Personal Project - Planning
Completed as specification(shown in report)
Completed as action plan(shown in process journal and report appendix)
(recorded in process journal and shown in report)
Specifications - Example
Specification stages1. Identify the details of a rigorous example of
your final outcome using the rigorous goal outcomes worksheet.
Specification stages2. For each specification develop a scale from a limited to adequate to substantial to rigorous, using the specification worksheet
Level Descriptor Task specific clarification1-2 Develop a limited criteria for the
product or outcome Some aspects stated Stated in list format
3-4 Develop adequate criteria for the product or outcome
Most aspects described Described list format
5-6 Develop substantial and appropriate criteria for the product or outcome
All aspects described Specification table attempted Suitable range shown for some aspects
7-8 Develop rigorous criteria for the product or outcome
All aspects described and are suitably challenging specification identified
Specification table completed Suitable range for all aspects
Specification rubric
Deadline to be uploaded: October 24th
Personal Project Action Plan
1. Now you will need to create a plan for how you will achieve your goal. Create a detailed “to do” list. The plan must include at least TEN tasks and the following information:
a. Tasks to be completedb. End dates for each task to be completedc. Resources needed to accomplish a task (name people, resources, etc.)
Level Descriptor Task specific clarification1-2 Present a limited or partial plan for
the project Stages of action are suggested
3-4 Present an adequate plan for the project
Most stages of action are recorded with a timeline
5-6 Present a substantial plan for the project
All required stages of action are recorded with a timeline
Some related details including who, what, where and how are incorporated, as required
7-8 Present a detailed and accurate plan for the project
All stages of action (including reflection and refinement) are recorded with a timeline
Including detailed who, what, where and how, as required
Action plan rubric
Deadline to be uploaded: October 31st
Note – there is a blank word document calendar with AISB dates accessible on the PP website
Meeting #3 Outcomes
• Project specifications • Action plan
And in addition:Continued researchContinued use of process journal
Deadline: November 4th