38.0 NIL 29.7 15.1 77.0 49.0 NIL
3 03.10.2016 31.4 21.6 86.0 36.0 NIL 29.5 14.9 67.0 43.0 NIL
4 04.10.2016 32.2 20.4 89.0 38.0 NIL 29.3 14.7 72.0 47.0 NIL
5 05.10.2016 31.4 17.9 88.0 39.0 NIL 28.7 14.3 86.0 62.0 1.4
6 06.10.2016 30.8 19.4 82.0 36.0 NIL 29.1 14.5 79.0 49.0 NIL
7 07.10.2016 31 19.8 84.0 37.0 NIL 30.7 14.7 67.0 37.0 NIL
8 08.10.2016 31.4 20.8 85.0 35.0 NIL 30.2 14.3 71.0 31.0 NIL
9 09.10.2016 32.4 21.1 86.0 36.0 NIL 30.4 14.1 73.0 35.0 NIL
10 10.10.2016 32.9 21.6 80.0 33.0 NIL 29.7 14.0 72.0 32.0 NIL
11 11.10.2016 33.6 21.9 69.0 30.0 NIL 29.9 14.2 67.0 30.0 NIL
12 12.10.2016 32.8 22.4 74.0 31.0 NIL 29.7 14.1 72.0 25.0 NIL
13 13.10.2016 32.6 22.1 72.0 30.0 NIL 30.1 14.3 69.0 27.0 NIL
14 14.10.2016 32 21.7 70.0 31.0 NIL 30.4 14.0 62.0 25.0 NIL
15 15.10.2016 31.7 21.7 68.0 30.0 NIL 30.1 14.2 59.0 26.0 NIL
16 16.10.2016 31.9 20.5 68.0 33.0 NIL 29.7 14.4 71.0 32.0 NIL
17 17.10.2016 30.8 20.2 64.0 34.0 NIL 29.5 14.2 69.0 29.0 NIL
18 18.10.2016 29.9 20.8 67.0 32.0 NIL 28.6 14.0 59.0 28.0 NIL
19 19.10.2016 30.1 19.4 60.0 29.0 NIL 28.5 13.9 53.0 26.0 NIL
20 20.10.2016 32.4 19.8 62.0 31.0 NIL 28.3 13.7 63.0 29.0 NIL
21 21.10.2016 31.9 20 60.0 33.0 NIL 24.7 13.1 53.0 28.0 NIL
22 22.10.2016 30.6 21.4 63.0 32.0 NIL 24.9 12.7 51.0 34.0 NIL
23 23.10.2016 30.7 19.1 57.0 28.0 NIL 25.2 12.9 62.0 36.0 NIL
24 24.10.2016 31.9 19.8 60.0 33.0 NIL 22.5 12.3 66.0 41.0 NIL
25 25.10.2016 30.6 20 63.0 32.0 NIL 23.9 11.9 46.0 33.0 NIL
26 26.10.2016 31.4 22.1 60.0 36.0 NIL 23.8 12.0 42.0 29.0 NIL
27 27.10.2016 32.4 21.7 62.0 35.0 NIL 24.0 11.8 50.0 31.0 NIL
28 28.10.2016 32.9 21.7 60.0 37.0 NIL 23.7 11.9 47.0 27.0 NIL
29 29.10.2016 33.6 20.5 63.0 36.0 NIL 23.5 11.7 45.0 30.0 NIL
30 30.10.2016 32.8 20.2 57.0 35.0 NIL 23.7 11.6 49.0 32.0 NIL
31 31.10.2016 33.8 20.8 60.0 38.0 NIL 21.5 11.4 52.0 33.0 NIL
South Portal North Portal
DateSr.
No.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 27
WEATHER REPORT FOR THE MONTH OF NOVEMBER 2016
Max.
Temp.
(°C)
Min.
Temp.
(°C)
Max.
Humidity
(%)
Min.
Humidity
(%)
Rainfall
Max.
Temp.
(°C)
Min.
Temp.
(°C)
Max.
Humidity
(%)
Min.
Humidity
(%)
Rainfall
1 01.11.2016 32.9 21.7 47.0 29.0 NIL 22.3 15.3 76.0 51.0 NIL
2 02.11.2016 33.6 21.9 49.0 31.0 NIL 23.1 15.1 77.0 49.0 NIL
3 03.11.2016 32.2 21.5 59.0 35.0 NIL 23.7 14.9 67.0 43.0 NIL
4 04.11.2016 31.4 20.0 46.0 29.0 NIL 23.5 14.7 72.0 47.0 NIL
5 05.11.2016 30.2 19.7 52.0 31.0 NIL 22.9 14.3 86.0 62.0 1.4
6 06.11.2016 30.4 18.8 46.0 27.0 NIL 22.7 14.5 79.0 49.0 NIL
7 07.11.2016 30 18.5 51.0 28.0 NIL 22.6 14.7 67.0 37.0 NIL
8 08.11.2016 29.4 18.1 47.0 31.0 NIL 22.5 14.3 71.0 31.0 NIL
9 09.11.2016 29.8 19.7 44.0 26.0 NIL 22.7 14.1 73.0 35.0 NIL
10 10.11.2016 29.7 19.5 56.0 29.0 NIL 22.9 14.0 72.0 32.0 NIL
11 11.11.2016 29.4 19.4 62.0 32.0 NIL 22.3 14.2 67.0 30.0 NIL
12 12.11.2016 29.1 19.7 59.0 28.0 NIL 20.7 14.1 72.0 25.0 NIL
13 13.11.2016 29.5 19.9 61.0 31.0 NIL 21.1 14.3 69.0 27.0 NIL
14 14.11.2016 29 19.5 57.0 29.0 NIL 22.7 14.0 62.0 25.0 NIL
15 15.11.2016 28.9 19.2 62.0 30.0 NIL 23.2 14.2 59.0 26.0 NIL
16 16.11.2016 28.7 19.0 61.0 32.0 NIL 23.5 14.4 71.0 32.0 NIL
17 17.11.2016 28.6 19.4 56.0 28.0 NIL 23.7 14.2 69.0 29.0 NIL
18 18.11.2016 28.4 19.0 49.0 27.0 NIL 23.5 14.0 59.0 28.0 NIL
19 19.11.2016 28.8 19.4 52.0 31.0 NIL 23.2 13.9 53.0 26.0 NIL
20 20.11.2016 28.9 19.2 63.0 29.0 NIL 23.4 13.7 63.0 29.0 NIL
21 21.11.2016 27.9 18.8 62.0 31.0 NIL 23.9 13.1 53.0 28.0 NIL
22 22.11.2016 28.1 18.6 65.0 33.0 NIL 24.0 12.7 51.0 34.0 NIL
23 23.11.2016 28.2 18.7 61.0 30.0 NIL 23.7 12.9 62.0 36.0 NIL
24 24.11.2016 28.9 19.2 49.0 29.0 NIL 20.9 12.3 66.0 41.0 NIL
25 25.11.2016 27.9 18.8 58.0 31.0 NIL 23.5 11.9 46.0 33.0 NIL
26 26.11.2016 28.3 18.5 46.0 27.0 NIL 24.3 12.0 42.0 29.0 NIL
27 27.11.2016 29.2 19.4 57.0 29.0 NIL 24.5 11.8 50.0 31.0 NIL
28 28.11.2016 28.6 18.7 59.0 31.0 NIL 24.7 11.9 47.0 27.0 NIL
29 29.11.2016 29.8 19.2 65.0 29.0 NIL 24.9 11.7 45.0 30.0 NIL
30 30.11.2016 28.7 18.9 51.0 27.0 NIL 23.7 11.6 49.0 32.0 NIL
South Portal North Portal
DateSr.
No.
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 28
11. PROGRESS OF THE PROJECT
11.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBALITY
Physical Progress has not to be taken as reference for financial progress, because it does not
include cost incurred (i) Construction of Labour camps, Batching plants and Labs (ii)
Procurement of machinery and advanced materials for construction.
Progress %
Progress
Overall
Progress
1 Portal Construction LS 4.00% 1.00 1.00 100.00% 4.00%
2 MEP work Portals LS 1.50% 1.00 0.97 97.00% 1.46%
3 Dump Area South LS 1.50% 1.00 1.00 100.00% 1.50%
4 Dump Area North LS 1.50% 1.00 0.95 95.00% 1.43%
5 Main Tunnel - Heading RM 23.40% 8980.00 8980.00 100.00% 23.40%
6 Main Tunnel - Benching RM 19.15% 8980.00 8980.00 100.00% 19.15%
7 Escape Tunnel - Heading RM 12.09% 8966.00 8966.00 100.00% 12.09%
8 Cross Passage - Heading RM 4.36% 945.38 945.38 100.00% 4.36%
9 Staging for Lining No. 1.40% 10.00 10.00 100.00% 1.40%
10 Water Proofing - Main tunnel RM 2.85% 8980.00 8980.00 100.00% 2.85%
11 Lining - Main Tunnel RM 5.35% 8980.00 8980.00 100.00% 5.35%
12 Water Proofing - Escape tunnel RM 1.21% 8966.00 8966.00 100.00% 1.21%
13 Lining - Escape Tunnel RM 2.25% 8966.00 8966.00 100.00% 2.25%
14 Lining - Cross Passage RM 0.84% 945.00 945.00 100.00% 0.84%
15 Ground Beam Works RM 1.68% 18879.00 18879.00 100.00% 1.68%
16 Pavement -Main Tunnel RM 1.55% 8980.00 8288.00 92.29% 1.43%
17 Pavement -Escape Tunnel RM 0.90% 8966.00 8966.00 100.00% 0.90%
18 MEP works - Main Tunnel RM 4.20% 8980.00 8000.00 89.09% 3.74%
19 MEP works - Escape Tunnel RM 2.33% 8966.00 8500.00 94.80% 2.21%
20 Approach Road Works - EW RM 1.07% 1820.00 1720.00 94.51% 1.01%
21 Approach Road Works -Granular RM 0.09% 1820.00 1720.00 94.51% 0.09%
22 Approach Road Works - PQC RM 0.15% 1820.00 1525.00 83.79% 0.13%
23 Misc work RM 0.46% 1.00 0.70 70.00% 0.32%
24 Bridges LS 0.55% 1.00 1.00 100.00% 0.55%
25 Toll Plaza LS 0.22% 1.00 0.50 50.00% 0.11%
26 Project Facilities LS 0.26% 1.00 0.50 50.00% 0.13%
27 Maintenance of Road LS 0.26% 1.00 0.95 95.00% 0.25%
29 Design LS 2.28% 1.00 0.96 96.00% 2.19%
30 Commercial Operations LS 2.60% 1.00 0.00 0.00% 0.00%
100.00% 96.01%
Physical Progress Percentage upto 30th November 2016
S. No. Item Unit WeightageTotal
Scope
Actual
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 29
11.2 Tunnel works monitoring
SOUTH PORTAL
Tunnel Excavation in Mtrs.
S.No. Location
Tunnel Meter Cumulative
Remarks
Initial Final Targets* Achieved % age
Progress
1 MT (Heading) 4403.5 4403.50 4403.50 4403.50 100.00 Completed
2 MT (Benching) 4403.0 4403.0 4403.00 4403.00 100.00 Completed
3 ET 4573.0 4573.00 4573.00 4573.00 100.00 Completed
4 Cross Passage 459.1 459.10 459.10 459.10 100.00 14 No’s completed
Final Lining:
Monthly Monthly Monthly
Target Achieved%
ProgressMTs Target Achieved
%
ProgressMTs Target Achieved
%
ProgressMTs Target Achieved
%
Progress
1 MT 4506.00 4506.00 100 0 4773.50 4773.50 100.00 15 4800.00 4800 100.00 325 4800.00 4800.00 100.00
2 ET 4573.00 4573.00 100 0 4485.00 4485.00 100.00
3 CP 459.05 459.05 100 33 459.05 459.05 100.00
Sno. Location
Ground Beam (M)
Cum
Final Linnig Ventilation slab Partion wall
Cumulative Cumulative Cumulative
Tunnel Road Works:
TotalAchieved %
ProgressTotal Achieved % Progress
1 MT M 4500.00 4500.00 100.00 4500.00 4500.00 100.00
2 ET M 4485.00 4485.00 100.00 4500.00 4500.00 100.00
3 CP Nos 14.00 14.00 100.00 14.00 14.00 100.00
Sno. Location Unit
Progress PCC/ DLC (cum) Progress PQC (cum)
Tunnel Drainage Works
TotalAchieved %
ProgressTotal Achieved % Progress
1 MT M 4500.00 4500.00 100.00 4500.00 4500.00 100.00
Sno. Location Unit
Progress Surface Drain (cum) Progress Main Drain Collector (cum)
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 30
NORTH PORTAL
Tunnel Excavation in Mtrs.
S.No Location
Tunnel Meter Cumulative Remarks
Initial Final Targets Achieved % age
Progress
1 MT (Heading) 4576.5 4576.5 4576.5 4576.5 100.0 Completed
2 MT
(Benching) 4576.0 4576.5 4576.5 4576.5 100.0 Completed
3 ET 4393.0 4393.0 4593.0 4593.0 100.0 Completed
4 Cross
Passage 486.40 486.4 486.4 486.40 100.0 15 No’s completed
Final Lining:
Monthly Monthly Monthly
Target Achieved%
ProgressMTs Target Achieved
%
ProgressMTs Target Achieved
%
ProgressMTs Target Achieved
%
Progress
MT 4473.00 4473.00 100 0 4205.50 4205.50 100.00 30 4179.00 4179 100.00 388 4179.00 4179.00 100.00
ET 4393.00 4393.00 100 0 4481.00 4481.00 100.00
CP 486.33 486.33 100 15 486.33 486.33 100.00
Location
Ground Beam (M)
Cum
Final Linnig
Cumulative
Ventilation slab
Cumulative
Partion wall
Cumulative
Tunnel Road Works:
TotalAchieved %
ProgressTotal Achieved % Progress
1 MT M 4479.00 4479.00 100.00 4479.00 4061.00 90.67
2 ET M 4481.00 4481.00 100.00 4466.00 4466.00 100.00
3 CP Nos 15.00 15.00 100.00 15.00 15.00 100.00
Unit
Progress PCC/ DLC (cum) Progress PQC (cum)
Sno. Location
Tunnel Drainage Works:
TotalAchieved %
ProgressTotal Achieved % Progress
1 MT M 4479.00 4479.00 100.00 4479.00 4479.00 100.00
Sno. Location Unit
Progress Surface Drain (cum) Progress Main Drain Collector (cum)
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 31
11.3 PHYSICAL PROGRESS CHARTS
Main Tunnel
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 32
Escape Tunnel
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 33
Cross Passages
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 34
STRIP CHART
SOUTH PORTAL
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 35
MAIN TUNNEL
ESCAPE TUNNEL
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 36
CROSS PASSAGE
PQC
DLC/PCC
Cross Passage Nos. CP-01 CP-02 CP-03 CP-04 CP-05 CP-06 CP-07 CP-08 CP-09 CP-10 CP-11 CP-12 CP-13 CP-14 CP-15 CP-16 CP-17 CP-18 CP-19 CP-20 CP-21 CP-22 CP-23 CP-24 CP-25 CP-26 CP-27 CP-28 CP-29
LH
S-M
CW
Co
stru
ctio
n
(N
orth
Bo
un
d)
Number of Structures NB
Status of Structures
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 37
NORTH PORTAL
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 38
12. QUALITY CONTROL AND TESTING OF MATERIALS.
12.1 UP TO DATE STATUS OF THE TESTS.
Total no.
of Tests
Required
No. of
Tests
Performed
No. of
Tests
Passed
No. of
Tests
Failed
Total no.
of Tests
Required
No. of
Tests
Passed
No. of
Tests
Failed
Action taken in case of
Failied Tests./Remarks
1
a 16 141 141 0 959 8067 34
b 8 13 13 0 496 1004 0
c 8 9 9 0 502 703 0
d 0 0 0 0 13 13 0
e 120 120 120 0 7507 10547 0
g 4 4 4 0 248 469 0
h 4 8 8 0 261 493 0
2
a 16 40 40 0 1115 3547 68
b 120 150 150 0 8277 12311 0
c 0 0 0 0 10 10 0
3
a 1 1 1 0 173 173 0
b 1 1 1 0 173 173 0
c 1 1 1 0 173 173 0
d 1 1 1 0 173 173 0
4
a 3 3 3 0 489 489 0
b 3 3 3 0 498 498 0
c 3 3 3 0 510 510 0
5
0 0 0 0 2594 2594 0
6
07 Days 33 60 60 0 1800 1800 0
28 Days 77 105 105 0 4617 4617 0
b M10 DLC 07 Days 135 288 288 0 1551 1551 0
07 Days 147 201 201 0 8025 8025 0
28 Days 288 435 435 0 19191 19191 0
07 Days 36 39 39 0 450 450 0
28 Days 39 48 48 0 447 447 0
07 Days 0 0 0 0 87 87 0
28 Days 0 0 0 0 345 345 0
07 Days 48 135 135 0 14853 14853 0
28 Days 102 687 687 0 62616 62616 0
07 Days 39 516 516 0 8559 8559 0
28 Days 519 780 780 0 15378 15378 0
07 Days 0 0 0 0 303 303 0
28 Days 0 0 0 0 1231 1231 0
07 Days 444 417 417 0 1773 1773 0
28 Days 387 397 397 0 1516 1516 0
07 Days Flexural
Strength444 417 417 0 1773 1773 0
28 Days Flexural
Strength387 397 397 0 1516 1516 0
07 Days 0 0 0 0 45 45 0
28 Days 0 0 0 0 111 111 0
7
0 0 0 0 5441 5441 0
M45
S.
No
For the month November 2016 Cumulative upto November 2016
Soundness
Specific gravity
Gradation
FI + EI
Moisture Content
Gradation
AIV
Log Angles
Crushing value
Fine Aggregate
M25
Cement Ambuja 53 Grade
Pullout Test for Rock Bolts at
North/South Portals
M15
Insitu Cores Compressive
Strengthat North/South
Portals
Insitu Cores Compressive Strength Test
a
h M40
f
k
c
M40 PQC
CUBE
UPTO DATE STATUS
Name of the Tests
Shortcrete / Concrete / Course Aggregate
IST & FST
Concrete Cube's Compressive Strength Test
07 days
Pullout Testing
28 days
Cement Cube Strength
Consistency
Moisture content
Specific Gravity
M10
M30
03 days
Fineness
M20
i
M40 PQC
BEAMj
M35
d
g
e
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 39
12.2 TEST RESULT OF CONCRETE CORES AND CUBES.
FOR THE MONTH OF SEPTEMBER 2016
DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF SEPTEMBR 2016.
SOUTH PORTAL
DATE
INSITU CORES PANEL CASTED
Remarks Pass Fail 1 days 7 days 28 days
01.09.2016 00 00 00 00 00
02.09.2016 00 00 00 00 00
03.09.2016 00 00 00 00 00
04.09.2016 00 00 00 00 00
05.09.2016 00 00 00 00 00
06.09.2016 00 00 00 00 00
07.09.2016 00 00 00 00 00
08.09.2016 00 00 00 00 00
09.09.2016 00 00 00 00 00
10.09.2016 00 00 00 00 00
11.09.2016 00 00 00 00 00
12.09.2016 00 00 00 00 00
13.09.2016 00 00 00 00 00
14.09.2016 00 00 00 00 00
15.09.2016 00 00 00 00 00
16.09.2016 00 00 00 00 00
17.09.2016 00 00 00 00 00
18.09.2016 00 00 00 00 00
19.09.2016 00 00 00 00 00
20.09.2016 00 00 00 00 00
21.09.2016 00 00 00 00 00
22.09.2016 00 00 00 00 00
23.09.2016 00 00 00 00 00
24.09.2016 00 00 00 00 00
25.09.2016 00 00 00 00 00
26.09.2016 00 00 00 00 00
27.09.2016 00 00 00 00 00
28.09.2016 00 00 00 00 00
29.09.2016 00 00 00 00 00
30.09.2016 00 00 00 00 00
Total 00 00 00 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 40
DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF SEPTEMBER 2016.
NORTH PORTAL
DATE
INSITU CORES PANEL CASTED
Remarks
Pass Fail 1 days 7 days 28 days
01.09.2016 03 00 00 05 05
02.09.2016 03 00 00 00 05
03.09.2016 00 00 00 00 00
04.09.2016 00 00 00 00 00
05.09.2016 00 00 00 00 00
06.09.2016 00 00 00 00 00
07.09.2016 03 00 00 00 05
08.09.2016 00 00 00 00 00
09.09.2016 03 00 00 00 05
10.09.2016 00 00 00 00 00
11.09.2016 03 00 00 00 05
12.09.2016 00 00 00 00 00
13.09.2016 00 00 00 00 00
14.09.2016 03 00 00 00 05
15.09.2016 00 00 00 00 00
16.09.2016 03 00 00 00 05
17.09.2016 00 00 00 00 00
18.09.2016 03 00 00 00 05
19.09.2016 00 00 00 00 00
20.09.2016 03 00 00 00 05
21.09.2016 00 00 00 00 00
22.09.2016 03 00 00 00 05
23.09.2016 00 00 00 00 00
24.09.2016 00 00 00 00 00
25.09.2016 00 00 00 00 00
26.09.2016 00 00 00 00 00
27.09.2016 00 00 00 00 00
28.09.2016 00 00 00 00 00
29.09.2016 00 00 00 00 00
30.09.2016 00 00 00 00 00
Total 30 00 00 05 50
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 41
DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.
SOUTH PORTAL
DATE Grout Cube Testing
Remarks
3 days 7 days 28 days
01.09.2016 00 00 05
02.09.2016 00 05 05
03.09.2016 00 05 05
04.09.2016 00 05 00
05.09.2016 00 05 05
06.09.2016 00 05 05
07.09.2016 00 05 05
08.09.2016 00 05 05
09.09.2016 00 05 05
10.09.2016 00 05 05
11.09.2016 00 05 05
12.09.2016 00 05 00
13.09.2016 00 05 05
14.09.2016 00 05 05
15.09.2016 00 05 05
16.09.2016 00 05 05
17.09.2016 00 00 00
18.09.2016 00 10 10
19.09.2016 00 05 05
20.09.2016 00 05 05
21.09.2016 00 05 05
22.09.2016 00 05 00
23.09.2016 00 05 05
24.09.2016 00 00 05
25.09.2016 00 05 05
26.09.2016 00 05 05
27.09.2016 00 05 05
28.09.2016 00 05 05
29.09.2016 00 05 05
30.09.2016 00 05 05
Total 00 140 135
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 42
DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.
NORTH PORTAL
DATE Grout Cube Testing
Remarks
3 days 7 days 28 days
01.09.2016 00 00 00
02.09.2016 00 00 00
03.09.2016 00 00 00
04.09.2016 00 00 00
05.09.2016 00 00 00
06.09.2016 00 00 00
07.09.2016 00 00 00
08.09.2016 00 00 00
09.09.2016 00 00 00
10.09.2016 00 00 00
11.09.2016 00 00 00
12.09.2016 00 00 00
13.09.2016 00 00 00
14.09.2016 00 00 00
15.09.2016 00 00 00
16.09.2016 00 00 00
17.09.2016 00 00 00
18.09.2016 00 00 00
19.09.2016 00 00 00
20.09.2016 00 00 00
21.09.2016 00 00 00
22.09.2016 00 00 00
23.09.2016 00 00 00
24.09.2016 00 00 00
25.09.2016 00 00 00
26.09.2016 00 00 00
27.09.2016 00 00 00
28.09.2016 00 00 00
29.09.2016 00 00 00
30.09.2016 00 00 00
Total 00 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 43
DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.
SOUTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M10 M10 DLC M15 M20 M25 M30
Remark 7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.09.2016 00 03 09 00 03 00 00 00 00 00 06 27
02.09.2016 06 06 09 00 09 09 00 00 00 00 06 45
03.09.2016 03 12 09 00 09 03 00 00 00 00 09 24
04.09.2016 03 09 09 00 06 00 00 00 00 00 09 06
05.09.2016 03 03 00 00 00 03 00 00 00 00 09 18
06.09.2016 03 06 09 00 03 09 00 00 00 00 09 18
07.09.2016 00 06 09 00 03 00 00 00 00 00 15 45
08.09.2016 00 00 09 00 00 09 03 00 00 00 06 24
09.09.2016 00 03 09 00 06 06 03 00 00 00 09 12
10.09.2016 00 03 18 00 00 06 00 00 00 00 09 48
11.09.2016 00 00 00 00 00 12 00 00 00 00 15 09
12.09.2016 00 00 09 00 06 00 06 00 00 00 03 00
13.09.2016 00 03 09 00 12 06 03 00 00 00 06 21
14.09.2016 00 03 09 00 12 03 00 00 00 00 06 18
15.09.2016 00 00 00 00 06 09 03 00 00 00 06 06
16.09.2016 00 09 09 00 00 09 03 00 00 00 06 24
17.09.2016 00 00 00 00 00 00 00 00 00 00 00 00
18.09.2016 06 00 18 00 12 15 09 00 00 00 12 48
19.09.2016 00 06 00 00 03 09 03 00 00 00 00 12
20.09.2016 00 09 00 00 06 15 00 00 00 00 03 18
21.09.2016 00 12 00 00 12 09 03 00 00 00 06 21
22.09.2016 00 00 09 00 00 09 03 00 00 00 09 09
23.09.2016 00 09 09 00 03 18 03 00 00 00 03 12
24.09.2016 00 09 00 00 00 12 00 00 00 00 00 24
25.09.2016 00 06 09 00 06 18 03 00 00 00 06 18
26.09.2016 03 06 18 00 03 00 03 00 00 00 00 30
27.09.2016 00 09 00 00 09 09 00 00 00 00 03 18
28.09.2016 00 00 09 00 06 03 00 00 00 00 06 27
29.09.2016 00 00 00 00 09 00 00 03 00 00 00 09
30.09.2016 00 00 00 00 12 09 00 03 00 00 09 09
Total 27 132 198 00 156 210 48 06 00 00 186 600
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 44
DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.
SOUTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M35 M40 M40
PQC
M40
PQC Flexural Strength
M45
Remarks
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.09.2016 12 24 09 00 12 03 12 03 00 00
02.09.2016 15 24 03 00 06 03 06 03 00 00
03.09.2016 03 30 03 00 06 00 06 00 00 00
04.09.2016 09 09 06 00 09 00 09 00 00 00
05.09.2016 15 21 03 00 12 03 12 03 00 00
06.09.2016 15 24 09 00 06 03 06 03 00 00
07.09.2016 18 30 00 00 09 03 09 03 00 00
08.09.2016 18 30 15 00 03 03 03 03 00 00
09.09.2016 15 24 09 00 03 03 03 03 00 00
10.09.2016 09 21 09 00 03 03 03 03 00 00
11.09.2016 03 27 03 00 03 03 03 03 00 00
12.09.2016 12 00 09 00 03 00 03 00 00 00
13.09.2016 12 15 06 03 09 03 09 03 00 00
14.09.2016 09 27 03 03 03 03 03 03 00 00
15.09.2016 06 21 00 03 09 03 09 03 00 00
16.09.2016 12 27 03 03 03 09 03 09 00 00
17.09.2016 00 00 00 00 00 00 00 00 00 00
18.09.2016 21 33 06 12 18 06 18 06 00 00
19.09.2016 09 15 03 09 06 00 06 00 00 00
20.09.2016 09 30 03 09 09 06 09 06 00 00
21.09.2016 12 18 06 06 00 06 00 06 00 00
22.09.2016 12 12 03 09 09 12 09 12 00 00
23.09.2016 06 18 03 03 03 06 03 06 00 00
24.09.2016 00 06 00 03 00 06 00 06 00 00
25.09.2016 12 12 00 06 03 09 03 09 00 00
26.09.2016 12 30 03 06 09 12 09 12 00 00
27.09.2016 09 42 00 09 15 06 15 06 00 00
28.09.2016 15 27 03 00 12 09 12 09 00 00
29.09.2016 18 27 00 15 15 03 15 03 00 00
30.09.2016 15 21 00 09 09 03 09 03 00 00
Total 333 645 120 108 207 129 207 129 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 45
DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.
NORTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M10 M10 DLC M15 M20 M25 M30
Remark 7 Day
s
28 Day
s
7 Day
S
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.09.2016 00 06 09 00 00 00 00 00 00 00 06 42
02.09.2016 03 00 09 00 03 00 00 00 00 00 06 09
03.09.2016 03 00 09 00 06 00 00 00 00 00 03 24
04.09.2016 03 00 00 00 00 00 00 00 00 00 03 27
05.09.2016 00 06 09 00 00 00 00 00 00 00 09 24
06.09.2016 00 15 00 00 03 09 00 00 00 00 03 24
07.09.2016 03 06 09 00 06 00 00 00 00 00 03 21
08.09.2016 03 00 18 00 00 12 00 00 00 00 03 42
09.09.2016 03 00 09 00 00 00 00 00 00 00 06 54
10.09.2016 03 00 09 00 03 12 00 00 00 00 06 24
11.09.2016 03 00 09 00 00 00 00 00 00 00 03 21
12.09.2016 00 00 09 00 03 00 00 00 00 00 03 00
13.09.2016 03 12 00 00 03 00 00 00 00 00 03 18
14.09.2016 03 12 09 00 03 06 00 00 00 00 03 18
15.09.2016 03 00 09 00 06 03 00 00 00 00 03 18
16.09.2016 00 00 09 00 06 09 00 00 00 00 06 12
17.09.2016 00 00 00 00 00 00 00 00 00 00 00 00
18.09.2016 00 06 18 00 03 06 00 00 00 00 09 33
19.09.2016 00 00 09 00 00 00 00 00 00 00 06 18
20.09.2016 00 00 00 00 03 00 00 00 00 00 00 21
21.09.2016 00 06 09 00 03 00 00 00 00 00 03 24
22.09.2016 00 00 09 00 00 00 00 00 00 00 03 21
23.09.2016 00 03 09 00 00 18 00 00 00 00 03 21
24.09.2016 00 15 00 00 03 18 00 00 00 00 00 09
25.09.2016 00 15 09 00 00 00 00 00 00 00 06 09
26.09.2016 03 00 09 00 00 00 00 00 00 00 06 21
27.09.2016 00 00 00 00 00 06 00 00 00 00 03 06
28.09.2016 00 06 09 00 03 00 00 00 00 00 03 12
29.09.2016 00 09 09 00 03 09 00 00 00 00 00 09
30.09.2016 00 09 00 00 00 00 00 00 00 00 03 24
Total 36 126 216 00 60 108 00 00 00 00 114 606
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 46
DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.
DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.
00
NORTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M35 M40 M40
PQC
M40
PQC Flexural Strength
M45
Remarks
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.09.2016 03 06 00 00 00 03 00 03 00 00
02.09.2016 03 06 00 00 00 03 00 03 00 00
03.09.2016 03 06 00 00 00 03 00 03 00 00
04.09.2016 03 06 00 00 00 03 00 03 00 00
05.09.2016 03 12 00 00 00 03 00 03 00 00
06.09.2016 03 06 00 00 00 00 00 00 00 00
07.09.2016 00 09 00 00 00 03 00 03 00 00
08.09.2016 03 09 00 00 00 00 00 00 00 00
09.09.2016 03 06 00 00 00 00 00 00 00 00
10.09.2016 03 06 00 00 03 00 03 00 00 00
11.09.2016 03 06 00 00 03 03 03 03 00 00
12.09.2016 03 00 00 00 03 00 03 00 00 00
13.09.2016 03 06 00 00 03 03 03 03 00 00
14.09.2016 03 06 00 00 03 00 03 00 00 00
15.09.2016 03 06 00 00 03 00 03 00 00 00
16.09.2016 03 06 00 00 03 00 03 00 00 00
17.09.2016 00 00 00 00 00 00 00 00 00 00
18.09.2016 06 12 00 00 03 00 03 00 00 00
19.09.2016 03 06 00 00 03 03 03 03 00 00
20.09.2016 00 09 00 00 00 03 00 03 00 00
21.09.2016 03 06 00 00 00 03 00 03 00 00
22.09.2016 03 06 00 00 00 00 00 00 00 00
23.09.2016 03 09 00 00 03 00 03 00 00 00
24.09.2016 00 06 00 00 00 00 00 00 00 00
25.09.2016 03 06 00 00 03 00 03 00 00 00
26.09.2016 03 06 00 00 03 00 03 00 00 00
27.09.2016 03 06 00 00 03 00 03 00 00 00
28.09.2016 03 00 00 00 03 00 03 00 00 00
29.09.2016 00 06 00 00 00 00 00 00 00 00
30.09.2016 03 09 00 00 03 00 03 00 00 00
Total 78 189 00 00 45 33 45 33 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 47
FOR THE MONTH OF OCTOBER 2016
DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF OCTOBER 2016.
SOUTH PORTAL
DATE
INSITU CORES PANEL CASTED
Remarks Pass Fail 1 days 7 days 28 days
01.10.2016 00 00 00 00 00
02.10.2016 00 00 00 00 00
03.10.2016 00 00 00 00 00
04.10.2016 00 00 00 00 00
05.10.2016 00 00 00 00 00
06.10.2016 00 00 00 00 00
07.10.2016 00 00 00 00 00
08.10.2016 00 00 00 00 00
09.10.2016 00 00 00 00 00
10.10.2016 00 00 00 00 00
11.10.2016 00 00 00 00 00
12.10.2016 00 00 00 00 00
13.10.2016 00 00 00 00 00
14.10.2016 00 00 00 00 00
15.10.2016 00 00 00 00 00
16.10.2016 00 00 00 00 00
17.10.2016 00 00 00 00 00
18.10.2016 00 00 00 00 00
19.10.2016 00 00 00 00 00
20.10.2016 00 00 00 00 00
21.10.2016 00 00 00 00 00
22.10.2016 00 00 00 00 00
23.10.2016 00 00 00 00 00
24.10.2016 00 00 00 00 00
25.10.2016 00 00 00 00 00
26.10.2016 00 00 00 00 00
27.10.2016 00 00 00 00 00
28.10.2016 00 00 00 00 00
29.10.2016 00 00 00 00 00
30.10.2016 00 00 00 00 00
31.10.2016 00 00 00 00 00
Total 00 00 00 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 48
DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF OCTOBER 2016.
NORTH PORTAL
DATE
INSITU CORES PANEL CASTED
Remarks
Pass Fail 1 days 7 days 28 days
01.10.2016 00 00 00 00 00
02.10.2016 00 00 00 00 00
03.10.2016 00 00 00 00 00
04.10.2016 00 00 00 00 00
05.10.2016 00 00 00 00 00
06.10.2016 00 00 00 00 00
07.10.2016 00 00 00 00 00
08.10.2016 00 00 00 00 00
09.10.2016 00 00 00 00 00
10.10.2016 00 00 00 00 00
11.10.2016 00 00 00 00 00
12.10.2016 00 00 00 00 00
13.10.2016 00 00 00 00 00
14.10.2016 00 00 00 00 00
15.10.2016 00 00 00 00 00
16.10.2016 00 00 00 00 00
17.10.2016 00 00 00 00 00
18.10.2016 00 00 00 00 00
19.10.2016 00 00 00 00 00
20.10.2016 00 00 00 00 00
21.10.2016 00 00 00 00 00
22.10.2016 00 00 00 00 00
23.10.2016 00 00 00 00 00
24.10.2016 00 00 00 00 00
25.10.2016 00 00 00 00 00
26.10.2016 00 00 00 00 00
27.10.2016 00 00 00 00 00
28.10.2016 00 00 00 00 00
29.10.2016 00 00 00 00 00
30.10.2016 00 00 00 00 00
31.10.2016 00 00 00 00 00
Total 00 00 00 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 49
DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.
SOUTH PORTAL
DATE Grout Cube Testing
Remarks
3 days 7 days 28 days
01.10.2016 00 00 05
02.10.2016 00 00 00
03.10.2016 00 00 10
04.10.2016 00 00 05
05.10.2016 00 00 05
06.10.2016 00 00 05
07.10.2016 00 00 05
08.10.2016 00 00 05
09.10.2016 00 00 05
10.10.2016 00 00 05
11.10.2016 00 00 05
12.10.2016 00 00 05
13.10.2016 00 00 05
14.10.2016 00 00 05
15.10.2016 00 00 00
16.10.2016 00 00 05
17.10.2016 00 00 05
18.10.2016 00 00 05
19.10.2016 00 00 05
20.10.2016 00 00 00
21.10.2016 00 00 00
22.10.2016 00 00 00
23.10.2016 00 00 00
24.10.2016 00 00 00
25.10.2016 00 00 00
26.10.2016 00 00 00
27.10.2016 00 00 00
28.10.2016 00 00 00
29.10.2016 00 00 00
30.10.2016 00 00 00
31.10.2016 00 00 00
Total 00 00 90
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 50
DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.
NORTH PORTAL
DATE Grout Cube Testing
Remarks
3 days 7 days 28 days
01.10.2016 00 00 00
02.10.2016 00 00 00
03.10.2016 00 00 00
04.10.2016 00 00 00
05.10.2016 00 00 00
06.10.2016 00 00 00
07.10.2016 00 00 00
08.10.2016 00 00 00
09.10.2016 00 00 00
10.10.2016 00 00 00
11.10.2016 00 00 00
12.10.2016 00 00 00
13.10.2016 00 00 00
14.10.2016 00 00 00
15.10.2016 00 00 00
16.10.2016 00 00 00
17.10.2016 00 00 00
18.10.2016 00 00 00
19.10.2016 00 00 00
20.10.2016 00 00 00
21.10.2016 00 00 00
22.10.2016 00 00 00
23.10.2016 00 00 00
24.10.2016 00 00 00
25.10.2016 00 00 00
26.10.2016 00 00 00
27.10.2016 00 00 00
28.10.2016 00 00 00
29.10.2016 00 00 00
30.10.2016 00 00 00
31.10.2016 00 00 00
Total 00 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 51
DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.
SOUTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M10 M10 DLC M15 M20 M25 M30
Remark 7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.10.2016 03 00 00 00 06 00 00 00 00 00 03 27
02.10.2016 00 00 00 00 00 00 00 00 00 00 00 00
03.10.2016 00 00 18 00 00 12 06 06 00 00 12 33
04.10.2016 00 00 09 00 06 24 00 03 00 00 09 12
05.10.2016 00 00 00 00 09 24 00 00 00 00 00 09
06.10.2016 00 00 09 00 00 09 00 03 00 00 03 33
07.10.2016 00 00 00 00 03 00 00 03 00 00 03 15
08.10.2016 00 09 09 00 03 24 00 00 00 00 06 06
09.10.2016 00 06 00 00 00 06 00 09 00 00 00 18
10.10.2016 03 00 00 00 03 06 00 03 00 00 03 00
11.10.2016 00 00 09 00 03 15 00 00 00 00 00 24
12.10.2016 00 00 09 00 03 18 03 03 00 00 00 09
13.10.2016 03 00 09 00 06 00 03 03 00 00 03 21
14.10.2016 03 00 00 00 03 09 00 03 00 00 00 03
15.10.2016 03 00 00 00 03 00 00 00 00 00 00 00
16.10.2016 03 00 09 00 03 18 00 03 00 00 00 27
17.10.2016 00 06 09 00 06 06 00 03 00 00 00 00
18.10.2016 00 00 09 00 06 09 00 00 00 00 00 06
19.10.2016 00 09 00 00 09 09 00 00 00 00 00 12
20.10.2016 00 00 09 00 03 12 00 00 00 00 00 00
21.10.2016 03 00 00 00 03 12 00 00 00 00 06 12
22.10.2016 00 06 18 00 03 15 00 00 00 00 00 03
23.10.2016 06 00 09 00 00 00 00 03 00 00 00 12
24.10.2016 00 00 00 00 06 00 03 03 00 00 00 06
25.10.2016 00 00 18 00 00 12 09 00 00 00 00 15
26.10.2016 03 00 00 00 03 15 06 00 00 00 00 00
27.10.2016 00 00 18 00 09 00 03 00 00 00 03 03
28.10.2016 03 00 00 00 15 06 00 00 00 00 00 09
29.10.2016 00 00 00 00 06 03 00 00 00 00 00 06
30.10.2016 00 00 00 00 00 00 00 00 00 00 00 00
31.10.2016 00 06 18 00 09 03 06 00 00 00 00 03
Total 33 42 189 00 129 267 39 48 00 00 51 324
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 52
DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.
SOUTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M35 M40 M40
PQC
M40
PQC Flexural Strength
M45
Remarks
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.10.2016 15 18 00 00 09 12 09 12 00 00
02.10.2016 00 00 00 00 00 00 00 00 00 00
03.10.2016 27 24 00 00 24 18 24 18 00 00
04.10.2016 21 21 00 00 21 15 21 15 00 00
05.10.2016 15 18 00 00 09 06 09 06 00 00
06.10.2016 21 12 00 00 12 09 12 09 00 00
07.10.2016 09 21 00 00 15 06 15 06 00 00
08.10.2016 21 21 00 00 12 09 12 09 00 00
09.10.2016 00 18 00 00 00 15 00 15 00 00
10.10.2016 21 15 00 00 15 09 15 09 00 00
11.10.2016 24 18 00 00 12 12 12 12 00 00
12.10.2016 15 21 00 00 12 06 12 06 00 00
13.10.2016 21 27 00 00 15 12 15 12 00 00
14.10.2016 27 15 00 00 15 06 15 06 00 00
15.10.2016 12 00 00 00 03 00 03 00 00 00
16.10.2016 24 21 00 00 12 04 12 04 00 00
17.10.2016 30 21 00 00 09 12 09 12 00 00
18.10.2016 21 18 00 00 09 15 09 15 00 00
19.10.2016 18 24 00 00 12 15 12 15 00 00
20.10.2016 12 30 00 00 09 18 09 18 00 00
21.10.2016 09 24 00 00 15 09 15 09 00 00
22.10.2016 15 24 00 00 12 09 12 09 00 00
23.10.2016 12 21 00 00 18 06 18 06 00 00
24.10.2016 12 24 00 00 09 18 09 18 00 00
25.10.2016 12 30 00 00 12 21 12 21 00 00
26.10.2016 09 24 00 00 09 09 09 09 00 00
27.10.2016 09 33 00 00 09 12 09 12 00 00
28.10.2016 03 18 00 00 03 15 03 15 00 00
29.10.2016 03 30 00 00 06 12 06 12 00 00
30.10.2016 00 00 00 00 00 00 00 00 00 00
31.10.2016 09 30 00 00 24 15 24 15 00 00
Total 447 621 00 00 342 325 342 325 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 53
DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.
NORTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M10 M10 DLC M15 M20 M25 M30
Remark 7 Day
s
28 Day
s
7 Day
S
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.10.2016 00 06 09 00 03 00 00 00 00 00 03 21
02.10.2016 00 03 09 00 00 03 00 00 00 00 03 09
03.10.2016 00 00 09 00 00 00 00 00 00 00 03 06
04.10.2016 00 06 00 00 00 06 00 00 00 00 06 09
05.10.2016 00 09 09 00 06 06 00 00 00 00 03 15
06.10.2016 00 03 09 00 03 09 00 00 00 00 03 15
07.10.2016 03 00 09 00 00 18 00 00 00 00 03 21
08.10.2016 03 00 09 00 00 30 00 00 00 00 03 18
09.10.2016 00 00 00 00 00 18 00 00 00 00 00 12
10.10.2016 03 00 09 00 00 00 00 00 00 00 03 24
11.10.2016 03 00 09 00 03 00 00 00 00 00 06 00
12.10.2016 03 00 00 00 09 15 00 00 00 00 06 06
13.10.2016 03 00 00 00 06 18 00 00 00 00 00 12
14.10.2016 00 00 00 00 03 00 00 00 00 00 06 15
15.10.2016 00 00 00 00 03 00 00 00 00 00 00 00
16.10.2016 00 00 00 00 03 06 00 00 00 00 00 27
17.10.2016 00 06 00 00 03 00 00 00 00 00 00 27
18.10.2016 00 00 00 00 00 00 00 00 00 00 00 27
19.10.2016 00 00 00 00 06 00 00 00 00 00 06 18
20.10.2016 03 00 00 00 03 03 00 00 00 00 09 06
21.10.2016 00 00 00 00 06 03 00 00 00 00 03 06
22.10.2016 00 00 00 00 00 12 00 00 00 00 03 06
23.10.2016 00 00 00 00 03 00 00 00 00 00 00 06
24.10.2016 03 00 00 00 03 00 00 00 00 00 03 12
25.10.2016 00 00 00 00 00 00 00 00 00 00 00 12
26.10.2016 00 00 00 00 00 15 00 00 00 00 00 09
27.10.2016 00 00 00 00 00 06 00 00 00 00 00 06
28.10.2016 00 09 09 00 00 00 00 00 00 00 03 06
29.10.2016 00 12 00 00 03 00 00 00 00 00 03 06
30.10.2016 00 00 00 00 03 00 00 00 00 00 03 06
31.10.2016 03 09 09 00 03 00 00 00 00 00 00 00
Total 27 63 99 00 72 168 00 00 00 00 84 363
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 54
DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.
DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.
00
NORTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M35 M40 M40
PQC
M40
PQC Flexural Strength
M45
Remarks
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.10.2016 03 06 00 00 03 03 03 03 00 00
02.10.2016 03 06 00 00 03 03 03 03 00 00
03.10.2016 03 06 00 00 03 03 03 03 00 00
04.10.2016 03 06 00 00 03 03 03 03 00 00
05.10.2016 03 06 00 00 03 03 03 03 00 00
06.10.2016 03 06 00 00 03 03 03 03 00 00
07.10.2016 03 06 00 00 03 03 03 03 00 00
08.10.2016 03 06 00 00 03 00 03 00 00 00
09.10.2016 00 06 00 00 00 03 00 03 00 00
10.10.2016 03 06 00 00 03 03 03 03 00 00
11.10.2016 03 00 00 00 03 00 03 00 00 00
12.10.2016 03 09 00 00 03 00 03 00 00 00
13.10.2016 03 06 00 00 03 00 03 00 00 00
14.10.2016 03 06 00 00 03 03 03 03 00 00
15.10.2016 03 00 00 00 03 00 03 00 00 00
16.10.2016 03 06 00 00 03 03 03 03 00 00
17.10.2016 03 06 00 00 03 03 03 03 00 00
18.10.2016 00 06 00 00 00 03 00 03 00 00
19.10.2016 03 06 00 00 03 03 03 03 00 00
20.10.2016 03 00 00 00 03 00 03 00 00 00
21.10.2016 03 06 00 00 03 03 03 03 00 00
22.10.2016 03 06 00 00 03 03 03 03 00 00
23.10.2016 00 06 00 00 03 03 03 03 00 00
24.10.2016 03 06 00 00 03 03 03 03 00 00
25.10.2016 00 06 00 00 00 03 00 03 00 00
26.10.2016 00 06 00 00 00 03 00 03 00 00
27.10.2016 00 06 00 00 00 03 00 03 00 00
28.10.2016 00 06 00 00 00 03 00 03 00 00
29.10.2016 00 03 00 00 03 03 03 03 00 00
30.10.2016 03 00 00 00 03 00 03 00 00 00
31.10.2016 03 03 00 00 03 03 03 03 00 00
Total 69 159 00 00 75 72 75 72 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 55
FOR THE MONTH OF NOVEMBER
DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF NOVEMBER 2016.
SOUTH PORTAL
DATE
INSITU CORES PANEL CASTED
Remarks Pass Fail 1 days 7 days 28 days
01.11.2016 00 00 00 00 00
02.11.2016 00 00 00 00 00
03.11.2016 00 00 00 00 00
04.11.2016 00 00 00 00 00
05.11.2016 00 00 00 00 00
06.11.2016 00 00 00 00 00
07.11.2016 00 00 00 00 00
08.11.2016 00 00 00 00 00
09.11.2016 00 00 00 00 00
10.11.2016 00 00 00 00 00
11.11.2016 00 00 00 00 00
12.11.2016 00 00 00 00 00
13.11.2016 00 00 00 00 00
14.11.2016 00 00 00 00 00
15.11.2016 00 00 00 00 00
16.11.2016 00 00 00 00 00
17.11.2016 00 00 00 00 00
18.11.2016 00 00 00 00 00
19.11.2016 00 00 00 00 00
20.11.2016 00 00 00 00 00
21.11.2016 00 00 00 00 00
22.11.2016 00 00 00 00 00
23.11.2016 00 00 00 00 00
24.11.2016 00 00 00 00 00
25.11.2016 00 00 00 00 00
26.11.2016 00 00 00 00 00
27.11.2016 00 00 00 00 00
28.11.2016 00 00 00 00 00
29.11.2016 00 00 00 00 00
30.11.2016 00 00 00 00 00
Total 00 00 00 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 56
DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF NOVEMBER 2016.
NORTH PORTAL
DATE
INSITU CORES PANEL CASTED
Remarks
Pass Fail 1 days 7 days 28 days
01.11.2016 00 00 00 00 00
02.11.2016 00 00 00 00 00
03.11.2016 00 00 00 00 00
04.11.2016 00 00 00 00 00
05.11.2016 00 00 00 00 00
06.11.2016 00 00 00 00 00
07.11.2016 00 00 00 00 00
08.11.2016 00 00 00 00 00
09.11.2016 00 00 00 00 00
10.11.2016 00 00 00 00 00
11.11.2016 00 00 00 00 00
12.11.2016 00 00 00 00 00
13.11.2016 00 00 00 00 00
14.11.2016 00 00 00 00 00
15.11.2016 00 00 00 00 00
16.11.2016 00 00 00 00 00
17.11.2016 00 00 00 00 00
18.11.2016 00 00 00 00 00
19.11.2016 00 00 00 00 00
20.11.2016 00 00 00 00 00
21.11.2016 00 00 00 00 00
22.11.2016 00 00 00 00 00
23.11.2016 00 00 00 00 00
24.11.2016 00 00 00 00 00
25.11.2016 00 00 00 00 00
26.11.2016 00 00 00 00 00
27.11.2016 00 00 00 00 00
28.11.2016 00 00 00 00 00
29.11.2016 00 00 00 00 00
30.11.2016 00 00 00 00 00
Total 00 00 00 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 57
DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.
SOUTH PORTAL
DATE Contact Grout Cube Testing
Remarks
3 days 7 days 28 days
01.11.2016 00 00 05
02.11.2016 00 00 00
03.11.2016 00 00 10
04.11.2016 00 00 05
05.11.2016 00 00 05
06.11.2016 00 00 05
07.11.2016 00 00 05
08.11.2016 00 00 05
09.11.2016 00 00 05
10.11.2016 00 00 05
11.11.2016 00 00 05
12.11.2016 00 00 05
13.11.2016 00 00 05
14.11.2016 00 00 05
15.11.2016 00 00 00
16.11.2016 00 00 05
17.11.2016 00 00 05
18.11.2016 00 00 05
19.11.2016 00 00 05
20.11.2016 00 00 00
21.11.2016 00 00 00
22.11.2016 00 00 00
23.11.2016 00 00 00
24.11.2016 00 00 00
25.11.2016 00 00 00
26.11.2016 00 00 00
27.11.2016 00 00 00
28.11.2016 00 00 00
29.11.2016 00 00 00
30.11.2016 00 00 00
Total 00 00 90
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 58
DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.
NORTH PORTAL
DATE Grout Cube Testing
Remarks
3 days 7 days 28 days
01.11.2016 00 00 00
02.11.2016 00 00 00
03.11.2016 00 00 00
04.11.2016 00 00 00
05.11.2016 00 00 00
06.11.2016 00 00 00
07.11.2016 00 00 00
08.11.2016 00 00 00
09.11.2016 00 00 00
10.11.2016 00 00 00
11.11.2016 00 00 00
12.11.2016 00 00 00
13.11.2016 00 00 00
14.11.2016 00 00 00
15.11.2016 00 00 00
16.11.2016 00 00 00
17.11.2016 00 00 00
18.11.2016 00 00 00
19.11.2016 00 00 00
20.11.2016 00 00 00
21.11.2016 00 00 00
22.11.2016 00 00 00
23.11.2016 00 00 00
24.11.2016 00 00 00
25.11.2016 00 00 00
26.11.2016 00 00 00
27.11.2016 00 00 00
28.11.2016 00 00 00
29.11.2016 00 00 00
30.11.2016 00 00 00
Total 00 00 00
01.11.2016 00 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 59
DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.
SOUTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M10 M10 DLC M15 M20 M25 M30
Remark 7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.11.2016 00 00 00 00 03 03 03 00 00 00 03 00
02.11.2016 00 00 09 00 09 06 00 03 00 00 00 00
03.11.2016 00 06 03 00 06 09 00 03 00 00 00 03
04.11.2016 00 06 00 00 06 06 00 00 00 00 03 00
05.11.2016 00 03 00 00 00 06 00 00 00 00 00 00
06.11.2016 00 03 00 00 00 06 00 00 00 00 00 00
07.11.2016 00 00 00 00 00 09 00 00 00 00 00 00
08.11.2016 00 00 00 00 00 06 00 00 00 00 00 00
09.11.2016 00 00 09 00 00 12 00 00 00 00 00 00
10.11.2016 00 00 00 00 06 06 03 00 00 00 00 00
11.11.2016 03 09 00 00 06 06 03 00 00 00 00 09
12.11.2016 00 00 00 00 00 09 03 00 00 00 00 00
13.11.2016 00 06 00 00 06 00 06 00 00 00 00 00
14.11.2016 00 00 09 00 06 09 03 03 00 00 00 00
15.11.2016 00 00 00 00 03 00 03 12 00 00 03 00
16.11.2016 03 06 00 00 03 03 00 06 00 00 00 00
17.11.2016 00 00 00 00 06 15 03 03 00 00 00 06
18.11.2016 06 03 00 00 06 18 03 00 00 00 00 00
19.11.2016 00 00 00 00 09 12 03 00 00 00 00 00
20.11.2016 00 00 00 00 06 06 03 03 00 00 03 00
21.11.2016 00 00 00 00 06 15 00 03 00 00 03 00
22.11.2016 00 00 00 00 03 06 00 03 00 00 03 03
23.11.2016 00 00 00 00 00 18 00 00 00 00 00 00
24.11.2016 00 00 00 00 00 09 00 00 00 00 00 00
25.11.2016 00 00 00 00 00 09 00 00 00 00 00 03
26.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
27.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
28.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
29.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
30.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
Total 12 42 36 00 90 204 36 39 00 00 18 24
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 60
DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.
SOUTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M35 M40 M40
PQC
M40
PQC Flexural Strength
M45
Remarks
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.11.2016 00 36 00 00 27 12 27 12 00 00
02.11.2016 00 24 00 00 18 12 18 12 00 00
03.11.2016 00 33 00 00 21 15 21 15 00 00
04.11.2016 03 36 00 00 09 15 09 15 00 00
05.11.2016 03 21 00 00 06 03 06 03 00 00
06.11.2016 00 33 00 00 00 12 00 12 00 00
07.11.2016 00 30 00 00 12 09 12 09 00 00
08.11.2016 00 33 00 00 06 09 06 09 00 00
09.11.2016 03 27 00 00 09 12 09 12 00 00
10.11.2016 03 21 00 00 06 09 06 09 00 00
11.11.2016 00 18 00 00 06 15 06 15 00 00
12.11.2016 00 24 00 00 12 12 12 12 00 00
13.11.2016 00 24 00 00 09 18 09 18 00 00
14.11.2016 00 24 00 00 12 09 12 09 00 00
15.11.2016 00 27 00 00 12 12 12 12 00 00
16.11.2016 00 15 00 00 18 09 18 09 00 00
17.11.2016 03 12 00 00 18 09 18 09 00 00
18.11.2016 03 03 00 00 24 03 24 03 00 00
19.11.2016 00 03 00 00 15 06 15 06 00 00
20.11.2016 00 06 00 00 18 15 18 15 00 00
21.11.2016 00 03 00 00 15 09 15 09 00 00
22.11.2016 00 00 00 00 12 27 12 27 00 00
23.11.2016 03 00 00 00 15 18 15 18 00 00
24.11.2016 00 00 00 00 00 21 00 21 00 00
25.11.2016 06 03 00 00 12 09 12 09 00 00
26.11.2016 00 03 00 00 09 06 09 06 00 00
27.11.2016 00 00 00 00 09 00 09 00 00 00
28.11.2016 00 00 00 00 15 12 15 12 00 00
29.11.2016 00 00 00 00 21 06 21 06 00 00
30.11.2016 00 03 00 00 21 09 21 09 00 00
Total 27 462 00 00 387 333 387 333 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 61
DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.
NORTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M10 M10 DLC M15 M20 M25 M30
Remark 7 Day
s
28 Day
s
7 Day
S
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.11.2016 03 09 00 00 03 06 00 00 00 00 03 15
02.11.2016 03 09 00 00 00 18 00 00 00 00 00 06
03.11.2016 00 06 09 00 03 06 00 00 00 00 09 00
04.11.2016 00 00 00 00 00 06 00 00 00 00 00 12
05.11.2016 00 00 00 00 03 09 00 00 00 00 03 00
06.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
07.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
08.11.2016 03 00 00 00 00 00 00 00 00 00 00 00
09.11.2016 00 00 09 00 00 09 00 00 00 00 00 00
10.11.2016 00 03 09 00 00 06 00 00 00 00 00 15
11.11.2016 00 00 09 00 00 18 00 00 00 00 00 00
12.11.2016 00 00 00 00 03 06 00 00 00 00 03 06
13.11.2016 00 00 09 00 00 00 00 00 00 00 03 00
14.11.2016 00 06 09 00 00 00 00 00 00 00 00 06
15.11.2016 00 00 00 00 00 00 00 00 00 00 03 00
16.11.2016 00 00 00 00 06 00 00 00 00 00 00 00
17.11.2016 03 00 00 00 00 00 00 00 00 00 00 00
18.11.2016 03 00 00 00 00 00 00 00 00 00 00 09
19.11.2016 03 00 00 00 00 00 00 00 00 00 00 09
20.11.2016 03 00 00 00 06 00 00 00 00 00 00 00
21.11.2016 00 00 00 00 03 00 00 00 00 00 00 00
22.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
23.11.2016 00 00 00 00 00 00 00 00 00 00 00 00
24.11.2016 00 00 00 00 06 00 00 00 00 00 00 00
25.11.2016 00 00 09 00 00 00 00 00 00 00 00 00
26.11.2016 00 00 09 00 00 00 00 00 00 00 00 00
27.11.2016 00 00 09 00 03 00 00 00 00 00 00 00
28.11.2016 00 00 00 00 09 00 00 00 00 00 06 00
29.11.2016 00 00 09 00 06 00 00 00 00 00 00 00
30.11.2016 00 00 09 00 06 00 00 00 00 00 00 00
Total 21 33 99 00 57 84 00 00 00 00 30 78
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 62
DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.
DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.
00
NORTH PORTAL
DATE
Concrete Cube’s Compressive Strength
M35 M40 M40
PQC
M40
PQC Flexural Strength
M45
Remarks
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
7 Day
s
28 Day
s
01.11.2016 03 03 00 00 03 03 03 03 00 00
02.11.2016 03 06 00 00 00 03 00 03 00 00
03.11.2016 00 03 00 00 00 03 00 03 00 00
04.11.2016 00 03 00 00 00 03 00 03 00 00
05.11.2016 00 03 00 00 00 03 00 03 00 00
06.11.2016 00 03 00 00 00 03 00 03 00 00
07.11.2016 00 03 00 00 00 03 00 03 00 00
08.11.2016 00 00 00 00 00 00 00 00 00 00
09.11.2016 00 03 00 00 03 03 03 03 00 00
10.11.2016 00 06 00 00 03 03 03 03 00 00
11.11.2016 00 03 00 00 03 03 03 03 00 00
12.11.2016 00 03 00 00 03 03 03 03 00 00
13.11.2016 03 00 00 00 03 03 03 03 00 00
14.11.2016 00 03 00 00 03 03 03 03 00 00
15.11.2016 00 00 00 00 00 00 00 00 00 00
16.11.2016 00 00 00 00 00 00 00 00 00 00
17.11.2016 00 00 00 00 00 00 00 00 00 00
18.11.2016 03 00 00 00 00 00 00 00 00 00
19.11.2016 00 00 00 00 03 03 03 03 00 00
20.11.2016 00 06 00 00 03 03 03 03 00 00
21.11.2016 00 03 00 00 03 03 03 03 00 00
22.11.2016 00 03 00 00 03 03 03 03 00 00
23.11.2016 00 03 00 00 03 00 03 00 00 00
24.11.2016 00 00 00 00 03 00 03 00 00 00
25.11.2016 00 00 00 00 03 00 03 00 00 00
26.11.2016 00 00 00 00 03 00 03 00 00 00
27.11.2016 00 00 00 00 03 00 03 00 00 00
28.11.2016 00 00 00 00 03 00 03 00 00 00
29.11.2016 00 00 00 00 06 00 06 00 00 00
30.11.2016 00 00 00 00 03 03 03 03 00 00
Total 12 57 00 00 57 54 57 54 00 00
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 63
12.3 DETAILS OF AGGREGATES TESTING
FOR THE MONTH OF SEPTEMBER
DETAILS OF TESTING IN THE MONTH OF SEPTEMBER 2016.
SOUTH PORTAL
MOISTURE CONTENT % GRADATION
DATE 10 & 20
mm Crusher
Dust Sand
10 mm
Crusher Dust
20 mm
Sand Combine
d F.I AIV
01.09.2016 04 01 02 01 01 01 01 01 00 00
02.09.2016 04 01 02 01 01 01 01 01 00 00
03.09.2016 04 01 02 01 01 01 01 01 00 00
04.09.2016 04 01 02 01 01 01 01 01 00 00
05.09.2016 04 01 02 01 01 01 01 01 00 00
06.09.2016 04 01 02 01 01 01 01 01 00 00
07.09.2016 04 01 02 01 01 01 01 01 00 00
08.09.2016 04 01 02 01 01 01 01 02 02 01
09.09.2016 04 01 02 01 01 01 01 01 00 00
10.09.2016 04 01 02 01 01 01 01 01 00 00
11.09.2016 04 01 02 01 01 01 01 01 00 00
12.09.2016 04 01 02 01 01 01 01 01 00 00
13.09.2016 04 01 02 01 01 01 01 01 00 00
14.09.2016 04 01 02 01 01 01 01 01 00 00
15.09.2016 04 01 02 01 01 01 01 01 00 00
16.09.2016 04 01 02 01 01 01 01 02 02 01
17.09.2016 00 00 00 00 00 00 00 00 00 00
18.09.2016 04 01 02 01 01 01 01 01 00 00
19.09.2016 04 01 02 01 01 01 01 01 00 00
20.09.2016 04 01 02 01 01 01 01 01 00 00
21.09.2016 04 01 02 01 01 01 01 01 00 00
22.09.2016 04 01 02 01 01 01 01 02 02 01
23.09.2016 04 01 02 01 01 01 01 01 00 00
24.09.2016 04 01 02 01 01 01 01 01 00 00
25.09.2016 04 01 02 01 01 01 01 01 00 00
26.09.2016 04 01 02 01 01 01 01 01 00 00
27.09.2016 04 01 02 01 01 01 01 01 00 00
28.09.2016 04 01 02 01 01 01 01 01 00 00
29.09.2016 04 01 02 01 01 01 01 01 00 00
30.09.2016 04 01 02 01 01 01 01 01 02 01
Total 116 29 58 29 29 29 29 32 08 04
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 64
DETAILS OF TESTING IN THE MONTH OF SEPTEMBER 2016.
NORTH PORTAL
MOISTURE CONTENT % GRADATION
DATE 10 & 20
mm Crusher
Dust Sand
10 mm
Crusher Dust
20 mm
Sand Combined F.I AIV
01.09.2016 04 01 02 00 00 00 00 01 00 00
02.09.2016 04 01 02 01 01 00 01 01 01 01
03.09.2016 04 01 02 01 01 01 01 03 01 01
04.09.2016 04 01 02 00 00 00 00 02 00 00
05.09.2016 04 01 02 00 00 00 00 02 00 00
06.09.2016 04 01 02 00 00 00 00 00 00 00
07.09.2016 04 01 02 01 01 01 01 02 01 01
08.09.2016 04 01 02 00 00 00 00 02 00 00
09.09.2016 04 01 02 01 01 00 01 02 01 01
10.09.2016 04 01 02 00 00 00 00 01 00 00
11.09.2016 04 01 02 00 00 00 00 02 00 00
12.09.2016 04 01 02 01 01 01 01 02 01 01
13.09.2016 04 01 02 00 00 00 00 00 00 00
14.09.2016 04 01 02 00 00 00 00 01 00 00
15.09.2016 04 01 02 00 00 00 00 01 00 00
16.09.2016 04 01 02 01 01 01 01 02 01 01
17.09.2016 00 00 00 00 00 00 00 00 00 00
18.09.2016 04 01 02 00 00 00 00 02 00 00
19.09.2016 04 01 02 00 00 00 00 02 00 00
20.09.2016 04 01 02 01 01 01 01 02 01 01
21.09.2016 04 01 02 00 00 00 00 02 00 00
22.09.2016 04 01 02 00 00 00 00 00 00 00
23.09.2016 04 01 02 00 00 00 00 01 00 00
24.09.2016 04 01 02 01 01 01 01 02 01 01
25.09.2016 04 01 02 00 00 00 00 02 00 00
26.09.2016 04 01 02 00 00 00 00 02 00 00
27.09.2016 04 01 02 00 00 00 00 00 00 00
28.09.2016 04 01 02 00 00 00 00 02 00 00
29.09.2016 04 01 02 01 01 01 01 02 01 01
30.09.2016 04 01 02 00 00 00 00 02 00 00
Total 116 29 58 09 09 07 09 45 09 09
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 65
FOR THE MONTH OF OCTOBER 2016
DETAILS OF TESTING IN THE MONTH OF OCTOBER 2016.
SOUTH PORTAL
MOISTURE CONTENT % GRADATION
DATE 10 & 20
mm Crusher
Dust Sand
10 mm
Crusher Dust
20 mm
Sand Combine
d F.I AIV
01.10.2016 04 02 02 01 01 01 01 01 00 00
02.10.2016 00 00 00 00 00 00 00 00 00 00
03.10.2016 04 02 02 01 01 01 01 01 00 00
04.10.2016 04 02 02 01 01 01 01 01 00 00
05.10.2016 04 02 02 01 01 01 01 01 00 00
06.10.2016 04 02 02 01 01 01 01 01 00 00
07.10.2016 04 02 02 01 01 01 01 01 00 00
08.10.2016 04 02 02 01 01 01 01 01 00 00
09.10.2016 04 02 02 01 01 01 01 01 02 01
10.10.2016 04 02 02 01 01 01 01 01 00 00
11.10.2016 04 02 02 01 01 01 01 01 00 00
12.10.2016 04 02 02 01 01 01 01 01 00 00
13.10.2016 04 02 02 01 01 01 01 01 00 00
14.10.2016 04 02 02 01 01 01 01 01 00 00
15.10.2016 04 02 02 01 01 01 01 01 00 00
16.10.2016 04 02 02 01 01 01 01 01 00 00
17.10.2016 04 02 02 01 01 01 01 01 02 01
18.10.2016 04 02 02 01 01 01 01 01 00 00
19.10.2016 04 02 02 01 01 01 01 01 00 00
20.10.2016 04 02 02 01 00 01 01 01 00 00
21.10.2016 04 02 02 01 00 01 01 01 00 00
22.10.2016 04 02 02 01 00 01 01 01 02 01
23.10.2016 04 02 02 01 00 01 01 01 00 00
24.10.2016 04 02 02 01 00 01 01 01 00 00
25.10.2016 04 02 02 01 00 01 01 01 00 00
26.10.2016 04 02 02 01 00 01 01 01 00 00
27.10.2016 04 02 02 01 00 01 01 01 00 00
28.10.2016 04 02 02 01 00 01 01 01 00 00
29.10.2016 04 02 02 01 00 01 01 01 00 00
30.10.2016 00 00 00 00 00 00 00 00 00 00
31.10.2016 04 02 02 01 00 01 01 01 02 01
Total 116 58 58 29 18 29 29 29 08 04
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 66
DETAILS OF TESTING IN THE MONTH OF OCTOBER 2016.
NORTH PORTAL
MOISTURE CONTENT % GRADATION
DATE 10 & 20
mm Crusher
Dust Sand
10 mm
Crusher Dust
20 mm
Sand Combined F.I AIV
01.10.2016 04 02 02 00 00 00 00 02 00 00
02.10.2016 00 00 00 00 00 00 00 00 00 00
03.10.2016 04 02 02 01 01 01 01 03 01 01
04.10.2016 04 02 02 00 00 00 00 02 00 00
05.10.2016 04 02 02 00 00 00 00 01 00 00
06.10.2016 04 02 02 00 00 00 00 00 00 00
07.10.2016 04 02 02 00 00 00 00 01 00 00
08.10.2016 04 02 02 00 00 00 00 01 00 00
09.10.2016 04 02 02 01 01 01 01 02 01 01
10.10.2016 04 02 02 00 00 00 00 01 00 00
11.10.2016 04 02 02 00 00 00 00 00 00 00
12.10.2016 04 02 02 00 00 00 00 01 00 00
13.10.2016 04 02 02 00 00 00 00 01 00 00
14.10.2016 04 02 02 00 00 00 00 01 00 00
15.10.2016 04 02 02 01 01 01 01 02 01 01
16.10.2016 04 02 02 00 00 00 00 01 00 00
17.10.2016 04 02 02 00 00 00 00 01 00 00
18.10.2016 04 02 02 00 00 00 00 00 00 00
19.10.2016 04 02 02 00 00 00 00 00 00 00
20.10.2016 04 02 02 01 01 01 01 00 00 00
21.10.2016 04 02 02 00 00 00 00 01 00 00
22.10.2016 04 02 02 00 00 00 00 00 00 00
23.10.2016 04 02 02 00 00 00 00 01 00 00
24.10.2016 04 02 02 00 00 00 00 02 00 00
25.10.2016 04 02 02 01 01 01 01 02 01 01
26.10.2016 04 02 02 00 00 00 00 00 00 00
27.10.2016 04 02 02 00 00 00 00 01 00 00
28.10.2016 04 02 02 00 00 00 00 00 00 00
29.10.2016 04 02 02 01 01 01 01 01 01 01
30.10.2016 00 00 00 00 00 00 00 00 00 00
31.10.2016 04 02 02 00 00 00 00 00 00 00
Total 116 58 58 06 06 06 06 28 05 05
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 67
FOR THE MONTH OF NOVEMBER 2016
DETAILS OF TESTING IN THE MONTH OF NOVEMBER 2016.
SOUTH PORTAL
MOISTURE CONTENT % GRADATION
DATE 10 & 20
mm Crusher
Dust Sand
10 mm
Crusher Dust
20 mm
Sand Combine
d F.I AIV
01.11.2016 02 00 01 01 00 01 01 01 00 00
02.11.2016 02 00 01 01 00 01 01 01 00 00
03.11.2016 02 00 01 01 00 01 01 01 00 00
04.11.2016 02 00 01 01 00 01 01 01 00 00
05.11.2016 02 00 01 01 00 01 01 01 00 00
06.11.2016 02 00 01 01 00 01 01 01 00 00
07.11.2016 02 00 01 01 00 01 01 01 02 01
08.11.2016 02 00 01 01 00 01 01 01 00 00
09.11.2016 02 00 01 01 00 01 01 01 00 00
10.11.2016 02 00 01 01 00 01 01 01 00 00
11.11.2016 02 00 01 01 00 01 01 01 00 00
12.11.2016 02 00 01 01 00 01 01 01 00 00
13.11.2016 02 00 01 01 00 01 01 01 00 00
14.11.2016 02 00 01 01 00 01 01 01 02 01
15.11.2016 02 00 01 01 00 01 01 01 00 00
16.11.2016 02 00 01 01 00 01 01 01 00 00
17.11.2016 02 00 01 01 00 01 01 01 00 00
18.11.2016 02 00 01 01 00 01 01 01 00 00
19.11.2016 02 00 01 01 00 01 01 01 00 00
20.11.2016 02 00 01 01 00 01 01 01 00 00
21.11.2016 02 00 01 01 00 01 01 01 02 01
22.11.2016 02 00 01 01 00 01 01 01 00 00
23.11.2016 02 00 01 01 00 01 01 01 00 00
24.11.2016 02 00 01 01 00 01 01 01 00 00
25.11.2016 02 00 01 01 00 01 01 01 00 00
26.11.2016 02 00 01 01 00 01 01 01 00 00
27.11.2016 02 00 01 01 00 01 01 01 00 00
28.11.2016 02 00 01 01 00 01 01 01 00 00
29.11.2016 02 00 01 01 00 01 01 01 00 00
30.11.2016 02 00 01 01 00 01 01 01 02 01
Total 60 00 30 30 00 30 30 30 08 04
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 68
DETAILS OF TESTING IN THE MONTH OF NOVEMBER 2016.
NORTH PORTAL
MOISTURE CONTENT % GRADATION
DATE 10 & 20
mm Crusher
Dust Sand
10 mm
Crusher Dust
20 mm
Sand Combined F.I AIV
01.11.2016 02 01 01 00 00 00 00 00 00 00
02.11.2016 02 01 01 00 00 00 00 02 00 00
03.11.2016 02 01 01 00 00 00 00 02 00 00
04.11.2016 02 01 01 00 00 00 00 02 00 00
05.11.2016 02 01 01 01 01 01 01 02 01 01
06.11.2016 02 01 01 00 00 00 00 06 00 00
07.11.2016 02 01 01 00 00 00 00 02 00 00
08.11.2016 02 01 01 00 00 00 00 00 00 00
09.11.2016 02 01 01 00 01 01 01 00 01 01
10.11.2016 02 01 01 00 00 00 00 00 00 00
11.11.2016 02 01 01 01 00 00 00 01 00 00
12.11.2016 02 01 01 00 00 00 00 01 00 00
13.11.2016 02 01 01 00 00 00 00 01 00 00
14.11.2016 02 01 01 00 00 00 00 01 00 00
15.11.2016 02 01 01 00 01 01 01 01 01 01
16.11.2016 02 01 01 00 00 00 00 01 00 00
17.11.2016 02 01 01 01 00 00 00 02 00 00
18.11.2016 02 01 01 00 00 00 00 01 00 00
19.11.2016 02 01 01 00 00 00 00 02 00 00
20.11.2016 02 01 01 00 01 01 01 02 01 01
21.11.2016 02 01 01 01 00 00 00 02 00 00
22.11.2016 02 01 01 00 00 00 00 01 00 00
23.11.2016 02 01 01 00 00 00 00 02 00 00
24.11.2016 02 01 01 00 00 00 00 02 00 00
25.11.2016 02 01 01 00 01 01 01 01 01 01
26.11.2016 02 01 01 00 00 00 00 01 00 00
27.11.2016 02 01 01 01 00 00 00 02 00 00
28.11.2016 02 01 01 00 00 00 00 01 00 00
29.11.2016 02 01 01 00 01 01 01 02 01 01
30.11.2016 02 01 01 00 00 00 00 02 00 00
Total 60 30 30 05 05 05 05 41 05 05
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 69
13. SAFETY REPORT
S.no. Particulars Up to last Month Current Month Cumulative
1 Total Man-hours Worked 15,291,992 2,97,623 15,589,615
2 Average No of Employees 1,88,455 6,250 1,94,705
3 Incidents 17 0 17
4 Environment Incidents 0 0 0
5 Training (Man Hours) 4,77,841 87 4,77,928
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 70
14 MINUTES OF MONTHLY PROGRESS MEETING
No Meeting during Quarter (September 2016- November 2016)
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 71
15 PHOTOGRAPHIC REPORT
02-09-2016_Dismantling Lining gantry at Escape Tunnel RD 5+000 approx.
07-09-2016_Electrical boards and MCC Ventilation Panels at Ventilation Building
North, ground floor
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 72
10-09-2016_Partition wall additional anchors for ventilation slab support,at
approx. RD 5+000
16-09-2016_Approach slab-expansion joint and wearing coat recently executed at
South Portal Bridge B1
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 73
04-10-2016_NAR excavation works ch. 10+600 to 10+720
04-10-2016_Drainage works in junction CP-16
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 74
04-10-2016_North Dump site profile view
04-10-2016_Main body of Wirtgen paver at Main Tunnel near CP-20 (North side) during
mechanical fitting
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 75
20-10-2016_Front view of macro-landslide North Toll Plaza at Hill side Protection Works
27-10-2016_View of SAR stretch chainage 0+140 to 0+300 with Gomaco paver
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 76
3-11-2016_Foundation pillar for EDCS Gantry at South Toll Plaza
3-11-2016_Foundation work for Static Weight Bridge at S Toll Plaza, besides PQC
passes
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 77
3-11-2016_North Approach road hill slopes with macro landslide
3-11-2016_North Approach_road hill slopes with macro landslide
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 78
3-11-2016_PQC panel executed in Main Tunnel Lay bay by screed
9-11-2016_Cutting joint at PQC North side, near RD 6+200 right side
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 79
9-11-2016_North Dumping yard panoramic, nose shaped with gabion walls and toe step
concrete walls
11-11-2016_South Switchyard installations commissioned during this month
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 80
11-11-2016_South Toll Plaza Installations and civil works
15-11-2016_VFD Panel at Main Control room of Ventilation Building South
Quarterly Progress Report September 2016 to November 2016
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 81
24-11-2016_Installation of Weigh in motion sensors in TP lanes
24-11-2016_North Portal entrance (incl. Ventilation Building) PQC at Main Tunnel
Quarterly Progress Report September 2016 to November 2016