Techniques, methods, and tools for planning,estimating, and monitoring the cost, budget,or schedule of a software project. Included inthis discussion are Function Point and Lines-of-Code cost estimation techniques.
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 3/21
Based From Wikipedia:
The ability to accurately estimate the timeand/or cost taken for a project to come in toits successful conclusion is a serious problemfor software engineers. The use of arepeatable, clearly defined and well
understood software development process has, in recent years, shown itself to be themost effective method of gaining usefulhistorical data that can be used for statistical
estimation. In particular, the act of samplingmore frequently, coupled with the looseningof constraints between parts of a project, hasallowed more accurate estimation and morerapid development times.
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 4/21
◦ The development of the IBM OS/360
operating system over 30 years ago was amonumental undertaking. That effortspawned many technical innovations, nowwidely copied. In spite of technicalsuccesses, the OS/360 was a managementfailure. "The product was late, it tookmore memory than planned, the costs
were several times the estimate, and it didnot perform well until several releasesafter the first".
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 5/21
Dr. Brooks published many of his lessons
learned from managing this project in thebook "The Mythical Man-Month: Essays onSoftware Engineering". The book remainsone of the best-regarded texts on software
project management. Today, situationssimilar to the OS/360 remain all toofamiliar.
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 6/21
There are several techniques for cost estimation,
but the 2 basic approaches are top-down andbottom-up. In the top-down approach, cost isderived from a business analysis of the majorproject components. In the bottom-up approach,cost is derived by accumulating estimates fromthe people responsible for various components.
The primary techniques for cost estimation are:
Ask an expert in the domain of interest
Analogy to other projects "Price-to-Win" strategy
Resource availability
Parametric models
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 7/21
Expert judgmentDelphi cost estimation
Work breakdown structure
Algorithmic cost modelsConstructive cost model (cocomo)
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 8/21
A software project typically starts with a smallgroup of capable people to do planning andanalysis, a larger, but still small group to doarchitectural design. The size of required
personnel increases in each successive phase,peaks at the implementation and system testingphase, and decreases in the maintenance phase.
The personnel level of effort required throughout
the life cycle of a software product can beapproximated by the following equation, whichdescribes a Rayleigh curve:
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 9/21
Express oneself clearly in English • Develop and validate software requirements
and
specifications • Work within applications area
• Perform software maintenance
• Perform economic analyses
• Work with project management techniques • Work in group
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 10/21
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 11/21
“Changes that have to be made to computer programs after they have beendelivered to the customer or user.
Corrective maintenanceAdaptive maintenancePerfective maintenance
Enhancements (Although technically they are not apart of software maintenance but, being a post-releaseactivity, are often considered a part of it)
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 12/21
Software maintenance costs around 50%of total software life-cycle cost.
But relatively little is known about thesoftware maintenance process and the factorsthat influence its cost.
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 13/21
Defect repairs keep software in operational condition costs absorbed by software supplier low pre-release defect removal efficiency (~85%) productivity = 8 defect repairs per month (can be higher with experienced personnel and defect-
tracking tools etc.)
Abeyant defects (10%) - based on unique combinationof
events Invalid defects (15%) - misdiagnosed errors Bad fix injection (7%) - derivative errors Duplicate defects - multiple complaints about the
same error
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 14/21
concentration of errors in particular modules common among large poorly-structured systems expensive to maintain, due to high bad fix
injection rate 500% more expensive than normal modules
interface between clients and defect repairteams effort depends on number of users • with phone contact, 1 customer support person
for 150 users
• with electronic contact, 1 customer supportperson for 1000 users
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 15/21
Code restructuring
done by automated tools to lower complexity
levels lowering complexity eases maintenance
precursor to other maintenance activities
Migration across platforms
from one OS or hardware to another
with well-documented specifications,
migration speed = 50 FP per month
with missing or obsolete specifications, migration speed = 5 FP per month
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 16/21
Conversion to new architectures
l changes to interface or file structure of apps.
l quality of specifications affects productivity
l reverse engineering may need to be
performed to extract missing design info.
Mandatory changes
l in response to changes in law or policy
l involve high costs and tight schedules
l difficult to predict in advance
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 17/21
Performance optimization
to minimize delays in transactions
improving performance at trouble spots Enhancements
adding new features as per user request
funded by user
annual rate = 7% increase in FP total of anapp.
high integration and testing costs for poorly
structured apps.
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 18/21
del for software maintenance effort estimation (MM)AM = (ACT)(MM)DEV (MM)AM : annual maintenance effort in man-
month (MM)DEV : development effort in man-month ACT : annual change traffic (fraction of
software that undergoes change during a year) For intermediate and detailed COCOMO, (MM)AM = (EAF)M(ACT)(MM)NOM (EAF)M : maintenance effort adjustment factor
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 19/21
(MM)M = (M/D)(MM)DEV
(MM)M : overall life-cycle maintenance effortin man-month
(MM)DEV : development effort in man-month
M/D : maintenance/development cost ratio Value of M/D ranges from 0.67 to 4.5,
depending on
application type.
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 20/21
origin: number of cards each software person can
maintain (KDSI/FSP)M : KDSI maintained per full-time software
person(KDSI)DEV
(FSP)M = ------------------
(KDSI/FSP)M
(FSP)M : number of software maintenance personnelrequired
(KDSI)DEV : size of software in KDSI
Value of (KDSI/FSP)M ranges from 3 to 132,depending on application type. The annual maintenance effort (MM)AM is then simply (MM)AM = 12 (FSP)M
7/31/2019 Matin-Ao & Delacruz (Cost Estimation Techniques)
http://slidepdf.com/reader/full/matin-ao-delacruz-cost-estimation-techniques 21/21
“Software processes must produce softwarethat can be gracefully evolved at reasonable costs. The choice of software architecture
significantly influences modifiability and hence
maintainability.Estimating maintenance is complex because of
the relationship between base application and changes being made. Moreover predicting adaptive maintenance and enhancements in advance is very difficult.