MM mechanical prototype
Work progress at CERN
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 1
Purpose
Demonstrate feasibility Setup of basic infrastructure Gain experience with
construction/assembly ideas/schemes Materials Procedures Precision (panel planarity, parallelism of skins, …)
Produce objects that can be measured Establish an Assembly Manual
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 2
CERN mechanical prototype (1)
Full-wedge small sector quadruplet Eta and stereo doublet
Drift gap spacers: 5 mm
Total thickness: 70–80 mm
Gas distribution
Mesh?
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 3
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 4
All panels of equal thickness: 11-12 mmStandard Al profiles of t=10 mm as frames with special angular insertsSkins = 0.5 mm (FR4)
Two possible scenarios: Al honeycomb of t=10 mm
expanding glue PB250/SD5604 glue gaps ≈ few 100 µm
Foam panel of t=10 mm plastic mesh of t=100-200µm glue Araldite 2011
CERN mechanical prototype (2)
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 5
Gluing test (1)
Step 1 – FR4 skins were placed on the table
Step 2 – Glue (Araldite 2011) has been applied and distributed on the surface
Step 3 – Plastic mesh placed on the surface
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 6
Gluing test (2)Step 4 – Al profiles and the foam panel with the glue on them were placed on the mesh
Step 5 – FR4 skin has been cut around “half panel”
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 7
Gluing test, second skinStep 1 – Araldite AY-103 (more fluid) has been applied to the second skin and “half panel”
Step 4 – “half panel” placed on the second skin and mesh
Dimensions
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 8
10+ 10+ 10+10+ 10+
5 5 5 5
MM multiplet stack(10+: 11 or 12 mm)
70 – 80 mm
Space for electronics(50 mm in phi)
Dead area: 50 mmSpace for electronics: 50 mm
20 mm
Electronics boards
Eta strips
Stereo strips
Collaborative effort
CERN, Dubna, Lecce … Drawings and calculations: Lecce and CERN Infrastructure and tooling: CERN Technical work: CERN, Dubna, Lecce Evaluation: all (two summer students for
mechanical)
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 9
What could/should be included
Realistic materials and glues Realistic thickness and segmentation of PCBs Space for on-chamber electronics boards Simplified cooling and cabling channels
We foresee to insert heating wires into the cooling channels to simulate electronics/cooling
Gas channels and seals (to allow for gas pressure tests) Mesh frame (but not necessarily the mesh) T-sensors (a few) to allow for test measurements Other ???
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 10
The table
Size: 4 x 2.5 m Flatness: ≤ 20 µm Location: B16 Available: Wednesday
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 11
X 5
VacuumClarinet gas
Skin (G10) Precision insertRohacell honeycomb
Vacuum
Using Skin suction Tool
Vacuum
Expansive glue
Vacuum
Precised shim
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 12
Stiff-back Simple stiff-back structure with suction heads (following
small test structure) used for 2 x 1 m2 prototype CERN-DT group is working on a more final system using a
perforated honeycomb structure with a perforated lower skin Work in progress
Small 50 x 50 cm2 system under construction Large system if prototype successful
MMM CERN, 24/06/2013 G. Sekhniaidze/J. Wotschack 13