NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
VISION: CREATE LOGISTICS ALTERNATIVES. ECONOMICALLY AND
ENVIRONMENTALLY FEASIBLE TO OUR CUSTOMERS.
Slide 4
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MISSION: GENERATE TAYLOR MADE PROJECTS TO FIT ALL INTERESTED
PARTIES(*) NEEDS. (*)PLANET. SHAREHOLDERS. LOCAL AND INTERNATIONAL
REGULATIONS. NEIGHBOURS. INVESTORS. ETC.
Slide 5
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
SPECIAL CARES: UNDERSTAND THE LOCAL SITUATION GEOLOGICALLY SEA
BOTTOM WINDS AND TIDES SHORE CONNECTION WEATHER USUAL AND UNUSUAL
CONDITIONS
Slide 6
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
UNDERSTAND THE FEASIBILITY OF THE DEAL. WHERE THE SUPPLY CHAIN
BEGINS? WHERE IT ENDS? WHICH LINK CAN WE PROVIDE? WHICH VALUE CAN
WE ADD TO THIS CHAIN? THE CIRCLE (RAW MATERIAL,
PROCESSING,TRANSPORTING, STORAGE, DISTRIBUTING, END CONSUMERS, IN
FULL COMPLIANCE WITH REGULATIONS, INVESTORS) IS COMPLETE?
Slide 7
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
TECHNOLOGY IS PROJECTED AND BUILT FOR: DIFFERENT WIND CONDITIONS
LIKE: STRENGHT, DIRECTIONS AND VARIATIONS ALONG THE TIME. DIFFERENT
TIDE CONDITIONS ( FLAT LAKES, WILD RIVERS, PROTECTED SEA WATERS,
OPEN SEA WATERS BY THE SHORE, OPEN SEA WATERS FAR FROM THE SHORE.
DIFFERENT BOTTOM STRUCTURE (ROCK, SAND, MUD)
Slide 8
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
RECEIVING DIFFERENT SIZE AND KIND OF VESSELS LIKE: OIL TANKER,
CONTAINER CARRIER, CHEMICAL TANKER, LNG TANKER OR BULK CARRIERS,
CRUISE VESSEL, FERRIES; PANAMAX, CAPE SIZE... OPERATING WITH
DIFFERENT KIND OF CARGOS: FUELS, CHEMICALS, LNG. COAL, IRON ORE,
GRAIN, SUGAR. CONTAINERS. OPERATING WITH SELF SUFFICIENT ELECTRICAL
POWER GENERATORS. GENERATE A MINIMUM OF ENVIRONMENTAL DAMAGES DUE
TO ITS SYSTEMS OF FIXING THE PORT/TERMINAL TO SHORE/SEA
BOTTOM.
Slide 9
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
CAN RESIST NATURAL DISASTERS LIKE HURRICANES, EARTHQUAKES,
TSUNAMIS. CAN BE MOVED TO ANOTHER PLACE/LOCATION AFTER IT IS NOT
NEEDED ANYMORE ON THE CURRENT LOCATION. ITS ALL BUILD OF: APPROVED
SHIP CONSTRUCTION STEEL, WITH AN ESTIMATED USEFUL LIFE OF 50 YEARS
(MINIMUM), WITH APPROPRIATE MAINTENANCE. IT HAS A HYDRAULIC SYSTEM
TO ADJUST AND POSITIONING THE JETTY TO THE RIGHT OPERATIONAL
POSITION. ITS ELECTRONICALLY CONTROLLED, TO ASSURE PROPER
OPERATIONAL CONDITIONS, LIKE: ELECTRICAL POWER GENERATION, LOADING
/ UNLOADING SPEED, FUEL LEVEL.
Slide 10
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
SAVES ONE THIRD TO HALF OF THE TIME TO BE BUILD, COMPARED TO
CONVENTIONAL TECHNOLOGY. IT COSTS LESS, ONE THIRD TO HALF OF THE
MONEY TO BUILD, COMPARED TO CONVENTIONAL TECHNOLOGY. THE PRODUCT
WILL BE DELIVERED ON TURN-KEY BASIS. THE PRODUCT WILL BE COMPLETELY
SURVEYED BY BUREAU VERITAS TO COMPLY WITH THE INTERNATIONAL NORMS
APPLYING.
Slide 11
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ETC. SEE NEXT 5
IMAGES
Slide 12
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
Slide 13
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
Slide 14
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
Slide 15
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
Slide 16
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
Slide 17
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING OIL,LIQUIDS, GAS, ETC. SEE NEXT 5 DIAS
AND 2 MOVIES
Slide 18
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
Above we show you the option to use the movable jetty as an oil
loading terminal. The marine loading arm is designed to load
sea-going tanker ships. The max. loading capacity of this loading
arm is max. 4000 m3/h. The loading arm is designed for transferring
mineral oil, chemicals and liquefied gases (incl. LNG) See attached
product data sheet of the loading arm B0030. MOVABLE JETTY FOR
LOADING OIL INTO TANKER SHIPS
Slide 19
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
Connection of the loading arm to the ships pipeline. Seen from the
vessel. Connection of the loading arm to the ships pipeline. Seen
from the movable jetty.
Slide 20
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING
B.V.
Slide 21
Slide 22
Slide 23
Double click on the picture to start the movie
Slide 24
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
Double click on the picture to start the movie
Slide 25
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR CONTAINER HANDLING SEE NEXT 8 IMAGES
Slide 26
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS IN LOWER POSITION (NOT
ABOVE WATERLINE)
Slide 27
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS Movable Jetty in lower
position (not above the waterline)
Slide 28
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS Movable Jetty in lower
position (not above the waterline)
Slide 29
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS Movable Jetty in lower
position (not above the waterline)
Slide 30
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS IN UPPER POSITION (ABOVE
WATERLINE)
Slide 31
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS Movable Jetty in upper
position (above the waterline)
Slide 32
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS Movable Jetty in upper
position (above the waterline)
Slide 33
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS Movable Jetty in upper
position (above the waterline)
Slide 34
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS Movable Jetty in upper
position (above the waterline)
Slide 35
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS Movable Jetty in upper
position (above the waterline)
Slide 36
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL SEE NEXT 6
IMAGES
Slide 37
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL IN LOWER POSITION
(NOT ABOVE WATERLINE)
Slide 38
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL Movable Jetty in
lower position (not above the waterline)
Slide 39
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL Movable Jetty in
lower position (not above the waterline)
Slide 40
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL Movable Jetty in
lower position (not above the waterline)
Slide 41
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL Movable Jetty in
lower position (not above the waterline)
Slide 42
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL IN UPPER POSITION
(ABOVE WATERLINE)
Slide 43
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL Movable Jetty in
upper position (above the waterline)
Slide 44
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY TERMINAL Movable Jetty in
upper position (above the waterline)
Slide 45
NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V.
THANK YOU FOR YOUR ATTENTION Kuipers Shipbuilding B.V. Het Tasveld
21 3342 GT Hendrik Ido Ambacht The Netherlands Tel: +31 78 683 3280
www.kuipersshipbuilding.com [email protected] Peter
Boezel Gerhardus Kuipers Technical Department C.E.O. Skype: Skype :
gerharduskuipers Email: [email protected] Email :
[email protected] Phone: +31 653 920 365 Phone :
+31 630 040 794