Mu2e WGM
6/16/2010
R. Ray
Mu2e Project manager
R. Ray - Mu2e WGM 2
L2 Systems and Managers
1.2 Accelerator
M. SyphersFNAL
1.3 Conventional ConstructionT. Lackowski
FNAL
1.4 Solenoids
M. LammFNAL
1.5 Muon Channel
S. FeherFNAL
1.6 Tracker
A. MukherjeeFNAL
1.7 Calorimeter
INFN
1.8 Cosmic Ray
VetoC. Dukes
UVa.
1.9 Trigger and
DAQM. Bowden
FNAL
1.1 Project
ManagementR. RayFNAL
Mark Bowden from CD added as new L2 Manager for Trigger/DAQ.Still working on Calorimeter.
R. Ray - Mu2e WGM 3
Accelerator Update
• Continued progress on most fronts.• Mike Syphers is leaving the Lab in about a month.
Critical that we identify a replacement before then so there can be some overlap.o Discussions ongoing.
• Pat Hurh has put us in touch with engineers from the high power target group at RAL.
They will be visiting next week to discuss possible contributions to LBNE and Mu2e
We are interested in having them work on the conceptual design of the production target, remote handling equipment and possible the heat shield.
R. Ray - Mu2e WGM 4
Solenoid Update
• Planning on a local review with some people outside of Mu2e at the end of June.
Chance to get some input on the direction we are heading.
• Planning on design review with world recognized magnet experts in late summer/early fall.
• Continued design progress on all fronts• Working on detailed quench calculations to understand the impact of
increasing resistance in aluminum stabilizer as the result of radiation damage.
May not be as bad as originally thought, but still a work in progress. Need an adequate safety factor.
R. Ray - Mu2e WGM 5
Building Location Update
We have chopped about 30 m off the length of the beamline.Length is driven by beam optics into extinction channel.Would still like to get East of Kautz Rd.
R. Ray - Mu2e WGM 6
Simulations update
• Dave Brown from LBNL has adopted the SuperB fastsim Monte Carlo to Mu2e and has implemented the T-Tracker geometry.
• Dave has simulated the intrinsic resolution of the T-Tracker (energy loss and multiple scattering) and found it to be sufficient (~ 110 KeV).
Some cross checks still needed. Pattern recognition errors and other more subtle effects can add non-Gaussian
tails to the momentum function. These will be studied later with G4 and full pattern recognition and fitting algorithums. Not needed for CD-1.
• Looking to make this tool generally available. Can use this to answer many questions related to the detector at the CD-1 level. Buy us some time to get full hit level G4 simulation in place for CD-2.
• Still struggling with muon channel simulations G4 implementation not ready G4beamline (Muons Inc. product) not very flexible and author is busy on other
thingso Trying to buy some time from Muons Inc.
R. Ray - Mu2e WGM 7
Tracker Update
• After significant discussion at the Collaboration meeting we have settled on a baseline configuration for CD-1
T-Tracker (decided several months ago) Electronics in vacuum.
o Preamp, updated BaBar Elefant chip, TDC implemented in FPGA, ADC.
o From MTBF for BaBar Elefant chip we estimate about one failure every 5 years.
o Looking for data on FPGAs. o Will eventually assess our threshold for missing channels/ groups of
channels with simulation.o Could decide to move electronics out of vacuum if electronics failure
rate too high or tolerance to missing channels too low.
R. Ray - Mu2e WGM 8
DAQ Update
• Mark Bowden is now the L2 Manager.
• Our baseline concept is a streaming architecture that allows maximum flexibility while recording the same volume of data as in the standard triggered configuration.
Similar to other modern DAQ architectureso CMS, NOvA, NA62,
LHCb
R. Ray - Mu2e WGM 9
Project Controls
• Our Project Controls person is no longer at the lab.• He was not a very good fit for what we are doing at this stage
of the process.• We have 2 new people doing Project Controls for Mu2e
Larry Kirkpatrick David Leeb
• Still getting up to speed. Reconstructing existing files. Will begin meeting with L2 managers by next week.
• Eventually will need 4 people doing Project Controls and EVMS
1 for Solenoids and Muon Beamline 1 for Accelerator 1 for Conventional Construction and Project Management 1 for Tracker, Calorimeter, CRV, DAQ
• A mix of permanent Fermilab employees and contractors
R. Ray - Mu2e WGM 10
Project Controls
• LBNE has a req on the street for a Project Controls person to set up their overall system and to lay the groundwork for hiring in several more over the next year.
3 interviews scheduled. I am on the interview team. If the 2d best person is good, I may
consider hiring him/her to augment the existing staff.
R. Ray - Mu2e WGM 11
ES&H
• Working on Project Information Form (PIF) for ES&H.• Will continue our discussion at IPT meeting tomorrow about the path
to a CX for Mu2e. PIF will be important input.
• Started work on Preliminary HA (required for CD-1). I could use some help from someone with ES&H background. Significant input needed from L2 managers about potential hazards
associated with their systems.
R. Ray - Mu2e WGM 12
CDR
Started writing CDR.• LBNE has 2 technical writers
working on their CDR.• They could roll off in the Fall, so I
may try to pick up some of their time to help with the Mu2e CDR.
R. Ray - Mu2e WGM 13
CD-1
Lehman CD-1 Review March 1, 2011
Director’s Review Feb. 1, 2011
CDR complete Jan. 15, 2011
Final cost & schedule and associated documentation.
Jan. 15, 2011
L2 CDR contributions submitted Dec. 1, 2010
Director’s Design Review Nov. 1, 2010
L2 Design Reviews October, 2010
Time
R. Ray - Mu2e WGM 14
Schedule
CD-1 CD-2/3a
CD-3
R. Ray - Mu2e WGM 15
Requirements
At June Collaboration meeting we filled in the table.
R. Ray - Mu2e WGM 16
Action Items
• Get L2 Manager for calorimeter in place – R. Ray Still working on this.
• Get resources required for CD-1 activities into P6. Begin adding relationships and developing BOEs – L2s/Walter Davis
Still a work in progress
• Understand and document the magnitude of the heat shield problem – Coleman/Mokhov
Still looking at potential solutions. More optimistic this month than last.
• Get moving on Electronics – Ron Ray Nothing done in the last month. Meeting scheduled with PPD EE on Friday.
• Complete set of requirements documents – Miller/Bernstein Got commitments at collaboration meeting. Now have to get people to follow
through.