Millstone Power Station
Drill Date - June 30, 2010
Radiological Emergency Preparedness (REP) Program
After Action Report/Improvement Plan
Published
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
This page is intentionally blank.
Millstone Power Station After Action Report/ImprovementPlan Contents Executive Summary 3Section 1: Exercise Overview 4
1.1 Exercise Details 4
1.2 Exercise Planning Team Leadership 4
1.3 Participating Organizations 4
Section 2: Exercise Design Summary 6
2.1 Exercise Purpose and Design 6
2.2 Exercise Objectives, Capabilities and Activities 8
2.3 Scenario Summary 8
Section 3: Analysis of Capabilities 9
3.1 Drill Evaluation and Results 9
3.2 Summary Results of Drill Evaluation 9
3.3 Criteria Evaluation Summaries 13
3.3.1 Support Jurisdictions 13
3.3.1.1 Windham Reception Center Direction & Control 13
3.3.1.2 Windham Reception Center Dosimetry 13
3.3.1.3 Windham Reception Center Evacuee Registration 13
3.3.1.4 Windham Reception Center Female Mon & Decon 14
3.3.1.5 Windham Reception Center KI Decision 14
3.3.1.6 Windham Reception Center Male Mon & Decon 14
3.3.1.7 Windham Reception Center Portal & SecondaryMonitoring
15
3.3.1.8 Windham Reception Center Vehicle Mon-Decon &Traffic
17
Section 4: Conclusion 19Appendix A: Drill Evaluators and Team Leaders 20Appendix B: Exercise Plan 21Appendix C: Windham Reception Center 36
1
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
This page is intentionally blank.
2
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
EXECUTIVE SUMMARY
On June 30, 2010, a Host Community Reception Center Drill was conducted in Windham,
Connecticut. The purpose of this drill was to assess the capability of the Windham Emergency
Management Personnel to respond to a radiological incident involving the Millstone Power
Station. This drill was held in accordance with FEMA's policies and guidance concerning the
exercise of State and Local Radiological Emergency Response Plans (RERP) and procedures.
FEMA wishes to acknowledge the efforts of the many individuals in the State of Connecticut, the
Support Jurisdiction of the Town of Windham, and the numererous volunteers who participated
in this drill.
Protecting the public health and safety is the full-time job of some of the Exercise participants
and an additional assigned responsibility for others. Still others have willingly sought this
responsibility as volunteers providing vital emergency services twenty four (24) hours to the
communities in which they live. Cooperation and teamwork of all the participants was observed
during this drill.
This report contains the final evaluation of the Windham Host Community Reception Center
Drill.
The Windham Host Community Emergency Management Response Organizations, Fire
Department Personnel, and Volunteers successfully demonstrated their knowledge to implement
their emergency response plans and procedures. There were no deficiencies. There were three
Areas Requiring Corrective Action that were re-demonstrated successfully on the spot. There
were two Areas Requiring Corrective Action from a prior exercise that were cleared through a
successful demonstration.
3
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
SECTION 1: EXERCISE OVERVIEW1.1 Exercise Details
Exercise Name
Millstone Power Station
Type of Exercise
Drill
Exercise Date
June 30, 2010
Program
Department of Homeland Security/FEMA Radiological Emergency Preparedness
Program
Scenario Type
Radiological Emergency
1.2 Exercise Planning Team LeadershipNone
1.3 Participating Organizations
Agencies and organizations of the following jurisdictions participated in the Millstone
Power Station drill:
State Jurisdictions
CT Department of Emergency Mangement and Homeland Security
CT Department of Environmental Protection, Radiation Division
CT Department of Developmental Services
Support Jurisdictions
Town of Windham: Town Clerks Office, Finance, Housing Code, Planning,
Human Services, Recreation, Public Works, Water Works & Water Treatment
Departments
Windham Emergency Management Office
4
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
Willimantic Fire Department
South Windham Volunteer Fire Department
North Windham Volunteer Fire Department
Windham Center Volunteer Fire Department
Columbia Fire Department
Willimantic Police Department
North Central District Health Department
Windham High School
Windham Community Emergency Response Team (CERT)
American Red Cross, Connecticut
Connecticut Towns Individual Volunteers
Private Organizations
Dominion: Millstone Emergency Preparedness
Federal Jurisdictions
Federal Emergency Management Agency
5
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
SECTION 2: EXERCISE DESIGN SUMMARY2.1 Exercise Purpose and Design
On December 7, 1979, the President directed FEMA to assume the lead responsibility for all
offsite nuclear planning and response. FEMA’s activities are conducted pursuant to 44 Code of
Federal Regulations (CFR) Parts 350, 351, and 352. These regulations are a key element in the
Radiological Emergency Preparedness (REP) Program that was established following the Three
Mile Island Nuclear Station accident in March 1979.
FEMA Rule 44 CFR 350 establishes the policies and procedures for FEMA's initial and
continued approval of State and local governments’ radiological emergency planning and
preparedness for commercial nuclear power plants. This approval is contingent, in part, on State
and local government participation in joint exercises with licensees.
FEMA's responsibilities in radiological emergency planning for fixed nuclear facilities include
the following:
A. Taking the lead in offsite emergency planning and in the review and evaluation of RERPs and
procedures developed by State and local governments;
B. Determining whether such plans and procedures can be implemented on the basis of
observation and evaluation of exercises of the plans and procedures conducted by State and local
governments;
C. Responding to requests by the U.S. Nuclear Regulatory Commission (NRC) pursuant to the
Memorandum of Understanding between the NRC and FEMA dated June 17, 1993 (Federal
Register, Vol. 58, No. 176, September 14, 1993); and
D. Coordinating the activities of Federal agencies with responsibilities in the radiological
emergency planning process:
U.S. Department of Commerce
U.S. Nuclear Regulatory Commission
U.S. Environmental Protection Agency
U.S. Department of Energy
6
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
U.S. Department of Health and Human Services
U.S. Center for Disease Control
U.S. Department of Transportation
U.S. Department of Agriculture
U.S. Department of the Interior
U.S. Food and Drug Administration
Representatives of these agencies serve on the FEMA Region I Regional Assistance Committee
(RAC), which is chaired by FEMA.
Formal submission of the RERPs for the Millstone Power Station to FEMA Region I by the State
of Connecticut and involved local jurisdictions occurred in 1982. Formal approval of the RERP
was granted by FEMA in October 1984, under 44 CFR 350.
The findings presented in this report are based on the evaluations of the federal evaluator team,
with final determinations made by the FEMA Region I RAC Chairperson, and approved by the
Regional Administrator.
The criteria utilized in the FEMA evaluation process are contained in the following:
A. NUREG-0654/FEMA-REP-1, Rev. 1, “Criteria for Preparation and Evaluation of
Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,”
November 1980;
B. 67 FR 20580, “FEMA Radiological Emergency Preparedness: Exercise Evaluation
Methodology,” September 12, 2001, amended April 25, 2002.
Section III of this report, entitled “Exercise Evaluation and Results,” presents detailed
information on the demonstration of applicable exercise objectives at each jurisdiction or
functional entity evaluated in a jurisdiction-based format.
7
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
2.2 Exercise Objectives, Capabilities and Activities
A Host Community Reception Center Evaluated Drill was conducted on June 30, 2010, by
FEMA Region I, REP Staff to assess the capabilities of the Emergency Management Personnel
of Windham, Connecticut, to demonstrate the adequacy of procedures, facilities, equipment, and
personnel for the radiological monitoring, decontamination, and registration of evacuees of a
Millstone Power Station incident. The purpose of this drill report is to present the drill results
and findings on the performance of the offsite response organizations (ORO) during a
simulated radiological emergency.
Section III of this report, entitled “Exercise Evaluation and Results,” presents detailed
information on the demonstration of applicable drill objectives at each jurisdiction or
functional entity evaluated in a jurisdiction-based format. This section also contains: (1)
descriptions of all deficiencies and Areas Requiring Corrective Action (ARCAs) assessed during
this drill, recommended corrective actions, and the State and Local Governments’ schedule of
corrective actions for each identified drill issue, and (2) descriptions of unresolved ARCAs
assessed during previous drills and the status of the OROs’ efforts to resolve them.
2.3 Scenario Summary
The exercise scenario was developed to evaluate the response of the exercise participants to a
radiological emergency. The scenario is listed in Appendix C: Exercise Plan.
8
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
SECTION 3: ANALYSIS OF CAPABILITIES3.1 Drill Evaluation and Results
Contained in this section are the results and findings of the evaluation at each jurisdiction or
functional entity that participated in the June 30, 2010, Windham Host Community Reception
Center Drill.
The purpose of this drill was to assess the capabilities of the Emergency Management Personnel
of Windham, Connecticut, to demonstrate the adequacy of procedures, facilities, equipment, and
personnel for the radiological monitoring, decontamination, and registration of evacuees of a
Millstone Power Station incident.
Each functional jurisdiction or entity was evaluated on its demonstration of criteria contained in
the drill evaluation areas as outlined in the federal Register, Volume 67, No. 80 "FEMA -
Radiological Emergency Preparedness: Exercise Evaluation Methodology" (April 25, 2002).
All activities were based on the plans and procedures and completed as they would have been in
an actual emergency except as noted in the Extent of Play Agreement.
3.2 Summary Results of Drill Evaluation
The State of Connecticut and Local Emergency Response Organizations successfully
demonstrated their capabilities to implement their off-site radiological emergency response plans
and procedures based on the evaluation of this drill by the Regional Assistance Committee and a
team of Federal evaluators. There were no deficiencies. There were three Areas Requiring
Corrective Action that were re-demonstrated successfully on the spot. There were two Areas
Requiring Corrective Action from a prior drill that were cleared through a successful
demonstration.
The matrix presented in the table on following pages presents the status of all drill evaluation
area criteria that were scheduled for demonstration during the drill at each participating
jurisdiction and functional entity. Drill criteria are listed by number, and the
demonstration status of those criteria are indicated by the use of the following letters:
M - Met (No Deficiency or ARCAs assessed and no unresolved ARCAs from prior exercise)
9
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
A - ARCAs assessed or unresolved ARCAs from previous exercises
D - Deficiency assessed
P - Plan Issues
N - Not Demonstrated
10
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
Table 3.1 - Summary of Drill Evaluation
DATE: 2010-06-30SITE: Millstone Power Station, CT
M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: NotDemonstrated
Win
dham
RC
Ops
Win
dham
RC
Dos
imet
ry
Win
dham
RC
Reg
n
WIn
dham
RC
Fem
ale
Mon
Dec
on
Win
dham
RC
KI
Win
dham
RC
Mal
e M
on D
econ
Win
dham
RC
Por
tal &
Sec
Mon
Win
dham
RC
Veh
icle
s
Emergency Operations Management
Mobilization 1a1 M
Facilities 1b1
Direction and Control 1c1 M
Communications Equipment 1d1 M
Equipment and Supplies to Support Operations 1e1 MProtective Action Decision Making
Emergency Worker Exposure Control 2a1
Dose Assessment & PARs & PADs for the Emergency Event 2b1
Dose Assessment & PARs & PADs for the Emergency Event 2b2
PADs for the Protection of persons with disabilities and access/functional needs 2c1
Radiological Assessment and Decision-making for the Ingestion Exposure Pathway 2d1
Radiological Assessment & Decision-making Concerning Post-Plume PhaseRelocation, Reentry, and Return
2e1
Protective Action Implementation
Implementation of Emergency Worker Exposure Control 3a1 M M M
Implementation of KI Decision for Institutionalized Individuals and the Public 3b1 M
Implementation of Protective Actions for persons with disabilities andaccess/functional needs
3c1
Implementation of Protective Actions for persons with disabilities andaccess/functional needs
3c2
Implementation of Traffic and Access Control 3d1 M
Implementation of Traffic and Access Control 3d2
Implementation of Ingestion Pathway Decisions 3e1
Implementation of Ingestion Pathway Decisions 3e2
Implementation of Post-Plume Phase Relocation, Reentry, and Return Decisions 3f1Field Measurement and Analysis
RESERVED 4a1
Plume Phase Field Measurement and Analyses 4a2
Plume Phase Field Measurement and Analyses 4a3
Post Plume Phase Field Measurements and Sampling 4b1
Laboratory Operations 4c1Emergency Notification and Public Info
Activation of the Prompt Alert and Notification System 5a1
RESERVED 5a2
Activation of the Prompt Alert and Notification System 5a3
Activation of the Prompt Alert and Notification System 5a4
Emergency Information and Instructions for the Public and the Media 5b1Support Operations/Facilities
11
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
Monitoring, Decontamination, and Registration of Evacuees 6a1 M M M M
Monitoring and Decontamination of Emergency Workers and their Equipment andVehicles
6b1 M M
Temporary Care of Evacuees 6c1
Transportation and Treatment of Contaminated Injured Individuals 6d1
12
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
a.
b.
c.
d.
e.
f.
g.
a.
b.
c.
d.
e.
f.
g.
a.
b.
c.
d.
e.
f.
3.3 Criteria Evaluation Summaries
3.3.1 Support Jurisdictions
3.3.1.1 Windham Reception Center Direction & Control
In summary, the status of DHS/FEMA criteria for this location is as follows:
MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1.
AREAS REQUIRING CORRECTIVE ACTION: None
DEFICIENCY: None
PLAN ISSUES: None
NOT DEMONSTRATED: None
PRIOR ISSUES - RESOLVED: None
PRIOR ISSUES - UNRESOLVED: None
3.3.1.2 Windham Reception Center Dosimetry
In summary, the status of DHS/FEMA criteria for this location is as follows:
MET: 3.a.1.
AREAS REQUIRING CORRECTIVE ACTION: None
DEFICIENCY: None
PLAN ISSUES: None
NOT DEMONSTRATED: None
PRIOR ISSUES - RESOLVED: None
PRIOR ISSUES - UNRESOLVED: None
3.3.1.3 Windham Reception Center Evacuee Registration
In summary, the status of DHS/FEMA criteria for this location is as follows:
MET: 6.a.1.
AREAS REQUIRING CORRECTIVE ACTION: None
DEFICIENCY: None
PLAN ISSUES: None
NOT DEMONSTRATED: None
PRIOR ISSUES - RESOLVED: None
13
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
g.
a.
b.
c.
d.
e.
f.
g.
a.
b.
c.
d.
e.
f.
g.
a.
b.
c.
d.
e.
f.
g.
PRIOR ISSUES - UNRESOLVED: None
3.3.1.4 Windham Reception Center Female Mon & Decon
In summary, the status of DHS/FEMA criteria for this location is as follows:
MET: 3.a.1, 6.a.1.
AREAS REQUIRING CORRECTIVE ACTION: None
DEFICIENCY: None
PLAN ISSUES: None
NOT DEMONSTRATED: None
PRIOR ISSUES - RESOLVED: None
PRIOR ISSUES - UNRESOLVED: None
3.3.1.5 Windham Reception Center KI Decision
In summary, the status of DHS/FEMA criteria for this location is as follows:
MET: 3.b.1.
AREAS REQUIRING CORRECTIVE ACTION: None
DEFICIENCY: None
PLAN ISSUES: None
NOT DEMONSTRATED: None
PRIOR ISSUES - RESOLVED: None
PRIOR ISSUES - UNRESOLVED: None
3.3.1.6 Windham Reception Center Male Mon & Decon
In summary, the status of DHS/FEMA criteria for this location is as follows:
MET: 3.a.1, 6.a.1.
AREAS REQUIRING CORRECTIVE ACTION: None
DEFICIENCY: None
PLAN ISSUES: None
NOT DEMONSTRATED: None
PRIOR ISSUES - RESOLVED: None
PRIOR ISSUES - UNRESOLVED: None
14
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
a.
b.
3.3.1.7 Windham Reception Center Portal & Secondary Monitoring
In summary, the status of DHS/FEMA criteria for this location is as follows:
MET: 6.a.1, 6.b.1.
AREAS REQUIRING CORRECTIVE ACTION: 6.a.1.
ISSUE NO.: 38-10-6a1-A-01
CRITERION: The reception center facility has appropriate space, adequate
resources, and trained personnel to provide monitoring, decontamination, and
registration of evacuees.
CONDITION: The team at the portal monitors was initially using outdated versions
of their procedures (HCP-4.5, Rev 08/03 and HCP-4.5, Rev 01/10).
POSSIBLE CAUSE: The team used the procedures they had found in the portal
monitor container, which was an outdated version. The accompanying materials box
had the correct version of the procedures.
REFERENCE: HCP-4.5, Rev 5/10; NUREG 0654, J.10.h; J.12; K.5.b.
EFFECT: If the procedures had changed, the team could have missed any updates.
CORRECTIVE ACTION DEMONSTRATED: Through discussion with the
controller and evaluator, the team re-demonstrated use of the latest procedures, dated
05/10, which were included in the accompanying materials box. Once they were
referencing the correct procedures, the team re-checked their work to ensure they
were in compliance.
ISSUE NO.: 38-10-6a1-A-02
CRITERION: The reception center facility has appropriate space, adequate
resources, and trained personnel to provide monitoring, decontamination, and
registration of evacuees.
15
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
CONDITION: The team at the portal monitors monitored the presentation pad at one
of the monitors using a CDV-700 survey meter to ensure it was not contaminated.
While doing so, the worker doing the monitoring allowed the cord of the instrument
to drag along the pad.
POSSIBLE CAUSE: The worker may not have been aware of the correct method to
monitor the pad.
REFERENCE: HCP-4.5, Rev 5/10; NUREG 0654, J.10.h; J.12; K.5.b.
EFFECT: Dragging the cord could have spread contamination in a real event.
CORRECTIVE ACTION DEMONSTRATED: The controller stopped play, trained
the worker on proper monitoring procedure, and the worker re-demonstrated the task
successfully.
ISSUE NO.: 38-10-6a1-A-03
CRITERION: The reception center facility has appropriate space, adequate
resources, and trained personnel to provide monitoring, decontamination, and
registration of evacuees.
CONDITION: Per procedure HCP 4.5b, Rev 05/10, page 4 of 14, workers at the
secondary monitoring station were to ask contaminated individuals if their car
alarmed the portal and report relevant information via radio to the vehicle monitoring
team for follow-up if necessary. During the exercise, workers were unaware of this
requirement and how to perform it.
POSSIBLE CAUSE: Workers were new to their positions and may not have been
familiar with this portion of their procedures.
REFERENCE: HCP 4.5b, Rev 05/10, page 4 of 14; NUREG 0654, J.10.h; J.12;
K.5.b.
16
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
c.
d.
e.
f.
g.
a.
b.
c.
d.
e.
f.
EFFECT: Lack of communication with the vehicle monitoring team could have led to
incorrect monitoring or classification of vehicles in a real event.
CORRECTIVE ACTION DEMONSTRATED: The controller stopped play and
conducted training on the procedure. When play resumed, the workers successfully
re-demonstrated the task through simulation and interview.
DEFICIENCY: None
PLAN ISSUES: None
NOT DEMONSTRATED: None
PRIOR ISSUES - RESOLVED: None
PRIOR ISSUES - UNRESOLVED: None
3.3.1.8 Windham Reception Center Vehicle Mon-Decon & Traffic
In summary, the status of DHS/FEMA criteria for this location is as follows:
MET: 3.d.1, 6.b.1.
AREAS REQUIRING CORRECTIVE ACTION: None
DEFICIENCY: None
PLAN ISSUES: None
NOT DEMONSTRATED: None
PRIOR ISSUES - RESOLVED: 3.d.1, 6.b.1.
ISSUE NO.: 38-03-3d1-A-11
ISSUE: Due to the need for personnel to direct vehicles along an elongated route into
the vehicle monitoring area, personnel from the clean vehicle parking area were
reassigned. This left only one person in the “Clean Parking Lot” to register vehicles.
A line began to form and was beginning to affect the ability of additional vehicles to
exit the portal monitor. There was no actual obstruction during the drill but sufficient
personnel need to be assigned to the “Clean Parking Lot” so that vehicle information
can be recorded at the parking space. This will free up the area leading into the lot
and not cause a backup during a true event.
CORRECTIVE ACTION DEMONSTRATED: Traffic control was successfully set-
17
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
g.
up with cones and emergency workers on the road leading to the automobile portal
monitor. Once determined a clean vehicle, they instructed the driver to the clean
parking lot. If the vechicle was determined dirt/contaminated, they instructed the
driver to the dirty parking lot. This was demonstrated successfully in accordance to
plans and procedures.
ISSUE NO.: 38-03-6b1-A-12
ISSUE: A greeter in the vehicle monitoring area was observed placing a hand on two
of the first three vehicles coming into the vehicle monitoring area. Although he
realized what he had done he took no action to determine if he was contaminated or
not. A vehicle monitoring team member logging contaminated vehicles placed a
clipboard on the hood of a contaminated vehicle in the contaminated vehicle parking
lot.
CORRECTIVE ACTION DEMONSTRATED: A past ARCA indicated Vehicle
Monitoring Staff had touched vehicles prior to monitoring. This was not observed at
this drill. Team members did not touch vehicle exteriors, interiors or occupants of
vehicles deemed contaminated.
PRIOR ISSUES - UNRESOLVED: None
18
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
SECTION 4: CONCLUSION
All criteria were successfully met and/or redemonstrated successfully.
19
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
APPENDIX A: DRILL EVALUATORS AND TEAM
LEADERS
DATE: 2010-06-30, SITE: Millstone Power Station, CT
LOCATION EVALUATOR AGENCYWindham Reception Center Direction & Control *Helen LaForge FEMA RI
Windham Reception Center Dosimetry *Helen LaForge FEMA RI
Windham Reception Center Evacuee Registration Melissa Savilonis FEMA - RI
Windham Reception Center Female Mon & Decon Patricia Foster FEMA RI
Windham Reception Center KI Decision Melissa Savilonis FEMA - RI
Windham Reception Center Male Mon & Decon Robert Swartz FEMA RI
Windham Reception Center Portal & Secondary Monitoring Ingrid Bruns FEMA RI
Windham Reception Center Vehicle Mon-Decon & Traffic *Helen LaForge FEMA RI
* Team Leader
20
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
APPENDIX B: EXERCISE PLAN This section contains a summary of the simulated sequence of events used as the basis for
invoking emergency response actions by OROs during the Millstone Nuclear Power Station
exercise on June 30, 2010.
The scenario was approved by the Federal Emergency Management Agency (FEMA) Region I.
The summary presented in this appendix is a compilation of exercise scenario materials
submitted by the Millstone Nuclear Power Station.
21
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
1
WIN
DH
AM
HO
ST C
OM
MU
NIT
Y
E
OC
/Rec
eptio
n C
ente
r
Exe
rcis
e Sc
enar
io 2
010
N
ote:
* in
dica
tes o
n-th
e-sp
ot c
orre
ctio
n al
low
ed
A
PPR
OX
. TIM
E O
F
DE
MO
NST
RA
TIO
N
EV
AL
. AR
EA
Su
b el
emen
t L
OC
AT
ION
C
ON
TR
OL
LE
R
ME
SSA
GE
to
PLA
YE
R
SC
EN
AR
IO E
VE
NT
EO
C P
HA
SE:
0745
No
Eval
uatio
n D
ispa
tch
Cen
ter
(Win
dham
Pu
blic
Saf
ety
Bui
ldin
g)
ME
SSA
GE
#1
(Ini
tial
Not
ifica
tion)
D
EMH
S R
egio
n 4
Con
trol C
ell
To W
indh
am
Dis
patc
h/EM
D
DE
MH
S R
egio
n 4
Off
ice—
M
essa
ge fr
om a
sim
ulat
ed D
EMH
S R
egio
n 4
Coo
rdin
ator
(con
trol c
ell)
to n
otify
W
indh
am H
ost C
omm
unity
via
tele
phon
e ca
ll of
dec
lare
d Si
te A
rea
Em
erge
ncy.
Will
iman
tic D
ispa
tch
rece
ives
cal
l, ta
kes m
essa
ge a
nd m
akes
not
ifica
tion
calls
pe
r the
ir pr
oced
ure.
08
00-0
815
No
Eval
uatio
n D
ispa
tch
Cen
ter
(Pub
lic S
afet
y B
uild
ing)
W
illim
antic
Dis
patc
her m
akes
cal
l to
EMD
/des
igne
e. E
MD
aut
horiz
es “
call-
out”
of
EO
C re
spon
ders
.
08
15-0
900
N
o Ev
alua
tion
EO
C
(Win
dham
Pu
blic
Saf
ety
Bui
ldin
g)
St
aff b
egin
s to
arriv
e at
EO
C.
0830
– 0
900
No
Eval
uatio
n E
OC
M
ESS
AG
E #
2 EO
C C
ontro
ller
To
Win
dham
EO
C
Follo
win
g EO
C a
ctiv
atio
n, c
omm
unic
atio
n ch
ecks
are
con
duct
ed w
ith si
mul
ated
R
egio
n 4
Off
ice
(con
trolle
r cel
l). “
This
is a
dr
ill”
will
be
used
dur
ing
all r
adio
co
mm
unic
atio
ns.
0900
1.
c.1
Dire
ctio
n an
d E
OC
M
ESS
AG
E #
3
The
sim
ulat
ed R
egio
n 4
Coo
rdin
ator
(c
ontro
ller)
pro
vide
s upd
ate
info
rmat
ion
on
22
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
2
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
Con
trol
D
EMH
S R
egio
n 4
Con
trol C
ell
To
Win
dham
EO
C
the
decl
ared
Gen
eral
Em
erge
ncy
at
Mill
ston
e di
rect
ing
Win
dham
Hos
t C
omm
unity
EO
C D
irect
or to
pre
pare
the
Rec
eptio
n C
ente
r to
rece
ive
evac
uees
from
th
e de
sign
ated
EPZ
tow
ns.
The
tota
l 20%
pop
ulat
ion
coun
t use
d fo
r N
ew L
ondo
n an
d Fi
sher
s Isl
and
in th
e pl
an
is 5
,440
for p
lann
ing
purp
oses
and
sh
elte
ring.
No
Eval
uatio
n E
OC
Prim
ary
Dis
play
s in
the
EOC
con
sist
of
Emer
genc
y C
lass
ifica
tion
Leve
l tab
le,
Shel
ter s
tatu
s Boa
rd, E
vacu
atio
n M
ap,
Loca
l Tra
ffic
Map
and
Shi
ft Si
gn-in
Boa
rd.
0900
EO
C
Th
e EM
D re
ques
ts th
e W
illim
antic
D
ispa
tche
r to
“ton
e-ou
t” W
indh
am F
ire
Dep
artm
ent s
taff
and
Vol
unte
er F
Ds t
o ac
tivat
e th
e R
ecep
tion
Cen
ter a
t Win
dham
H
. S.
0900
-100
0 3.
d.1
Traf
fic C
ontro
l (N
o Ev
alua
tion)
EO
C
Th
e W
indh
am P
olic
e D
ept.
is re
spon
sibl
e fo
r the
tow
n’s T
raff
ic C
ontro
l fro
m e
ntry
po
int t
o R
ecep
tion
Cen
ter a
nd w
ill
parti
cipa
te a
t the
EO
C o
nly
(not
eva
luat
ed).
Im
plem
enta
tion
of tr
affic
con
trol i
nclu
ding
Tr
affic
Con
trol p
oint
s and
pot
entia
l im
pedi
men
ts to
traf
fic fl
ow a
s the
y ex
ist o
n th
e da
y of
the
drill
will
be
cond
ucte
d by
di
scus
sion
onl
y.
0915
EO
C
ME
SSA
GE
#4
Reg
ion
4 C
ontro
l C
ell T
o W
indh
am
EOC
Dire
ctor
EMD
/Dire
ctor
is n
otifi
ed b
y R
egio
n 4
Coo
rdin
ator
(Con
trolle
r mes
sage
) tha
t the
EP
Z pu
blic
is b
eing
adv
ised
to ta
ke K
I ta
blet
s.
23
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
3
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
EO
C
The
Red
Cro
ss a
nd sc
hool
adm
inis
trativ
e pe
rson
nel d
iscu
ss p
lan
for o
peni
ng
shel
ter(
s).
Thes
e w
ill b
e po
sted
on
the
EOC
shel
ter b
oard
.
E
OC
det
erm
ines
shel
ter n
eeds
for
popu
latio
n ex
pect
ed.
AR
C re
pres
enta
tive
and
EOC
Dire
ctor
may
det
erm
ine
orde
r of
shel
ter o
peni
ng b
ased
on
avai
labi
lity,
lo
catio
n an
d ca
paci
ty o
f eac
h fa
cilit
y.
EO
C
R
ed C
ross
cal
ls o
ut fo
r Red
Cro
ss
repr
esen
tativ
es to
staf
f the
Rec
eptio
n C
ente
r to
assi
st w
ith sh
elte
r ass
ignm
ent.
(Sh
elte
rs w
ill n
ot b
e st
affe
d fo
r thi
s de
mon
stra
tion.
) R
ed C
ross
pre
pare
s she
lter
man
agem
ent r
oste
r/pla
n. A
t lea
st o
ne
repr
esen
tativ
e as
sist
s reg
istra
tion
staf
f with
in
form
atio
n on
shel
ter a
vaila
bilit
y at
the
rece
ptio
n ce
nter
. R
EC
EPT
ION
CE
NT
ER
SE
T-U
P PH
ASE
/With
EO
C A
ctiv
ated
R
EC
EPT
ION
C
EN
TE
R
(Win
dham
H
.S.)
R
ecep
tion
Cen
ter
Act
ivat
ion
Win
dham
F.D
dis
tribu
tes e
quip
men
t and
su
pplie
s to
rece
ptio
n ce
nter
. W
indh
am F
.D. a
lso
prov
ides
radi
o eq
uipm
ent a
nd w
ill p
rovi
de tr
affic
con
trol
at th
e ve
hicl
e m
onito
ring
and
park
ing
area
on
ly.
1.
c.1
Dire
ctio
n an
d C
ontro
l
The
Win
dham
FD
des
igna
ted
Inci
dent
C
omm
ande
r will
act
as R
ecep
tion
Cen
ter
Man
ager
and
mai
ntai
n co
mm
unic
atio
ns a
nd
cont
act b
etw
een
Rec
eptio
n C
ente
r loc
atio
ns
and
the
Win
dham
EO
C.
A c
omm
and
24
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
4
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
cent
er w
ill b
e es
tabl
ishe
d at
the
Rec
eptio
n C
ente
r, af
ter w
hich
the
Win
dham
EO
C w
ill
ceas
e to
be
the
com
man
d ce
nter
. 09
15 -0
930
1.e
.1*
Equi
p an
d Su
pplie
s
3.a.
1*
Dos
imet
ry
3.
d.1
Dos
imet
ry B
riefin
g
RE
CE
PTIO
N
CE
NT
ER
Follo
win
g th
eir b
riefin
g, W
illim
antic
and
W
indh
am F
Ds w
ill b
egin
to se
t-up
the
Rec
eptio
n C
ente
r.
Dos
imet
ry is
pre
pare
d an
d do
sim
etry
pa
perw
ork
is in
itiat
ed fo
r loc
al W
indh
am
radi
olog
ical
em
erge
ncy
wor
kers
onl
y. A
PR
D a
nd 0
-5R
Sel
f-re
adin
g do
sim
eter
s are
is
sued
. (T
he 0
-200
R D
osim
eter
con
tain
ed
with
in th
e pa
cket
is n
ot is
sued
to h
ost E
-w
orke
rs p
er p
roce
dure
.)
A D
osim
etry
brie
fing
is p
rovi
ded
to a
ll Em
erge
ncy
wor
kers
dur
ing
the
dosi
met
ry
issu
e pr
oces
s. F
emal
e w
orke
rs w
ill b
e br
iefe
d on
spec
ial l
imits
for d
ecla
red
preg
nant
fem
ales
.
The
Win
dham
FD
Rad
iolo
gica
l Off
icer
w
ill p
rovi
de g
uida
nce
as n
eede
d w
ith
radi
olog
ical
issu
es.
0945
- 10
45
1.d.
1*
Com
m. a
nd E
quip
R
EC
EPT
ION
C
EN
TE
R/
EO
C
C
omm
unic
atio
n: R
adio
che
cks a
re
cond
ucte
d be
twee
n R
ecep
tion
Cen
ter
Man
ager
and
the
Win
dham
EO
C.
Com
mun
icat
ions
che
cks a
t Rec
eptio
n C
ente
r bet
wee
n th
e R
ecep
tion
Cen
ter
Man
ager
and
rem
ote
loca
tions
thro
ugho
ut
RC
are
als
o co
nduc
ted.
(R
adio
com
mun
icat
ions
shou
ld b
egin
an
d en
d w
ith “
This
is a
dri
ll.”)
25
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
5
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
0945
- 10
45
6.a.
1*
Mon
/Dec
on.
Reg
iste
r Wor
kers
an
d Ev
acue
es
RE
CE
PTIO
N
CE
NT
ER
W
indh
am
Hig
h Sc
hool
Pr
epar
atio
n of
CD
V-7
00 su
rvey
met
ers.
Su
rvey
met
ers
(CD
V-7
00) a
re
oper
atio
nally
che
cked
for i
ssue
to
mon
itorin
g st
aff r
eady
for u
se. H
and
surv
eys w
ill b
e de
mon
stra
ted
at th
e Se
cond
ary
Mon
itorin
g ar
ea a
nd
Dec
onta
min
atio
n A
reas
.
6.
a.1*
M
on/D
econ
. R
egis
ter W
orke
rs
and
Evac
uees
Pers
onne
l Por
tal M
onito
rs:
Two
porta
l m
onito
rs w
ill b
e se
t up
in th
e gy
mna
sium
an
d op
erat
iona
lly c
heck
ed w
ith a
1 m
icro
-cu
rie c
heck
sour
ce.
(The
se a
re st
agge
red
to
prev
ent e
xitin
g ev
acue
es fr
om c
ross
ing
path
s to
Seco
ndar
y M
onito
ring
or
Reg
istra
tion
path
way
s.)
0945
- 10
45
6.b
.1*
Mon
/Dec
on/
Mon
itorin
g Eq
uipm
ent a
nd
Veh
icle
s
RE
CE
PTIO
N
CE
NT
ER
Veh
icle
Mon
itori
ng/D
econ
.: O
ne v
ehic
le
porta
l will
be
set u
p pe
r dia
gram
in H
igh
Scho
ol p
arki
ng lo
t.
Cle
an a
nd c
onta
min
ated
par
king
are
as
are
show
n in
the
vehi
cle
mon
itorin
g ar
ea
diag
ram
.
V
ehic
le/E
quip
men
t Dec
on. w
ill ta
ke
plac
e by
dis
cuss
ion
only
.
6.a.
1*
Mon
/Dec
on
Reg
iste
r Wor
kers
an
d Ev
acue
es
A S
econ
dary
Mon
itori
ng A
rea
will
be
esta
blis
hed
for m
anua
l sur
vey
prio
r to
deco
ntam
inat
ion
or re
leas
e to
Reg
istra
tion
0945
- 10
45
6.
a.1*
M
on/D
econ
R
egis
ter W
orke
rs
and
Evac
uees
RE
CE
PTIO
N
CE
NT
ER
Sepa
rate
Dec
onta
min
atio
n A
reas
will
be
set u
p fo
r mal
e an
d fe
mal
es w
ithin
sepa
rate
at
hlet
ic lo
cker
room
s. E
ach
has l
ocal
and
fu
ll bo
dy d
econ
tam
inat
ion
area
s, i.e
. han
ds,
face
and
full
body
show
ers i
f nec
essa
ry.
26
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
6
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
T
empo
rary
clo
thin
g is
issu
ed a
s nee
ded.
A
repr
esen
tativ
e sa
mpl
e of
tem
pora
ry
repl
acem
ent c
loth
ing
will
be
avai
labl
e at
ea
ch d
econ
tam
inat
ion
area
.
6.a.
1*
Mon
/Dec
on
Reg
iste
r Wor
kers
an
d Ev
acue
es
Loc
al E
PZ to
wn/
Stat
e E
mer
genc
y W
orke
rs:
Emer
genc
y w
orke
rs w
ho c
ome
to th
e ho
st c
omm
unity
are
iden
tifie
d at
the
Porta
l Mon
itorin
g or
Sec
onda
ry M
onito
ring
stat
ions
. Th
ese
wor
kers
will
hav
e be
en
issu
ed th
eir o
wn
dosi
met
ry (W
orke
rs w
ho
alar
m p
orta
l ret
urn
thei
r dos
imet
ry to
the
desi
gnat
ed c
onta
min
ated
side
of t
he
dosi
met
ry is
sue
tabl
e fo
r mon
itorin
g,
othe
rwis
e it
is re
turn
ed to
cle
an si
de.)
6.
a.1*
M
on/D
econ
R
egis
ter W
orke
rs
and
Evac
uees
RE
CE
PTIO
N
CE
NT
ER
Post
-Dec
onta
min
atio
n m
onito
ring
is
loca
ted
just
pas
t the
dec
onta
min
atio
n ar
eas
prio
r to
indi
vidu
als e
xitin
g th
e de
cont
amin
atio
n ar
eas t
o go
to re
gist
ratio
n.
Pers
onne
l mon
itorin
g fo
rms a
re c
ompl
eted
an
d ev
acue
es re
ceiv
e a
gree
n w
rist b
and
(if
clea
n) a
nd c
opy
of p
erso
nnel
mon
itorin
g fo
rm p
rior t
o be
ing
dire
cted
to th
e re
gist
ratio
n ar
ea.
Esco
rts a
re st
atio
ned
just
out
side
eac
h de
con
area
to a
ssis
t in
dire
ctin
g ev
acue
es
upst
airs
to th
e re
gist
ratio
n ar
ea.
0945
-104
5
3.b.
1 Im
plem
ent K
I
RE
CE
PTIO
N
CE
NT
ER
The
Reg
istr
atio
n C
oord
inat
or w
ill d
irect
R
egis
tratio
n an
d K
I Iss
ue a
reas
and
repo
rt to
the
Rec
eptio
n C
ente
r Man
ager
. Th
e W
indh
am H
uman
Ser
vice
s and
H
ealth
Dep
t will
be
disp
atch
ed to
set u
p a
27
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
7
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
KI T
riage
, KI I
ssue
and
Reg
istra
tion
in th
e up
per l
evel
gym
nasi
um o
f Win
dham
HS.
H
ealth
Dep
t. st
aff w
ill h
ave
the
resp
onsi
bilit
y of
pre
parin
g fo
r the
issu
e of
K
I. A
bin
of K
I tab
lets
, etc
. will
be
avai
labl
e fo
r dis
tribu
tion,
but
will
not
ac
tual
ly b
e is
sued
. (C
andy
may
be
subs
titut
ed fo
r act
ual t
able
ts.)
0945
- 10
45
6.a.
1*
Mon
/Dec
on
Reg
iste
r Wor
kers
an
d Ev
acue
es
RE
CE
PTIO
N
CE
NT
ER
Hum
an S
ervi
ces w
ill d
irect
Eva
cuee
R
egis
tratio
n w
ith p
ossi
ble
assi
stan
ce fr
om
CE
RT
vol
unte
ers f
or d
irect
ing
traff
ic.
Reg
istra
tion
is c
ondu
cted
via
face
-to-f
ace
inte
rvie
w b
y w
ritte
n fo
rms.
Win
dham
IT st
aff w
ill p
rovi
de th
e m
eans
fo
r Dat
a en
try o
f inf
orm
atio
n fr
om th
e fo
rms u
sing
lapt
op c
ompu
ters
.
R
EC
EPT
ION
C
EN
TE
R
Th
e R
ed C
ross
will
ass
ist e
vacu
ees w
ith
shel
ter a
ssig
nmen
t as n
eede
d.
1000
-110
0 1.
c.1
Dire
ctio
n an
d C
ontro
l
RE
CE
PTIO
N
CE
NT
ER
/
EO
C
R
ecep
tion
Cen
ter
Man
ager
/Inc
iden
t C
omm
and
O
nce
Rec
eptio
n C
ente
r sta
tions
repo
rt th
eir r
eadi
ness
to th
e R
ecep
tion
Cen
ter
Man
ager
, the
Rec
eptio
n C
ente
r Man
ager
no
tifie
s the
EO
C th
at th
e R
ecep
tion
Cen
ter
is fu
lly o
pera
tiona
l.
T
he E
OC
will
con
tinue
to re
ceiv
e up
date
s on
stat
us o
f Rec
eptio
n C
ente
r op
erat
ions
and
repo
rts th
is in
form
atio
n to
th
e R
egio
n 4
Coo
rdin
ator
(als
o th
e EO
C
Con
trolle
r) o
nce
Rec
eptio
n C
ente
r is
oper
atio
nal.
28
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
8
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
1100
RE
CE
PTIO
N
CE
NT
ER
Whe
n th
e R
ecep
tion
Cen
ter i
s rea
dy to
re
ceiv
e ev
acue
es a
nd E
OC
has
bee
n no
tifie
d, th
e ac
tual
dem
onst
ratio
n w
ith w
ill
begi
n as
eva
cuee
s arr
ive.
Th
e Le
ad C
ontro
ller w
ill n
otify
the
evac
uees
to p
roce
ed b
y ve
hicl
e to
R
ecep
tion
Cen
ter v
ia H
igh
Stre
et, t
urni
ng
into
the
Hig
h Sc
hool
.
Eva
cuee
s will
be
prov
ided
iden
tific
atio
n pa
cket
s for
this
pur
pose
. R
EC
EPT
ION
CE
NT
ER
DE
MO
NST
RA
TIO
N P
HA
SE/w
ith E
OC
min
imal
ly st
affe
d:
1100
6.a.
1*, 6
.b.1
* V
ehic
le M
onito
ring
& D
econ
tam
inat
ion
Tr
affic
Con
trol
RE
CE
PTIO
N
CE
NT
ER
M
ESS
AG
E #
5
V
ehic
le
Con
trolle
r To
V
ehic
le M
onito
r Le
ad
Veh
icle
Mon
itori
ng
All
arriv
ing
vehi
cles
(mar
ked
as E
vacu
ee
Veh
icle
s) w
ill b
e di
rect
ed th
roug
h th
e po
rtal m
onito
r, lo
gged
if c
onta
min
ated
, m
arke
d an
d di
rect
ed to
par
k in
a d
esig
nate
d “c
lean
” or
“co
ntam
inat
ed”
area
as
appr
opria
te.
(Veh
icle
s may
be
thos
e co
min
g in
from
the
EOC
as w
ell a
s vo
lunt
eer e
vacu
ees.)
11
00 -
1200
6.b.
1*
Mon
/Dec
on
Reg
iste
r Equ
ipm
ent
and
Veh
icle
s
RE
CE
PTIO
N
CE
NT
ER
At l
east
two
vehi
cles
will
be
desi
gnat
ed
“con
tam
inat
ed”
by c
ontro
ller i
njec
t.
Cle
an v
ehic
les m
ay b
e ta
gged
/mar
ked
late
r if
notif
ied
that
the
occu
pant
s wer
e de
term
ined
to b
e co
ntam
inat
ed.
As c
onve
nien
t
Rec
eptio
n C
ente
r M
essa
ge #
6
Veh
icle
ont
rolle
r to
Veh
icle
Mon
. Te
am
Des
crib
e ho
w a
nd w
here
veh
icle
s cou
ld b
e de
cont
amin
ated
if n
eede
d
1100
- 12
00
6.a.
1*
Mon
/Dec
on/R
egis
t. R
EC
EPT
ION
C
EN
TE
R
ME
SSA
GE
#7
Po
rtal M
onito
r Pe
rson
nel M
onito
ring
A
ll in
divi
dual
s (ex
cept
Eva
luat
ors,
29
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
9
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
Wor
kers
and
Ev
acue
es
Con
trolle
r To
Po
rtal M
onito
r A
ttend
ants
Con
trolle
rs, O
bser
vers
) ent
erin
g th
e fa
cilit
y w
ill b
e m
onito
red.
Em
erge
ncy
wor
kers
an
d sp
ecia
l nee
ds in
divi
dual
s, in
clud
ing
pare
nts w
ith c
hild
ren
may
be
give
n hi
gher
pr
iorit
y du
ring
mon
itorin
g.
Indi
vidu
als w
ho a
larm
a p
orta
l mon
itor a
re
dire
cted
to se
cond
ary
mon
itorin
g fo
r a
who
le-b
ody
hand
surv
ey w
ith a
CD
V-7
00
surv
ey m
eter
. In
divi
dual
s who
do
not a
larm
the
porta
l m
onito
r rec
eive
a g
reen
wris
t ban
d as
pro
of
of m
onito
ring,
and
are
dire
cted
to
regi
stra
tion
via
clea
n pa
thw
ay.
A g
reen
wri
st b
and
on th
e ha
nd fr
om
po
rtal m
onito
ring,
seco
ndar
y m
onito
ring
or
po
st d
econ
mon
itorin
g
indi
cate
s the
indi
vidu
al is
“cl
ean”
and
ca
n pr
ocee
d to
reg
istr
atio
n.
11
00 -
1200
6.
b.1*
M
on/D
econ
/Reg
iste
r Equ
ipm
ent a
nd
Veh
icle
s
RE
CE
PTIO
N
CE
NT
ER
M
ESS
AG
E #
8 C
ontin
genc
y Po
rtal C
ontro
ller
to P
orta
l A
ttend
ants
C
ontin
genc
y m
essa
ge (c
aptu
re
dosi
met
ry b
efor
e it
gets
to
seco
ndar
y m
onito
ring)
At l
east
two
indi
vidu
als (
one
fem
ale,
one
m
ale)
will
be
“con
tam
inat
ed”
per c
ontro
ller
mes
sage
. A
t lea
st tw
o of
the
cont
amin
ated
in
divi
dual
s will
be
evac
uate
d EP
Z Em
erge
ncy
Wor
kers
who
will
als
o be
w
earin
g pr
ior i
ssue
d do
sim
etry
.
The
Emer
genc
y w
orke
rs’ d
osim
etry
is
rem
oved
, bag
ged
and
retu
rned
to th
e D
osim
etry
Issu
e/R
etur
n de
sk to
be
read
and
re
cord
ed p
rior t
o th
e em
erge
ncy
wor
ker
leav
ing
the
rece
ptio
n ce
nter
. A c
opy
of th
e
30
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
10
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
com
plet
ed fo
rm sh
ould
be
retu
rned
to th
e em
erge
ncy
wor
ker.
1100
- 12
00
6.a.
1*
Mon
/Dec
on/R
egis
ter W
orke
rs a
nd
Evac
uees
6.
b.1*
M
on/D
econ
/Reg
iste
r Equ
ipm
ent a
nd
Veh
icle
s
RE
CE
PTIO
N
CE
NT
ER
M
ESS
AG
E #
9 C
ontin
genc
y
Seco
ndar
y M
onito
ring
Con
trolle
r to
Se
cond
ary
Mon
itor
Veh
icle
Mon
itorin
g is
not
ified
of p
oten
tial
inte
rnal
con
tam
inat
ion
of a
veh
icle
(p
revi
ousl
y m
onito
red
as c
lean
) so
that
it
can
be ta
gged
/mar
ked
for i
nter
ior
mon
itorin
g la
ter e
ven
if pa
rked
in a
de
sign
ated
cle
an p
arki
ng a
rea.
M
onito
ring
resu
lts w
ill b
e pr
ovid
ed b
y th
e co
ntro
ller.
As C
onve
nien
t 6.
a.1*
M
on/D
econ
/ R
egis
ter W
orke
rs
and
Evac
uees
RE
CE
PTIO
N
CE
NT
ER
M
ESS
AG
E #
10
Po
rtal M
onito
r C
ontro
ller
To
Porta
l Mon
itor
Atte
ndan
ts
Port
al M
onito
ring
(pre
-sta
ged)
de
mon
stra
tion:
Thi
s dem
onst
ratio
n w
ill
take
pla
ce a
fter t
he “
norm
al”
evac
uees
ha
ve g
one
thro
ugh.
Th
e co
ntro
ller w
ill d
irec
t six
indi
vidu
als
thro
ugh
each
por
tal m
onito
r, on
e m
onito
r at
a ti
me
for e
valu
atio
n pu
rpos
es.
A co
ntro
ller a
nd e
valu
ator
mus
t be
pres
ent
for t
his p
ortio
n of
the
dem
onst
ratio
n.
Port
al m
onito
r atte
ndan
ts sh
ould
pro
vide
cl
ear d
irec
tion
for e
nter
ing
and
exiti
ng th
e m
onito
rs a
nd e
nsur
e th
at st
ep-o
ff to
cle
an
area
s are
mai
ntai
ned.
Con
trol
ler s
houl
d al
so ti
me
the
wal
kthr
ough
and
reco
rd
resu
lts.
Popu
latio
ns fo
r eac
h ho
st a
re
mai
ntai
ned
in th
e H
CP-
4.6,
Atta
chm
ent 2
.
M
ESS
AG
E #
11
Seco
ndar
y Pe
rson
nel M
onito
ring
Form
s are
initi
ated
at
Seco
ndar
y M
onito
ring
to in
dica
te th
e
31
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
11
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
Mon
itor
Con
trolle
r To
Sec
onda
ry
Mon
itor
loca
tion
and
cont
amin
atio
n le
vels
for
actio
n in
the
Dec
onta
min
atio
n ar
eas.
H
owev
er, i
f sec
onda
ry m
onito
ring
in
dica
tes n
o co
ntam
inat
ion,
the
indi
vidu
al m
ay b
e di
rect
ed v
ia c
lean
pa
thw
ay to
Reg
istr
atio
n.
Mon
itorin
g re
sults
will
be
prov
ided
by
the
cont
rolle
r. 11
00 -
1200
6.
a.1*
M
on/D
econ
/Reg
iste
r Wor
kers
and
Ev
acue
es
RE
CE
PTIO
N
CE
NT
ER
M
ESS
AG
E #
12
Dec
on A
rea
Are
a C
ontro
ller
To
Post
-Dec
on
Mon
itors
Mal
e/Fe
mal
e D
econ
tam
inat
ion
Are
as
Dec
onta
min
atio
n st
aff r
evie
w P
erso
nnel
M
onito
ring
Form
s and
adv
ise/
assi
st w
ith
deco
ntam
inat
ion
via
disc
ussi
on.
If m
inim
al lo
cal c
onta
min
atio
n is
det
ecte
d,
near
by b
athr
oom
sink
s may
be
utili
zed.
Si
mpl
e in
stru
ctio
ns m
ay b
e po
sted
ove
r si
nk w
ith a
n at
tend
ant n
earb
y to
ass
ist a
nd
dire
ct in
divi
dual
s to
Post
Dec
onta
min
atio
n M
onito
ring.
If
dec
onta
min
atio
n is
succ
essf
ul a
t thi
s po
int,
indi
vidu
als w
ill re
ceiv
e a
gree
n w
rist
brac
elet
and
will
be
dire
cted
to th
e R
egis
tratio
n A
rea
with
a c
opy
of th
eir
Pers
onne
l Mon
itorin
g Fo
rm. M
onito
ring
resu
lts w
ill b
e pr
ovid
ed b
y th
e co
ntro
ller.
If fu
ll sh
ower
is re
com
men
ded,
de
cont
amin
atio
n pr
oced
ures
will
be
desc
ribed
ver
bally
. Te
mpo
rary
repr
esen
tativ
e “c
over
ings
” w
ill
be a
vaila
ble
for d
emon
stra
tion.
Fi
nal m
onito
ring
resu
lts w
ill b
e pr
ovid
ed
by th
e co
ntro
ller.
32
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
12
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
NO
TE
: E
vacu
ees m
ust e
xit
deco
ntam
inat
ion
area
s thr
ough
the
clea
n pa
th to
reg
istr
atio
n. A
traf
fic fl
ow
assi
stan
t sho
uld
be p
oste
d po
st d
econ
to
dire
ct p
eopl
e to
the
door
lead
ing
into
the
gym
nasi
um.
Veh
icle
Mon
itorin
g Te
am, u
pon
bein
g no
tifie
d of
pot
entia
l con
tam
inat
ion
of
vehi
cle
inte
rior s
houl
d ta
g ve
hicl
es fo
r fu
ture
inte
rior m
onito
ring.
(In
terio
r m
onito
ring
of v
ehic
les w
ill n
ot b
e de
mon
stra
ted)
.
3.
b.1
Impl
emen
t KI
KI I
SSU
E
All
“eva
cuee
s” w
ill b
e di
rect
ed to
the
Reg
istra
tion
Are
a, fo
r pro
cess
ing
in th
e gy
mna
sium
.
1.
At K
I Tria
ge, e
vacu
ees w
ill b
e as
ked
if th
ey h
ave
take
n K
I prio
r to
arriv
al.
2.
If Y
ES, e
vacu
ees w
ill b
e di
rect
ed to
R
egis
tratio
n.
3.
If N
O, e
vacu
ees w
ill b
e di
rect
ed to
K
I Iss
ue.
11
00 -
1200
6.
a.1*
M
on/D
econ
/Reg
iste
r Wor
kers
and
Ev
acue
es
RE
CE
PTIO
N
CE
NT
ER
For R
euni
ficat
ion
– A
num
ber o
f inq
uirie
s w
ill b
e m
ade
by th
e co
ntro
ller t
o lo
cate
fa
mily
mem
bers
. Ev
acue
es a
re in
terv
iew
ed/re
gist
ered
by
regi
stra
rs a
t the
regi
stra
tion
area
.
33
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
13
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
A g
reen
wris
t ban
d on
the
hand
or
com
plet
ed P
erso
nnel
Mon
itorin
g Fo
rm is
pr
oof o
f “no
n-co
ntam
inat
ion”
and
pr
evio
usly
mon
itore
d/cl
ean
evac
uees
.
Reg
istra
tion
is c
ompl
eted
by
hand
writ
ten
form
with
ass
ista
nce
from
a re
gist
rar.
B
efor
e le
avin
g ev
acue
es a
re a
lso
prov
ided
with
dec
onta
min
atio
n ad
viso
ry
info
rmat
ion
eith
er v
erba
lly o
r on
a
prin
ted
card
. A
com
pute
r sof
twar
e pr
ogra
m m
ay b
e us
ed
to p
roce
ss in
form
atio
n fr
om th
e w
ritte
n fo
rm to
cre
ate
a da
taba
se o
f inf
orm
atio
n.
An
info
rmat
ion
area
is lo
cate
d ne
ar th
e re
gist
ratio
n ar
ea to
pos
t mes
sage
s giv
en to
re
gist
rars
for r
euni
ficat
ion
of fa
mily
m
embe
rs.
R
ED
CR
OSS
A
ssis
tanc
e A
rea
Sh
elte
r inf
orm
atio
n an
d w
ater
are
pro
vide
d by
Red
Cro
ss st
aff f
ollo
win
g re
gist
ratio
n.
Evac
uees
will
be
dire
cted
to th
e Ex
it or
the
wai
ting
area
. 12
00 -
1230
RE
CE
PTIO
N
CE
NT
ER
M
ESS
AG
E #
13
Le
ad C
ontro
ller
To
Rec
eptio
n C
ente
r M
anag
er
Exe
rcis
e T
erm
inat
ion
Whe
n al
l Rec
eptio
n C
ente
r obj
ectiv
es h
ave
been
dem
onst
rate
d to
the
satis
fact
ion
of
eval
uato
rs, a
con
trolle
r mes
sage
is is
sued
to
the
Rec
eptio
n C
ente
r Man
ager
that
T
he E
xerc
ise
is te
rmin
ated
. (T
he R
CM
m
ay c
hoos
e to
bre
ak d
own
area
s as t
hey
com
plet
e th
eir m
issi
on a
nd re
turn
do
sim
etry
and
met
ers w
hile
oth
er a
reas
are
34
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
14
APP
RO
X. T
IME
OF
D
EM
ON
STR
AT
ION
E
VA
L. A
RE
A
Sub
elem
ent
LO
CA
TIO
N
CO
NT
RO
LL
ER
M
ESS
AG
E to
PL
AY
ER
SC
EN
AR
IO E
VE
NT
still
com
plet
ing
thei
r act
iviti
es.)
Play
end
s and
all
area
s are
retu
rned
to
norm
al c
ondi
tion.
POST
DE
MO
NST
RA
TIO
N P
HA
SE:
1230
- 13
00
R
EC
EPT
ION
C
EN
TE
R
C
ontro
llers
col
lect
al
l pap
er w
ork
and
prov
ide
to
Lead
Con
trolle
r
Play
ers w
ill b
e di
rect
ed to
retu
rn th
eir a
reas
to
a n
orm
al c
ondi
tion
and
repo
rt to
a
spec
ified
are
a fo
r the
ir co
mm
ents
and
lunc
h
35
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
APPENDIX C: WINDHAM RECEPTION CENTER
Extent of Play State of Connecticut & Millstone Station
FEMA Evaluated Windham Host Community –June 30, 2010
Evaluation Area 1 - Emergency Operations Management Sub-element 1.a.1 - Mobilization.
Criterion 1.a.1: Off-site Response organization use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. (NUREG-0654, A.4., D.3., 4., E.1., 2., H.4) INTENT This sub-element is derived from NUREG-0654 which provides that OROs should have the capability to alert, notify, and mobilize emergency personnel and to activate and staff emergency facilities. EXTENT OF PLAY - GENERAL Responsible OROs should demonstrate the capability to receive notification of an emergency situation from the licensee, verify the notification, and contact, alert, and mobilize key emergency personnel in a timely manner. In addition, responsible OROs should demonstrate the activation of facilities for immediate use by mobilized personnel when they arrive to begin emergency operations. Activation of facilities should be completed in accordance with the plan and/or procedures. Pre-positioning of emergency personnel is appropriate, in accordance with the extent of play agreement, at those facilities located beyond a normal commuting distance from the individual’s duty location or residence. Further, pre-positioning of staff for an out-of-sequence demonstration is appropriate in accordance with the extent of play agreement. All activities must be based on the ORO’s plans and procedures, and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. The Windham Host Community will be mobilized by phone call or controller message from
the State Region 4 Coordinator to the Windham Emergency Management Director. 2. No turnover between the Windham EOC and the Reception Center will be demonstrated. 3. Activation of congregate care facilities will be simulated. 4. Operations/communications staff will show call down or computerized lists for the
notification of Windham officials and emergency responders to the FEMA evaluator.
36
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
5. Volunteer Fire Department personnel may be prepositioned at a nearby location. 6. Additional responders from outside the immediate area, to include American Red Cross,
may be prepositioned at a nearby location. Areas Requiring Corrective Action (ARCA) NONE Evaluation Area 1 – Emergency Operations Management Sub-element 1.b.1 – Facilities.
Criterion 1.b.1: Facilities are sufficient to support the emergency response. (NUREG-0654, H) INTENT This sub-element is derived from NUREG-0654, which provides that OROs should have facilities to support emergency response. EXTENT OF PLAY - GENERAL Facilities will only be specifically evaluated for this criterion if they are new or have substantial changes in structure or mission. Responsible OROs should demonstrate the availability of facilities that support the accomplishment of emergency operations. Some of the areas to be considered are: adequate space, furnishings, lighting, restrooms, ventilation, backup power and/or alternate facility (if required to support operations). Facilities must be set up based on the ORO’s plans and procedures and demonstrated, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. The Windham EOC will not be evaluated. 2. The Eastern Connecticut State University Student Center is a new facility on the list of
shelters, and FEMA will do a walk-through of that shelter out of sequence. Areas Requiring Corrective Action (ARCA) NONE
37
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
Evaluation Area 1 – Emergency Operations Management Sub-element 1.c.1. Direction and Control.
Criterion 1.c.1: Key personnel with leadership roles for the Off-Site Response Organization provide direction and control to that part of the overall response effort for which they are responsible. NUREG-0654, A.1.d., 2.a.,b.) INTENT This sub-element is derived from NUREG-0654, which provides that the ORO have the capability to control their overall response to an emergency. EXTENT OF PLAY - GENERAL Leadership personnel should demonstrate the ability to carry out essential functions of the response effort, for example; keeping the staff informed through periodic briefings and/or other means, coordinating with other appropriate OROs and ensuring completion of requirements and requests. All activities associated with direction and control must be performed based on the ORO’s plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. The Reception Center Manager as Incident Commander will be in command at the Reception
Center. Areas Requiring Corrective Action (ARCA) NONE Evaluation Area 1 – Emergency Operations Management Sub-element 1.d.1. Communications and Equipment.
Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations. (NUREG-0654, F.1., 2.) INTENT This sub-element is derived from NUREG-0654, which provides that OROs should establish reliable primary and backup communication systems to ensure communications with key emergency personnel at locations such as the following: appropriate contiguous governments
38
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
within the emergency planning zone (EPZ), Federal emergency response organizations, the licensee and its facilities, emergency operations centers (EOC), and field teams. EXTENT OF PLAY - GENERAL OROs will demonstrate that a primary, and at least one backup system, are fully functional at the beginning of an exercise. If a communications system or systems are not functional, but exercise performance is not affected, no exercise issue will be assessed. Communications equipment and procedures for facilities and field units should be used as needed for the transmission and receipt of exercise messages. All facilities and field teams should have the capability to access at least one communication system that is independent of the commercial telephone system. Responsible OROs should demonstrate the capability to manage the communication systems and ensure that all message traffic is handled without delays that might disrupt the conduct of emergency operations. OROs should ensure that a coordinated communication link for fixed and mobile medical support facilities exist. The specific communications capabilities of OROs should be commensurate with that specified in the response plan and/or procedures. Exercise scenarios could require the failure of a communications system and the use of an alternate system. All activities associated with the management of communications capabilities must be demonstrated based on the ORO’s plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. Communications checks will be demonstrated throughout the Reception Center, and
between Windham Emergency Management and the Region 4 Office, and between the Windham EOC and the Reception Center.
2. Immediate correction of performance issues relating to communications and equipment where remediation is possible will be allowed.
Areas Requiring Corrective Action (ARCA) NONE Evaluation Area 1 – Emergency Operations Management Sub-element 1.e.1. - Equipment And Supplies To Support Operations.
Criterion 1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations. (NUREG-0654, H., J.10.a.b.e.f.j.k., 11, K.3.a.)
39
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
INTENT This sub-element is derived from NUREG-0654, which provides that OROs have emergency equipment and supplies adequate to support the emergency response. EXTENT OF PLAY - GENERAL Equipment within the facility(ies) should be sufficient and consistent with the role assigned to that facility in the ORO’s plans and/or procedures in support of emergency operations. Use of maps and displays is encouraged. All instruments, including air sampling flow meters (field teams only), should be inspected, inventoried, and operationally checked before each use. They should be calibrated in accordance with the manufacturer’s recommendations (or at least annually for the unmodified CDV-700 series or if there are no manufacturer’s recommendations for a specific instrument; modified CDV-700 instruments should be calibrated in accordance with the recommendation of the modification manufacturer.). A label indicating such calibration should be on each instrument or verifiable by other means. Note: Field team equipment is evaluated under 4.a.1; radiological laboratory equipment under 4.c.1; reception center and emergency worker facilities’ equipment is evaluated under 6.a.1; and ambulance and medical facilities’ equipment is evaluated under 6.d.1. Sufficient quantities of appropriate direct-reading and permanent record dosimetry and dosimeter chargers should be available for issuance to all categories of emergency workers that could be deployed from that facility. Appropriate direct-reading dosimeters should allow individual(s) to read the administrative reporting limits and maximum exposure limits contained in the ORO’s plans and procedures. Dosimeters should be inspected for electrical leakage at least annually and replaced, if necessary. CDV-138s, due to their documented history of electrical leakage problems, should be inspected for electrical leakage at least quarterly and replaced if necessary. This leakage testing will be verified during the exercise, through documentation submitted in the Annual Letter of Certification, and/or through a staff assistance visit. Responsible OROs should demonstrate the capability to maintain inventories of KI sufficient for use by emergency workers, as indicated on rosters; institutionalized individuals, as indicated in capacity lists for facilities; and, where stipulated by the plan and/or procedures, members of the general public (including transients) within the plume pathway EPZ.
Quantities of dosimetry and KI available and storage locations(s) will be confirmed by physical inspection at storage location(s) or through documentation of current inventory submitted during the exercise, provided in the Annual Letter of Certification submission, and/or verified during a Staff Assistance Visit. Available supplies of KI should be within the expiration date indicated on KI bottles or blister packs. As an alternative, the ORO may produce a letter from FEMA
40
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
indicating that the KI supply remains potent, in accordance with Food and Drug Administration (FDA) guidance. FEMA issues these letters based upon the findings of the certified independent laboratory that performed the analysis at the ORO’s request and expense. At locations where traffic and access control personnel are deployed, appropriate equipment (e.g., vehicles, barriers, traffic cones and signs, etc.) should be available or their availability described. All activities must be based on the ORO’s plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. A limited number of supplies (for demonstration purposes only) will be brought to the
Reception Center. 2. Immediate correction will be allowed if initially not being able to show proper equipment
supplies, or documentation. Areas Requiring Corrective Action (ARCA) NONE Evaluation Area 3 – Protective Action Implementation Sub-element 3.a.1. Implementation of Emergency Worker Exposure Control.
Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.) INTENT This sub-element is derived from NUREG-0654, which provides that OROs should have the capability to provide for the following: distribution, use, collection, and processing of direct-reading dosimeters and permanent record dosimeters; provide for direct-reading dosimeters to be read at appropriate frequencies by emergency workers; maintain a radiation dose record for each emergency worker; and provide for establishing a decision chain or authorization procedure for emergency workers to incur radiation exposures in excess of protective action guides, always applying the ALARA (As Low As is Reasonably Achievable) principle as appropriate. EXTENT OF PLAY - GENERAL OROs should demonstrate the capability to provide appropriate direct-reading and permanent record dosimetry, dosimetry chargers, and instructions on the use of dosimetry to emergency workers. For evaluation purposes, appropriate direct-reading dosimetry is defined as dosimetry that allows
41
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
individual(s) to read the administrative reporting limits (that are pre-established at a level low enough to consider subsequent calculation of Total Effective Dose Equivalent) and maximum exposure limits (for those emergency workers involved in life saving activities) contained in the OROs plans and procedures. Each emergency worker should have the basic knowledge of radiation exposure limits as specified in the ORO's plan and/or procedures. Procedures to monitor and record dosimeter readings and to manage radiological exposure control should be demonstrated. During a plume phase exercise, emergency workers should demonstrate the procedures to be followed when administrative exposure limits and turn-back values are reached. The emergency worker should report accumulated exposures during the exercise as indicated in the plans and procedures. OROs should demonstrate the actions described in the plan and/or procedures by determining whether to replace the worker, to authorize the worker to incur additional exposures or to take other actions. If scenario events do not require emergency workers to seek authorizations for additional exposure, evaluators should interview at least two emergency workers, to determine their knowledge of whom to contact in the event authorization is needed and at what exposure levels. Emergency workers may use any available resources (e.g. written procedures and/or co-workers) in providing responses. Although it is desirable for all emergency workers to each have a direct-reading dosimeter, there may be situations where team members will be in close proximity to each other during the entire mission and adequate control of exposure can be affected for all members of the team by one dosimeter worn by the team leader. Emergency workers who are assigned to low exposure rate areas, e.g., at reception centers, counting laboratories, emergency operations centers, and communications centers, may have individual direct-reading dosimeters or they may be monitored by dosimeters strategically placed in the work area. It should be noted that, even in these situations, each team member must still have their own permanent record dosimeter. Individuals without specific radiological response missions, such as farmers for animal care, essential utility service personnel, or other members of the public who must re-enter an evacuated area following or during the plume passage, should be limited to the lowest radiological exposure commensurate with completing their missions. All activities must be based on the ORO’s plans and procedures and completed as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. Dosimetry packets will be issued to a representative number of Reception Center
radiological emergency workers only. (Non-radiological emergency workers such as KI issue and registration staff will not be issued dosimetry.)
2. Radiological emergency worker knowledge will be demonstrated through evaluator interviews.
42
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
3. Immediate correction of issues relating to exposure control where remediation is
possible will be allowed. Areas Requiring Corrective Action (ARCA) None Evaluation Area 3 – Protective Action Implementation Sub-element 3.b.1 – Implementation of KI Decision
Criterion 3.b.1: KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained. (NUREG-0654, E. 7., J. 10. e., f.) INTENT This sub-element is derived from NUREG-0654, which provides that OROs should have the capability to provide radio-protective drugs for emergency workers, institutionalized individuals, and, if in the plan and/or procedures, to the general public for whom immediate evacuation may not be feasible, very difficult, or significantly delayed. While it is necessary for OROs to have the capability to provide KI to emergency workers and institutionalized individuals, the provision of KI to the general public is an ORO option, reflected in ORO’s plans and procedures. Provisions should include the availability of adequate quantities, storage, and means of the distribution of radioprotective drugs. EXTENT OF PLAY - GENERAL OROs should demonstrate the capability to make KI available to emergency workers, institutionalized individuals, and, where provided for in the ORO plan and/or procedures, to members of the general public. OROs should demonstrate the capability to accomplish distribution of KI consistent with decisions made. Organizations should have the capability to develop and maintain lists of emergency workers and institutionalized individuals who have ingested KI, including documentation of the date(s) and time(s) they were instructed to ingest KI. The ingestion of KI recommended by the designated ORO health official is voluntary. For evaluation purposes, the actual ingestion of KI is not necessary. OROs should demonstrate the capability to formulate and disseminate appropriate instructions on the use of KI for those advised to take it. If a recommendation is made for the general public to take KI, appropriate information should be provided to the public by the means of notification specified in the ORO’s plan and/or procedures. Emergency workers should demonstrate the basic knowledge of procedures for the use of KI whether or not the scenario drives the use of KI. This can be accomplished by an interview with the evaluator.
43
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
All activities must be based on the ORO’s plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. The supply of general public (evacuee) KI will be available for evaluator inspection, only a
representative number of packets will be used for simulated distribution during the evaluated exercise.
2. Reception center staff will demonstrate the process, procedures and equipment for KI distribution and direction to ingest KI through discussion to simulated evacuees at the facility. KI will not be ingested by any drill participants.
Area Requiring Corrective Action (ARCA) NONE
Evaluation Area 3 – Protective Action Implementation Sub-element 3.d.1. Implementation of Traffic and Access Control –TCP/ACP are established.
Criterion 3.d.1: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel. (NUREG-0654, J.10.g., j., k.) INTENT This sub-element is derived from NUREG-0654, which provides that OROs have the capability to implement protective action plans, including relocation and restriction of access to evacuated areas. This sub-element focuses on selecting, establishing, and staffing of traffic and access control points and removal of impediments to the flow of evacuation traffic. EXTENT OF PLAY - GENERAL OROs should demonstrate the capability to select, establish, and staff appropriate traffic and access control points consistent with evacuation/sheltering decisions (for example evacuating, sheltering and relocation), in a timely manner. OROs should demonstrate the capability to provide instructions to traffic and access control staff on actions to take when modifications in protective action strategies necessitate changes in evacuation patterns or in the area(s) where access is controlled. Traffic and access control staff should demonstrate accurate knowledge of their roles and responsibilities. This capability may be demonstrated by actual deployment or by interview in accordance with the extent of play agreement.
44
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
In instances where OROs lack authority necessary to control access by certain types of traffic (rail, water, and air traffic), they should demonstrate the capability to contact the State or Federal agencies with authority to control access. All activities must be based on the ORO’s plans and procedures and completed, as they would be in an actual emergency, unless specified above or indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. Traffic control points, designated in the plan, will not actually be posted by the police. Area Requiring Corrective Action (ARCA) NONE Evaluation Area 6 – Support Operations/Facilities Sub-element 6.a.1. Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees.
Criterion 6.a.1: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.; K.5.b.) INTENT This sub-element is derived from NUREG-0654, which provides that OROs have the capability to implement radiological monitoring and decontamination of evacuees and emergency workers, while minimizing contamination of the facility, and registration of evacuees at reception centers. EXTENT OF PLAY - GENERAL Radiological monitoring, decontamination, and registration facilities for evacuees/ emergency workers should be set up and demonstrated as they would be in an actual emergency or as indicated in the extent of play agreement. This would include adequate space for evacuees’ vehicles. Expected demonstration should include 1/3 of the monitoring teams/portal monitors required to monitor 20% of the population allocated to the facility within 12 hours. Prior to using a monitoring instrument(s), the monitor(s) should demonstrate the process of checking the instrument(s) for proper operation. Staff responsible for the radiological monitoring of evacuees should demonstrate the capability to attain and sustain a monitoring productivity rate per hour needed to monitor the 20% emergency planning zone (EPZ) population planning base within about 12 hours. This monitoring productivity rate per hour is the number of evacuees that can be monitored per hour by the total complement of monitors using an appropriate monitoring procedure. A minimum of six individuals per monitoring station should be monitored, using equipment and procedures specified in the plan and/or procedures, to allow demonstration of monitoring, decontamination, and registration capabilities. The monitoring sequences for the first six simulated evacuees per monitoring team will be timed by the evaluators in order to determine whether the twelve-hour requirement can be met. Monitoring of emergency workers does not
45
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
have to meet the twelve-hour requirement. However, appropriate monitoring procedures should be demonstrated for a minimum of two emergency workers.
Decontamination of evacuees/emergency workers may be simulated and conducted by interview. The availability of provisions for separately showering should be demonstrated or explained. The staff should demonstrate provisions for limiting the spread of contamination. Provisions could include floor coverings, signs and appropriate means (e.g. partitions, roped-off areas) to separate clean from potentially contaminated areas. Provisions should also exist to separate contaminated and uncontaminated individuals, provide changes of clothing for individuals whose clothing is contaminated, and store contaminated clothing and personal belongings to prevent further contamination of evacuees or facilities. In addition, for any individual found to be contaminated, procedures should be discussed concerning the handling of potential contamination of vehicles and personal belongings. Monitoring personnel should explain the use of action levels for determining the need for decontamination. They should also explain the procedures for referring evacuees who cannot be adequately decontaminated for assessment and follow up in accordance with the ORO’s plans and procedures. Contamination of the individual will be determined by controller inject and not simulated with any low-level radiation source. The capability to register individuals upon completion of the monitoring and decontamination activities should be demonstrated. The registration activities demonstrated should include the establishment of a registration record for each individual, consisting of the individual’s name, address, results of monitoring, and time of decontamination, if any, or as otherwise designated in the plan. Audio recorders, camcorders, or written records are all acceptable means for registration. EXTENT OF PLAY - SPECIFIC 1. Three portal monitors assigned to Windham will be demonstrated—two for personnel, one
for vehicles (one portal monitor is required for personnel, one for vehicles). 2. At least one staff radiological monitor will demonstrate hand-held instrument monitoring
techniques for personnel at the Secondary Monitoring Station. 3. Reception Center staff will use radiological monitoring equipment issued to the Windham
Fire Department, to include CD V 700 with probe. 4. Contamination control measures and decontamination techniques for at least one male and
one female subject will be simulated. 5. Vehicle monitoring will be demonstrated via portal monitoring only. 6. A representative sample of replacement clothing resources will be available for
decontaminated individuals in the male and female decontamination areas. 7. Immediate correction of issues relating to monitoring, decontamination and registration
where remediation is possible will be allowed. Areas Requiring Corrective Action (ARCA) 1. A greeter in the vehicle monitoring area was observed placing a hand on two of the first three
vehicles coming into the vehicle monitoring area. Although he realized what he had done, he took no action to determine if he was contaminated or not. A vehicle monitoring team
46
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
member logging contaminated vehicles placed a clipboard on the hood of a contaminated vehicle in the contaminated vehicle parking lot.
RECOMMENDATION: Additional training to insure that procedures are followed and an awareness established of potential cross-contamination causes while working with potentially contaminated vehicles and equipment. 2. Due to the need for personnel to direct vehicles along an elongated route into the vehicle
monitoring area, personnel from the clean vehicle parking area were reassigned. This left only one person in the “Clean Parking Lot” to register vehicles. A line began to form and was beginning to affect the ability of additional vehicles to exit the portal monitor. There was no actual obstruction during the drill but sufficient personnel need to be assigned to the “Clean Parking Lot” so that vehicle information can be recorded at the parking space. This will free up the area leading into the lot and not cause a backup during a true event.
RECOMMENDATION: Review the reception center plan, vehicle traffic and monitoring sections, to insure that sufficient personnel are allocated to those operations. Evaluation Area 6 – Support Operations/Facilities Sub-element 6.b.1. Monitoring and Decontamination of Evacuee Vehicles and Emergency Worker equipment.
Criterion 6.b.1: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment including vehicles. (NUREG-0654, K.5.b) INTENT This sub-element is derived from NUREG-0654, which provides that OROs have the capability to implement radiological monitoring and decontamination of emergency worker equipment, including vehicles. EXTENT OF PLAY - GENERAL The monitoring staff should demonstrate the capability to monitor equipment, including vehicles, for contamination in accordance with the ORO’s plans and procedures. Specific attention should be given to equipment, including vehicles, that was in contact with individuals found to be contaminated. The monitoring staff should demonstrate the capability to make decisions on the need for decontamination of equipment including vehicles based on guidance levels and procedures stated in the plan and/or procedures. The area to be used for monitoring and decontamination should be set up as it would be in an actual emergency, with all route markings, instrumentation, record keeping and contamination control measures in place. Monitoring procedures should be demonstrated for a minimum of
47
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
one vehicle. It is generally not necessary to monitor the entire surface of vehicles. However, the capability to monitor areas such as air intake systems, radiator grills, bumpers, wheel wells, tires, and door handles should be demonstrated. Interior surfaces of vehicles that were in contact with individuals found to be contaminated should also be checked. Decontamination capabilities, and provisions for vehicles and equipment that cannot be decontaminated, may be simulated and conducted by interview. All activities associated with this criterion must be based on the ORO’s plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. Decontamination capabilities and provisions for vehicles and equipment will be
demonstrated by discussion. 2. No vehicle interiors will be monitored. 3. Immediate correction of issues relating to monitoring and decontamination of evacuees and
emergency worker equipment will be allowed. Areas Requiring Corrective Action (ARCA) None Evaluation Area 6 – Support Operations/Facilities Sub-element 6.c.1 Temporary Care of Evacuees Criterion 6.c.1: Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross planning guidelines (found in MASS CARE-Preparedness Operations, ARC 3031). Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities. (NUREG-0654, J.10.h., 12.) INTENT This sub-element is derived from NUREG-0654, which provides that OROs demonstrate the capability to establish relocation centers in host areas. Congregate care is normally provided in support of OROs by the American Red Cross under existing letters of agreement. EXTENT OF PLAY - GENERAL Under this criterion, demonstration of congregate care centers may be conducted out of sequence with the exercise scenario. The evaluator should conduct a walk-through of the center to determine, through observation and inquiries, that the services and accommodations are consistent with ARC 3031 In this simulation, it is not necessary to set up operations, as they would be in an actual
48
UnclassifiedRadiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Millstone Power Station
_____________________________________________________________________
emergency. Alternatively, capabilities may be demonstrated by setting up stations for various services and providing those services to simulated evacuees. Given the substantial differences between demonstration and simulation of this criteria, exercise demonstration expectations should be clearly specified in extent-of-play agreements. Congregate care staff should also demonstrate the capability to ensure that evacuees have been monitored for contamination, have been decontaminated as appropriate, and have been registered before entering the facility. This capability may be determined through an interview process. If operations at the center are demonstrated, material that would be difficult or expensive to transport (e.g., cots, blankets, sundries, and large-scale food supplies) need not be physically available at the facility(ies). However, availability of such items should be verified by providing the evaluator a list of sources with locations and estimates of quantities. All activities associated with this criterion must be based on the ORO’s plans and procedures and completed, as they would be in an actual emergency, unless noted above or otherwise indicated in the extent of play agreement. EXTENT OF PLAY - SPECIFIC 1. Only one shelter, the new ECSU Student Center, will be evaluated. This will take place during a
walk-through, out of sequence from the Reception Center portion of the exercise. Areas Requiring Corrective Action (ARCA) None
49
UnclassifiedRadiological Emergency Preparedness Program (REP)