1
LIST OF PROJECTS IN INFRASTRUCTURE AND CONSTRUCTION
Conceptual/Planning Stage
N Organization Project Title / Details Location Budget Euro*
Contacts Sector
1 A2Z
Maintenance &
Engineering
Services
Gurgaon based engineering, procurement and construction (EPC)
company plans to set up a 500-MW biomass power plant from
municipal solid-waste, within two years. Funding planned through
IPO and internal accruals.
NA 521.12 Mamta Joshi, CEO (Admin), 5th & 6th
Floor, Enkay Square 448–A, Udyog
Vihar, Phase – V, Gurgaon – 122016,
Haryana. T: 0124 - 4517600, 4776100,
F: 4380014, (Amit Mittal, CMD)
Biomass
Energy
2 Jaiprakash
Associates Ltd
The company plans to expand its clinker and cement
manufacturing capacity of existing unit Baga in Himachal
Pradesh. The current capacity is 4 MTPA and would be further
expanded by 2.5 MTPA by 2012.
Baga
Himachal
Pradesh
217.13 Rahul Kumar, Chief Financial Offi cer,
Jaypee Vasant Continental, Vasant
Vihar, New Delhi - 110057. T: 011-
26140101 / 54099, F: 26151177,
Cement
3 Orient Paper &
Industries Ltd
The company is into paper, cement and electrical goods
manufacturing. This company is contemplating plans to scale up
its cement production capacity from 5 MTPA to 15 MTPA in the
next few years. This expansion will be carried out mainly by
setting up greenfield projects. These projects are likely to be
announced in the next six months.
NA NA 9/1, R. N. Mukherjee Road, Kolkata,
West Bengal - 700001. T: 033- 2248
0135/22131680, F: 22430490,
Cement
4 Kalinga
Calciners Ltd
The company is interested in setting up a Calcined Petroleum
Coke plant at Kalinganagar.
Kalingana-
gar Orissa
NA G M Goenka, Head of Dept,
Udayabata. Post Paradeepgarh, District
Jagatsingpur, Paradip, Orissa - 754
Coke
3
5 The Orissa
Renewable
Energy
Development
Agency
(OREDA)
Plans to setup a renewable energy park at Nawarangpur spread
over 2-3 acre of land. The detailed project report is being
prepared. The completion will take one year from the work
commencement date.
Nawrang-
pur Orissa
0.17 AK Chaudhary, Deputy Director, S-
3/59, Mancheswar Industrial Estate,
Bhubaneswar-751010, T: 0674-580660,
M: 09861310407
Energy
Park
6 Ishan
Developers &
Infrastructure
Ltd/Best
Western India
These companies have signed an agreement to set up Premier
Hotel Mohali near Chandigarh. The hotel will be built in 2 phases
consisting of 239 rooms and suites. The first phase will be
completed by March 2012.
Mohali
Chandigarh
(U.T.)
34.74 BB Geol, CFO, Ishan Group of
Companies, S.C.O. 24-25, Sector 33-D
Chandigarh. T: 0172-5026664-69, F:
2623025, [email protected] (R K
Sharma, MD)
Hospitality
7 The company is setting up an inland container depot (ICD) at
Kalinganagar. The Ministry of Commerce has recently accorded
approval to this project. This logistic park will cater to the
requirements of the steel units coming up in the area.
Kalingana-
gar Orissa
NA Logistics
Park
8
Apeejay
Infralogistics Pvt
Ltd The company is setting up Haldia inte-grated logistics park
spread over 90 acre. This project will be executed in phases. The
project Phase-I will come up by year end comprising ICD,
warehousing facilities, trade facilitation centre and other facilities.
Haldia West
Bengal
34.74
Renu Kakkar, Corp Comm, Apeejay
House, 15 Park Street, Kolkata 700016.
T: 033- 44035455-58, F: 22172075, M:
9980946435, rkakkar@apee-
jaygroup.com, (Sourav Daspatnaik,
Director) [email protected],
(Sourav Daspatnaik, Director)
Logistics
Park
9 Gopalpur Ports
Ltd (GPL)
This company is a special purpose vehicle formed for developing
the minor port at Gopalpur into an all-weather port. GPL has
plans to construct eight stone embankments off the Ganjam
coast. Clearance from the MoEF are not yet received.
Ganjam
Orissa
4.69 M M Moharana, Director - Operations,
Arjeepalli, VIA Chhatrapur, Ganjam,
Orissa -761020. T: 06811-257699,
257799, F: 263383,
www.gopalpurports. com
Port
4
10 Gopalpur Ports
Ltd (GPL)
The port authorities plans to implement the second stage of
Phase-I project comprising construction of deep-water direct
berthing facility. The financial closure is achieved in this regard.
The port authorities had signed a loan agree-ment with a
consortium of 11 banks for a total amount of Rs 848.78 cr.
Ganjam
Orissa
156.33 M M Moharana, Director - Operations,
Arjeepalli, VIA Chhatrapur, Ganjam,
Orissa -761020. T: 06811-257699,
257799, F: 263383,
www.gopalpurports.com
Port
11 Dumraon
Textiles Ltd
Plans to set up a 2 MW husk based captive power plant. The
environment clearance is pending. The work is expected to start
in a couple of months.
Buxar Bihar NA Pawan Patwari, Director, 26A, Camac
Street, Park Street, Kolkata, West
Bengal-700016, T: 033-22873025,
M: 09831079279
Power
12 Ministry of
Power, Govt of
India
Requests for Qualification (RFQs) for the Surguja Ultra Mega
Power Project (UMPP) is current invited. This UMPP project will
have a capacity of 4,000 MW.
Chhattisgarh NA N D Tyagi, CEO, Power Finance Corpo-
ration (PFC), Urjanidhi, 1, Barakhamba
Lane, Connaught Place, New Delhi -
110001. T: 011-23456504, 23456000,
www.pfcindia.com
Power
13 The corporation has recently invited expression of interest for a
JV partner to setup 3200 MW coal based power plant at Dhopave
in Konkan. The JV model with 26% stake to Mahagenco would
ensure that the state gets 100% power generated at these plants
as Mahagenco will be able to leverage supply of coal and land.
Dhopave
Maharashtra
NA
14 Mahagenco
The corporation has recently invited expression of interest for a
JV partner to setup 1600 MW coal based power plant at Dhondai
in Dhule District. The JV model (26% stake to Mahagenco) would
ensure the State gets 100% power generated at these plants as
Mahagenco will be able to leverage supply of coal and land.
Dhule
District
Maharashtra
NA
AT Dawlekar, Executive Director -
Projects, Prakashgad, Plot No. G-9,
Bandra (East), Mumbai - 400051. T:
022-26478121, 26474211, F: 26476749
Power
5
15 Tata Power Ltd The company plans to start construction of 1,600-MW power
project in Raigad district by September 2010. This project will be
based on imported coal.
Raigad
District
Maharashtra
NA Shalini Singh-CCM, Corporate Center,
Block A, 34 Sant Tukaram Road,
Carnac Bunder, Mumbai - 400009. T:
022-66658748 / 7511, F: 66658626,
[email protected] (Prasad
Menon, MD)
Power
16 Sonebhadra
Power
Generation
Company Ltd
Plans to set up for 3x660 MW Dopaha Thermal Power project in
Sonebhadra District. So far, discussions are on with the State
Government with regard to signing of the MOU. After approval is
received the detailed project report will be prepared.
Lucknow
Uttar
Pradesh
NA VK Verma, Chief Engineer (Project),
3rd Floor, Shakti Bhawan Extension,
14-Ashok Marg, Lucknow, Uttar
Pradesh. T: 522- 2287867. F: 2288484,
Power
17 Prajay
Engineers
Syndicate Ltd
This company plans development of residential town ship of
approximate 45,00,000 square feet in Hyderabad. In this regard,
the company has received foreign investment.
Hyderabad
Andhra
Pradesh
NA Sujata Rao, Project Manager, 8-2-
293/82/APlot # 1091,Road#41, Near
Peddamma Temple Jubilee Hills,
Hyderabad -500033. T: 040 -
66222999, F: 66222966,
Real
Estate
18 The company is planning to build a residential project at
Ambattur. The total area floor space of the project would be
around 6-7 lakh sft.
Ambattur
Tamil Nadu
36.48 Real
Estate
19
Vijay Shanthi
Builders Ltd
(VSBL) The company is planning a premium residential project at
Thiruvanmiyur.
Thiruvan-
miyur Tamil
Nadu
8.68
Jayanti, Sales Manager, Vijay Complex,
No 3, Blackers Road, Mount Road,
Chennai - 600002. T: 044-28582336,
M: 09790716666,
(Suresh Jain, MD)
Real
Estate
20 Rail Land
Development
Authority (RLDA)
RLDA is responsible for the commercial development of vacant
Railway land for revenue generation. The authority is likely to
invited private participation for exploiting about 33,000 sq mtr of
Kolkata
West Bengal
NA Anil Kumar Gupta, Project Manager,
IRCON Office Compound, Next to
Safdarjung Railway Station, Moti Bagh
Real
Estate
6
unused space in possession with the Kolkata Metro Railway. The
authority intends to develop air-space and railway land at six
Metro Railway stations — Central, Chandni Chowk, Mahanayak
Uttam Kumar, New Garia and Masterda Surya Sen — through a
long-term revenue sharing model.
I, New Delhi - 110021. T: 011-
24122834/5, F: 24104793
7
21 Andhra Pradesh
State Rural
Roads De-
velopment
Agency
(APSRRDA)
This agency is implementing Phase VI for construction of rural
roads in Andhra Pradesh under Pradhan Mantri Gram Sadak
Yojana (PMGSY). The Ministry of Rural Development has
released grant in aid of Rs 33 cr in this regard. The sum is from
the special window created in NABARD.
Andhra
Pradesh
5.73 R. Venkateswara Rao, Cheif Engineer,
SRTGN Bhavan, Erramanzil Colony,
O/O ENC PR Hyderabad. T: 040-
23321306
Roads/
Highways
22 Gujarat State
Rural Roads
Development
Agency
(GSRRDA)
This agency is implementing Phase- VIII, for construction of rural
roads in Gujarat under Pradhan Mantri Gram Sadak Yojana
(PMGSY).The Ministry of Rural Development has released grant
in aid of Rs 29 cr in this regard. The sum is from the special
window created in NABARD.
Gujarat 5.04 H D Vala, CEO, R&B Department,
Block No.-14/3, New Sachivalaya,
Gandhinagar. T: 02712-23220280,
23251816.
Roads/
Highways
23 Ministry of Road
Transport and
Highways, Govt
of India
The five national highways approved by the ministry are
Hamirpur-Sujanpur-Palampur 60-km highway, Brahmpukhar-
Bilaspur-Sarkaghat 12- km stretch, Bharmaur-Pathankot 133-km,
106-km Taradevi-Nalagarh road and Chandigarh-Baddi-
Shalaghat of 84-km length.
Himachal
Pradesh
NA S K Marva, Chief Engineer - North East
Projects, (P 10), Transport Bhavan,
Room No. 345, 3rd Floor No. 1,
Parliament Street, New Delhi - 110001.
T: 011-23719070. F: 23730647.
Roads/
Highways
24 Jammu &
Kashmir State
Rural Roads
Development
Agency
(JKSRRDA)
This agency is implementing Phase VII for construction of rural
roads in Jammu & Kashmir under Pradhan Mantri Gram Sadak
Yojana (PMGSY). The Ministry of Rural Development has
released grant in aid of Rs 20 cr in this regard. The sum is from
the special window created in NABARD.
Jammu &
Kashmir
3.47 Khalid Muzaffer, Cheif Engineer,
Engineering Complex Rajbagh Bund
Srinagar. T: 0191-2312435
Roads/
Highways
25 Karnataka Rural
Roads
Development
Agency
This agency is implementing Phase VIII for construction of rural
roads in Karnataka under Pradhan Mantri Gram Sadak Yojana
(PMGSY). The Ministry of Rural Development has released grant
in aid of Rs 131.11 cr in this regard. The sum is from the special
Karnataka 22.77 P S Prakash Kumar, Chief Engineer,
2nd Flr, Kscc Bldg,Nirman Bhavan, Dr
Rajkumar Rd, Rajajinagar, Bangalore -
560010. T: 080-23376145, 23376096,
Roads/
Highways
8
(KRRDA) window created in NABARD. 23376124, 23376112, F: 23376122
9
26 Maharashtra
Rural Roads
Development
Association
(MRRDA)
This agency is implementing Phase VII, for construction of rural
roads in Maharashtra under Pradhan Mantri Gram Sadak Yojana
(PMGSY).The Ministry of Rural Development has released grant
in aid of Rs 134.18 cr in this regard. The sum is from the special
window created in NABARD.
Maharashtra 23.31 Sudhir Thakare, CEO, 1st Floor, Main
Bldg, RD & Water Conservation Dept.,
Mantralaya, Mumbai-400032. T: 022-
22025201
Roads/
Highways
27 Geodesic
Techniques Pvt
Ltd
The company has proposed a 59-km monorail system for
Bangalore.The project is under evaluation by the Bangalore
Metropolitan Land and Transport Authority. The final clearance of
the Karnataka Govt is awaited and thereafter bids will be invited
for this project.
Bangalore
Karnataka
NA K S Kartik, Business Development
Officer, # 31, HM Elegance Museum
Road, Bangalore-560001. T: 080-
42971200/18, F: 42971219,
Transport
28 The State Government plans to implement a drinking water
scheme with a capacity to supply 270 million litres per day in
Vellore district.
Vellore
District
Tamil Nadu
312.67 Leelavati, Executive Engineer, Northern
Region, No.8, 1st East Main Road,
Gandhi Nagar, Vellore-632006. T:
0416-2243201, 2243743, F: 2242294,
Water
Sector
29 The State Government plans to take up drinking water projects in
Virudunagar, Pudukottai, Kovilpatti, Kayalpatti, Tiruvanamallai,
Pudukottai and Chennai.
Tamil Nadu 173.71
30
Government of
Tamil Nadu
The State Government also plans to take water connectivity
projects with the sup-port of Union Government for 7,000 rural
households.
Tamil Nadu 66.11
Raghunathan, Chief Engineer, 31,
Kamaraj Salai, Chepauk, Chennai - 5.
T: 044 28416420, 28412341, F:
2247368
Water
Sector
*figures are approximate (in million)
CONTRACT AWARDED
N Organization Project Title / Details Location Budget Contacts Sector
10
Euro*
11
31 Consolidated
Construction
Consortium Ltd
(CCCL)
This company has bagged Goa airport
construction project from Airport Authority of
India. The contract comprises building a 5 lakh
sq.ft terminal, with a capacity to handle over 8
lakh passengers annually, and a 1.6 lakh sq.ft
multi-level car park for the airport.
Goa 34.74 1) K. Nellaiappan, Manager -Business
Development, No 5, Second Link Street, CIT
Colony, Mylapore, Cennai-600004, Tamil Nadu.
T: 044-23454500, 24661083, F: 24990225 2)
PV Subbayam, Sr. DGM, No 5, Second Link
Street, CIT Colony, Mylapore, Chennai-600004,
Tamil Nadu. T: 044-23469300, 23454500,
24661083, F: 24990225
Airport
32 Larsen & Toubro
Ltd
The Metallurgical, Material Handling & Water
Operating Company of Larsen &Toubro has
bagged contract from Hindal-co Industries for
an aluminium rolling mill complex at its Hirakud
unit. The order is scheduled for completion in
16 months.
Hirakud
Orissa
36.65 K. Venkataramanan, President (Engineering
and Construction), Saki-Vihar Road, P.O. Box
8901, Powai, Mumbai-400072, T: 022-
67050505, F: 67051462, [email protected]
Aluminium
33 Sadbhav
Engineering Ltd
The company has been awarded the project/
works consisting of Two Jobs by Western Coal
Fields Ltd. (A subsidiary of Coal India Ltd.)
NA 15.99 Parul Shah, Sr. Business Develop-ment Officer
Sadbhav House Opp Law Garden Police
Chowki, Ellisbridge, Ahmedabad-
380006.Gujarat. T: 079-26463384, F:
26400210. parul.shah@ sadbhaveng. com,
(Vishnubhai M Patel, MD)
Coal
34 ARSS
Infrastructure
Projects Ltd
The company has received an order from
RITES Ltd, Nagpur for undertaking earthwork
and constructing bridges, supply of permanent
way material, supply of ballast and permanent
way linking for proposed private railway siding
for NTPC Mauda, Nagpur
Nagpur
Maharashtra
19.88 Gyanaranjan Bihari, Tender Manager, Plot No
38, Sector-A, Zone-D, Mancheswar Industrial
Estate, Bhubaneswar-751010. Orissa. T: 0674-
2588552 2588554, F: 2585074, M:
09437578023, gyanabihari@gmail. com
(Subhash Agarwal, Chairman)
Construction
12
35 Punj Lloyd Ltd This company has bagged contract from the
Rajiv Gandhi Institute of Petroleum Technology
(RGIPT) to construct their technical institute at
Jais in Rae Bareli, Uttar Pradesh. The scope of
work entails civil, structural and associated
work including site development for setting up
of RGIPT. This would involve construction of 27
building consisting of the adminis-tration and
library building, auditorium, community centre,
lecture halls, commer-cial centre, staff housing
facility, hostels and healthcare centre. The
order will be executed over a period of 24
months.
Rae Bareli
Uttar
Pradesh
NA Bhavna Dayal, Head PR, P.K. Gupta, Director,
78 Institutional Area, Sector 32, Gurgaon,
Haryana - 122001. T: 0124- 2620123, 2620152,
F: 2620111.
Construction
36 ARSS
Infrastructure
Projects Ltd
The company has received a new work order
from Northeast Frontier Railway,
Maligaon/Guwahati on June 04, 2010.
Guwahati
Assam
7.21 Gyanaranjan Bihari, Tender Manager, Plot No
38, Sector - A, Zone - D, Mancheswar Industrial
Estate, Bhubaneswar-751010. Orissa. T: 0674-
2588552 2588554, F: 2585074, M:
09437578023, [email protected]
(Subhash Agarwal, Chairman)
Railways
37 PBA Infrastructure
Ltd
The company has got contract from
Maharashtra Industrial Development
Corporation for the construction of WMM road
with asphalt treatment including central road
divider and allied work in IT Park-II (Phase-I).
The location is Nagpur (Butibori) Industrial
Area.
Nagpur
Maharashtra
2.49 Sunil Wadhawan, Project Manager, 611/3,
V.N.Purav Marg, Chembur, Mumbai - 400071.
T: 022-67978200, 67973767, F: 25229699,
[email protected], www.pbail.com
Roads/
Highways
13
38 Maytas Infra Ltd
Bagged a contract from ITNL ENSO Rail
Systems Ltd (IERS) for design and construction
of elevated viaduct (single/ double line) and six
stations for Rapid Metro Rail Gurgaon Ltd for a
total value of Rs 185.32 crore.
Gurgaon
Haryana
32.19 Tarun Udwala, Dy. Manager - Corporate
Communications, 285 6-3-1186 / 5 / A, 3rd
Floor, Amogh Plaza, Begumpet, Hyderabad -
500016. T: 040-23408100, 40037800, F:
23401107, [email protected],
www.maytasinfra.com
Transport
JOINT VENTURE
39 Indian Oil
Corporation(IOC)
The company is likely to an agreement with
NPCIL to form a joint venture to set up nuclear
power plant.
NA NA
V K Mittal, GM - Project, 3079 / 3, JB Tito Marg,
Sadiq Nagar, New Delhi - 110049. T: 011-
26260000, 24360443, www.iocl.com
Power
40 Indian Oil
Corporation(IOC)
The company has joined hands with Tata
Power for a thermal plant to be set up in Orissa
for the Paradip refi nery and petrochemical
complex. The Tatas will hold a 74 per cent
stake in the venture.
Paradip
Orissa NA
V K Mittal, GM - Project, 3079 / 3, JB Tito Marg,
Sadiq Nagar, New Delhi - 110049. T: 011-
26260000, 24360443, www.iocl.com
Power
*figures are approximate (in million)
14
COMMISSIONED PROJECT
N Organization Project Title / Details Location Budget Euro*
Contacts Sector
41 Airport Authority of
India
The new integrated terminal building of
Mangalore airport was inaugurated on 15th
May 2010. As part of the upgrada-tion
project, the work order for extending the
runway would be issued soon, cargo
complex will also come up.
Mangalore
Karnataka
31.27 Peter Abraham, Director, Airports Authority of India
Mangalore Airport Mangalore, T: 0824-2220400, F:
2254175, [email protected]
Airport
42 Consolidated
Construction
Consortium Ltd
(CCCL)
This company is implementing Chennai
Airport Project. The work on the Chennai
airport terminal expansion is likely to be
completed by August 2011.
Chennai
Tamil Nadu
NA 1) K. Nellaiappan, Manager -Business Development,
No 5, Second Link Street, CIT Colony, Mylapore,
Chennai-600004, Tamil Nadu. T: 044-23454500,
24661083, F: 24990225 2) PV Subbayam, Sr. DGM,
No 5, Second Link Street, CIT Colony, Mylapore,
Chennai-600004, Tamil Nadu. T: 044-23469300,
23454500, 24661083, F: 24990225
Airport
43 National Aviation
Company of India
Ltd (NACIL) /
Boeing
Plans to set up an aircraft maintenance
base along with Boeing at Nagpur in three
years time. Lease agreement is signed
between Air India and Maharashtra Airport
Development Company Ltd (MADC) for 50
acre land in the special economic zone
(SEZ) near Nagpur airport for this project.
Nagpur
Maharashtra
NA K Unnikrishnan, Additional General Manager -
NACIL, Old Airport, Santacruz (East), Mumbai -
400029. T: 022- 26263558,
Aviation
15
44 FACT-RCF
Building Products
Ltd (FRBL)
The joint venture between FACT and
Mumbai-based RCF is constructing a new
plant within the compound of FACT Kochi
Division at Ambalamedu. The plant will
manufacture wall panels, wall plaster, wall
putty and other products from gypsum, a
by-product in the production of phosphor-ic
acid. The commissioning of this project is
expected shortly.
Kochi Kerala NA FACT-CD Campus, Ambalamedu, Ernakulam Dist,
Kerala-682303. T: 0484-2721971, F: 2721972,
Building
Materials
45 Municipal
Corporation of
Delhi
The municipal corporation plans
construction of conventional underground
multilevel car parking at Central Market
Park Ashok Vihar in Rohini zone. Tenders
evaluation process is on. The completion
will take 18 months from the
commencement date.
Delhi NA M P Gupta, Executive Engineer (Project), Room No.
31, Ambedkar Stadium, Delhi Gate, Delhi-02, Delhi.
T: 011-23988845, M: 9717788605
Car Parking
46 Hindustan
Construction
Company Ltd
The company got an order from Nuclear
Power Corporation of India Ltd for civil
works of the main plant of Rajasthan
Atomic Power Project (RAPP), Units 7 & 8
(2x700 MW) PWHR at Rawatbhata, Kota,
Rajasthan. The completion period is of 50
months.
Kota
Rajasthan
154.23 Sandeep Sawant, DGM-Media Relations, Hincon
House, Lal Bahadur Shastri Marg, Vikhroli West,
Mumbai-400083. Maharashtra. T: 022-25775959, F:
25777568. sandeep.sawant@hccindia. com, ( Ajit
Gulabchand, CMD)
Construction
47 Adani-Welspun
Exploration Ltd
(AWEL)
The company will begin drilling at its
onshore block in the Cambay basin close
to Bharuch shortly.
Gujarat NA Devendra Amin, President, Sambhaav Press
Building, Nr Judges Bunglow, Bodakdev,
Ahmedabad – 380015. T: 079-25556900, 25556850,
Oil & Gas
16
F: 25556846, [email protected]
17
48 GAIL Ltd The company plans to commence work on
the 800-km pipeline shortly. This pipeline
will be used to transport gas from the LNG
terminal in Dabhol to Bidadi near
Bangalore.
Dabhol Ma-
harashtra
347.41 Jignesh Vasavada, Dy. Manager -Corporate
Communications, 16, Bhikaji Cama Place, New Delhi
- 110066. T: 011-26172580, 26182955, ext: 6771, F:
26185941, M: 09871039345
Pipeline
49 Cairn India Ltd The company plans to commission its 590-
KM heated crude oil pipeline, from its
Barmer field to near the Gujarat coast,
early next month.
Barmer
Rajasthan
NA Manu Kapoor, Director - Corporate Affairs, 3rd & 4th
Floor, Vipul Plaza, Suncity, Sector 54, Gurgaon -
122002. T: 0124-4593000, 2703000, F: 2889320,
cilmediainfo@cairnindia. com (Rahul Dhir, CEO)
Pipeline
50 Cochin Port Trust
(CPT)
The port trust plans to set up an interna-
tional bunkering terminal to supply fuel to
foreign vessels calling at port.
Kochi Kerala NA Jay Karthikeyan, Chief Engineer, Willingdon Island,
Cochin - 682 009. T: 0484-2666414, 2666871,
2668122, F:2668163, [email protected]
Port
51 Ministry of Power,
Govt of India
Requests for Qualification (RFQs) for the
Bedabahal Ultra Mega Power Project
(UMPP) is current invited and the deadline
for submitting the proposal is July 31. This
UMPP project will have a capacity of 4,000
MW.
Chhattisgarh NA N D Tyagi, CEO, Power Finance Corporation (PFC),
Urjanidhi, 1, Barakhamba Lane, Connaught Place,
New Delhi -110001. T: 011-23456504, 23456000,
www.pfcindia.com
Power
52 Gammon
Infrastructure
Projects Ltd
The company plans setting up a 250 MW
coal based power plant, in Western India.
The letter of allocation for supply of water
for its operations is received.
NA NA Satish Chandran, Company Secretary, Gammon
House, Veer Savarkar Marg, P O Box No 9129,
Prabhadevi, Mumbai-400025. T: 022- 6661400, F:
67444025. (R L Telang, VP - Marketing)
Power
53 Neyveli Lignite
Corporation Ltd
The company has dedicated Unit-I of the
Barsingsar Thermal Power Plant and
announced the inauguration of Unit-II
synchronization of the Barsingsar Power
Rajasthan NA S RajaGopal, CEO-Projects, Block - 1, Neyveli -
607801, Cuddalore District, Tamil Nadu. T & F :
04142- 252205, F: 252645, M: 09443369327,
[email protected], (A R Ansari, CMD)
Power
18
Plant.
19
54 National Highway
Authority of India
(NHAI)
Request for Qualification was recently
invited for the project of design,
engineering, fi nance, construction,
operation & maintenance of 6 laning of
Kishangarh Udaipur Ahmedabad Section
of NH 79A, 79, 78 & NH -8 on BOT (Toll)
Basis in the State of Gujarat & Rajasthan.
Gujarat 891.81 B K Thakur, Deputy General Manager (MC II), G-5&
6, Sector-10, Dwarka, New Delhi-110075. T: 011-
25074100 Ext. 2251, F: 25074100
Roads/
Highways
55 CCCL
Infrastructure Ltd
This company is a subsidiary of CCCL and
is setting up a food processing SEZ in
Tuticorin.
Tuticorin
Tamil Nadu
NA 1) K. Nellaiappan, Manager - Busi-ness
Development, No 5, Second Link Street, CIT Colony,
Mylapore, Chennai-600004, Tamil Nadu. T: 044-
23454500, 24661083, F: 24990225 2) PV Sub-
bayam, Sr. DGM, No 5, Second Link Street, CIT
Colony, Mylapore, Chennai-600004, Tamil Nadu. T:
044-23469300, 23454500, 24661083, F: 24990225
SEZ
56 Rapid Metro Rail
Gurgaon Ltd
The company a joint venture between
ITNL, ENSO Rail Systems Ltd, DLF Metro
Ltd and IL&FS, is developing the rail metro
link in Gurgaon. The project will be
executed on build, operate and transfer
basis and has achieved financial closure.
Gurgaon
Haryana
188.99 The IL&FS Financial Centre’, Plot No. C 22, G Block,
Bandra-Kurla Complex, Bandra (East), Mumbai 400
051. T: 022- 26533333
Transport
*figures are approximate (in million)
20
PROJECTS UNDER IMPLEMENTATION STAGE
N Organization Project Title / Details Location Budget Euro*
Contacts Sector
57 Airports Authority
of India (AAI)
Plans to install solar panels on the roof of the
new terminal at Leh Airport that will be used to
generate about 100kw and use that to heat up
water. This green project is likely to be ready in
next two years.
Leh Jammu &
Kashmir
0.86 Piyush Joshi, Director (Planning), Rajiv Gandhi
Bhawan, Safdarjung Airport, New Delhi -
110003. T: 011- 24610517, 24632950
Airport
58 Grand Luxe
Hotels Ltd
Chennai based company is refurbishing Queen’s
Palace hotel spread over 3.5 acre at Pudukottai.
The hotel in Pudukottai will be converted into 27-
room luxury hotel.
Pudokottai
Tamil Nadu
6.94 K Shriram, Head (Finance), Pallavaram -
Thuraipakkam 200 Feet Road, Okkiam
Thuraipakkam, Chennai - 600 097. T: 044-
24967013, 24967020, F: 24967070,
[email protected], www.etlinfra.com
Hospitality
59 Uniworld
Logistics
The company is setting up an integrated logistics
park in Mumbai. The work has started and likely
to complete in 5 months.
Navi Mumbai
Maharashtra
13.03 Nihar Parida, Vice President - Logistics &
Marketing, #225, S.T Bed Extn, 5th Main, 4th
Block, Koramangala, Ban-galore - 560034. T:
080-25633366, M: 09910897083,
[email protected], (Prem
Kumar M, Group Managing Director & CEO)
Logistics
Park
60 Sri City Pvt Ltd This company is developing Sri City Logistics &
Warehousing Park spread over 500 acre near
TADA near Chennai bordering Andhra Pradesh.
250-acre will be for a Free Trade Warehousing
Zone (FTWZ) and another 250 acre in the
domestic industrial zone. The project will be
Tamil Nadu NA Raghini Peter, Vice President -Business
Development, 85, Kutchery Road, Mylapore,
Chennai, Tamil Nadu - 600004. T: 044-
39402000, 24616768, M: 09840444085,
Logistics
Park
21
executed in 3 phases. Phase-1 will commission
by end of 2010. So far, the preliminary work has
started.
22
61 Adani Welspun
Exploration Ltd
(AWEL)
The company is a 65:35 venture between Adani
Enterprises Ltd and Welspun Natural Resources
Pvt Ltd. The company has recently commenced
exploratory drilling in the Palej block in Cambay
Basin near Bharuch.
Bharuch
District Gujarat
NA Devendra Amin, President, Sambhaav Press
Building, Nr Judges Bunglow, Bodakdev,
Ahmedabad – 380015. T: 079-25556900,
25556850, F: 25556846, [email protected]
Oil & Gas
62 Jindal Power Ltd Setting up a 4000 MW hydroelectric power
project in Etalin, Arunachal Pradesh. The
projects in Arunachal Pradesh are being
developed through joint ventures with Hydro
Power Development Corporation of Arunachal
Pradesh Ltd. (HPDCAPL).
Etalin
Arunachal
Pradesh
NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor,
DCM Building, Plot No: -94, Sector- 32,
Gurgaon- 122001, T: 0124-6689000, F:
6689101.
Power
63 Jindal Power Ltd Setting up a 2400 MW (4x600 MW) power
project in Chhattisgarh. This project is expected
to be completed by 2013.
Chhattisgarh 2329.42 Shoubhik Khamrohi, Asst. Manager, 2nd Floor,
DCM Building, Plot No: -94, Sector- 32,
Gurgaon- 122001, T: 0124-6689000, F:
6689101.
Power
64 Jindal Power Ltd The company is setting up 1,320 MW at Dumka
Equipment supplier is not yet finalised.
Dumka
Jharkhand
NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor,
DCM Building, Plot No: -94, Sector- 32,
Gurgaon- 122001, T: 0124-6689000, F:
6689101.
Power
65 Jindal Power Ltd The company is setting up 660 MW coal based
power project in Godda. Equipment supplier is
not yet finalised.
Godda
Jharkhand
NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor,
DCM Building, Plot No: -94, Sector- 32,
Gurgaon- 122001, T: 0124-6689000, F:
6689101.
Power
23
66 A2Z Maintenance
& Engineering
Services
Gurgaon based engineering, procurement and
construction (EPC) company is setting up three
co-generation power plants in collaboration with
sugar mills on a Build-Own-Operate-Transfer
(BOOT) model for a period of 15 years. A2Z will
provide steam and power for operating the
manufacturing process of the sugar mills during
the crushing season.
Punjab NA Mamta Joshi, CEO (Admin), 5th & 6th Floor,
Enkay Square 448–A, Udyog Vihar, Phase – V,
Gurgaon – 122016, Haryana. T: 0124 -
4517600, 4776100, F: 4380014, (Amit Mittal,
CMD)
Power
67 Sri Krishna
Developers
The company is coming up with a commercial
office space project named ‘Krishe Sapphire’ in
Hyderabad. This project will have 6,00,000 sq. ft
office space and is expected to be ready by
December 2010. The funding is through a mix of
debt, equity and internal accruals.
Hyderabad
Andhra
Pradesh
60.79 Suresh Sarma, Marketing Manager, Krishe
Gardens, Opp Begumpet Police Stn, Huda
Lane, Begumpet, Hyderabad - 500016. T: 040-
23201829, 23201379, 23202288,
www.krishegardens.com (Saji Koshy Paul, Vice-
President)
Real
Estate
68 Sri Krishna
Developers
The company is coming up with a one luxury
residential complex project named ‘Krishe Valley
‘in Hyderabad. This project will have premium
apartments and is expected to be ready by
December 2011.
Hyderabad
Andhra
Pradesh
13.89 Suresh Sarma, Marketing Manager, Krishe
Gardens, Opp Begumpet Police Stn, Huda
Lane, Begumpet, Hyderabad - 500016. T: 040-
23201829, 23201379, 23202288,
www.krishegardens.com (Saji Koshy Paul, Vice-
President)
Real
Estate
69 Acron Developers
Pvt Ltd
Vivara Residences’ is a real estate project
addressing senior citizens housing category. The
project is on and the first set of Vivara homes will
be ready in 2-3 months. The project comprises
52 apartments.
Arpora Goa NA HH Fernandes, Marketing & Sales Consultant,
591, Montemar, Retreat House Road, Baga,
Goa 403 516. T: 0832-2276147, 2276342, F:
2277706 (Dr John Britto, Director)
Real
Estate
24
70 Sunil Mantri
Group
The Square is a residential cum com-mercial
project coming up at Solapur. The project
comprises G+7 floors of 2-3 bhk, total 140
apartments with amenities like clubhouse, gym,
swimming pool, shops etc.
Solapur
Maharashtra
NA Park Chowk, Solapur 413001. T: 0217-2740221,
2740222, F: 2740223, solapuroffi
Real
Estate
71 Satra Properties
India Ltd
The company has undertaken ‘Satra City’ which
is a SRA (Slum Rehabilita-tion Authority) project
at Ghatkopar in Mumbai. The project is spread
over 7.50 acre and will have a saleable area of
nine lakh sq ft.
Mumbai
Maharashtra
NA Anuradha Singh, Leasing Manager, Dev Plaza,
2nd Floor, Opp. Andheri Fire Station, S. V.
Road, Andheri (W), Mumbai 400058. T: 022-
26719999, F: 26203999,
[email protected] (Praful N. Satra, CMD)
Real
Estate
72 Satra Properties
India Ltd
The company was successful in getting a tender
sanctioned for a property located at Matunga for
premium luxurious residence project on 1.5 acre.
Mumbai
Maharashtra
15.63 Anuradha Singh, Leasing Manager, Dev Plaza,
2nd Floor, Opp. Andheri Fire Station, S. V.
Road, Andheri (W), Mumbai 400058. T: 022-
26719999, F: 26203999,
[email protected] (Praful N. Satra, CMD)
Real
Estate
73 SJ Developers &
Housing Ltd
Royal Heritage’ is an upcoming residential
project to be developed on 1.3 acre at
Patrapada. The project comprises 70 flats in
eight storeys bldgs offering a mix of 1-2-3-4 BHK
flats and a total built-up area of 1.3 lakh sq ft.
The construction work has already started and
completion is targeted by March 2012.
Bhubaneswar
Orissa
NA Mohan Chaudhary, Manager-Marketing, 103,
Miknik Mall,Room No B/6, Nr Iscon Temple &
Rajdhani GAS Complex, Nayapalli,, Nayapalli,
Bhubaneshwar - 751012. T: 0674-2725875,
2565575, 2565675, [email protected],
(Debidutta Mishra, MD)
Real
Estate
25
74 Earth
Infrastructure Ltd
Earth Town’ is an affordable housing project
being developed by the company comprising
2,400 units. The completion is expected by June
2012.
Greater Noida
Uttar Pradesh
86.85 Shubham Khanna, Marketing Associate, Karol
Bagh, New Delhi, Noida, T: 09311114064-68,
M: 9268573999
Real
Estate
75 Earth
Infrastructure Ltd
Earth Sapphire Court is a commercial project
which would be a green building with a saleable
area of six lakh sq feet. The completion is
expected by June 2013.
Greater Noida
Uttar Pradesh
22.58 Shubham Khanna, Marketing Associate, Karol
Bagh, New Delhi, Noida, T: 09311114064-68,
M: 9268573999
Real
Estate
76 Satra Properties
India Ltd
The company has joined hands with Gammon
India for undertaking a township project spread
over 15 acre in Bhopal. This project will take 3
years to complete and will have 25 lakh sq ft
saleable area.
Bhopal
Madhya
Pradesh
NA Anuradha Singh, Leasing Manager, Dev Plaza,
2nd Floor, Opp. Andheri Fire Station, S. V.
Road, Andheri (W), Mumbai 400058. T: 022-
26719999, F: 26203999,
[email protected] (Praful N. Satra, CMD)
Township
77 The Kolkata
Metro Rail
Corporation
(KMRC)
East-West Kolkata Metro corridor project is 14.5-
km corridor starting from Salt Lake Sector V up
to Howrah Maidan. Of this, around 8 km will be
underground with six stations and the balance
will be on an elevated track. About 6 km of
elevated roads work is awarded to Gammon
India and so far they have completed 30% of the
work. Recently the contract for con-structing 5
km underground pathway is awarded to Afcons.
This work will start by December 2010. The
project completion will take 4 years.
Kolkata West
Bengal
846.75 Tarun Kumar, Chief Engineer, 4th Floor, HRBC
House, Munsi Premchand Sarani, Kolkata-
700021. T: 033-22134350, F: 2213 4347,
[email protected], www. kmrc.in, (Sumantra
Chowdhury, MD)
Transport
26
78 A2Z Maintenance
& Engineering
Services
Gurgaon based engineering, procurement and
construction (EPC) company is setting municipal
15 MW solid-waste-to-power project using RDF
(Refuse Derived Fuel), which is derived from
solid waste for Kanpur Municipal Corporation.
This plant will be operational by March 2011.
Kanpur Uttar
Pradesh
NA Mamta Joshi, CEO (Admin), 5th & 6th Floor,
Enkay Square 448–A, Udyog Vihar, Phase – V,
Gurgaon – 122016, Haryana. T: 0124 -
4517600, 4776100, F: 4380014, (Amit Mittal,
CMD)
Waste-to-
Energy
79 Government of
Karnataka
Karnataka Rural Water Supply and Sanitation
Project (Jal Nirmal Project) aims to increase rural
communities’ access to improved and
sustainable drinking water and sanitation
services. The World Bank has recently approved
Rs 698 crore International Development
Association (IDA) credit in additional financing
for this project.
Karnataka NA P Boregowda, Director, 2nd Floor, E Block,
K.H.B Complex, Cauvery Bhavan, K.G Road,
Bangalore-560009. T: 080-22240508,22122851,
F: 22240509
Water
Sector
*figures are approximate (in million)