Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25941 RESOLVED That the Design Commission, having considered designs for the installation of distilling equipment, Kings County Distillery, Building 121, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn, submitted by the Brooklyn Navy Yard Development Corporation, represented by exhibits 6063-JJ & JK of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that a landscape proposal will be coordinated with the adjacent Admiral’s Row development and submitted for review before the Admirals’ Row project is submitted for final review. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25943 RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 972 Flatbush Avenue, northwest corner of Albemarle Road and Flatbush Avenue, Brooklyn, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7263-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25944 RESOLVED That the Design Commission, having considered designs for the reconstruction of Morrison Avenue Plaza, between Westchester Avenue and Harrold Place, Bronx, submitted by the Department of Design and Construction and the Department of Transportation, represented by exhibits 7248-A, B, C, D & E of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the team will submit the following for committee review before returning for final: (1) confirmation of the stone dust material, which must be porous; (2) a lighting plan; (3) a grading plan; and (4) the prototypical kiosk design. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25945 RESOLVED That the Design Commission, having considered final photographs for the installation of Plaza Perch by Austin Thomas, Humboldt Plaza, Humboldt Street between Varet Street and Moore Street, Brooklyn, submitted by the Department of Design and Construction, the Department of Transportation, and the Department of Consumer Affairs' Percent for Art Program, represented by exhibits 2318-AC & AD of record in this matter, hereby gives to the same unanimous final approval. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25946 RESOLVED That the Design Commission, having considered designs for the reconstruction of the Bronx-Pelham Parkway westbound lanes and Pelham Parkway North, including the installation of Davit poles, from Boston Road to Stillwell Avenue, Bronx, submitted by the Department of Design and Construction, the Department of Transportation, and the Department of Parks & Recreation, represented by exhibits 4249-AK, AL, AM & AN of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25947 RESOLVED That the Design Commission, having considered designs for the installation of rooftop equipment, George Motchan Detention Center, 15-15 Hazen Street, Rikers Island, Bronx, submitted by the Department of Correction, represented by exhibits 1554-QQ, QR, QS, QT & QU of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25948 RESOLVED That the Design Commission, having considered designs for the installation of rooftop equipment, George R. Vierno Center, 09-09 Hazen Street, Rikers Island, Bronx, submitted by the Department of Correction, represented by exhibits 1554-QV, QW, QX, QY & QZ of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25949 RESOLVED That the Design Commission, having considered designs for the installation of a rooftop ladder, Frank D. Paulo Intermediate School, 455 Huguenot Avenue, Staten Island, submitted by the Department of Education, represented by exhibits 4320-K, L, M, N & O of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25950 RESOLVED That the Design Commission, having considered designs for the installation of an ADA lift, 89 7th Avenue, Manhattan, submitted by the Department of Transportation, represented by exhibits 7264-A, B, C, D & E of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25951 RESOLVED That the Design Commission, having considered designs for the installation of streetscape improvements as Phase III of the streetscape master plan, New York Presbyterian Hospital and Columbia University Medical Center, St. Nicholas Avenue, West 168th Street, Audubon Avenue, and West 167th Street, Manhattan, submitted by the Department of Transportation, represented by exhibits 1093-BJ, BK, BL, BM & BN of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25914 RESOLVED That the Design Commission, having considered designs for the reconstruction of Bloomingdale Playground, Amsterdam Avenue between West 104th Street and West 105th Street, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 3371-I, J, K & L of record in this matter, hereby gives to the same unanimous preliminary approval. Commissioner Sheffer recused herself. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25952 RESOLVED That the Design Commission, having considered a proposal for the conservation of Fountain of the Dolphins by Steven Dickey, Father Capodanno Boulevard and Sand Lane, Staten Island, submitted by the Department of Parks & Recreation, represented by exhibits 3093-AO, AP & AQ of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon commencement of work before November 14, 2018, and submission of this project for final review and approval. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25953 RESOLVED That the Design Commission, having considered designs for the reconstruction of Avenue B Playgrounds, Tompkins Square Park, Avenue A, East 10th Street, Avenue B, and East 7th Street, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 320-AZ, BA & BB of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25954 RESOLVED That the Design Commission, having considered designs for the reconstruction of Lawrence Playground, College Point Boulevard, Botanical Garden Bridge, and the Van Wyck Expressway, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 7265-A, B & C of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that DEP approved the proposed grading over the sewer easement. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25955 RESOLVED That the Design Commission, having considered designs for the reconstruction of Van Nest Memorial Park, Van Nest Avenue, White Plains Road, Mead Street, and Unionport Road, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 1374-I, J & K of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the plant list will be revised per Commissioner Nielsen’s recommendations. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25956 RESOLVED That the Design Commission, having considered designs for the rehabilitation of a comfort station, Corlears Hook Park, Cherry Street, Jackson Street, and the FDR Drive, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 6485-H, I & J of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25957 RESOLVED That the Design Commission, having considered designs for the rehabilitation of the Hansborough Recreation Center, 35 West 134th Street, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 1090-AO & AP of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25958 RESOLVED That the Design Commission, having considered designs for the installation of skateboard deterrents, Frederick Douglass Circle, Central Park West, 110th Street, Cathedral Parkway, Manhattan, submitted by the Department of Parks & Recreation and the Department of Cultural Affairs’ Percent for Art Program, represented by exhibits 6446-AG & AH of record in this matter, hereby gives to the same unanimous preliminary and final approval. Commissioner Sheffer recused herself. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25959 RESOLVED That the Design Commission, having considered designs for the construction of a dog run, Bronx Park, Boston Road and Bronx Park East, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 7233-D, E, F & G of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25960 RESOLVED That the Design Commission, having considered designs for the construction of a prototypical comfort station and maintenance building, Lincoln Terrace Park, East New York Avenue between Rochester Avenue and Buffalo Avenue, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 2043-X, Y, Z, AA & AB of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25961 RESOLVED That the Design Commission, having considered designs for the construction of a prototypical comfort station, West Playground, Avenue Y, West Street, Avenue Z, and West 1st Street, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 2859-L, M, N, O & P of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25962 RESOLVED That the Design Commission, having considered designs for the reconstruction of bus stops and adjacent site work, Riverside Park, Riverside Drive from West 79th Street to West 129th Street, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 2287-JJ, JK, JL, JM & JN of record in this matter, hereby gives to the same unanimous final approval. Commissioner Sheffer recused herself. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25963 RESOLVED That the Design Commission, having considered designs for the reconstruction of Laurelton Playground, 136th Avenue, Brookville Boulevard, 137th Avenue, and Laurelton Parkway, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 2014-H, I & J of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25964 RESOLVED That the Design Commission, having considered designs for the reconstruction of Out Building 22 as part of the United States Tennis Association’s Billie Jean King National Tennis Center strategic vision plan, Flushing Meadows Corona Park, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 2103-ABS, ABT, ABU, ABV, ABY & ABZ of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25965 RESOLVED That the Design Commission, having considered a proposal for the conservation of the Matthew J. Buono War Memorial Fountain, Staten Island, submitted by the Department of Parks & Recreation, represented by exhibits 4248-V, W & X of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon commencement of work before November 14, 2018, and submission of this project for final review and approval. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25966 RESOLVED That the Design Commission, having considered designs for the reconstruction of the sidewalk, including installation of M-poles, and adjacent site work, Prospect Park, west side of Flatbush Avenue between Grand Army Plaza and the Prospect Park Zoo, Prospect Park, Brooklyn, submitted by the Department of Parks & Recreation and the Department of Transportation, represented by exhibits 912-BM, BN & BO of record in this matter, hereby gives to the same unanimous final approval. The Commission encourages the Department of Transportation to install M-poles on the eastern side of Flatbush Avenue for a consistent treatment along this stretch of roadway. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25967 RESOLVED That the Design Commission, having considered designs for the construction of the New York Wheel, Richmond Terrace, Nicholas Street, and Hamilton Avenue, Staten Island, submitted by the Economic Development Corporation, represented by exhibits 138-HT, HU & IB of record in this matter, hereby gives to the same unanimous final approval with the understanding that the revised lighting proposal will be submitted by May 2017. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25968 RESOLVED That the Design Commission, having considered designs for the installation of prototypical ferry service signage for installation citywide, submitted by the Economic Development Corporation, represented by exhibits 6816-FS, FT & GD of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding the following will be submitted: (1) a dimensioned drawing showing the proposed text size and layout for each ferry sign; (2) a plan and elevations showing the signage structures adjacent to the gate structure; and (3) drawings showing the 8” wide LED panel integrated into the 9” wide column. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25969 RESOLVED That the Design Commission, having considered designs for the reconstruction of the landscape to accommodate citywide ferry service, including the installation of electrical equipment, fencing and access gate, East 90th Street, the FDR Drive, and East River, Manhattan, submitted by the Economic Development Corporation and the Department of Parks & Recreation, represented by exhibits 6350-AC, AD & AE of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25970 RESOLVED That the Design Commission, having considered designs for the reconstruction of the landscape to accommodate citywide ferry service, including the installation of electrical equipment, fencing and access gate, East River Park, Jackson Street, the FDR Drive, and East River, Manhattan, submitted by the Economic Development Corporation and the Department of Parks & Recreation, represented by exhibits 7266-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that a permanent location for the equipment will be submitted in coordination with the East Side Coastal Resiliency project. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25971 RESOLVED That the Design Commission, having considered designs for the installation of an emergency generator and rooftop mechanical and solar thermal equipment, Engine Company 237, 43 Morgan Avenue, Brooklyn, submitted by the Fire Department, represented by exhibits 7267-A, B, C & D of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25972 RESOLVED That the Design Commission, having considered designs for the installation of an emergency generator, Engine Company 321, 2165 Gerritsen Avenue, Brooklyn, submitted by the Fire Department, represented by exhibits 1649-M, N, O & P of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before November 14, 2018, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25973 RESOLVED That the Design Commission, having considered designs for the rehabilitation of Emergency Medical Station 39 (EMS 39), 265 Pennsylvania Avenue, Brooklyn, submitted by the Fire Department, represented by exhibits 7243-A, B & D of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the team will submit the following for committee review before returning for final review: (1) a revised proposal that (a) considers using a clear, polycarbonate ‘glass,’ and (b) lightens the window’s glass color, frames, and mullions, and guardrail finish as much as possible so that all elements match; (2) a materials list specifying the guardrail, mullions, and steel sill and lintel finishes and brick colors; (3) details on the planting, soil depth and irrigation at the parapet; and (4) brick samples. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director

Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau, Signe Nielsen, Ann Tenenbaum, Commissioners

November 14, 2016 CERTIFICATE 25974 RESOLVED That the Design Commission, having considered designs for the reconstruction of the perimeter landscaping between West 86th Street and West 90th Street, Central Park, Manhattan, submitted by the Department of Parks & Recreation and the Central Park Conservancy, represented by exhibits 5124-H, I & J of record in this matter, hereby gives to the same unanimous preliminary approval. Commissioner Sheffer recused herself. Preliminary approval is conditioned upon submission of this project for final review and approval before November 14, 2018. A true copy of resolution adopted by the Design Commission at its meeting on November 14, 2016. Justin Garrett Moore Executive Director