Page 1: MONKSTOWN VILLAGE TRAFFIC MANAGEMENT IMPROVEMENT SCHEME

24/03/2016

1

Monkstown Village Traffic Management Improvement Scheme

UPDATE

March 2016

History• Non Statutory Public Consultation took place in August and

September 2012 and 78 submissions were received.

• A meeting with a representative group of businesses and residents was held in January 2013.

• A Report on the submissions received was presented to the 4th March 2013 DLAC meeting

• A presentation on the revised proposals including the public realm elements was given to the Dun Laoghaire Area Committee in April 2015

• Project update to Dun Laoghaire Councillors given prior to the Council Meeting in October 2015

• Detailed Design commenced Dec 2015

Scheme:

Architecture & Culture Department

Page 2: MONKSTOWN VILLAGE TRAFFIC MANAGEMENT IMPROVEMENT SCHEME

24/03/2016

2

End

Additional element:

Level difference at restaurants

- Reduce carriageway to 6m

- Widen path at restuarants

- Indented parking bays

- Planting

- Discrete drainage

- Crossing point at Avoca

Current Situation

Current Situation:

Avoca

Page 3: MONKSTOWN VILLAGE TRAFFIC MANAGEMENT IMPROVEMENT SCHEME

24/03/2016

3

Proposed Current Situation

Existing street lighting and cablesImpact on parking

Existing Proposed

Clifton Avenue

+9 spaces

Impact on

parking

Monkstown Crescent: - Loading bays reduced in size - 1 car space lost adjacent to shops - 2 spaces lost opposite Avoca. 3 additional space at Link Road.

Page 4: MONKSTOWN VILLAGE TRAFFIC MANAGEMENT IMPROVEMENT SCHEME

24/03/2016

4

Carrickbrennan Road

+1 spaceOverall gain of

10 no. spaces

Next steps…….

- Engage with business on Monkstown Crescent

- Detailed design completed July 2016

- Contractor appointed September 2016

- Contract duration approximately 6 months

Questions?