MoDOT – ACECSt. Louis Partnering Meeting
November 12, 2019
Agenda• Introductions & Department Update Tom Evers• Design Updates Jeff Bohler• External Civil Rights April Hendricks-Brown• Consultant Updates Laura Ellen• Planning Updates Wesley Stephen• Construction Inspection Mike Castro• STL North County Lisa Kuntz• STL SW County Stuart McNeil• Franklin/Jefferson Shirley Norris• St. Charles Chris Kelly• STL City Aaron Groff• District Contracts Alvin Nieves-Rosario• Alternative Project Delivery Stacey Smith• ACEC Update Steve Wells
Department Update
Topics:- Funding Outlook
- Cost share
- Staffing Challenges- Consultant
Solicitations
Tom Evers, P.E.Assistant District Engineer(314) [email protected]
A Look at Transportation Funding in Missouri
November 2019
Missouri has $8 billion in unfunded transportation needs.
• $503 Million Toward Unfunded Needs• $351 Million State General Revenue/Bonding• $81 Million Federal INFRA Grant• $50 Million State General Revenue Cost Share• $21 Million Federal Bridge Grant
But we’re making progress
High Priority Unfunded Needs
Legislature appropriated $50 million from general revenue to jump-start Gov. Mike Parson’s “Focus on Bridges” program.
Will repair or replace 45 bridges during FY 2020.
$255 million project = a new I-70 Missouri River Bridge + I-70 climbing lanes at Mineola Hill
In July, we received a federal grant to build a new Missouri River Bridge at Rocheport
The INFRA grant triggered $301 million in bonding to be paid back from State General Revenue.
Will repair or replace 215 bridges across the state that were already high priority projects.
Frees $351 million in the current Statewide Transportation Improvement Program for new projects to be determined at the local level.
ONE $81.2 MILLION GRANT LEADS TO MORE THAN $600 MILLION IN IMPROVEMENTS TO THE STATE NETWORK OF ROADS AND BRIDGES.
Missouri legislators appropriated $50 million in general revenue to fund the Governor’s Transportation Cost-Share Program
Other Good News
Design Updates• Solicitations• Quality Plans• Feedback• Utility/ Surveying needs• Performance evaluations
Jeff Bohler, P.E.District Design Engineer(314) [email protected]
External Civil Rights MoDOT DBE Mentor Protégé Program
April Hendricks-BrownSenior Civil Rights Specialist(314) [email protected]
Consultant Updates
• FY2020 Budget: $45 million
• On-call solicitation
Laura Ellen, P.E.Design Support Engineer(314) [email protected]
Planning and Local Programs Update
• Industry Meeting• Governors Cost Share
Program• System Improvement
Needs
Wesley Stephen, AICPDistrict Planning Manager(314) [email protected]
CONSTRUCTION INSPECTION Mike Castro, P.E.
District Construction Engineer
(314) 453-1850
St. Louis County - North
Lisa Kuntz, P.E.(314) [email protected]
Pavement and ADA:• Route 67, Route 115,
Route N, Route AC (Scoping Only)
Bridges:• Midland/Lackland over
I-170 (FY21)• I-70 @ MO 180 (FY24)
St. Louis County – SouthWest
Stuart McNeil, P.E.(314) [email protected]
• Bridge– Bridge rehabs over Meramec
near Lewis Road.
• Pavement/ADA – Route 67 (Route D to Swan Dr.)– Bridge improvement Deer Creek
• BUS Rapid Transit/High Occupancy Vehicle
Franklin and Jefferson Counties
Shirley Norris, P.E.(314) [email protected]
Franklin County• Route AD, Resurface from Route YY to Route
50 (FY2021)• Route 30, Resurface, GR and ADA Upgrades
and Replace two bridges (FY 2023)
Jefferson County
• Route M, Add J-Turns at St. Luke’s Church Road and Moss Hollow Road (FY2021)
• Route 61, Add TWLTL from Rote 231 to Richardson Road (FY2021)
• Route BB, Resurface and Upgrades from Route 30 to Old Highway 21 (FY2022)
• Start work on various Scoping only projects through Approved Preliminary Plans
St. Charles CountyChris Kelly, P.E.(314) [email protected] • I-70 Pavement
resurfacing, repair, Warren Co. Line to Wentzville Pkwy. (FY 22)
• Misc. Pavement Improvement Projects (D, Z, 94, I-64)
• Emerging needs/cost share
St. Louis CityAaron Groff, P.E.(314) [email protected]
• Bridges– I-55 Rehabilitations (FY 2022)
• Lindbergh to Arsenal– Overpasses
• I-64: Sarah & Vandeventer (FY 2023)• I-44: Nebraska, Macklind & Edwards
(FY 2023)
• Pavement– I-55 (FY 2023)
• Lindbergh to I-44– Hall Street (FY 2022)
District ContractsAlvin Nieves-Rosario, P.E.(314) [email protected]
• I-44 structure replacement– Broadway (St Louis City)– FY21
• Route 50 surfacing, guardrail, crossroad pipes and ped facilities– Independence Rd to Route 47
(Franklin)– FY22
• Route D surfacing and ped facilities– I-170 to City Limits (St Louis)
• Route 61 pavement improvements– Lincoln Co to I-70 in
Wentzville• Districtwide bridge
– Checklist
Alternative Project DeliveryStacey Smith, P.E.(314) [email protected]
Potential APD:• I-70 Outer Road
Improvements (FY21) *• Safety Improvements 2.0
(FY22)• ADA Improvements
(potentially FY24; unfunded)
• I-70 NS RR/Wentzville Curve (unfunded) *
* Owner’s consultant already hired
Notes:• APD does not always equal
Design-Build• “Potential APD” does not
guarantee APD
GENERAL• 120+ Active Member Firms• www.acecmo.org• Bruce Wylie – Executive Director• Steve Wells – 2019/2020 President
PRIORITIES• Continue support of Governor / staff• Improve Business Practices• Develop Partnerships thru Liaison Committees
BENEFITS• Engineering Excellence Awards• Future Leaders Academy• Legislative / Funding Advocacy
QUESTIONS?