STATE ENVIRON-MENT IMPACT ASSESSMENT AUTHOBay No. 55-58, Prayatan Bhawan, Sector-2, PAN
No. SEIAAIHR/20161 LSS Dated:...I
To
M/s GLS Infratech Pvt. Ltd,31 l, 3nr floors, JMD Pacific Square,Sector- I 5, Part-II, Gurgaon- 1 22001
Subject:
Dear Sir,
Environmental ClearanceHousimg Colony Project atGurga,on, Haryana.
for constructionVillage Sohna &
This lertter is in reference to your application no.
addressed to M.S. SllIAA, Haryana received on 04.12.2014 and
24.11.2015 seeking prior Environmental Clearance for the above
Notification,2006. The proposal was transferred to MoEF & CC,
action was taken and the case was returned to SEIAA on 3 1.08.201
The proposal has be,sn appraised as per prescribed procedure in
under the EIA Notifi,;ation,2006 on the basis of the mandatory
the application viz., Form-I, Forrnl-A, Conceptual Plan and
furnished in responsie to the observations of the State Expert
(SEAC) constituted by MOEF, GOI vide their Notification 21.08.
held on 04.03.2015. 22.12.2015 &.16.02.2016 awarded "Gold"
I2l It is intrlr-alia, noted that the project involves the consrt
Group Housing Colony Project at Village Sohna & Khaika, Sector-
total plot area of 40468.5 sqm (10 Acre). The total built up area s
The proposed Project shall comprise of 16 Towers; Tower I to I
Tower 13 to 16 (GF + 08 Floors), Cornmunity Hall and Aganwadi
units shall'be 1632. llhe maxirnurn heieht of the buildine shall be
water requirement shall be I166 KLD. The fresh water requireme:
The waste water serreration shall be 985 KLD. which will be
1200 KLD (600 KLD + 600 KLD) capacity. The total power requi
KW which will be supplied by DHBVN. The Project Proponent
green belt on 20.0I7'% of project area (I5o/o tree plantation + 5.01
Project Proponent proposed to constnrct 10 rain water harvesting
generation will be 5Ct6l kg/day. The bio-degradable waste will be
area by installation ol OWC (organic waste converter). The total
are 1958 Two Wheelers and 209 ECS.
t3l The State Expert Appraisal Committee, Haryana after
the relevant documemts submitted by the project proponent and
of'Ktr
la r.tot . A.
Affordable Groupika, Sector-4, Distt
il dated 04.12.2014
uent letter d,rted
ject under the EIA
I on 27 .03.20 I 5. No
after its constitution.
light of provisions
ments enclosed with
itional clarifications
isal Committee
015, in its meetings
ng to the project.
ion of Affordable
, Distt Gurgaon on a
lbe 92321.664 sqm.
(GF + 13 Floors)
. The total Dwelling
.85 rneter. The total
t shall be 146 KLD.
in the 2STPs of
t shall be 7960
proposed to develop
landscaping). The
its. The solid waste
reated in the project
ing spaces proposed
consideration of
l--
itional clarification
furnished in response to its observations, have recommended the
clearance for the prroject rnentioned above, subject to compliz
t of environmental
with the stipulated
shall be of ultra low
(Protection) Rules
ndersround tanks and
conditions. Accordingly, the State Ilnvironment Impact Assessl ent Authority in its
meeting held on 28t'.03.2016 decided to agree with the recorn ions of SEAC to
accord necessary environmental clearance for the project under
Notification2006 su.bject to the strict compliance with the specific
ategory 8(a) of EIA
nd seneral conditions
mentioned belolv:-
PART A-SPECIFIC CONDITI9NSi-Construction Phaser-
lU "Consent for Establish" shall be obtained from Haryana
Board under Air and Water Act and a copy shall be s
Haryana before the start of any construction work at site.
A first aid room as proposed in the project report shall
construction and operational phase ofthe project.
I2l
l3l
I4l
tsl
t6l
te Pollution Control
itted to the SEIAA.
provided both during
Adequate drinking water and sanitary facilities shall be ided for construction
workers at the site. Provision should be made for mobile ilets. Open defecation
by the labour,os is strictly prohibited. The safe disposal of'so id wastes/ waste water
fforts shall be made togenerated during the construction phase should be ensured.
provide mobile STP for treatment of waste water during the on phase.
All the topsoil excavated during construction activities I be stored for use in
horticulture/landscape development within the project site.
The project proponent shall ensure that the building required during
construction phase is properly stored within the project area and disposal of
construction waste should not create anv adverse effe on the neighboring
communities and should be disposed of after taking precautions for
general safety and health aspects of people, only in approverC
of compel.ent authority.
ites with the approval
Construction spoils, including bituminous material and o r hazardous materials,
dump sites for such
the ground water and
must not be allowed to contaminate watercourses and t
material must be secured so that they should not leach int
any hazardour; waste generated during construction phase, sh
per applicabl: rules and norms with necessary approval
Pollution Control Board.
uld be disposed off as
f the Haryana State
I7l The diesel generator sets to be used during construction ph
sulphur diese,l type and should conform to Enviro
prescribed for air and noise emission standards.
I8l The diesel required for operating DG sets shall be stored
if required, clearance frorn Chief'Controller of Explosives llbe taken.
tel Ambient noise levels shall conforrn to the residential standa
niqht. lnslsmernt?l pollution loads on the ambient air and
both during daY and
quality should be
should be taken to
pre-mixed concrete,
ation Building
ir conditioned sPaces
f appropriate thermal
as well as water
[10]
[11]
Ir2l
ll3l
closely monitored during construction phase. Adequate meas
reduce ambient air pollution and noise level during cons ion phase, so as to
conform to the stipulated residential standards of CPCBAyIo
Fly ash shall be used as building material in the construction as per the provisions
27th Auglst 2003.of Fly Ash Notification of Septemb et 1999 and as amended
Storm water c,ontrol and its re-use as per CGWB and BIS dards for various
applications should be ensured.
Water demand during construction shall be reduced by use
curing agents and other best practices.
ln view of the severe constrains in water supply augmentati n in the region and
NOC from CGWAsustainability of water resources, the developer will submit t
speciffing water extraction quantities and assurance from DA/ utility provider
indicating soufce of water supply and quantity of water wit details of intended
required for both
itted to the SEIAA
use of water potable and non-potable. Assurance is
construction atrd operation stages separately. It shall be su
and RO, MOE,F, Chandigarh before the start of construction'
[141
llsl
Roof must meet prescriptive requirement as per Energy
Code by ul;ing appropriate thermal insulation material.
Opaque w'all must meet prescriptive requirement as per
Building Code which is proposed to be mandatory for all
while it is desirable for non-air-conditioned spaces by use
insulation material to fulfill requirement.
ergy Conservation
The approval olithe competent authority shall be obtained for
building on account of earthquake, adequacy of fire fighting
tructural safetY of the
ipments, etc. as Per
National Building Code including protection measures frorn lightening etc. If anY
Forest Conservationforest lancl is involved in the proposed site, clearance un
Act shall be obtained frorn the competent Authority.
Overexploited groundwater and impending severe shortage water supPlY in the
conservation Plan.region requires the developer to redraw the water and
Developer shall reduce the overall footprint of the proposecl
proponent sha.ll incorporate water efficiency /savings meas
velopment. Project
reuse/recycling within 3 months and before start of cont ction to the SEIAA,
Haryana and IiO, MOEF, GOI, Chandigarh.
The Project Proponent as stated in the proposal shall con t total 10 rain water
harvesting pit;s for recharging the ground water within the ject premises. Rain
water harvesting pits shall be designed to make provisions fi silting chamber and
ntenance budget and
ll6l
l17l
I18l
removal of flctating matter before entering harvesting pit'
tlel
[20]
t2rl
A+
persons responsible for maintenance must be provided' C
that contaminated water do not enter any RWH pit'
The projeot proponent shall provide for adequate fire
equipments as required by Haryana Fire Service Act, 2009
by the locsl Authority/Directorate of fire from time to time
proponent shall take necessary permission regarding fire sa
competent AuthoritY as required'
The Project Proponent shall obtain assurance from the DHB for supply of 7960
KW of po.wer supply before the start of construction. In n<l case project will be
from any externaloperational solely on generators without any power su
power utility.
shall also be taken
measures and
instructions issued
Further the Project
schemeA{OC from
the project shall be
before the start of
the natural land
flow from the
ion does not exceed
ent Haryana.
, proper sprinkling
r pollution during
the lower level of the
width and proPer
Detail calculalion of power load and ultimate power
submitted to DHBVN under intimation to SEIAA
construction. Provisions shall be rnade for electrical
atea.
load o
I22l
Harya
infrasl ture in the project
The Project J?roponent shall not raise any constructton
depression / lrtrallah/water course and shall ensure that the
Nallah/water c,ourse is not obstructed.
The Proji:ct Proponent shall keep the plinth level of he building blocks
sufficiently above the level of the approach road to the Pr<r.; . Levels of the other
ooding.areas in the Projects shall also be kept suitably so as to avoid
I23l
124]l
12sl
126l
I27l
t28l
l2el
[30]
Construction lshall be carried out so that density of popu
norms approved by Director General Town and Country De
The Project Proponent shall submit an affidavit with the laration that ground
water will not be used for construction and only treated
construction.
should be used for
The project proponent shall not cut any existing tree and pr
should be modified to include those trees in green area'
landscaping plan
The project proponent shall provide 3 meter high icade around the
project area, dust screen for every floor above the grou
and covering of stored material to restrict dust and
construction.
The project proponent shall construct a sedimentation basrn r
project site to trap pollutant and other wastes during rains.
The project proponent shall provide proper rasta of pro
strength for ttLe project before the start of construction'
The project proponent shall ensure that the U-value of the is less than3.ll7
and maxirnunr solar heat gain co-efficient is 0.25 for vertical enestratlon.
[31]
I32l
The project pr,oponent shall adequately control construction
non-silica dust and wood dust. Such dusts shall not spread ott
usts like silica dust,
ide project premises'
nt to all construction
stem. Solid waste
le waste, STP,
er and one till 39
ponent shall not
ould not be sold
officer for building
iom concerned local
d sewerage sYstem
al authorities beside
Project Proponent shall provide respiratory protective equiprn
workers.
The project proponent shall develop complete civic infi ure of the Group
Housing colony including intemal roads, green belt devel sewerage line,
Rain Water rocharge arrangements, Storm water drainage
panagement r;ite and provision for treatment of bio-deg
possession of the units/flats thereafter.
l33l The project proponent shall provide one refuge atea till 24
meter each, as per National Building Code. The project
convert any refuse area in the habitable space and it
out/commercialized.
[34]
[3s]
water supply [ine, dual plumbing line' electric supply li etc. and shall offer
The project ptoponent shall provide fire control room and tfi
above 30 rneter as per National Building Code'
The projeot proponent shall obtain permission of Mines
for excavation of soil before the start of construction.
Geology Department
136l The project prroponent shall seek specific prior approval
Authority/HuDA regarding provision of storm drainage
includins their inteeration with external services of HUDA/
other required services before taking up any construction acti
t37l The project proponent shall submit the copy of fire safety
Fire Departme:nt before the start of construction.
duly approved bY
t38l The project proponent shall discharge excess oftreated water/storm water m
the public drainage system and shall seek permission of Fl A before the start of
construction.
t39l The project pr:oponent shall maintain the distance between
line.
t40l The project proponent shall ensure that the stack height is
highest tower.
t4U The proje,ot proponent shall ensure that structural stability tt
of masnitude 8.5 on Richter scale.
and water suPPlY
earthquake
Operational Phasel
tal "Consent to Operate" shall be obtained from
Board under Air and Water Act and a copy
Haryana.
The Sewage Treatment Plant (STP) shall be
sewage to thrl prescribed standards including
meter more than the
Haryana St Pollution
shall be sutr itted to the
installed for treatment of the
effluent will be
Control
SEIAA,
thelbt
odour and
recycled to achieve zero exit discharge. The installation of shall be certified
treatment of vraste water is mandatory. The project propon
only Ortho-Phosphorus but total Phosphorus to the extent o less than 2mglhter.
Similarly total Nitrogen level shall be less than 2mglliter in iarv treated waste
water. Discharge of treated sewage shall conform to the s and standards of
CPCB/ HSPCB, whichever is environmentally better. Pr'c ect Proponent shall
by an independent expert and a report in this regard shall
SEIAA, Haryana before the project is commissioned fo'
implement suoh STP technology which does not require
project propo:nent shall essentially provide two numbersl
common area illumination and for domestic use should be
conform to rules made under the Environment (Protect.i
as green cover area for tree plantation especially all aroun
project and on the road sides preferably with local speci
the project shall be preferably landscaped and covered
herbs & shrubs. Only locally available plant species shall be
The project proponent shall strive to minimize water in irui
efficient irrig;ation system, scheduling irrigation only a
transpiration clata.
be submitted to the
operation. TertiarY
nt shall remove not
Iter backwash. The
as the case may
f enclosed type and
n) Act, 1986. The
the periphery of the
which can provide
open spaces inside
of STPs preferably
equivalent to !i\o/o of total capacity or as per the initial occu
be.
lcl Separation of t.he grey and black water should be done by the: e of dual plumbing
line. Treatmerrt of 1000 grey water by decentralized ent should be done
ensuring that the re-circulated water should have BOD level less than 5 mg/litre
and the recycl:d water will be used for flushing, gardening DG set coolins etc.
to achieve zero exit discharge.
For disinfection of the treated wastewater ultra-violet racl
process shoulcl be used.
on or ozofilzalron
Diesel power generating sets proposed as source of p power for lifts,
ldl
lel
IfJ
lel
location of the DG sets shall be in the open as p
proponent with appropriate stack height above the highest
by the project
level of the project
as per the CPCB norms. The diesel used for DG sets shall
diesel (35 ppnr sulphur), instead of low sulphur diesel.
ultra low sulphur
Ambient Noise level should be controlled to ensure that it
prescribed standards both within and at the boundary of tht:
Group Housing Project.
does not exceed the
Affordable
The project ploponent as stated in the proposal should main in at least 20.017%
protection against noise and suspended particulate matter.
ith vegetation/grass,
used.
ion of landscaPe bY
minimizing gr:ass area, using native variety, xeriscaping an mulching, utilizingthl
checking evapo-
lil Rain water harvesting for roof run-off and surface run-off, per plan submitted
off, pre- treatmentshould be implemented. Before recharging the surface
through sedirrLentation tanks must be done to remove sus ed matter, oil and
srease. The bore well for rainwater recharging shall be kept at least 5 mts. above
the highest ground water table. Care shall be taken that con inated water do not
Water Harvesting of
material or paint which can contaminate rain water. Wire
without any toxic
and filters should
be used wherever required.
ffl The ground water level and its quality should be
consultation with Central Ground Water Authority.
regularly in
lkl A report on the energy conservation measures conforming 1: energy conservatlon
norms finalized by Bureau of Energy Efficiency should be
details about building materials & technology, R & U Facto
the SEIAA,Haryana in three months time.
ared incoqporating
ul Energy conservation measures like installation of LED onl for lighting the areas
outside the building and inside the building should be in part of the project
design and sh.ould be in place before project commissionin
must be adapted to the maximum energy conservation.
. Use of solar panels
lml The Project Proponent shall use zero ozone depleting potential material rn
insulation, refiigeration, air-conditioning and adhesive. Proj
provide Halon free fire suppression system.
Proponent shall also
The solid wa:;te generated should be properly collected segregated as per the
requirement of the MSW Rules, 2000 and as amended from ime to time. The bio-lnl
enter any RWH pit. The project proponent shall avoid Rain
first 10 minutes of rain fall. Roof top of the building shall
degradable wilste should be treated by appropriate technolo
the site ear-marked within the project area and drylinert
disposed off to the approved sites for land filling after
material.
etc and submitted to
(proposed OWC) at
lid waste should be
Ipl
recovering recyclable
lol The provision, of the solar water heating system shall be as norms specified by
HAREDA and shall be made operational in each building
The traffic plrn and the parking plan proposed by the Proj t Proponent should be
adhered to rneticulously with further scope of additi I parking for future
entry and exit pointsrequirement.'fhere should be no traffic congestion near t
from the roards adjoining the proposed project site. P
internalized arnd no public space should be used.
ing should be fully
The Project shall be operationalized only when HUDA/loca
domestic water supply systern in the area.
lql authority will provide
[.] Operation and maintenance of STP, solid waste
Infrastructure, pollution control measures shall be en
completion of project.
lsl Different type of wastes should be disposed off as per provisi of municipal solid
waste, biomedical waste, hazardous waste, e-waste, batteries & plastic rules made
under Environment Protection Act, 1986. Particularly E-w and Battery waste
20Il and Batteries
a collection center
for E-waste and it shall be disposed of to only registered and rized dismarfiler /
recycler.
Itl Standards for discharge of environmental
schedules of rule 3 of Environment Protection
with.
Rule 1986 I be strictly complied
Water supply shall be metered among different users and diflfi
than the highest
lul
lvl
shall be disposed of as per existing E-waste Management Ru
Management Rules 2001. The project proponent should mai
nt and electrical
even after the
pollutants as hrined in various
nd air are within the
DG sets greater than
Variable speed drive,
ntesrated Point Load
lwl
lxl
Izl
800 KVA shall be as per CPCB latest standards for high ity DG sets.
All electric supply exceeding 100 amp, 3 phase shall mai in the power factor
between 0.98 lag to I at the point of connection.
The ;project proponent shall not use fresh water for HVAC and DG cooling. Air
ater shall be used by
t Proponent shall also
system for HVAC in
The project proponent shall ensure that the of DG sets is
tower and also ensure that the emission standards of noise
CPCB latest prescribed limits. Noise and Emission level o
based HVAC system should be adopted and only treated
project proponent for cooling, if it is at all needed. The Proj
summer and winter seasons should be kept at optimal levell.
best Co-efficient of Performance (CoP), as well as optimall
project proponent shall obtain manufacturer'S certificate alscr
The project proponent shall ensure that exit velocity fronr
sufficiently high. Stack shall be designed in such a way t
down-wash under any meteorological conditions.
use evaporative cooling technology and double stage coolinr
order to reduce water consumption. Further temperature, ive humidity during
lvl
Value and minirnum outside fresh air supply may be for conservation of
power and water. Coil type cooling DG Sets shall be used fi saving cooling water
conSurnption for water cooled DG Sets.
The project proponent shall ensure that the transformer is with high
quality grain oriented, low loss silicon steel and virgin el yte grade
that.
the stack
there
copper. The
should be
is no stack
The proiect proponent shall provide water sprinkling systenl in the project area to
suppress the dust in addition to the already suggested miti
Air Environment ChaPter of EMP.
laalion measures in the
[ab] The project proponent shall ensure proper Air Ventilation light system in the
basements area for comfortable livine of hurnan being and ll ensure that number
of Air Changes per hour/(ACII) in basement never falls low 15. In case of
emergency capacity for increasing ACH to the extent of 30
project proponent.
st be provided by the
[acl The project proponent shall ensure drinking/ domestic ter supply as per
prescribed standards till treated water supply is made avai by HUDA.
lil The Project Proponent shall ensure the commitments made Form-1- Form-lA-
EIA/EMP and other documents submitted to the SEIAA br the protection of
environment and proposed environmental safeguards are plied with in letter
and spirit. In case of contradiction between two or more ments on any point,
the most environmentally friendly commitment on the pcr
commitment by project proponent.
liil The project proponent shall also submit six monthly on the status of
compliance of the stipulated EC conditions including resuL of monitored data
Regional Office of(both in hard copies as well as by e-mail) to the north
MoEF, HSPCB and SEIAA Haryana.
lii il STP outlet after stabilization and stack emission shall be monitored monthly.
Other environmental parameters and green belt shall be rrr itored on quarterly
basis. After every 3 (three) months, the project nt shall conduct
[ad] The project proponent shall install solar panel for energy
PART-B. GENERAL CONDITIONS:
environmental audit and shall take corrective measure, if reqru
The SEIAA. Harvana reserves the risht to add additional
ation.
shall be taken as
red, without delay.
safeguard measures
ncements issued
livl
lvl
lvil
subsequently, if found necessary. Environmental C sranted will be
revoked if it is found that false information has been siven fj getting approval of
this project. SEIAA reserves the right to revoke the c if conditions
stipulated are not implemented to the satisfaction of SEI
The Project proponent shall not violate any judicial orders/
by any Court/Tribunal.
All other statutory clearances such as the approvals for stora of diesel from Chief
Department, Forest
, Forest Act, 1927,
Controller of Explosives, Fire Department, Civil Aviati
Conservation Act, 1980 and Wildlife (Protection) Act, 19t
PLPA 1900, etc. shall be obtained, as applicable by proj proponents from the
respective authorities prior to construction of the project.
The Project proponent should infbrm the public that the pro.j has been accorded
Environment Clearance by the SEIAA and copies ot clearance letter are
available with the Haryana State Pollution Control Board & li AA. This should be
letter at least in twr-r
[vii]
advertised within 7 davs frorn the date of issue of the clearan
L0
lviiil
lixl
lxil
local newspapers that are widely circulated in the region
should be forwarded to SEIAA Haryana' A copy of
conditions shall also be put on project proponent's web site fi
Under the provisions of Environment (Protection) Act' 19
initiated against the Project Proponent if it was found th
project has been started before obtaining prior Environmenta,l
AnyappealagainstthethisEnvironmentalClearanceshall
Green Tribunal, if preferred, within a period of 30 days
Section 16 of the National Green Tribunal Act, 2010'
the copy of the same
ent Clearance
public awareness.
legal action shall be
construction of the
learance.
ie with the National
as prescribed under
and year wise
nder rules prescribed
t, Haryana
struction/operation
ion Under Control'
lxl The project proponent shall put in place Corporate En ironment PolicY as
(I) dated 26.4.2012
should be submittedmentioned in MoEF, GoI OM No. J-l101314112006-14 l:
within 3 months period. Latest Corporate Environment Polit;
to SEIAA within 3 rnonths of issuance of this letter'
The fund ear-marked for environment protection measu should be kePt in
sepalate account and should not be diverted for other pu
expenditure shall be reported to the SEIAA/RO MOEF GOI
for Environment Audit.
[xii] The project proponent shall ensure the compliance of Forest
Notifi carion no. S. o. 121 lP A2 I 1900 I s.4 I 97 dated 28.1 | .199''l
[xiii] The Project Proponent shall ensure that no vehicle during
phase enter the project premises without valid 'Pollu
certifi cate from competent Authority.
[xiv] The project proponent is responsible for compliance
Environmental Clearance letter and project
f all
t can
ractor
conditions in
not absolve
engaged bYhimielf /herself of the responsibility by shifting it to any co:n
project proponent.
[xv] The project proponent shall seek fresh Environmental
is change in the planning of the proposed project'
ce ifat anY stage there
[xvi] Besides the developer/applicant, the responsibility to re the compliance of
Environmental Safeguards/ conditions imposed in the Envi mental Clearance
letter shall also lie on the licensee/licensees in w name/names the
license/ClU has been granted by the Town & Country lanning DePartment,
Haryana.
[xviil The proponent shall upload the status of compliance f the stipulated EC
conditions, including results of monitored data on their ite and shall uPdate
Regional Office ofthe same periodically. It shall simultaneously be sent t<l
MoEF, the respective Zonal Office of CPCB and the SPC
levels namely; PMz.s, PMto, SOx NOv, Ozone, Lead' C
The criteria Pollutant
Benzene, Ammonia,
Benzopyrine, arsenic and Nickel. (Ambient levels as well stack ernissions) or
II
critical sectoral parameters, indicated for the project
displayed at a convenient location near the main gate of the:
domain.
[xviii] The environmental statement for each financial year endin
as is mandated to be submitted by the project proponent tcr
as prescribed under the Environment (Protection) Rut
subsequently, shall also be put on the website of the compal
of compliance of the EC conditions and shall also be
Regional Offices of MoEF by e-mail.
Ixix]
lxxl
The project proponent shall conduct environment audit
interval and thereafter corrected measures shall be tak
Details of environmental audit and corrective measures
monitoring report.
Colporate Environment and Social Responsibility (CSER.)
the project proponent (2% shall be eannarked) as per gui
Office Memorandum No. J-lI}l3l4L12006-IA.II(I) dated I
of Corporate Affairs, GoI Notification Dated 27.02.20
statement shall be submitted in the compliance. Envi
proposed to be executed under this responsibility
simultaneously. The project proponent shall select and
for implementation of CSER of its own choice and shal.
the start of construction.
Endst. No. SEIAA/HR/20L61
A copy of the above is forwarded to the following:
l. The Additional Director (lA Division), MoEF&CC,Bhavan, Zor bagh Road-New Delhi.The Regional office, Ministry of Environment, Forests &of India, Bay's no.24-25, Sector 31-A, Dakshin Marg, Cha
3. The Chairman, Haryana State Pollution Control Board, C-1.1
Assessment Authority, Haryanr
ll be monitored and
ompany in the public
31"' March in Form-V
e HSPCB Panchkula
1986, as amended
along with the status
t to the respective
every three months
without anv delav.
ll be submitted in the
all be laid down by
lines of MoEF. GoI
05.2012 and Ministry
4. A separate audit
t related work
hall be undertaken
the list of the work
bmit the same before
mpactAssessment Authority, Haryarr
Dated:
State Level Environmen
\ Indra Paryavaran
imate Change, Gor,t.
Sector-6, Pkl.
Impact. Panchkula.
\\
Member Secreta
'ember SecretaState Level Environment