AT
TS
XETE FO
SA4 4 5 6
REG
IS
TERED ARCHITEC
TWAL
LY HUERTA
FOR CITY OF HOUSTON USE ONLY
DRAWING SCALE
SHEETNo: OF
HORZ :
VERT :
FILE NO:
STORM
WASTEWATER
WATER
FACILITIES
STORM WATER QUALITY
STREET & TRAFFIC
CITY OF HOUSTONDEPARTMENT OF PUBLIC WORKS AND ENGINEERING
NOTE: CITY SIGNATURES VALID FOR ONE YEAR ONLY AFTER DATE OF SIGNATURES
DATE:
JOB NUMBER:
DESIGNED BY:
DRAWN BY:
-
BURNETT TRANSIT CENTERESCALATOR DESIGN
88
APP. DATE
BUY AMERICA REQUIREMENTS(49 CFR 661)
ALL IRON, STEEL, AND MANUFACTUREDPRODUCTS USED IN THIS PROJECT MUST
BE PRODUCED IN THEUNITED STATES OF AMERICA
3
2
1
02/08/16
1
WH
SD
BURNETT TRANSIT CENTERESCALATOR DESIGN
CONSTRUCTION DOCUMENTDRAWINGS
February 08, 2016
METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTYCARRIN PATMAN, CHAIR
JIM ROBINSON, CFE, FIRST VICE-CHAIRCINDY SIEGEL, SECOND VICE-CHAIR
TROI TAYLOR, SECRETARYLISA GONZALES CASTANEDA, P.E.
DON ELDER JR.LEX FRIEDEN
SANJAY RAMABHADRAN (RAM), P.E.CHRISTOF SPIELER
AT
TS
XETE FO
SA4 4 5 6
REG
IS
TERED ARCHITEC
TWAL
LY HUERTA
FOR CITY OF HOUSTON USE ONLY
DRAWING SCALE
SHEETNo: OF
HORZ :
VERT :
FILE NO:
STORM
WASTEWATER
WATER
FACILITIES
STORM WATER QUALITY
CITY OF HOUSTONDEPARTMENT OF PUBLIC WORKS AND ENGINEERING
NOTE: CITY SIGNATURES VALID FOR ONE YEAR ONLY AFTER DATE OF SIGNATURES
DATE:
JOB NUMBER:
DESIGNED BY:
DRAWN BY:
-
BURNETT TRANSIT CENTERESCALATOR DESIGN
88
APP. DATE
BUY AMERICA REQUIREMENTS(49 CFR 661)
ALL IRON, STEEL, AND MANUFACTUREDPRODUCTS USED IN THIS PROJECT MUST
BE PRODUCED IN THEUNITED STATES OF AMERICA
3
2
1
STREET & TRAFFIC
02/08/16
2
WH
SD
A001INDEX & LOCATION
MAP
Project Address: Burnett TC Casa De Amigos SB, Houston TX
Location Map: Not To Scale
INDEX OF DRAWINGS
GENERALA001 - INDEX & LOCATION MAPA002 - ABBREVIATIONS
CIVILC001 - GENERAL NOTESC002 - METRO BURNETT STATION, A SUBDIVISION OF 4.1087
ACRES OF LAND LOCATED IN THE JOHN AUSTIN SURVEY A-1C003 - PARTIAL TOPOGRAPHIC SURVEY OF 4.1419 ACRE PARCEL,
BURNETT PLAZA JOHN AUSTIN SURVEY, A-1, SHEET 1C004 - PARTIAL TOPOGRAPHIC SURVEY OF 4.1419 ACRE PARCEL,
BURNETT PLAZA JOHN AUSTIN SURVEY, A-1, SHEET 2C005 - EXISTING SURVEY - GROUND LEVELC006 - EXISTING SURVEY - UPPER LEVELC007 - DEMOLITION PLAN - GROUND LEVELC008 - DEMOLITION PLAN - UPPER LEVELC009 - SITE PLAN - GROUND LEVELC010 - SITE PLAN - UPPER LEVELC011 - UTILITY PLAN - GROUND LEVELC012 - STORM WATER POLLUTION PREVENTION PLANC013 - CIVIL DETAILS SHEET 1 OF 2C014 - CIVIL DETAILS SHEET 2 OF 2C015 - SAFETY PLAN - UPPER LEVELC016 - SAFETY PLAN - GROUND LEVELC020 - REFERENCE DRAWING 1 OF 12
EXISTING SANITARY AND WATER TO SITEC021 - REFERENCE DRAWING 2 OF 12
EXISTING ELECTRICAL POWER TO SITEC022 - REFERENCE DRAWING 3 OF 12
EXISTING ELECTRICAL POWER TO MEP BUILDINGC023 - REFERENCE DRAWING 4 OF 12
EXISTING MECHANICAL AND PLUMBING TO SITEC024 - REFERENCE DRAWING 5 OF 12
EXISTING PLUMBING TO MEP BUILDINGC025 - REFERENCE DRAWING 6 OF 12
EXISTING FIRE LINE TO SITEC026 - REFERENCE DRAWING 7 OF 12
EXISTING FIRE LINE TO MEP BUILDINGC027 - REFERENCE DRAWING 8 OF 12
IRRIGATION PLAN AREA BC028 - REFERENCE DRAWING 9 OF 12
PARTIAL SITE PLAN BC029 - REFERENCE DRAWING 10 OF 12
GRADING PLAN AREA BC030 - REFERENCE DRAWING 11 OF 12
DRAINAGE AREA MAPC031 - REFERENCE DRAWING 12 OF 12
BURNETT PLAZA FIRST FLOOR
ARCHITECTURALA101 - OVERALL SITE PLANA102 - DEMOLITION PLANA103 - GROUND LEVEL PLANA104 - PLAN (UPPER LANDING TO LOWER LANDING)A105 - ROOF PLANA106 - REFLECTED CEILING PLANA107 - SOUTH ELEVATIONA108 - NORTH ELEVATIONA109 - EAST ELEVATIONA110 - SECTION THROUGH ESCALATORA111 - SECTION THROUGH STAIRSA112 - SECTIONA113 - METAL SCREENA114 - ESCALATOR DESIGN - REFERENCE ONLYA115 - CANOPY DETAILSA116 - ENLARGED SECTIONSA117 - CURTAIN WALL SCHEDULEA118 - CURTAIN WALL SCHEDULEA119 - CURTAIN WALL SCHEDULEA120 - METAL SCREEN DETAILS
STRUCTURALS0.01 - GENERAL NOTESS1.01 - GROUND LEVEL PLANS2.01 - PLATFORM FRAMING PLANS3.01 - ROOF FRAMING PLANS4.01 - NORTH ELEVATIONS4.02 - SOUTH ELEVATIONS4.03 - EAST ELEVATIONS5.01 - CONCRETE DETAILSS5.02 - CONCRETE DETAILSS5.03 - CONCRETE DETAILSS5.04 - CONCRETE DETAILSS6.01 - STEEL DETAILSS6.02 - STEEL DETAILSS6.03 - STEEL DETAILSS6.04 - STEEL DETAILS
ELECTRICALEEF-1000 - ELECTRICAL GENERAL NOTES & LEGENDEEF-1001 - SITE ELECTRICAL PLANEEF-1011 - GROUND LEVEL POWER PLANEEF-1012 - SECURITY CAMERA PLANEEF-1022 - CANOPY LEVEL LIGHTING PLANEEF-1031 - ROOF POWER PLANEEF-2001 - ELECTRICAL SECTION PLANEEF-4001 - ONE-LINE DIAGRAM & LOAD ANALYSISEEF-4002 - PANEL SCHEDULESEEF-4003 - PANEL SCHEDULESEEF-4004 - EXISTING PANEL SCHEDULESEEF-5001 - ELECTRICAL DETAILS
MECHANICALMEF-1000 - MECHANICAL GENERAL NOTESMEF-1011 - GROUND LEVEL MECHANICAL PLANMEF-1013 - ROOF MECHANICAL PLANMEF-3001 - MECHANICAL SCHEDULES
PLUMBINGPEF-1000 - PLUMBING GENERAL NOTESPEF-1011 - BELOW GROUND PLUMBING PLANPEF-1012 - ABOVE GROUND PLUMBING PLANPEF-1013 - LANDING LEVEL PLUMBING PLANPEF-2001 - PLUMBING SECTION PLANPEF-3001 - PLUMBING SCHEDULES
APPLICABLE CODES:2012 INTERNATIONAL BUILDING CODE (IBC)
WITH CITY OF HOUSTON AMENDMENTSAS PER SECTION 101.4
2012 UNIFORM MECHANICAL CODE (UMC)2012 UNIFORM PLUMBING CODE (UPC)2014 NATIONAL ELECTRICAL CODE (NEC)2012 INTERNATIONAL FIRE CODE (IFC)2009 IECC OR ASHRAE 90.1-2007
PROJECT DESCRIPTION: ESCALATOR AND CANOPY
CONSTRUCTION TYPE: 2B
OCCUPANCY: B WITH A ZERO OCCUPANT LOAD1
PLAN EXAMINING CORRECTIONS 04/01/16
1
1
AT
TS
XETE FO
SA4 4 5 6
REG
IS
TERED ARCHITEC
TWAL
LY HUERTA
FOR CITY OF HOUSTON USE ONLY
DRAWING SCALE
SHEETNo: OF
HORZ :
VERT :
FILE NO:
STORM
WASTEWATER
WATER
FACILITIES
STORM WATER QUALITY
CITY OF HOUSTONDEPARTMENT OF PUBLIC WORKS AND ENGINEERING
NOTE: CITY SIGNATURES VALID FOR ONE YEAR ONLY AFTER DATE OF SIGNATURES
DATE:
JOB NUMBER:
DESIGNED BY:
DRAWN BY:
-
BURNETT TRANSIT CENTERESCALATOR DESIGN
88
APP. DATE
BUY AMERICA REQUIREMENTS(49 CFR 661)
ALL IRON, STEEL, AND MANUFACTUREDPRODUCTS USED IN THIS PROJECT MUST
BE PRODUCED IN THEUNITED STATES OF AMERICA
3
2
1
STREET & TRAFFIC
02/08/16
3
WH
SD
A002
ABBREVIATIONS
ACOUS ACOUSTICALAD AREA DRAINADH ADHESIVEADJ ADJACENTADMIN ADMINISTRATIONAFF ABOVE FINISH FLOORAGG AGGREGATEAHU AIR HANDLING UNITALT ALTERNATEALUM ALUMINUMAP ACCESS PANELAPPROX APPROXIMATELYARCH ARCHITECTASPH ASPHALTAUTO AUTOMATICAUX AUXILIARYAVE AVENUEAVG AVERAGEA/C AIR CONDITIONINGA/V AUDIO VISUAL
BD BOARDBLDG BUILDINGBLK BLOCKBLKG BLOCKINGBOT BOTTOMBRK BRICKBTWN BETWEENBUR BUILT UP ROOFINGB/F BOTH FACES
C CARPETCAB CABINETCEM CEMENTCER CERAMICCJ CONTROL JOINTCL CENTERLINECLG CEILINGCLR CLEAR(ANCE)CLO CLOSETCMU CONCRETE MASONRY
UNITCNTR COUNTERCO CASED OPENINGCOL COLUMNCONC CONCRETECOND CONDITIONCONF CONFERENCECONTR CONTRACTORCONT CONTINUOUSCORR CORRIDORCSMT CASEMENTCTR CENTERCT CERAMIC TILEC-C CENTER TO CENTER
DBL BOUBLEDF DRINKING FOUNTAINDIA DIAMETERDIAG DIAGONALDIM DIMENSIONDISP DISPENSERDL DEAD LOADDMPFG DAMPROOFINGDN DOWNDR DOORDS DOWNSPOUTDTL DETAILDWG DRAWINGDWR DRAWER
EA EACHEDF ELECTRONIC DRINKING FOUTAINEFOB EXTERIOR FACE OF BUILDINGEJ EXPANSION JOINTELEC ELECTRICALELEV ELEVATOREL ELEVATIONEMERG EMERGENCYEQUIP EQUIPMENTEQ EQUALEWC ELECTRIC WATER COOLEREWH ELECTRIC WATER HEATEREXIST EXISTINGEXP EXPOSEDEXT EXTERIOR
FA FIRE ALARMFD FLOOR DRAINFEC FIRE EXTINGUISHER CABINETFHC FIRE HOSE CABINETFIN FINISH/FINISHEDFIXT FIXTUREFLR FLOORFLRG FLOORINGFLSHG FLASHINGFRPF(G) FIREPROOF(ING)FT FOOT(FEET)FURN FURNISHFV FIELD VERIFY
GA GAUGEGAL GALLONGALV GALVANIZEDGC GENERAL CONTRACTORGD GUARDGEN GENERALGI GALVANIZED IRONGL GLASS, GLAZINGGR GRADE, GRADINGGYP GYPSUM
HB HOSE BIBHC HARDENED CONCRETEHD HEADHDCP HANDICAPPEDHDWD HARDWAREHM HOLLOW METALHORIZ HORIZONTALHR HOURHT HEIGHTHVAC HEATING/VENTILATING/
AIR CONDITIONINGHYD HYDRANT
ID INSIDE DIAMETERIN INCHINCAD INCANDESCENTINCL INCLUDEINFO INFORMATIONINSUL INSULATION/INSULATINGINT INTERIORINTL INTERNATIONAL
JAN JANITORJST JOISTJT JOINT
PR PAIRPRKG PARKINGPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPTD PAINTEDPTN PARTITIONPVC POLYVINYL CHLORIDEPVG PAVINGPVMT PAVEMENTP/C PRECAST
R RISERRAD RADIUSRCP REFLECTED CEILING PLANRD ROOF DRAINRE REFER TOREBAR REINFORCING BARREC RECESSEDRECEP RECEPTACLERECEPT RECEPTIONRECOM RECOMMENDATIONREF REFRIGERATORREG REGULATIONREINF REINFORCEDREQD REQUIREDRES RESILIENTRET RETURNREV REVISIONRFG ROOFINGRH RIGHT HANDRM ROOMROW RIGHT OF WAYR/A RETURN AIRR/AG RETURN AIR GRILLE
S SOUTHSC SOLID CORESCHED SCHEDULE(D)SECT SECTIONSERV SERVICESF SQUARE FEETSHLV SHELVES/SHELVINGSHT SHEETSHTHG SHEATHINGSHWR SHOWERSIM SIMILARSPEC SPECIFICATIONSQ SQUARESS STAINLESS STEELSTA STATIONSTAB STABILIZE(D)STC SOUND TRANSMISSION
COEFFICIENTSTD STANDARDSTL STEELSTOR STORAGESTRUC STRUCTURE/STRUCTURALSUSP SUSPENDEDSW SWITCHSYN SYNTHETICS/AD SUPPLY AIR DIFFUSER
T TREADTAS TEXAS ACCESSIBILITY
STANDARDTC TOP OF CURBTEL TELEPHONETEMP TEMPEREDTHK THICK(NESS)THRES THRESHOLDTKBD TACKBOARDTME TO MATCH EXISTINGTOS TOP OF STEEL
ABBREVIATIONS
LAM LAMINATE(D)LAV LAVARAORYLB POUNDLGTH LENGTHLH LEFT HANDLIN LINEARLKR LOCKERLRV LIGHT RAIL VEHICLELT(G) LIGHT(ING)LVL LEVELLVR LOUVERLWT LIGHTWEIGHT
MACH MACHINEMAINT MAINTENANCEMAS MASONRYMATL MATERIALMAX MAXIMUMMECH MECHANICALMEMB MEMBRANEMEP MECHANICAL, ELECTRICAL, PLUMBINGMFR MANUFACTURERMH MANHOLEMIN MINIMUMMISC MISCELLANEOUSML METAL LATHMO MASONRY OPENINGMOD MODIFYMR MOISTURE RESISTANTMTD MOUNTEDMTG MOUNTINGMTL METALMULL MULLION
N NORTHNA NOT APPLICABLENFPA NATIONAL FIRE PROTECTION
ASSOCIATIONNIC NOT IN CONTRACTNO OR # NUMBERNOM NOMINALNTS NOT TO SCALE
OA OVERALLOC ON CENTER(S)OD OUTSIDE DIAMETEROFCI OWNER FURNISHED/ CONTR INSTALLEDOFF OFFICEOFOI OWNER FURNISHED/ OWNER INSTALLEDOH OVERHEADOP OPERABLE PARTITIONOPHD OPPOSITE HANDOPNG OPENINGOPP OPPOSITEORD OVERFLOW ROOF DRAINO/A OUTSIDE AIR
PC POLYCARBONATEPERF PERFORATEDPFP PREFINISHED PANELPL PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTICPLAST PLASTERPLBG PLUMBINGPLWD PLYWOODPNL PANELPOL POLISHED
TRANS TRANSFORMERTRTD TREATEDTTL TOTALTV TELEVISIONTXDOT TEXAS DEPARTMENT OF TRANSPORTATIONTYP TYPICAL
UL UNDERWRITERS LABORATORYUNO UNLESS NOTED OTHERWISEUR URINALUTIL UTILITYU/C UNDER CABINET
VAC VACCUMVCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEVWC VINYL WALL COVERINGVENT VENTILATION
W WESTW.P. WORK POINTWC WATER CLOSETWD WOODWDW WINDOWWF WIDE FLANGEWH WALL HUNGWI WROUGHT IRONWP WATERPROOF/
WATERPROOFINGWR WATER RESISTANTWT WEIGHTWWF WELDED WIRE FABRICW/ WITHW/I WITHINW/O WITHOUT
C0025 OF 88
C0036 OF 88
C0047 OF 88
10777 Westheimer, Suite 400Brown & Gay Engineers, Inc.
TBPE Registration No. F-1046Tel: 281-558-8700 ● www.browngay.com
C006
EDGE OF SIDEWALK BELOW
ELEVATOR CANOPY ABOVE
WALK BELOW
1" = 5'-0"1 EXISTING CONDITIONSNOTES
1. EXISTING CONDITIONS BASED ON:
SURVEY, SEE SHEET C003.RE: TEMPORARY BENCH MARK #2 AND #3 THIS SHEET.
ASBUILTS PROVIDED BY METRO.PERTINENT DRAWINGS PROVIDED BY METRO ARE INCLUDED AS PART OF THIS DRAWING SEEREFERENCE SHEETS C002 THROUGH C004 AND C020 THROUGH C031.
10777 Westheimer, Suite 400Brown & Gay Engineers, Inc.
TBPE Registration No. F-1046Tel: 281-558-8700 ● www.browngay.com
C008
LIGHT POLEON UPPER DECKTO BE REMOVEDSEE NOTES 1 & 2
LIGHT POLEGRADE LEVEL
TO BE REMOVEDSEE SHEET C007
LIGHT POLEON STAIRLANDING
TO BE REMOVEDSEE NOTES 1 & 2
LIGHT POLEON STAIRLANDING
TO BE REMOVEDSEE NOTES 1 & 2
EXIST GUARD RAILON UPPER DECKTO BE REMOVED
SEE NOTE 5
LIGHT POLEON UPPER DECKTO BE REMOVEDSEE NOTES 1 & 2
LIGHT POLE ONUPPER DECK TO BEREMOVEDSEE NOTES 1, 2 & 3
EXIST CANOPYOVER
ELEVATORSTO REMAINSEE NOTE 3
EXIST STORMINLET TO REMAIN
EXIST FIRE HOSEBOX TO REMAIN
EXISTLANDSCAPEAREA BELOW
EXIST EDGE SIDEWALK BELOW
1" = 5'-0"1 DEMOLITION PLAN
10777 Westheimer, Suite 400Brown & Gay Engineers, Inc.
TBPE Registration No. F-1046Tel: 281-558-8700 ● www.browngay.com
C010
GENERAL NOTES
1. SEE STRUCTURAL SHEET S2.01 FOR SUPPORT LOCATION AND SIZE.
2. REPAIR CONCRETE PLATFORM AND STAIR LANDING, AS NEEDED, DUE TO REMOVAL OF EXISTING LIGHT POLE. CONCRETEREPLACEMENT TO MATCH EXISTING GRADE AND FINISH.
3. SEE ARCHITECTURAL, STRUCTURAL AND MEP SHEETS FOR ADDITIONAL IMPROVEMENTS TO UPPER PLATFORM LEVEL, INCLUDING NEWHOSE BIB, ELECTRICAL OUTLET, LIGHTING AND INFRASTRUCTURE FOR FUTURE CCTV/SECURITY.
NEW CANOPY SUPPORT LOCATIONSSEE NOTE 1REPAIR CONCRETE WALKSEE NOTE 2
CONCRETEWALKSEE NOTE 2
CONCRETEWALKSEE NOTE 2
CONCRETEWALKSEE NOTE 2
ESCALATOR TO ATTACH TOEXISTING CONCRETE LEDGE ATEDGE OF PLATFORM SEESTRUCTURAL SHEET S.5.03 FORDETAILS.
ESCALATOR SUPPORTS BELOWSEE STRUCTURAL SHEET S1.01FOR LOCATIONS.
ESCALATOR SUPPORTS BELOWSEE STRUCTURAL SHEET S1.01FOR LOCATIONS
1" = 5'-0"1 SITE PLAN
NEW CANOPYSUPPORT
LOCATIONS SEENOTE 1
CANOPY ABOVE
CANOPY ABOVE
ESCALATOR PIT BELOW
CANOPY SUPPORTS BELOWSEE ARCHITECTURAL SHEET A103
CANOPY SUPPORTS BELOWSEE ARCHITECTURAL SHEET A103.
RELOCATED BENCH BELOW
10777 Westheimer, Suite 400Brown & Gay Engineers, Inc.
TBPE Registration No. F-1046Tel: 281-558-8700 ● www.browngay.com
C013
10777 Westheimer, Suite 400Brown & Gay Engineers, Inc.
TBPE Registration No. F-1046Tel: 281-558-8700 ● www.browngay.com
C014
DETAIL 3
DETAIL 1
DETAIL 3
DETAIL 3
DETAIL 4
4
10777 Westheimer, Suite 400Brown & Gay Engineers, Inc.
TBPE Registration No. F-1046Tel: 281-558-8700 ● www.browngay.com
C015
1" = 10'-0"1 SAFETY PLAN - UPPER LEVEL
10'
15'
Top Related