Construction Authority
Construction Authority was created by state legislation in 1998
to plan, design and build the Metro Gold Line from Union
Station east to Montclair (updated in 2011)
Enabling legislation provides all necessary powers to complete
the project
Construction Authority is overseen by board of directors Board of directors receives feedback from all corridor cities
through JPA and TAC
Construction Authority works closely with Metro
- Roles and responsibilities formalized in Master
Cooperative Agreement- Construction Authority builds the project per Metros design
and safety specifications
- Both agencies play a role in project safety, planning and
education
2
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
3/53
Metros Long Range
Transportation Plan,
projects partially
funded by Measure R
Construction Authority Responsibility
Montclair
3
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
4/53
Planning/Construction Phases
Pasadena to Azusa ExtensionUnderway/Funded by Measure R
11.5 Miles, 5 Cities, 6 Stations/Construction Completion Anticipated - September 2015
Pasadena-Azusa Azusa-Montclair Airport Ext.
Azusa to Montclair ExtensionEnvironmentally Cleared
12.3 Miles, 6 Stations/Estimated Funding Needed is $950 Million
Ontario Airport Extension - Proposed
Approximately 8 Miles/Unfunded
Los Angeles-Pasadena
Los Angeles to Pasadena Extension - Opened 2003
13.7 Miles, 3 Cities, 13 Stations
4
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
5/53
Doug TessitorChair
Marisol SalgueroAlternate, City of Los Angeles
John FasanaMember
Paul LeonMember
Lara Larramendi
Member, Non-Voting
Dan Evans
Member, Non-Voting
Bill Bogaard
Member, Non-Voting
Sam Pedroza1stVice Chair
Board of Directors
Alan Wapner
Member, Non-Voting
5
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
6/53
Joint Powers Authority and TAC
Governance Structure includes Representation by All Corridor Cities
- Elected OfficialsJoint Powers Authority
- City StaffTechnical Advisory Committee
6
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
7/53
Community Consensus
7
http://negretemcleod.house.gov/file/2198/13/2019 Metro Gold Line Foothill Extension Construction Authority
8/53
Connections
8
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
9/53
Regional Destinations
Santa Anita Racetrack
LA County Fairplex
City of Hope National Medical Center
LA/Ontario International Airport
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
10/53
Higher Education
Tens of thousands of students and faculty/staff within a
half mile radius of station areas
10
http://www.sluedu.us/http://www.cst.edu/about_claremont/index.phphttp://mtsierra.edu/index.php8/13/2019 Metro Gold Line Foothill Extension Construction Authority
11/53
Historic Downtowns and Hospitals
1111 Historic Downtowns and Dozens of Hospitals/Medical Centers
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
12/53
Pasadena to AzusaProject Update
12
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
13/53
Fully funded by Measure R
Construction completion anticipated - September 2015
Three design-build contracts:
DB1: I-210 Bridge Contract: Skanska USA - $18.6 million - Completed
DB2: Alignment Contract: Kiewit Parsons Joint Venture - $486 million
DB3: Parking Facilities Contract: Webcor Builders - $48.7 million
Pasadena-Azusa
Pasadena to Azusa: On Time; On Budget
13
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
14/53
Pasadena to Azusa Major Milestones
DB1: Gold Line Bridge Complete December 2012
DB2: Alignment ContractOn Schedule/On Budget
- 50% Complete
Freight track realignment complete east of San Gabriel Ave 12/14 at-grade street crossings complete or underway
22/24 bridge structures complete or underway Drainage65% complete Retaining walls65% complete Soundwalls35% complete
OCS foundations55% complete Light rail track installation - began Dec 2013 DesignAll Packages are AFC
14
DB3/Parking: Construction underway on Arcadia, Monrovia
and Azusa Structures
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
15/53
Gold Line Bridge
100% Safety Record, >95,000 work hours performed
Majority Domestic Content:
More than 90% of the material used to build the
bridge is from domestic, and local sources
15
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
16/53
Completed Dec. 15 ,2012
16
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
17/53
Design Concept: Artist, Andrew Leicester
San GabrielValleys Newest Landmark
San GabrielValleys Newest Landmark2013 Awards:
Best Project in Southern California, Highways/Bridges - Engineering News-Record
Outstanding Public Civil Engineering ProjectAmer. Society of Civil Engineers
Engineering Achievement AwardAmer. Council of Engineering Companies
Project Achievement AwardConstruction Management Association of Amer.
Distinguished Project AwardWestern Council of Construction Consumers17
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
18/53
DuarteMonroviaArcadia
Azusa-CitrusAzusa-AlamedaIrwindale
Station Construction Status
Under Construction Under Construction Under Construction
Station work to begin soon in Irwindale
Under Construction Under Construction
18
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
19/53
Highland
1st &SantaClara
BuenaVista
Pasadena
Alameda
Virginia
Mountain
Dalton
Magnolia
Myrtle
California
SanGabriel
Azusa
Mayflower
Yet to Start
In Progress Completed
14 At-Grade (Street-level) Crossings
Arcadia MonroviaDuarte
Azusa
Irwindale
19
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
20/53
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
21/53
Structures Highlights
21
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
22/53
Shared CorridorFuture Condition
Shared use corridor east of San Gabriel River (light rail and freight
share right of way, but use separate tracks)
Must keep freight line operational through construction
Shared-Use Corridor
(Light Rail and
Freight)
Light RailOnly
22
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
23/53
New Freight Track Installation
Complete from San Gabriel Ave
through Glendora city limit
Construction ActivitiesShared Corridor
23
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
24/53
Operation Campus
New 24-acre facilitylocated in Monrovia
Provide adequate capacity for Gold Line and other regional light
rail lines84 car capacity
24
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
25/53
Pre-Construction Site Conditions
25
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
26/53
26
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
27/53
Construction Activities
27
Maintenance of Way Storage
Structure
Main Building
Six Miles of Light Rail Track
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
28/53
Major Milestones
Light rail track installationBegan Oct 2013 (M&O)/Dec 2013(Alignment)
Complete freight track realignmentmid 2014
Began parking structure constructionDecember 2013
Complete all at-grade crossingsOctober 2014
Complete steel frame for Operations Campus main buildingApril 2014; Complete main buildingJanuary 2015
Operations Campus ready for MetroMarch 2015
Alignment ready for Metro (testing/pre-revenue service)
September 2015
28
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
29/53
-29-
Improving Connectivity
w/Future Stations
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
30/53
Intermodal Enhancements
$9 million FTA grant to identify potential opportunities to improve connectivity
to the future Gold Line stations; $6 million of which is going to implement
recommendations of Bus/Ped Interface Improvements Study
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
31/53
Bus Interface Planning
Began initial analysis - Azusa to Montclair cities
Future grants - work with cities and service providers to re-route existing
lines or develop new lines to service the future stations
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
32/53
Last Mile Analysis
32
Began initial analysis of walking & biking connections from future stations to
area points of interest; future grants will be explored to continue this work &
make recommendations for enhancements around future stations
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
33/53
Station Art
33
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
34/53
Station Art
Artist and concept were selected by the
community, and approved by each city council
Artwork reflects individuality of city location
Artist helped select station colors and materials Some stations have artistic betterments
Artists are now members of design-build team
bring designs to 100%, fabricate pieces,
installation oversight
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
35/53
Arcadia
Michael DavisArtist
GLASS TVM CANOPY
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
36/53
Monrovia
Cha Rie TangArtist
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
37/53
Duarte
Andrea Myklebust & Stanton Sears Artist Team
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
38/53
Irwindale
Robin BrailsfordArtist
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
39/53
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
40/53
Azusa- Citrus
Lynn GoodpastureArtist
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
41/53
All Future Stations Have Parking
* Gold Line parking will be integrated into multi-use structure with City and Foothill Transit
Separate design-build contract
Work to be completed late 2015
Six intermodal parking facilities
Four parking structures:
Arcadia300 Spaces
Monrovia350 Spaces Irwindale350 Spaces
Azusa-Citrus200 Spaces
Two surface parking lots:
Duarte125 Spaces
Azusa-Alameda200 Spaces*
DB3: Parking Facilities Contract: Webcor Builders - $48.7 million
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
42/53
Azusa to Montclair
42
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
43/53
Locally Preferred AlternativeMetro Gold Line Foothill ExtensionAzusa to Montclair
Future Glendora Station
Future San Dimas Station
Future laremont Station
Future Montclair StationFuture Pomona StationFuture La Verne Station
Approved by Construction Authority Board of Directors
March 201343
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
44/53
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
45/53
Activity 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Environmental
Clearance
Preliminary
Design/Advanced
Conceptual
EngineeringFinancing &
Procurement
Design &
Construction
Measure R funding available for ACE only
Schedule - Azusa to Montclair
Measure R funding available for preliminary design/advanced conceptual engineering
(ACE) only; construction funding must be secured between 2015-2016 to meet schedule
Project currently included in unfunded portion of Long Range Transportation Plan;
identified as top priority for new funding by Metro board in LRTP
Measure R mandates Azusa to Montclair must be included in future tax
45
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
46/53
Next Steps
In Early 2014: RFP/Procurement process to hire consultants for advanced
conceptual engineering/NEPA work
Contract with station artists for 18-month design process
Re-engage SDAR Committees
Mid-2014:
Approve MOUsbetween each city & the Construction
Authority
Begin regular coordination meetings with cities
First meetings with SDAR Committees
46
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
47/53
Funding Update Approved Funding Agreement with Metro includes $36
million for advanced conceptual engineering/NEPA work Construction ROM = $950 million (currently unfunded)
Metro discussing plans for new tax increase or extension of
Measure R in 2016
Azusa to Montclair must be included
Montclair/Gold Line Agreement
Montclair to pay up to $2.8 million for San Bernardinos
share of the project design cost, plus SANBAGs
oversight costs
SANBAG Board reaffirmed commitment to building the
Foothill Extension to Montclair, once LA County finds
majority funding
47
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
48/53
Jobs/Economic Benefits
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
49/53
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
50/53
Project Spending by Category
73% 12%
6%
2%
1%2%2%
Construction
Real Estate
Architectural & EngineeringServices
Insurance
Legal Services
Administrative Services
Fees & Permits
50
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
51/53
Azusa to Montclair extension will create additional
construction impacts
Upon project completion, the fully operational Metro
Gold Line Foothill Extension will likely lead to further
development and economic activity for many years
Efficient transit and appropriate zoning has served as
a catalyst for investment and long term economic
development around stations in other cities
A similar pattern of densification and transit-orienteddevelopment around the Gold Line stations can be
expected and will have an additional significant economic
impact
Long Term Impact
51
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
52/53
The 24-mile corridor can absorb significantinfill
development potential:
1,200 acres of opportunity sites
Roughly equivalent to the size of
Downtown Los Angeles
Cities are actively pursuing
station area development
opportunities:
17,000 DU 3 million SF retail
7.5 million SF office
Economic Impact is Significant
52
8/13/2019 Metro Gold Line Foothill Extension Construction Authority
53/53
www.foothillextension.org
Top Related