Download - Lower Ground Floor Ground Floor First Floor

Transcript
Page 1: Lower Ground Floor Ground Floor First Floor

DN

UP

8 m²

Kitchen

25 m²

Living10 m²

Hall

1 m²

C'brd

( Up )

9 m²

Outbuilding

+1.570

+1.570

+730

+0.0

+1.700

+0.0

( Flat Roof )

11 m²

Bedroom 2

11 m²

Bedroom 1

6 m²

Bedroom 3

8 m²

Bathroom

6 m²

Landing

8 m²

Cellar

5 m²

Outbuilding

Head Office29 Broad StreetNewtownPowysSY16 2BQ

t - 01686 610311

w - www.hughesarchitects.co.uk

Drawing No :-

Drawn by :-

Scale :-

Date :-

Checked :-

Rev :-

Drawing Status :-

Project :-

Drawing Title :-

This drawing is COPYRIGHT. It must not be

reproduced or disclosed to third parties

without our prior permission. Do not scale

from this drawing, or, interrogate and use

electronic information.

Any discrepancies should be reported

immediately.

Any surveyed information incorporated

within this drawing cannot be guaranteed as

accurate unless confirmed by a fixed

dimension. All dimensions are in millimetres

unless noted otherwise.

1 : 100

Extension at Hillside, Swyddfynnon, Ystrad Meurig, Ceredigion, SY25 6AL

Existing Plans and Elevations

DHHB

13.09.19

Stage 3b ( Building Regs )

U025.3b. 1.100

1 : 100

Ground Floor1 : 100

First Floor1 : 100

Lower Ground Floor

Page 2: Lower Ground Floor Ground Floor First Floor

UP

5165

9227

A - A

103

Stub stack SVP with air admittance valve

SOAKAWAY USING CRATES Trench of soakaway to be provided slightly largely than designed depth after porosity test (if required) but just over 1m3 min from invert level of pipe. Provide suitable geotextile over the base and up the sides of the trench over 100mm level and compact bed of coarse sand. Install AquaCell crate units or equivalent as manufacturer’s details. Geotextile to be wrapped around crates. Provide 100mm of coarse sand between the trench walls and over the AquaCell structure. Backfill with suitable material.

( RWP )

Gulley

R 4000

New FWICCL = Ground LevelIL = To Suit Falls

RAINWATER DRAINAGENew rainwater goods to be new 110mm UPVC half round gutters taken and connected into 68mm dia UPVC downpipes. Rainwater taken to new soakaway, situated a min distance of 5.0m away from any building, via 110mm dia UPVC pipes surrounded in 150mm granular fill.

INSPECTION CHAMBERSUnderground quality proprietary UPVC 450mm diameter inspection chambers to be provided at all changes of level, direction, connections and every 45m in straight runs. Inspection chambers to have bolt down double sealed covers in buildings and be adequate for vehicle loads in driveways.

UNDERGROUND STORM DRAINAGEUnderground drainage to consist of 100mm diameter UPVC proprietary pipe work to give a 1:100 fall. Surround pipes in 100mm pea shingle. Provide 600mm suitable cover (900mm under drives). Shallow pipes to be covered with 100mm reinforced concrete slab over compressible material. Provide rodding access at all changes of direction and junctions. All below ground drainage to comply with BS EN 1401-1: 2009.

PIPEWORK THROUGH WALLSWhere new pipework passes through external walls form rocker joints either side wall face of max length 600mm with flexible joints with short length of pipe bedded in wall.Alternatively provide 75mm deep pre-cast concrete plank lintels over drain to form opening in wall to give 50mm space all round pipe: mask opening both sides with rigid sheet material and compressible sealant to prevent entry of fill or vermin.

UNDERGROUND FOUL DRAINAGEUnderground drainage to consist of 100mm diameter UPVC proprietary pipe work to give a 1:40 fall. Surround pipes in 100mm pea shingle. Provide 600mm suitable cover (900mm under drives). Shallow pipes to be covered with 100mm reinforced concrete slab over compressible material. Provide rodding access at all changes of direction and junctions. All below ground drainage to comply with BS EN 1401-1: 2009.

Connect proposed foul water to existing septic tank

Care to be taken when excavating existing floor not to undermine existing foundations of garden wall.

125mm Ridged PIR insulation with 25mm perimiter upstand to entirity of extension floor. 65mm screed laid ontop of insulation finished to existing FFL.

Beam and block floor to manufacturers design and specification. Depth of beams subject to manufacturers guidance.

STRIP FOUNDATIONProvide 225mm x 600mm concrete foundation, concrete mix to conform to BS EN 206-1 and BS 8500-2. All foundations to be a minimum of 1000mm below ground level, exact depth to be agreed on site with Building Control Officer to suit site conditions. All constructed in accordance with 2010 Building Regulations A1/2 and BS 8004:1986 Code of Practice for Foundations. Ensure foundations are constructed below invert level of any adjacent drains. Base of foundations supporting internal walls to be min 600mm below ground level. Sulphate resistant cement to be used if required. Please note that should any adverse soil conditions be found or any major tree roots in excavations, the Building Control Officer is to be contacted and the advice of a structural engineer should be sought.

Stronghold ties to be installed at blockwork connections.

No Ground works to this area.

5505

2767

1685

Wall taken down to DPC level, Floor screed to be poured up to this level.

Pad Foundations, Column and ground beams subject to structural engineer design and specification

910

Re-inforced eccentric strip foundation subject to structural engineers design and specification.

Existing Shed wall to be removed

Existing garden wall to be removed

BLOCK AND BEAM FLOOR VENTILATIONProvide cross-ventilation of the under floor to outside air by ventilators in at least 2 opposite external walls of the building. Ventilation openings having an opening area of 1500mm² per metre run of perimeter wall or 500mm² per square metre of floor area, whichever is the greater.

Retain existng shed wall up to ground level to retain subsidence

2496

4545

150310

150

150310

150

Care to be taken when excavating existing floor not to undermine existing foundations of garden wall.

BUILDING REGULATIONS NOTES

CDM REGULATIONS 2015The client must abide by the Construction Design and Management Regulations 2015. The client must appoint a contractor, if more than one contractor is to be involved, the client will need to appoint (in writing) a principal designer (to plan, manage and coordinate the planning and design work) and a principal contractor (to plan, manage and coordinate the construction and ensure there are arrangements in place for managing and organising the project).

Domestic clientsThe domestic client is to appoint a principal designer and a principal contractor when there is more than one contractor, if not your duties will automatically transferred to the contractor or principal contractor.

The designer can take on the duties, provided there is a written agreement between you and the designer to do so.

The Health and Safety Executive is to be notified as soon as possible before construction work starts if the works:

(a) Last longer than 30 working days and has more than 20 workers working simultaneously at any point in the project.Or:(b) Exceeds 500 person days.

THERMAL BRIDGINGCare shall be taken to limit the occurrence of thermal bridging in the insulation layers caused by gaps within the thermal element, (i.e. around windows and door openings). Reasonable provision shall also be made to ensure the extension is constructed to minimise unwanted air leakage through the new building fabric.

MATERIALS AND WORKMANSHIPAll works are to be carried out in a workmanlike manner. All materials and workmanship must comply with Regulation 7 of the Building Regulations, all relevant British Standards, European Standards, Agreement Certificates, Product Certification of Schemes (Kite Marks) etc. Products conforming to a European technical standard or harmonised European product should have a CE marking.

BASIC RADON PROTECTIONProvide a 1200g (300 um) radon membrane under floor slab lapped 300mm double welted and taped with gas proof tape at joints and service entry points. Carry membrane over cavity and provide suitable cavity tray and weep holes.

SITE PREPARATION Ground to be prepared for new works by removing all unsuitable material, vegetable matter and tree or shrub roots to a suitable depth to prevent future growth. Seal up, cap off, disconnect and remove existing redundant services as necessary. Reasonable precautions must also be taken to avoid danger to health and safety caused by contaminants and ground gases e.g. landfill gases, radon, vapours etc. on or in the ground covered, or to be covered by the building.

EXISTING STRUCTUREExisting structure including foundations, beams, walls and lintels carrying new and altered loads are to be exposed and checked for adequacy prior to commencement of work and as required by the Building Control Officer.

ELECTRICAL All electrical work required to meet the requirements of Part P (electrical safety) must be designed, installed, inspected and tested by a competent person registered under a competent person self certification scheme such as BRE certification Ltd, BSI, NICEIC Certification Services or Zurich Ltd. An appropriate BS7671 Electrical Installation Certificate is to be issued for the work by a person competent to do so. A copy of a certificate will be given to Building Control on completion.

INTERNAL LIGHTINGInstall low energy light fittings that only take lamps having a luminous efficiency greater than 45 lumens per circuit watt and a total output greater than 400 lamp lumens. Not less than three energy efficient light fittings per four of all the light fittings in the main dwelling spaces to comply with Part L of the current Building Regulations and the Domestic Building Services Compliance Guide.

SMOKE DETECTIONMains operated linked smoke alarm detection system to BS EN 14604 and BS5839-6:2013 to at least a Grade D category LD3 standard and to be mains powered with battery back up. Smoke alarms should be sited so that there is a smoke alarm in the circulation space on all levels/ storeys and within 7.5m of the door to every habitable room. If ceiling mounted they should be 300mm from the walls and light fittings. Where the kitchen area is not separated from the stairway or circulation space by a door, there should be an interlinked heat detector in the kitchen.

BACKGROUND AND PURGE VENTILATIONBackground ventilation - Controllable background ventilation via trickle vents to BS EN 13141-3 within the window frame to be provided to new habitable rooms at a rate of min 5000mm²; and to kitchens, bathrooms, WCs and utility rooms at a rate of 2500mm² Purge ventilation - New Windows/rooflights to have openable area in excess of 1/20th of their floor area, if the window opens more than 30° or 1/10th of their floor area if the window opens less than 30°Internal doors should be provided with a 10mm gap below the door to aid air circulation.Ventilation provision in accordance with the Domestic Ventilation Compliance Guide.

FIXED EXTERNAL LIGHTINGExternal light fittings to be fitted as calculated in the DER and in compliance with the Domestic Building Services Compliance Guide.Light fitting to be either:a. lamp capacity not greater than 100 lamp-watts per light fitting and provided with automatic movement detecting devices (PIR) and automatic daylight sensors ensuring lights shut off automatically when not required.Orb. lamp efficacy greater than 45 lumens per circuit-watt; fitted with manual controls and automatic day light cut-off sensors so that lights switch off when daylight is sufficient.

Head Office29 Broad StreetNewtownPowysSY16 2BQ

t - 01686 610311

w - www.hughesarchitects.co.uk

Drawing No :-

Drawn by :-

Scale :-

Date :-

Checked :-

Rev :-

Drawing Status :-

Project :-

Drawing Title :-

This drawing is COPYRIGHT. It must not be

reproduced or disclosed to third parties

without our prior permission. Do not scale

from this drawing, or, interrogate and use

electronic information.

Any discrepancies should be reported

immediately.

Any surveyed information incorporated

within this drawing cannot be guaranteed as

accurate unless confirmed by a fixed

dimension. All dimensions are in millimetres

unless noted otherwise.

1 : 50

B

Extension at Hillside, Swyddfynnon, Ystrad Meurig, Ceredigion, SY25 6AL

Ground Works Plan

DHHB

13.09.19

Stage 3b ( Building Regs )

U025.3b. 1.101

1 : 50

Ground Works Plan

A - HB - Updated following Clinets Comments - 07.04.20

B - HB - Updated to Client Comments - 15.04.20

Page 3: Lower Ground Floor Ground Floor First Floor

DN DN

( Up )

+1.700

9 m²

Kitchen

2250

2250

1740

Living

Living

Cpd

Decking

A - A

103

32mm Dia Pipe

40

mm

Dia

P

ipe

10

0m

m D

ia P

ipe

32mm Dia Pipe

40

mm

Dia

P

ipe

10

0m

m D

ia P

ipe(

Fan

)

15 m²

Dining Area

BathroomEn-Suite

17 m²

Bedroom

Stub stack SVP with air admittance valve

Sliding door

INTERNAL STUD PARTITIONS100mm x 50mm softwood treated timbers studs at 400mm ctrs with 50 x 100mm head and sole plates and solid intermediate horizontal noggins at 1/3 height or 450mm. Provide min 10kg/m³ density acoustic soundproof quilt tightly packed (eg. 100mm Rockwool or Isowool mineral fibre sound insulation) in all voids the full depth of the stud. Partitions built off doubled up joists where partitions run parallel or provide noggins where at right angles, or built off DPC on thickened concrete slab if solid ground floor. Walls faced throughout with 12.5mm plaster board with skim plaster finish. Taped and jointed complete with beads and stops.

STAIRSDimensions to be checked and measured on site prior to fabrication of stairs. Timber stairs to comply with BS585 and with Part K of the Building Regulations. Max rise 220mm, min going 220mm. Two risers plus one going should be between 550 and 700mm. Tapered treads to have going in centre of tread at least the same as the going on the straight. Min 50mm going of tapered treads measured at narrow end. Pitch not to exceed 42 degrees. The width and length of every landing should be at least as great as the smallest width of the flight. Doors which swing across a landing at the bottom of a flight should leave a clear space of at least 400mm across the full width of the flight. Min 2.0m headroom measured vertically above pitch line of stairs and landings. Handrail on staircase to be 900mm above the pitchline, handrail to be at least one side if stairs are less than 1m wide and on both sides if they are wider. Ensure a clear width between handrails of minimum 600mm. Balustrading designed to be unclimbable and should contain no space through which a 100mm sphere could pass. Allow for all structure as designed by a Structural Engineer.

TIMBER FRAME WALL To achieve minimum U Value of 0.19W/m²KShiplap horizontal Cedar/Larch Cladded finish.42 x 42mm SW vertical batten. 50mm continous cavity. Ply fixed to treated timber frame studs constructed using 140mm x 38mm treated timbers with head & sole plates and vertical studs (with noggins) at 400mm ctrs, or to s/engineer's details & calculations. 140mm Celotex FR5000 insulation to be provided between studs. Finish with VLC under 15mm Celotex PL3050 insulated Plasterboard and 3mm skim coat of finishing plaster. All junctions to have water tight construction, seal all perimeter joints with tape internally and with silicon sealant externally.

NEW AND REPLACEMENT WINDOWSNew and replacement windows to be double glazed with 16mm argon gap and soft coat low-E glass. Window Energy Rating to be Band C or better and to achieve U-value of 1.6 W/m²K. The door and window openings should be limited to 25% of the extension floor area plus the area of any existing openings covered by the extension.

STRUCTURAL REQUIREMENTSTimber Frame Manufacture to provide engineers structural calculations, details and specification for beams, timber frame, joists and trusses.

BALUSTRADINGAll balcony balustrades to be min 1.1m in height. Balustrades to be in accordance with Part K (Part N in Wales) of the Building Regulations and designed to resist the horizontal force given in BS 6180:2011. No openings in any balustrading should allow the passage of a 100mm sphere and children should not readily be able to climb the guarding.

EXTRACT TO BATHROOM AND ENSUITEBathroom to have mechanical vent ducted to external air to provide min 15 litres / sec extraction. Vent to be connected to light switch and to have 15 minute over run if no window in room. Internal doors should be provided with a 10mm gap below the door to aid air circulation. Ventilation provision in accordance with the Domestic Ventilation Compliance Guide. Intermittent extract fans to BS EN 13141-4. All fixed mechanical ventilation systems, where they can be tested and adjusted, shall be commissioned and a commissioning notice given to the Building Control Body.

Stronghold Wall ties to wall connection

Neighbouring PropertyNeighbouring Property

stacked Washer/Dryer

( Up )

+1.700

9 m²

Kitchen

2250

2250

1740

velux flatroofventedrooflight

velux flatroofventedrooflight

Living

Living

Cpd

Landscaped area

STRAPPING FOR FLAT ROOF Gable walls should be strapped to roofs at 2m centres. All external walls running parallel to Flat roof Joists to be restrained at roof level using 1000mm x 30mm x 5mm galvanised mild steel horizontal straps or other approved to BSEN 845-1 built into walls at max 2000mm centres and to be taken across minimum 3 joists and screw fixed. Provide solid noggins between rafters at strap positions. All wall plates to be 100 x 50mm fixed to inner skin of cavity wall using 30mm x 5mm x 1000mm galvanized metal straps or other approved to BSEN 845-1 at maximum 2m centres.

20

0m

m m

inim

um

eave

s o

verh

an

g

Late

ral R

estr

ain

t str

aps

FLAT ROOF VENTILATIONCross-ventilation to be provided on opposing sides by a proprietary eaves ventilation strip equivalent to 25mm continuous with fly proof screen. Flat roof insulation is to be continuous with the wall insulation but stopped back to allow a 50mm air gap above the insulation for ventilation.

Flat roof joists doubled up to support Roof lights

Stud walls to be build up to roof joists but not to provide structural support

47 x 220mm C24 sorftwood joists at 400 centres to carry .75 - 1KN/M2

Maximum span of 5.13M. Sedum Roof manufacturers to clarify loading adequacy.

ROOF LIGHTSMin U-value of 1.6 W/m²K.Roof-lights to be double glazed with16mm argon gap and soft low-E glass. Window Energy Rating to be Band C or better. Roof lights to be fitted in accordance with manufacturer's instructions with rafters doubled up to sides and suitable flashings etc.

Neighbouring PropertyNeighbouring Property

Late

ral R

estr

ain

t str

aps

Late

ral R

estr

ain

t str

aps

Late

ral R

estr

ain

t str

aps

Late

ral R

estr

ain

t str

aps

100mm minimum overhang

Late

ral R

estr

ain

t str

aps

400

400

400

Head Office29 Broad StreetNewtownPowysSY16 2BQ

t - 01686 610311

w - www.hughesarchitects.co.uk

Drawing No :-

Drawn by :-

Scale :-

Date :-

Checked :-

Rev :-

Drawing Status :-

Project :-

Drawing Title :-

This drawing is COPYRIGHT. It must not be

reproduced or disclosed to third parties

without our prior permission. Do not scale

from this drawing, or, interrogate and use

electronic information.

Any discrepancies should be reported

immediately.

Any surveyed information incorporated

within this drawing cannot be guaranteed as

accurate unless confirmed by a fixed

dimension. All dimensions are in millimetres

unless noted otherwise.

1 : 50

B

Extension at Hillside, Swyddfynnon, Ystrad Meurig, Ceredigion, SY25 6AL

Ground Floor Plan

CheckerAuthor

13.09.19

Stage 3b ( Building Regs )

U025.3b. 1.102A - HB - Updated following Clinets Comments - 07.04.20

B - HB - Updated to Client Comments - 15.04.20

1 : 50

Proposed Ground Floor Plan1 : 50

Ceiling Joist Plan

Page 4: Lower Ground Floor Ground Floor First Floor

310

SUSPENDED BLOCK AND BEAM FLOOR Remove top soil and vegetation, apply weed killer –The underside of beams not less than 150mm above the top of the ground. PCC beams to be supplied and fixed to beam manufacturer's plan, layout and details (details and calculations to be sent to Building Control and approved before works commence). Minimum bearing 100mm onto DPC and load bearing walls. Provide concrete blocks to BS6073 pt.1, wet and grout all joints with 1:4 cement/sand mix. Provide double beams below non-load bearing partitions. Lay 1200g DPM/radon barrier, with 300mm laps double welted and taped at joints and service entry points using radon gas proof tape, over beam and block floor. Lay floor insulation over DPM, 100mm Celotex FF4000 applied as a rigid material. Lay 500g separating layer over insulation and provide 60mm sand/cement screed over and prepare for floor finishes as required. The top surface of the ground cover under the building shall be above the finished level of the adjoining ground.Ventilation - Provide cross-ventilation of the under floor to outside air by ventilators in at least 2 opposite external walls of the building. Ventilation openings having an opening area of 1500mm² per metre run of perimeter wall or 500mm² per square metre of floor area, whichever is the greater. Sleeper walls shall be of honeycombed construction or have provision for distribution of ventilation.

DPCProvide horizontal strip polymer (hyload) damp proof course to both internal and external skins minimum 150mm above external ground level. New DPC to be made continuous with existing DPC’s and with floor DPM. Vertical DPC to be installed at all reveals where cavity is closed.

VENTILATED GREEN FLAT ROOF(imposed load max 1.0 kN/m² - dead load max 0.75 kN/m²)To achieve U value of 0.15 W/m²KGreen roof construCtion make up as per Sedum roof to be installed tomanufacturers recommendations -Oldroyd or similar drainage channels to be laid on roofing felt and draped into gutter.

47 x 220mm C24 sorftwood joists at 400 centres to carry .75 - 1KN/M2

Maximum span of 5.13M. Sedum Roof manufacturers to clarify loading adequacy.

165mm Celotex XR4000 between joists and 25mm FR5000 under joists. Ceilings to be 12.5mm plasterboard over vapour barrier with skim plaster finish.Provide cavity tray where pitched roof meets existing wall. Provide restraint to flat roof by fixing using of 30 x 5 x 1000mm ms galvanised lateral restraint straps at maximum 2000mm centres fixed to 100 x 50mm wall plates and anchored to wall. Workmanship to comply to BS 8000:4.

LEAD WORK AND FLASHINGS All lead flashings, any valleys or soakers to be Code 5 lead and laid according to Lead Development Association. Flashings to be provided to all jambs and below window openings with welded upstands. Joints to be lapped min 150mm and lead to be dressed 200mm under tiles, etc. All work to be undertaken in accordance with the Lead Development Association recommendations.

TIMBER FRAME WALL To achieve minimum U Value of 0.19W/m²KShiplap horizontal Cedar/Larch Cladded finish.42 x 42mm SW vertical batten. 50mm continous cavity. Ply fixed to treated timber frame studs constructed using 140mm x 38mm treated timbers with head & sole plates and vertical studs (with noggins) at 400mm ctrs, or to s/engineer's details & calculations. 140mm Celotex FR5000 insulation to be provided between studs. Finish with VLC under 15mm Celotex PL3050 insulated Plasterboard and 3mm skim coat of finishing plaster. All junctions to have water tight construction, seal all perimeter joints with tape internally and with silicon sealant externally.

2100

Void

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

GA

RD

EN

WA

LL

Beam and Block

Head Office29 Broad StreetNewtownPowysSY16 2BQ

t - 01686 610311

w - www.hughesarchitects.co.uk

Drawing No :-

Drawn by :-

Scale :-

Date :-

Checked :-

Rev :-

Drawing Status :-

Project :-

Drawing Title :-

This drawing is COPYRIGHT. It must not be

reproduced or disclosed to third parties

without our prior permission. Do not scale

from this drawing, or, interrogate and use

electronic information.

Any discrepancies should be reported

immediately.

Any surveyed information incorporated

within this drawing cannot be guaranteed as

accurate unless confirmed by a fixed

dimension. All dimensions are in millimetres

unless noted otherwise.

1 : 20

A

Extension at Hillside, Swyddfynnon, Ystrad Meurig, Ceredigion, SY25 6AL

Section

CheckerAuthor

13.09.19

Stage 3b ( Building Regs )

U025.3b. 1.103A - HB - Updated following Clinets Comments - 07.04.20

1 : 20

Section A - A

Page 5: Lower Ground Floor Ground Floor First Floor

SAFETY GLAZINGAll glazing in critical locations to be toughened or laminated safety glass to BS 6206, BS EN 14179 or BS EN ISO 12543-1:2011 and Part K (Part N in Wales) of the current Building Regulations, i.e. within 1500mm above floor level in doors and side panels within 300mm of door opening and within 800mm above floor level in windows.

TRADITIONAL BALUSTRADES Provide balustrades to balcony min 1100mm in height and capable of resisting at least the horizontal force given in BS 6180:2011. No openings in any balustrading should allow the passage of a 100mm sphere and children should not readily be able to climb the guarding.

Horizontal timber cladding

Powder coated aluminium fascia

Grass roof

Powder coated aluminium windows

Horizontal timber boards

Aluminium and glazed balustrade

Engineering brick Plynth

Horizontal timber cladding

Powder coated aluminium fascia

Engineering brick Plynth

GARDEN WALL

Horizontal timber cladding Powder coated aluminium fascia

Existing Kitchen

First Floor Bedroom

Floor Void

Horizontal timber boards

Aluminium and glazed balustrade

Horizontal timber cladding

Powder coated aluminium fascia

Green Roof

Head Office29 Broad StreetNewtownPowysSY16 2BQ

t - 01686 610311

w - www.hughesarchitects.co.uk

Drawing No :-

Drawn by :-

Scale :-

Date :-

Checked :-

Rev :-

Drawing Status :-

Project :-

Drawing Title :-

This drawing is COPYRIGHT. It must not be

reproduced or disclosed to third parties

without our prior permission. Do not scale

from this drawing, or, interrogate and use

electronic information.

Any discrepancies should be reported

immediately.

Any surveyed information incorporated

within this drawing cannot be guaranteed as

accurate unless confirmed by a fixed

dimension. All dimensions are in millimetres

unless noted otherwise.

1 : 50

B

Extension at Hillside, Swyddfynnon, Ystrad Meurig, Ceredigion, SY25 6AL

Elevations

CheckerAuthor

13.09.19

Stage 3b ( Building Regs )

U025.3b. 1.104A - HB - Updated following Clinets Comments - 07.04.20

B - HB - Updated to Client Comments - 15.04.20

1 : 50

Proposed Front Elevation

1 : 50

Proposed Side Elevation 21 : 50

Proposed Rear Elevation

1 : 50

Proposed Side Elevation