Download - Legend To Daulat Ram College - UTTIPEC

Transcript

STOP

Roop

Nagar

Roop

Nagar

Kamla

Nagar

Kamla

Nagar

Transformer

Transformer

Towards Maurice Nagar

Towards Maurice Nagar

Towards Shakti Nagar

Chowk

Towards Shakti Nagar

Chowk

3.6M2M

6.7M1.1M

7.8M 1.8M2M

Footpath FootpathShoulder ShoulderCarriageway Carriageway

Median

3.6M 2.4M 7M 1M 7M 0.6M Variable

MedianCarriagewayCarriageway

Buffer FootpathFootpath

Existing Cross Section (GG') - Satyawati Road

Proposed Cross Section (GG') - Satyawati Road

FOOTPATH

BUFFER SPACE

TABLE TOP / RAMPS

MEDIAN AND ISLANDS

BUS STOPS

TOILET BLOCKS

IPT PICK-DROP

VENDOR

UTILITIES

PARALLEL CAR PARKING

0 2m 5m 10m

0 5m 10m 15m

TITLE: REVISION

DHRUPAD CONSULTANTS PVT. LTD.7E, POCKET B, SIDDHARTH EXTENSION,NEW DELHI-14CONTACT: 011-49270513, 9958056935EMAIL: [email protected],[email protected] : www.dhrupadconsultants.com

Delhi DevelopmentAuthority

DATE

DRAWN BYSNEHA

CHKD. BYROHIT

This drawing is a property of DhrupadConsultants Pvt. Ltd and must not becopied or reproduced in any form

Sl.No. CLIENTS:CONSULTANTS: DWG No.

DCPL/DDA/UTTIPEC/TP/BCP/01

PROJECT:

15.102.2021

Walkability Plan

Part - H

Preparation of Walkability plans for various sites/ stretches in Delhi.

Name of the Area: Kamla Nagar

Existing - Satyawati Marg

Proposed - Satyawati Marg

To Nangia Park Chow

k

To D

aula

t Ram

Colle

ge

To Nangia Park Chow

k

To D

aula

t Ram

Colle

ge

Bus stop

Bus stop

Transformer to be shifted

Relocation of toiletblock in buffer space

Carriageway (7M)

Buffer space (0.6M)Footpath (3.5M)

G'

G

G'

G

Part H

Legend

Key Map

Note: All the design consideration are as per IRC 35 :

2015 (guidelines for road marking), IRC 67 : 2012

(guidelines for signages) and IRC 103 : 2012

(Guidelines for pedestrian facilities).

SCALE:

(For Plans)

All Dimensions are in meters unless mentioned otherwise.

(For Sections)

User
Typewritten text
(Option-2)