Toowoomba Second Range Crossing

Page 2: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -
Page 3: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -
Page 4: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

Benefits The TSRC will provide vehicles with an alternative crossing of the existing Toowoomba Range, which will improve driver safety and relieve pressure on local roads. •  The TSRC will bypass up to 18 sets of traffic lights (depending on the route). •  Travel time will be reduced by up to 40 minutes for heavy vehicles. •  Almost 80% of heavy and super-heavy commercial vehicles will be re-

directed away from the existing crossing and out of the Toowoomba CBD. •  An improved road grade of 6.5% will improve road safety and improve travel

efficiencies. •  The TSRC will improve freight efficiency and increase economic activity in

the region by $2.4 billion over 30 years.

Page 5: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

Design and Construction (D&C) Phase

The design and construction of the bypass, including: •  All infrastructure •  Assets •  Systems •  40-month phase from contract

award

Operations and Maintenance (O&M) Phase

The operation and maintenance of the toll road, including: •  Traffic management •  Incidence response •  Asset management •  Data management •  Reporting •  25-year phase from completion of the

toll road

Project scope

Page 6: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

Commercial Framework

Page 7: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

Cintra has more than 60 years’ experience as a leading private investor in transport infrastructure and manages more than 24 toll road concessions in Europe, Canada and the United States.

Plenary has achieved unrivalled success in our key markets of Australia and North America, closing 34 PPP porjects since inception, valued add $24b.

ACCIONA Concesiones is one of the leading infrastructure developers in the world by number and volume of projects, with a total experience of 33 projects developed and managed.

Nexus Infrastructure

Page 8: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

Acciona has been delivering road projects in Europe for more than 50 years. Acciona Australia has recently completed Legacy Way, a landmark road tunnelling project, characterised by on-budget delivery, innovation and exceptional stakeholder and environmental outcomes.

As a construction company with proven innovations in toll road delivery, Ferrovial focuses on the use of new materials and construction methods, improvements in traffic management and operational safety and sustainability.

Nexus Delivery

Page 9: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

Registrations of interest

(ROI)

Expressions of interest

(EOI)

Assessment of EOIs and

shortlist consortia

Request for proposals

(RFP) from shortlisted consortia

Evaluate proposals

and secure cabinet on preferred proponent

Contract award

Jan – Mar 2014

June – July 2014

July – Sept 2014

Sept 2014 – Feb 2015

Q1, Q2 2015

21 August 2015

TSRC procurement process

Page 10: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

Nexus Infrastructure was selected to build and operate the TSRC based on value for money, innovative solutions and high-quality outcomes. •  Four lanes from Warrego Highway East

Interchange to Warrego Highway West •  Grade-separated interchanges at

Warrego Highway West, Toowoomba-Cecil Plains Road and Gore Highway

•  A grade-separated connection to Mort Street in Toowoomba

•  Approximately 30 metre deep cutting at the top of the range

•  An 800 metre viaduct east of the New England Highway.

Our proposal

Page 11: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

An open cut solution: •  Accommodates over sized and dangerous goods vehicles •  Is more cost efficient to maintain •  Offers improved environmental outcomes, such as reduced

energy requirements.

Open cut solution

Page 12: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

CONTRACT AWARD

Design and Procurement

Survey, Geotechnical Investigations

and Site Establishment

Vegetation Clearing

Earthworks and Structures Pavement Finishing and

Commissioning

PRACTICAL COMPLETION

Toll Road Opens

2016 2017 2018

TSRC project timeline

•  Nexus Infrastructure is still early in the detailed design phase •  Pre-construction survey and geo-technical works have begun •  Construction will commence in 2016 •  Works will ramp up over time during the D&C phase in line with design •  Procurement will also follow design packages as they are released.

Page 13: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

75% local involvement

2.5% Indigenous

employment

We are committed to developing a greater connection with local industry and suppliers.

1800 direct and indirect

jobs

•  Construction labour •  Suppliers •  Sub-contractors

•  Toowoomba •  Darling Downs •  South-west

Queensland

SOURCED FROM

Local industry participation

Page 14: John Hagan - Nexus Infrastructure - Toowoomba Second Range Crossing -

- Nexustsrc

To keep up-to-date with the progress of the TSRC and to register for updates visit www.nexustsrc.com.au