LHS RHS LHS RHS
Description RemarksS.
No
OBSRTUCTIONS LIST
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Nos of Obstruction
Removed
Nos of Obstruction
TotalFrom To Length
39 Trees 57000 58000 1000 32 118 32 118
40 Trees 58000 59000 1000 26 43 26 43
41 Trees 59000 60000 1000 16 13 16 13
42 Trees 60000 61000 1000 76 147 76 147
43 Trees 61000 62000 1000 99 126 99 126
44 Trees 62000 63000 1000 59 52 59 52
45 Trees 63000 63900 900 97 111 97 111
46 Trees 75900 76900 1000 47 61 47 61
47 Trees 76900 77900 1000 65 82 65 82
48 Trees 77900 78900 1000 46 67 46 67
49 Trees 78900 79900 1000 78 56 78 56
50 Trees 79900 80900 1000 51 73 51 73
51 Trees 80900 81900 1000 74 173 74 173
52 Trees 81900 82900 1000 133 151 133 151
53 Trees 82900 83900 1000 42 38 42 38
54 Trees 83900 84900 1000 8 34 8 34
55 Trees 84900 85900 1000 61 114 61 114
56 Trees 85900 86900 1000 13 96 13 96
57 Trees 86900 87900 1000 10 37 10 37
58 Trees 87900 88900 1000 54 40 54 40
59 Trees 88900 89900 1000 80 16 80 16
60 Trees 89900 90900 1000 116 84 116 84
61 Trees 90900 91900 1000 111 59 111 59
62 Trees 91900 92900 1000 67 72 67 72
63 Trees 92900 93900 1000 86 10 86 10
64 Trees 93000 94000 1000 15 25 15 25
65 Trees 93900 94900 1000 58 9 58 9
66 Trees 94000 95000 1000 18 20 18 20
67 Trees 95000 96000 1000 3 5 3 5
68 Trees 96000 97000 1000 - 10 - 10
69 Trees 97000 98000 1000 24 42 24 42
70 Trees 98000 99000 1000 29 40 29 40
71 Trees 99000 100000 1000 45 41 45 41
72 Trees 100000 101000 1000 116 148 116 148
73 Trees 101000 102000 1000 60 18 60 18
74 Trees 102000 103000 1000 50 69 50 69
75 Trees 103000 104000 1000 93 69 93 69
76 Trees 104000 105000 1000 92 100 92 100
77 Trees 105000 106000 1000 34 83 34 83
Page 194 of 246
LHS RHS LHS RHS
Description RemarksS.
No
OBSRTUCTIONS LIST
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Nos of Obstruction
Removed
Nos of Obstruction
TotalFrom To Length
78 Trees 106000 107000 1000 29 155 29 155
79 Trees 107000 108000 1000 36 180 36 180
80 Trees 108000 109000 1000 35 119 35 119
81 Trees 109000 110000 1000 50 32 50 32
82 Trees 110000 111000 1000 106 72 106 72
83 Trees 111000 112000 1000 19 197 19 197
84 Trees 112000 113000 1000 69 81 69 81
85 Trees 113000 114000 1000 32 57 32 57
86 Trees 114000 115000 1000 390 529 390 529
87 Trees 115000 116000 1000 335 294 335 294
88 Trees 116000 117000 1000 272 214 272 214
89 Trees 117000 118000 1000 53 134 53 134
90 Trees 118000 119000 1000 46 91 46 91
91 Trees 119000 120000 1000 3 9 3 9
92 Trees 120000 121000 1000 9 32 9 32
93 Trees 121000 122000 1000 15 2 15 2
94 Trees 122000 123000 1000 67 31 67 31
95 Trees 123000 123454 454 46 9 46 9
Total 7,324 8,232 7,324 8,232
Page 195 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
F. DETAILS OF HINDRANCES
AFFECEING THE WORK
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 196 of 246
Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]
Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014 Annexure-10FAnnexure-10FAnnexure-10FAnnexure-10F
FromFromFromFrom ToToToToLength in Length in Length in Length in
MtrsMtrsMtrsMtrsLHSLHSLHSLHS RHSRHSRHSRHS
BOTH BOTH BOTH BOTH
SIDESIDESIDESIDE
46200 46550 350 350 350.0Existing Major Bridge (Ozat river) @ 46+375 proposed for
re-construction (CoS)- In principle approval pending
Gap in 4 lane traffic and structure work along with
approaches of Highway on LHS Side
48450 48520 70 70 70.0 Service Road end & tapering portion at Kanza village Service road, tapering portion to MCW & lined drain
50900 51500 600 600 1,200.0 100m RoW land for Toll Plaza (1)Toll Plaza DLC, PQC, Admin Buildings, Toll Booth, all
Toll Plaza allied works, Bus Shelter after Toll Plaza
56700 57100 400 400 400.0 CoS - Re-construction of MJB @ 56+769 delayed approvalsMajor Bridge construction, Highway works & protection
works
63600 75000 11400 11,400 22,800.060m RoW not available (work carried out in available RoW
of 30 m @ Keshod Bypass with restricted EMB slope)
Service Road works (2.60 Km), Shoulder slopes, unlined
drain, Lined drain at Service Road, Major and Minor
Junction, Bus shelter, Embankment protection, Turfing
91300 91500 200 200 Underground electric line crossing issues at Service Road
Tapering portion (Somnath side)Service Road construction at MCW merging point
96700 96800 100 100 100.0 Land issues at Service Road Tapering portion Service Road construction at MCW merging point
110980 111110 130 130 Payment for property is pending (Universal Construction
Office)All highway works.
111840 111920 80 80 160.0 Matter for acquisition of land is in High Court (PIL 13477)All Highway works and also the connectivity in the
Veraval realignment (1.1 Km length).
108680 109280 600 600 1,200.0 100m RoW land for Toll Plaza (2)Toll Plaza DLC, PQC, Admin Buildings, Toll Booth, all
Toll Plaza allied works, Bus Shelter after Toll Plaza
26.326.326.326.3
13.113.113.113.1
Affected WorksAffected WorksAffected WorksAffected Works
Cumulative Two-lane length affected Cumulative Two-lane length affected Cumulative Two-lane length affected Cumulative Two-lane length affected
(in 2L-Kms):(in 2L-Kms):(in 2L-Kms):(in 2L-Kms):
Cumulative Four-lane length affected Cumulative Four-lane length affected Cumulative Four-lane length affected Cumulative Four-lane length affected
(in 4L-Kms):(in 4L-Kms):(in 4L-Kms):(in 4L-Kms):
ChainageChainageChainageChainage Hindrances inHindrances inHindrances inHindrances in
2 Lane Affected 2 Lane Affected 2 Lane Affected 2 Lane Affected
length in Mtrslength in Mtrslength in Mtrslength in MtrsDetail of HindrancesDetail of HindrancesDetail of HindrancesDetail of Hindrances
Page 197 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-11
APPROVAL OF GAD FOR ROB
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 198 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
APPROVAL OF GAD’s FOR ROBs
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 199 of 246
Status as on : 30 June '14
R.O.B. No and
Ch.
Village detail, Land Acquisition and
Land Availability Status
GAD Status Detailed Design Status Excavation Commencement as per MIP Remarks
Detailed Design for Foundation & Substructure
approved from Western Railways.
Detailed Design for superstructure (RCC girder
spans P1-P2 and P2-P3) is under process for
Submission to ICT approval
Girder Launching Scheme approval by CRS is also
completed
29-Oct-12
RE WALL: Detailed Design approved by IE Work started on 12 Oct '13 but commencement
is delayed by 348 days with respect to MIP start
date (29 Oct '12)
Vadal Village 15-Mar-13
(On HOLD due to Land Acquisition
of Junagadh Bypass) ON HOLD
Delayed by 472 days as on 30 June '14
28-Dec-12
Work started on 28 June '13 but commencement
is delayed by 182 days with respect to MIP start
date (28 Dec '12)
28-Nov-12
Work started on 07 May '13 but commencement
is delayed by 160 days with respect to MIP start
date (28 Nov '12)
On hold due to Junagadh Bypass
STATUS UPDATE FOR R.O.B.'s
Four Laning of Jetpur Somnath-Section of NH-8D
R.O.B. No.1 @
Ch: 2.800
Approved 1. Substructure works (except P2) completed
on both sides of Jetpur & Somnath end.
2. RE wall works are in progress on both ends
3. Steel girder Assembling is under progress
for Span P3-A2 & Span A1-P1
R.O.B. No.2 @
Ch: 21.370
Approved Detailed Design for Foundation & Substructure will be
prepared after finalization of Junagadh Bypass
Land Possession Completed
1. Level Crossing shifting Completed
2. Substructure works completed
3. RCC Retaining wall work is completed on
LHS on both ends
4. RCC Retaining wall work is under progress
on RHS Somnath end
R.O.B. No.3 @
Ch: 112.938
Approved Plan for Shifting Level Crossing is approved by WR,
HQ and CRS approval also received from Railways.
Detailed Design for Foundation & Substructure
approved from Western Railways.
Detailed Design for superstructure is approved by IIT,
Mumbai
1. Level Crossing shifting Completed
2. foundation completed and Substructure
works are in progress with in railway
boundary
3. Substructure completed for A2 LHS and A1
RHS
4. RE wall work are in progress on Jetpur end
BHS
R.O.B. No.4 @
Ch: 118.374
Approved Plan for Shifting Level Crossing is approved by WR,
HQ and CRS approval also received from Railways.
Detailed Design for Foundation & Substructure
approved from Western Railways.
Detailed Design for superstructure (solid slab &
bearings) is approved by IIT, Mumbai and submitted to
IE & Western Railways. Approval from ICT is obtained
but Western Railways is awaited for Non Railway
spans (A1-P1 and P2-A2)
Land Possession Completed
Land Possession Completed
Page 200 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-12
LIST OF CHANGE OF SCOPE
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 201 of 246
MONTHLY PROGRESS REPORT – JUNE ‘2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
LIST OF VARIATIONS (CHANGE OF SCOPE) UNDER ARTICLE 16 OF
CONCESSION AGREEMENT
Status of Change of Scope as on date is appended in below table:
Sl.
No
Details of Proposal Estimate
(Apprx)
Approval status Construction
Status
1 CoS proposal for 14
Nos Additional
culverts
4.07 Cr In principal Approval
accorded by NHAI.
In progress / 50%
Completed
2 CoS Proposal for
Wider Median
11.93 Cr In principal Approval
accorded by NHAI.
In progress / 38%
Completed
3 CoS Proposal for
VUP at Jetalsar at ch.
5+900
5.26 Cr In principal Approval
accorded by NHAI.
In progress / 50%
Completed
4 CoS Proposal for
PUP at 3+800
1.00 Cr In principal Approval
accorded by NHAI.
In progress / 87%
Completed
5 CoS proposal for
Reconstruction of
Bridges (1 MNB + 4
MJB)
27.30 Cr In principal Approval
accorded by NHAI.
To be started
6 CoS Proposal for
Animal Under pass at
ch 46+180
2.30 Cr In principal Approval
accorded by NHAI.
In progress / 72%
Completed
7 Construction of the
Syphon at Km.
60.050 (Ch. 57+490)
of NH 8D.
0.39 Cr The Authority has
forwarded the proposal
to Irrigation department
to deposit the estimated
amount
Yet to be taken up /
Waiting for deposit by
Irrigation department
8 Proposal for Repair &
rehabilitation of
Existing Road
6.52 Cr Proposal recommended
by PD to RO,
Gandhinagar for further
necessary approval from
NHAI HQ
In progress / 100%
Completed
9 Proposal for PUP in
the approaches of
RoB-1
2.10 Cr In principal Approval
accorded by NHAI.
In progress
10 Proposal for Overlay
in Junagadh Bypass
18.00 Cr Proposal under review
with NHAI
In progress / 33%
Completed/ Waiting
for COS approval
from NHAI
11 Construction of PUP
113+306
0.855 Cr In principal Approval
accorded by NHAI.
In progress / 50%
Completed/
Page 202 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
I) Addition of New structures in bypass stretches for balancing as required
based on codal provisions and addition of structures as already exist at site but
not included in contract scope (Missed during DPR).
While carrying out structural Inventory at site, additional structures have been found at
following locations. There will be change of scope for these structures, which are not
included in Schedule B of Concession Agreement. The estimates for these additional
structures have been forwarded to IE for verification and approval. IE has forwarded the
recommendation with cost of four (4) Box culverts and eight (8) Hume Pipe culverts to
NHAI (vide letter no. ICT: 655: NCS: 2099 dated 15.02.2013, ICT: 655: NCS::2519 dtd.
26.02.2013, and ICT: 655: NCS: 12017 dtd. 01.10.2013) for their further approval.
NHAI has accorded their In-principle Approval for Additional culverts Vide Letter No:
NHAI/PIU/RAJ/2014/D-683 Dt: 24/02/24 for An Amount of 4.07 Cr.
The detailed status of change of scope is tabulated as below for ready reference:
Page 203 of 246
LIST OF ADDITIONAL CULVERTS AT FOUR LANING OF JETPUR - SOMNATH SECTION OF NH-8D
1 4+185.000 RCC Box New JSTL/2012/71 Dated 14-08-2012
Recommended for Approval(vide lr.
ICT:655:NCS::2099 dtd. 15.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
2 4+420.000 RCC Box New JSTL/2012/71 Dated 14-08-2012
Recommended for Approval(vide lr.
ICT:655:NCS::2099 dtd. 15.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
3 65+200.000 HPC New JSTL/IE/703/2013dated 31-08-2013Recommended for Approval(vide lr.
ICT:655:NCS:12017 dated 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
4 67+040.000 HPC New JSTL/2012/71 Dated 14-08-2012
Recommended for Approval(vide lr.
ICT:655:NCS::2099 dtd. 15.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
5 67+934.000 HPC New JSTL/2012/71 Dated 14-08-2012
Recommended for Approval(vide lr.
ICT:655:NCS::2099 dtd. 15.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
6 69+120.000 HPC New JSTL/2012/71 Dated 14-08-2012
Recommended for Approval(vide lr.
ICT:655:NCS::2099 dtd. 15.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
7 70+620.000 HPC New JSTL/2012/71 Dated 14-08-2012
Recommended for Approval(vide lr.
ICT:655:NCS::2099 dtd. 15.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
8 71+225.000 HPC New JSTL/2012/71 Dated 14-08-2012
Recommended for Approval(vide lr.
ICT:655:NCS::2099 dtd. 15.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
9 71+700.000 HPC New JSTL/2012/71 Dated 14-08-2012
Recommended for Approval(vide lr.
ICT:655:NCS::2099 dtd. 15.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
10 110+499.213RCC Box converted
to HPC
Reconstruction
(VUP Approach)JSTL/IE/703/2013dated 31-08-2013
Recommended for Approval(vide lr.
ICT:655:NCS::2519 dtd. 26.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
11 110+812.230RCC Box converted
to HPCReconstruction JSTL/IE/703/2013dated 31-08-2013
Recommended for Approval(vide lr.
ICT:655:NCS:12017 dated 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
Treatment Notification from ConcessionaireProposed Type In principal Approval NHAI S.No. Design Chainage I.E. Recommendation
Page 204 of 246
LIST OF ADDITIONAL CULVERTS AT FOUR LANING OF JETPUR - SOMNATH SECTION OF NH-8D
Treatment Notification from ConcessionaireProposed Type In principal Approval NHAI S.No. Design Chainage I.E. Recommendation
12 112+900.609HPC Converted to
Box
Reconstruction
(ROB Approach)JSTL/IE/703/2013dated 31-08-2013
Recommended for Approval(vide lr.
ICT:655:NCS::2519 dtd. 26.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14; but later NHAI conveyed to relocate the
existing box culvert from Ch. 3+800 to same size box
culvert in approaches to ROB-3 at Ch. 112+978 vide
letter No. NHAI/NHDP/COS/JET/RJK/2012/54 dt.
30.10.13
13 119+794.822 Pipe Reconstruction JSTL/IE/703/2013dated 31-08-2013
Recommended for Approval(vide lr.
ICT:655:NCS::2519 dtd. 26.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
14 120+632.246 Pipe Reconstruction JSTL/IE/703/2013dated 31-08-2013
Recommended for Approval(vide lr.
ICT:655:NCS::2519 dtd. 26.02.2013
ICT:655:NCS:12017 dtd. 01.10.2013)
NHAI/PIU/RAJ/2014/D-683
Dt: 24/02/14
Page 205 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
II) Change of scope due to provision of wider median section by NHAI over a
length of 13.40 Km. to save the trees (Protected & Ficus) to get the approval from
MOEF in respect of Diversion of forest land and permission for cutting of trees in
protected forest.
In pursuant to FAC-I conditions of MOEF, a proposal for diversion of protected forest
with specific condition of having a wider median to save maximum number of trees has
been prepared over an alignment of 13.4 km length as given below.
The revised drawings to accommodate the FAC-I proposal have been approved by the
Independent Engineer. Based on the approved TCS by the IE, cost estimate worked to
Rs.11.93 Cr. has been approved already.
S.
No
Existing Chainage
Notification from
Concessionaire
Action from IE Action from
Authority Date Reference No.
From To Length
(km)
1 53.00 53.50 0.50
20-Nov-12 JSTL/2012/113
Recommended for
approval to PD
NHAI Vide letter
No.
ICT/655/NSC/145
13 Dated 30.11.12
In Principle Approval
from NHAI Received
thru letter vide
NHAI/PIU/RJK/ICT/2
013/868 dt 22.03.13
2 54.10 56.00 1.90
3 62.00 66.00 4.00
4 103.00 110.00 7.00
Total 13.40
Page 206 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
III) Change of scope Notice under Clause 16.1.2 of CA due to addition /deletion of
following items from the scope
a) With reference to the MOM and discussions had during the Project Review
Meeting held on 29th Sep „12 with NHAI, EPC Contractor and IE representatives,
wherein it was agreed for Deletion / Addition of items from the scope defined in
Schedule of CA at the following locations.
b) As per the local villagers demand vide Jetalsar Gram Panchyat, Jetalsar vide letter No. 5/13 dt
14.05.2013, for underpass for crossing of their tractors, bullock carts etc. during non rainy
season so that their vehicles can cross the 4-lane highway and during the rainy season it
caters for drainage from the adjoining areas. IE has visited the site on 08th June 2013, and felt
S.
No
Existing Chainage Notification from
Concessionaire
Action from IE Action from Authority
Date Reference
No.
1
Demand to replace
the PUP 6+100 with
VUP 5+920 by local
public
17-Nov-
12
JSTL/2012/
112
Recommended for
principal approval to
PD NHAI vide
Letter No.
ICT/655/NCS/15206
dated 12.12.12
In Principle Approval from
NHAI Received thru letter
vide
NHAI/PIU/RJK/ICT/2013/
868 dt 22.03.13
2 Demand for Deletion
of box culvert at Ch.
59+760 by local
public
NHAI has approved
relocation Of BC from Ch.
59+760 to Ch.69+950 thru
letter Vide
NHAI/IU/RJK/ICT/2013/868
dt 22.03.13
3 Demand to replace
Box Culvert with
PUP at Ch. 59+415
(Agatrai Re-
alignment) by local
public
NHAI has approved
relocation of PUP from
Ch. 64+882 to Ch.59+415
thru letter vide
NHAI/PIU/RJK/ICT/2013/
868 dt 22.03.13
4 Provision of Box
Culvert at Ch.
69+950
NHAI has approved
relocation of BC from
Ch.59+760 to ch.69+950
thru letter vide
NHAI/PIU/RJK/ICT/2013/868
dt 22.03.13
5 Deletion of box
culvert at Ch.
51+111
Recommended for
in principal approval
to PD NHAI by IE
vide Letter No.
ICT/655/NCS/10241
dated 13.08.13
NHAI has approved
relocation of BC from
Ch.59+760 to ch.69+950
thru letter vide
NHAI/PIU/RJK/ICT/2013/868
dt 22.03.13
Page 207 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
that underpass may be provided at Ch. 3+825 with a minor skew angle to meet the demand
of local villagers. Thus recommended for a negative change of scope in deletion of 3x2.1m
RCC box culvert and introduction of an underpass (CUP/PUP) of size 5x3.50m to PD, NHAI
PIU Rajkot vide letter No. ICT/502/NCS/7539 (New dispatch No. 7623) dt 11.06.2013
NHAI has approved Provision of underpass at Ch.3+800 as a positive variation with an
indicative cost of Rs. 99,80273/- and to relocate the existing box culvert from Ch. 3+800 to
same size box culvert in approaches to ROB-3 at Ch. 112+978 vide letter No.
NHAI/NHDP/COS/JET/RJK/2012/54 dt. 30.10.13 and NHAI/PI/RJK/General/2013/D-3872 dt
07.11.13
IV) Change of scope Notice under Clause 16.1.2 of CA due to
Rehabilitation/Reconstruction of existing structures, which are in distress condition
& beyond the limits of economical repairs
As per the recommendation of IE and the joint site visit of committee on Dt. 13 – 15
September 2012 formed as per recommendation of Hon‟ble Member Finance, the
superstructure of all the below five bridges reviewed and observed that superstructure is in a
very dilapidated condition and major distresses were noticed in all the below mentioned
structures.
Concessionaire has submitted indicative cost of dismantling, repair & rehabilitation,
construction of return walls, wind wall and median wall, construction of approaches. IE has
approved the proposal and recommended to PIU Rajkot vide letter No. ICT/655/NCS/2044
dated 14.02.13. Further NHAI, PIU, Rajkot has requested CGM, NHAI to accord approval of
change of scope vide letter No. NHAI/PI/RJK/Jet-Som/2013/D-494 dt 22.02.13. NHAI has
S.
No
Existing Chainage Request from NHAI, PIU Rajkot Action from IE Action from
Authority
Date Reference No.
1
Demand to replace
the Box Culvert at
Ch.3+800 with PUP
at Ch. 3+825 by
local villagers
16 May „13
NHAI/PIU/RJK/ICT/
2013/D-1691
Recommended for
principal approval to
PD NHAI vide
Letter No.
ICT/502/NCS/7539
(New dispatch No.
7623) dt 11.06.2013
NHAI has approved
thru vide letter No.
NHAI/NHDP/COS/J
ET/RJK/2012/54 dt.
30.10.13 and
NHAI/PI/RJK/Genera
l/2013/D-3872 dt
07.11.13
Page 208 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
approved thru vide letter No. NHAI/11012/I/ Jetpur-Somnath/NH-8D/2013/178 dt 21.04.2014
and NHAI/PIU/RAJ/2014/D-1291 dt 21.04.2014
S. No Existing
Chainage
Notification from
Concessionaire Action from IE
Action from
Authority Date
Reference
No.
1 Minor Bridge at
Ch. 45+130
01.12.12
JSTL/2012/
121
Recommended for
principal approval
NHAI vide Letter No.
ICT/655/NCS/2044
dated 14.02.13 and
IE/JSTPL/196 dtd.
19.03.2013
NHAI has
approved thru
vide letter No.
NHAI/11012/I/J
etpur-
Somnath/NH-
8D/2013/178 dt
21.04.2014 and
NHAI/PIU/RAJ/
2014/D-1291 dt
21.04.2014
2 Major Bridge at
Ch. 46+375
3 Major Bridge at
Ch. 56+780
4 Major Bridge at
Ch. 99+150
5 Major Bridge at
Ch. 99+500
V) Change of scope Notice under Clause 16.1.2 of CA for construction of
Underpass for Wild life animal crossing.
While giving stage II approval for protected forest on 28.12.12, MoEF has proposed to
construct an underpass between Ch.48+000 to Ch.49+000 for wildlife crossing.
Location of proposed CUP has been finalized at Ch.46+180 jointly by Forest Department,
IE, and Concessionaire‟s representatives during site visit.
Authority has given “ In-Principle” approval for construction of structure of span 10m X
6m for crossing of animals in compliance to the Forest & Environment advisory Committee
GOI, thru letter vide NHA/PIU/RJK/ICT/2013/868 dt.22.03.13 for an amount of 2.30Cr.
VI) Change of scope Notice under Clause 16.1.2 of CA for construction of the
Syphon at Km. 60.050 (Ch. 57+490) of NH 8D.
As requested by Executive Engineer, Junagadh Irrigation project division for construction of
the Shyphon at Km. 60.050 (Ch. 57+490) of NH 8D for canal crossing vide letter No. PB-
A/Sabli/Canal/NH.Xing/5358 Dt. 9.11.2012, the matter has been evaluated by the
Concessionaire and the project Independent Engineer.
Based on the requirement by Irrigation department, concessionaire has prepared the
design and drawing for the proposed structure along with the cost estimate and it was duly
reviewed and recommended by the project Independent Engineer.
The Authority has forwarded the proposal to Irrigation department to deposit the
estimated amount of Rs. 39,26,656/-. Upon receipt of the said amount from Irrigation
department, construction of the structure can be taken up by Concessionaire to match
Page 209 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
with the schedule of project. Authority has pursued the matter with Irrigation department
to deposit the amount to proceed further.
VI) Urgent Repair and Maintenance needs for existing Junagadh Bypass due to
non-availability / further delays in land possession for Proposed Junagadh
Bypass
JSTPL has submitted the proposal for major maintenance / strengthening of existing
Junagadh Bypass through letter No. JSTPL/2014/365 dated 10.03.14 and requested
the Authority to accord approval, under change of scope, for carrying out major
maintenance prior to monsoon period, so that excessive deterioration during
monsoon can be avoided and the existing bypass can be maintained in traffic worthy
condition for the benefit of road users.
VII) Provision of underpass (PUP) in both sides of ROB approaches at RoB-I
near Jetalsar Village as per demand of Villagers
As submitted the demand for provision of underpass by villagers of Jetalsar through
Hon‟ble Member of Parliament, vide letter dated 22.02.14, JSTPL was instructed to submit
the proposal for provision in both sides of ROB-1, through Independent Engineer.
JSTPL has submitted the proposal through letter No. JSTPL/IE/885/2014 dated 03 March
‟14, along with the concept plan. IE has reviewed the same and recommend to PIU, Rajkot
through Letter no. ICT:655:NCS:2866 dated 12 March ‟14.
PIU, Rajkot has sent the request for approval to CGM, Gandhinagar through letter No.
NHAI/PIU/RJK/Jet-Som/2013/D-1020 dated 27.03.2014
Manager (T) for CGM (T) & RO-Gujarat has sent recommendation to NHAI, HQ for In
principle approval of the competent authority through Letter no. NHAI/12013/2/2010-RO-
GNR/Tech./Jet-Som/490 dt 23.05.2014.
NHAI has approved thru vide letter No. NHAI/11012/I/ Jetpur-Somnath/NH-8D/2013/190
dt 16.06.2014.
VIII) Provision of additional underpass (PUP) at design Chainage 113+306
under Change of Scope (Size 5 m x 3.5m)
Various applications had been received from local bodies and leaders for considering a
provision of PUP between Km 113-114 near village Dabhor for smooth connectivity for the
nearby villagers as the stretch falls under high embankment zone due to ROB-3 and Major
Bridge 113+160 and there exist access roads on both sides of the highway. The work has
been stopped by the representatives of local villagers for want of an Underpass.
Independent Engineer after conducting a detailed study of the area and 24 hr traffic survey
has submitted a proposal for necessity of an PUP at Ch. 113+306 vide its letter
ICT/IC/IND/NH-8D/NHAI-PD/933 dt 31.03.2014
Page 210 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
Preliminary Cost estimate submitted by Concessionaire was reviewed by Independent
Engineer and the recommendation was submitted through letter no. ICT:655:NCS:4817 dt
02 May 14 with an indicative financial implication of Rs. 87.26 Lakhs.
Manager (T) for CGM (T) & RO-Gujarat has sent recommendation to NHAI, HQ for In
principle approval of the competent authority through Letter no. NHAI/12013/2/2010-RO-
GNR/Tech./Jet-Som/490 dt 23.05.2014.
NHAI has approved thru vide letter No. NHAI/11012/I/ Jetpur-Somnath/NH-8D/2013/190
dt 16.06.2014.
Page 211 of 246
Type of
Construction
Side
Excavation
& PCC
Pipe
Laying
Head
WallMisc
A. Pipe Culvert
65.200 65+200 1 X 1.2 2 Lane LHS 23-Jan-14 27-Jan-14 31-Jan-14
65.200 65+200 1 X 1.2 2 Lane RHS 17-Dec-13 21-Dec-13 31-Dec-13
67.040 67+350 1 X 1.2 2 Lane LHS 1-Sep-13 4-Sep-13 9-Sep-13
67.040 67+350 1 X 1.2 2 Lane RHS 6-Jun-13 25-Jun-13 9-Sep-13
67.934 67+934 1 X 1.2 2 Lane LHS 18-Jul-13 10-Aug-13 19-Aug-13
67.934 67+934 1 X 1.2 2 Lane RHS 14-Sep-13 18-Sep-13 8-Oct-13
69.120 69+120 1 X 1.2 2 Lane LHS
69.120 69+120 1 X 1.2 2 Lane RHS
70.620 70+620 1 X 1.2 2 Lane LHS
70.620 70+620 1 X 1.2 2 Lane RHS
71.225 71+325 1 X 1.2 2 Lane LHS 20-Jul-13 30-Jul-13 25-Oct-13
71.225 71+325 1 X 1.2 2 Lane RHS 4-Jun-13 5-Jul-13 11-Jul-13
71.700 71+748 1 X 1.2 2 Lane LHS 1-Jun-13 6-Jun-13 19-Jul-13
71.700 71+748 1 X 1.2 2 Lane RHS 16-Jun-13 19-Jul-13 26-Jul-13
Available
1 Available
Up to Date Work
S NoDesign
Chainage
Drawing
ChainageGFC status
Span
Arrangement
2 Available
Change of Scope - Strip Chart of Pipe Culverts
3 Available
4 Available
5 Available
6 Available
7
Page 212 of 246
Type of
Construction
Side
Excavation
& PCC
Pipe
Laying
Head
WallMisc
Up to Date Work
S NoDesign
Chainage
Drawing
ChainageGFC status
Span
Arrangement
Change of Scope - Strip Chart of Pipe Culverts
LHS 7-Mar-14 14-Mar-14 29-Mar-14
RHS 9-May-14 31-Mar-14 16-May-14
110+812 110+812 3 X 1.2 2 Lane LHS 2-Dec-13 7-Dec-13 31-Dec-13
110+812 110+812 3 X 1.2 2 Lane RHS 5-Dec-13 8-Jan-14 17-Jan-14
10 119.794 119+794 Available 2 X 0.9 4 Lane+SR BHS 15-Jun-14
LHS 19-Feb-14 21-Jun 8-Mar-14
RHS 26-Feb-14 21-Jun-14 30-Jun-14
4 Lane+SR110.499 110+501 Available 2 X 1.2
4 LaneAvailable120+640120.63211 3 X 1.2
9 Available
8
Page 213 of 246
Type of
Constructio
n
Element SideExcavation
& Foundation
Wall /
abutmentSuper Str Misc.
1 Additional Available 04+185 1x2 4 lane 2 2 2 -
LHS 20-Sep-13 30-Sep-13 7-Oct-13 -
RHS 12-Oct-13 16-Oct-13 23-Oct-13 -
2 Additional Available 04+420 1x4 4 lane 2 4 2 -
LHS 16-Mar-13 5-Apr-13 5-Jun-13 -
RHS 20-Mar-13 17-Apr-13 27-Jul-13 -
TOTAL 4 6 4 0
Change of Scope - Strip Chart of Box Culverts
S NoDesign
ChainageDrawing
Drawing
Chainage
Span
Arrange
ment
Total Scope (Quantity)
Page 214 of 246
Type of
ConstructionSide
Excavation
& Foundation
Wall /
abutmentSuper Str Misc.
1 3+800 1 x 5 x 3.5 4 lane 2 2 2 0
LHS 25-Nov-13 17-Dec-13 24-Dec-13
RHS 30-Nov-13 3-Jan-14 15-Jan-14
2 113+305 1 x 5.8 x 3.5 4 lane 2 2 0 0
LHS 23/Jun/14 30-Jun-14
RHS 28-Apr-14 11-Jun-14
Change of Scope - Strip Chart for PUP
S NoDrawing
Chainage
Span
Arrangement
Total Scope (Quantity)
Page 215 of 246
Type of
Constructi
on
SideExcavation
& Foundation
Wall /
abutmentSuper Str Misc.
1 5+920 1x10x6.0 4 lane 2 2 2 0
LHS 3-Oct-13 8-Nov-13 12-Nov-13
RHS 14-Feb-14 14-Mar-14 24-Mar-14
2 46+180 1x10x10.0 4 lane 2 2 2 0
LHS 22-Oct-13 9-Nov-13 12-Nov-13
RHS 28-Apr-14 21-May-14 26-May-14
TOTAL #REF! #REF! #REF! #REF!
Change of Scope - Strip Chart of VUP
S NoDrawing
Chainage
Span
Arrangement
Total Scope (Quantity)
Page 216 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-13
EXTENSION OF TIME
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 217 of 246
MONTHLY PROGRESS REPORT – JUNE ’ 2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H -8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
Notice for Extension of Time
1. Entitlement of Concessionaire to Extension of Time ("EoT-I'') due to delays in the scheduled four-laning date caused by delayed delivery of land (as of 28 Feb ‘13 -Clause I 0.3.4, I 0.3.5, 12.4.1, 12.4.2, 35.2, 35.3 and 35. 6 and Schedule-G of CA
The appointed date for the project was delayed considerably due to delays in fulfilling CP's
by NHAI in terms of delays in land acquisition. MoEF clearances and other clearances and
the appointed date for the Project was finally declared as 31 March 2012 vide NHAI Letter
No. NHAI/BOT/DBF0/11019/02/07/27425 dt 12 April 2012. The appointed date declaration
thus happened almost 14 months after signing of the CA (and almost 19 months after bid
submission) against the stipulated period of 180 days (approximately 6 months) specified in
CA.
Clause 1 2.4.1 of the CA mandates that 910th day from the appointed date shall be the
"Scheduled Four-Laning Date''. During the meeting on 27 Mar ‘12 with NHAI for
discussions on 'Appointed Date', it was informed to Concessionaire that Land
Acquisition was in a fairly advance stage and FAC clearance for diversion of protected
forest had already been obtained on 24 Feb ‘12. Thus it was reasonably expected that
balance land shall be made available to us within 90 days of appointed date in compliance
with the provisions of clause I0.3.4 of CA.
Concessionaire have been regularly apprising NHAI and IE about this alarming position of
land availability through various communications including the key Issues requiring urgent
actions from NHAI to mitigate the delays in terms of clause 35.6 of CA. However
concessionaire has been severely constrained in his efforts for project execution due
to non-availability of RoW for the land required for the project due to various
factors and has caused irreparable damages to the project schedule.
In view of above, Concessionaire has submitted application for extension of time in terms
of clause 10.3.5 of CA for the delays occurred in the Project till 28 Feb 13 thru letter No.
JSTPL/ IE/ EOT-I/2013 dt 08 March 13 and requested to approve an interim extension of
project completion Schedule in terms of Schedule G, as above for a minimum period of
180 days (Six months).
Further these delays to the Project Completion Schedule and four-laning date will
also affect the COD for the project in terms of clause 15.1 of CA and since these
delays have happened due to breaches on the part of NHAI to provide adequate
RoW for project land as foreseen in the CA, hence also requeste d to grant an
equivalent extension of Concession period in terms of clause 35.3 of CA. IE has
reviewed the application and forwarded the recommendation to NHAI for further
approval. Now, Action from Authority is awaited.
Page 218 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H -8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
2. Entitlement of Concessionaire to Extension of Time ("EoT'') due to affected by the Force Majeure Event (as of 14 Sep I 3 -Clause 12.4.1, 12.4.2, 34.2, 34.5 and 34. 6 and Schedule-G of CA)
As the project has been witnessed by heavy rainfalls during the on-going monsoon season,
which shall be considered as extremely adverse weather conditions under clause 34.2 of
CA. This heavy rainfall is severely impaired all the works at site including borrow areas
operation, over moist of already laid earth layers, stacked materials of aggregate, stone
dust and sand, which was led to non-execution of any kind of pavement works including
Asphalt works.
Therefore, Concessionaire has requested thru letter no. JSTPL/2013/284 dt 14 Sep ’13 to
consider a minimum entitlement of extension of time by 2.25 months as on 14 Sep ’13, in
terms of Clause 34.6.2 (a) of CA.
3. Entitlement of Concessionaire to Extension of Time ("EoT-II'') due to
delays occurred (till 31 Dec ’13) in handing over ROW for the project at
various stretches due to delay in Land Acquisition and possession thru letter
No. JSTPL/IE/EOT dt 15 Feb ’14.
Delays occurred in the project till Feb’13 due to various reasons as follows:
a. Delays in handing over RoW for the land required for the Project at various
stretches due to delays in Land Acquisition and possession
b. Delays in handing over RoW for the land required for four (4) Villages of Choki,
Bhiyal, Kathrota & Tantivela in a length of 9.6 km due to delays in Land Acquisition
c. Inordinate delays in handing over land at Pedla Village, which has severely affected
the Project works in the stretch of Jetpur Bypass and the surrounding areas
starting from Km 0.000 to km. 11.150 (villages of Navagadh, Pedla, Jetalsar, Navi
Sakli and June Sakli)
d. Delays in the stretch from Km. 99+580 to Km 110+500 due to Special Civil
Application No. 9269 of 2012 against Land Acquisition by NHAI in Six (6) Villages
of Simar, Shukpur, Dari, Supasi, Sidokar, & Kindarwa.
e. Delays in land acquisition and availability of RoW for Junagadh bypass land as per
the alignment proposed in CA.
f. Delays due to change in proposed alignment and delayed approval of revised
alignment for Keshod bypass (due to local representation) leading to revision in LA
requirements and delays in handing over RoW for the land in Keshod Bypass.
g. Delays in land Acquisition due to missing 3D for 27 Villages (missing survey
numbers from earlier published 3D) causing non-availability of RoW for the land
stretches in the affected areas.
h. Delays due to non-availability of RoW for the Toll Plazas (including Traffic Aid Post
& Medical Aid Posts) due to delays in Land Acquisition for the same
i. Delay in start of work for construction of ROB due to non-availability of RoW for
ROB land
j. Delays in handing over RoW for the lane in the stretch from Km. 9+000 to Km.
35+000 due to notice received from DCF for the consent of NBWL
k. Delays in cutting of trees in the non-notified protected forest in the stretch from
Km. 11+120 to Km 20+850 and Km 112+600 t Km 122+130 due to the PIL’s (Writ
Page 219 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H -8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
Petition No. 99 of 2012 and Writ Petition No. 117 of 2012) causing delay in the
said process and affecting handing over of RoW for those stretches.
l. Delay in procurement of the approval from MoEF for diversion of 129.971 ha of
protected forest land causing delay in handing over of RoW for those land
stretches of the Project.
m. Delays in availability of RoW for the land affected by Utility Shifting of GETCO
n. Delays in availability of RoW for the land affected by Utility of PGVCL
o. Delays in availability of RoW for the land affected by Utility Shifting of GWSSB
The delays occurred due to land acquisition & possession as mentioned above, to the
project completion Schedule and four-laning date, will also affect the COD for the
project in terms of clause 15.1 of CA, and since these delays have happened due to
breaches on the part of NHAI to provide adequate RoW for project land as foreseen
in the CA, concessionaire requested Authority to grant an equivalent extension of time
of Concession Period in terms of clause 35.3 of CA.
PD-NHAI has recommended 96 days EOT (addition to EOT-I recommendation) i.e. shifting of Milestone –IV up to 30th June ’15 to the Authority through letter no. NHAI/PIU/RJK/Jet-Som/2013/D-038 dt 27.03.2014. As RO, NHAI has raised certain observations on this, JSTPL has JSTPL submitted the clarifications to the observations raised by NHAI RO through letter no. JSTPL/IE/991/2014 dt 21 May 2014. Approval from NHAI is awaited for revision of Milestones and extension of Project Completion Schedule.
Page 220 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-14
WEATHER REPORT
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 221 of 246
DateMinimum
TempratureMaximum
TempratureHumidity Minimum
Humidity Maximum
Weather Clear/Cloudy
Rainfall in mm
Cum. Rainfall in mm
Remarks
1-June'14 39.0 39.0 25.0 51.0 Clear - -
2-June'14 41.2 41.2 23.0 49.0 Clear - -
3-June'14 41.5 41.5 26.0 53.0 Clear - -
4-June'14 42.0 42.0 26.0 52.0 Clear - -
5-June'14 40.6 40.6 27.0 54.0 Clear - -
6-June'14 41.7 41.7 29.0 57.0 Clear - -
7-June'14 40.2 40.2 27.0 55.0 Clear - -
8-June'14 39.6 39.6 25.0 52.0 Clear - -
09-June'14 38.9 38.9 24.0 49.0 Clear - -
10-June'14 38.2 38.2 23.0 44.0 Clear - -
11-June'14 38.6 38.6 25.0 47.0 Clear - -
12-June'14 36.9 36.9 25.0 49.0 Clear - -
13-June'14 36.2 36.2 23.0 53.0 Clowdy - -
14-June'14 36.8 36.8 23.0 54.0 Rainy 2 2
15-June'14 36.1 36.1 26.0 63.0 Rainy 18 20
16-June'14 33.6 33.6 24.0 68.0 Clowdy - 20
17-June'14 34.7 34.7 23.0 60.0 Clear - 20
18-June'14 33.5 33.5 23.0 59.0 Clear - 20
19-June'14 35.5 35.5 23.0 59.0 Clear - 20
20-June'14 35.8 35.8 24.0 57.0 Clear - 20
21-June'14 35.2 35.2 24.0 61.0 Clear - 20
22-June'14 35.1 35.1 23.0 58.0 Clear - 20
23-June'14 35.1 35.1 26.0 61.0 Clear - 20
24-June'14 34.6 34.6 24.0 55.0 Clear - 20
25-June'14 35.2 35.2 23.0 57.0 Clear - 20
26-June'14 35.1 35.1 28.0 53.0 Clear - 20
27-June'14 36.2 36.2 25.0 52.0 Clear - 20
28-June'14 35.8 35.8 26.0 53.0 Clear - 20
29-June'14 35.1 35.1 24.0 51.0 Clowdy - 20
30-June'14 35.6 35.6 28.0 52.0 Clear - 20
20.0 mm
2201.3 mm
2221.3 mm
Upto Previous Month Cumulative Rail Faill
Cumulative Rainfall till date
Project :- Four Laning of Jetpur-Somnath Section of NH 8D from Km 0.000 to 127.600 (Design Length 123.454) in the State) of
Gujarat under NHDP Phase III on BOT (Toll) Basis under DBFOT Pattern.
WEATHER REPORTMonth of June-2014 Package No.-1 (Chowki Camp)
This month total Rain fall
JETPUR SOMNATH TOLLWAYS PVT. LTD.
Page 222 of 246
DateMinimum
TempratureMaximum
TempratureHumidity Minimum
Humidity Maximum
Weather Clear/Cloudy
Rainfall in mm
Cum. Rainfall in mm
Remarks
1-June'14 31.0 37.7 38.0 59.0 Sunny - -
2-June'14 30.9 40.4 37.0 60.0 Sunny - -
3-June'14 31.1 39.6 32.0 57.0 Suny - -
4-June'14 31.6 44.2 30.0 56.0 Sunny - -
5-June'14 30.4 42.9 35.0 59.0 Clear - -
6-June'14 29.1 39.6 32.0 65.0 Clear - -
7-June'14 30.9 38.4 34.0 60.0 Clear - -
8-June'14 30.4 39.2 35.0 58.0 Clear - -
09-June'14 31.6 38.5 21.0 55.0 Clear - -
10-June'14 32.2 41.0 25.0 57.0 Clear - -
11-June'14 31.7 42.6 29.0 64.0 Clear 1.00 1.00
12-June'14 30.5 40.4 27.0 59.0 Clear 2.00 3.00
13-June'14 31.1 38.9 24.0 60.0 Clear 19.50 22.50
14-June'14 30.6 34.0 43.0 73.0 Rainy 270.00 292.50
15-June'14 28.4 33.5 65.0 83.0 Rainy 30.00 322.50
16-June'14 29.6 34.2 73.0 80.0 Rainy - 322.50
17-June'14 30.1 34.7 70.0 84.0 Cloudy - 322.50
18-June'14 29.5 33.8 52.0 79.0 Cloudy - 322.50
19-June'14 29.7 33.4 50.0 74.0 Cloudy - 322.50
20-June'14 29.9 34.3 69.0 81.0 Cloudy - 322.50
21-June'14 30.5 33.9 66.0 73.0 Cloudy - 322.50
22-June'14 29.2 32.1 62.0 78.0 Cloudy - 322.50
23-June'14 29.8 33.3 49.0 82.0 Clear - 322.50
24-June'14 29.6 33.8 47.0 68.0 Clear - 322.50
25-June'14 29.5 33.6 49.0 67.0 Cloudy - 322.50
26-June'14 28.4 34.1 41.0 72.0 Clear - 322.50
27-June'14 30.5 35.4 44.0 77.0 Clear - 322.50
28-June'14 29.3 35.1 40.0 73.0 Clear - 322.50
29-June'14 29.7 35.6 34.0 68.0 Clear - 322.50
30-June'14 29.5 35.7 39.0 71.0 Clear - 322.50
322.50 mm
2959.60 mm
3282.10 mm
Upto Previous Month Cumulative Rail Faill
Cumulative Rainfall till date
Project :- Four Laning of Jetpur-Somnath Section of NH 8D from Km 0.000 to 127.600 (Design Length 123.454) in the State)
of Gujarat under NHDP Phase III on BOT (Toll) Basis under DBFOT Pattern.
WEATHER REPORTMonth of June-2014 Package No.-2 (Shapur Camp)
This month total Rain fall
JETPUR SOMNATH TOLLWAYS PVT. LTD.
Page 223 of 246
DateMinimum
Temprature
Maximum
Temprature
Humidity
Minimum
Humidity
Maximum
Weather
Clear/Cloudy
Rainfall
in mm
Cum.
Rainfall
in mm
Remarks
1-June'14 22.00 39.00 54.00 71.00 Clear 0 0
2-June'14 21.50 38.50 53.00 72.00 Clear 0 0
3-June'14 22.50 39.50 55.00 78.00 Clear 0 0
4-June'14 22.00 37.20 52.00 77.00 Clear 0 0
5-June'14 23.00 37.20 55.00 71.00 Clear 0 0
6-June'14 25.00 35.90 51.00 71.00 Clear 0 0
7-June'14 26.00 37.00 56.00 76.00 Clear 0 0
8-June'14 25.00 36.00 55.00 78.00 Clear 0 0
09-June'14 28.00 36.00 56.00 79.00 Clear 0 0
10-June'14 29.00 36.00 40.00 68.00 Clear 0 0
11-June'14 29.80 35.90 35.00 56.00 Clear 0 0
12-June'14 29.70 34.70 42.00 67.00 CLOUDY 0 0
13-June'14 29.40 35.00 42.00 70.00 CLOUDY 0 0
14-June'14 28.30 32.30 42.00 77.00 RAINY 12 12
15-June'14 27.70 31.60 42.00 84.00 RAINY 130 142
16-June'14 28.30 31.60 58.00 86.00 RAINY 2.4 144.4
17-June'14 28.50 31.60 52.00 76.00 CLOUDY 0 144.4
18-June'14 29.10 32.60 51.00 76.00 RAINY 1.5 145.9
19-June'14 29.50 33.00 48.00 73.00 CLOUDY 0 145.9
20-June'14 29.40 33.30 51.00 73.00 CLOUDY 0 145.9
21-June'14 29.10 32.60 49.00 66.00 Clear 0 145.9
22-June'14 29.70 33.00 48.00 66.00 Clear 0 145.9
23-June'14 29.40 32.90 47.00 67.00 Clear 0 145.9
24-June'14 29.10 33.50 46.00 66.00 Clear 0 145.9
25-June'14 28.50 33.20 44.00 71.00 Clear 0 145.9
26-June'14 29.40 32.90 44.00 69.00 Clear 0 145.9
27-June'14 29.40 33.90 42.00 64.00 Clear 0 145.9
28-June'14 29.70 33.20 41.00 62.00 Clear 0 145.9
29-June'14 29.20 33.60 42.00 64.00 Clear 0 145.9
30-June'14 29.30 33.10 41.00 64.00 Clear 0 145.9
145.9 mm
2520.4 mm
2666.3 mm
Upto Previous Month Cumulative Rail Faill
Cumulative Rainfall till date
Project :- Four Laning of Jetpur-Somnath Section of NH 8D from Km 0.000 to 127.600 (Design Length 123.454) in the State)
of Gujarat under NHDP Phase III on BOT (Toll) Basis under DBFOT Pattern.
WEATHER REPORT
Month of June-2014 Package No.-3 (Juthal Camp)
This month total Rain fall
JETPUR SOMNATH TOLLWAYS PVT. LTD.
Page 224 of 246
DateMinimum
Temprature
Maximum
Temprature
Humidity
Minimum
Humidity
Maximum
Weather
Clear/Cloudy
Rainfall
in mm
Cum.
Rainfall
in mm
Remarks
1-June'14 29.10 35.10 64.00 88.00 Clear 0 0
2-June'14 29.20 35.50 61.00 89.00 Clear 0 0
3-June'14 29.00 35.40 60.00 89.00 Clear 0 0
4-June'14 28.90 34.40 71.00 94.00 Clear 0 0
5-June'14 28.90 35.10 64.00 94.00 Clear 0 0
6-June'14 29.20 34.90 64.00 92.00 Clear 0 0
7-June'14 28.90 35.30 61.00 92.00 Clear 0 0
8-June'14 29.10 35.10 63.00 84.00 Clear 0 0
9-June'14 29.60 35.20 61.00 93.00 Clear 0 0
10-June'14 29.90 35.40 55.00 94.00 Clear 0 0
11-June'14 29.20 34.60 62.00 87.00 Clear 0 0
12-June'14 29.00 34.40 65.00 86.00 Cloudy+ Drizzling 0 0
13-June'14 29.10 33.30 70.00 87.00 Cloudy+ Drizzling 0 0
14-June'14 28.70 32.50 74.00 96.00 Cloudy+ Drizzling 0 0
15-June'14 28.00 31.50 88.00 99.00 Rainy 175 175
16-June'14 28.30 32.50 81.00 99.00 Cloudy+ Drizzling 0 175
17-June'14 28.00 32.60 73.00 99.00 Rainy 4 179
18-June'14 28.10 32.40 81.00 99.00 Rainy 2 181
19-June'14 29.10 33.10 74.00 96.00 Clear 0 181
20-June'14 29.40 32.80 78.00 94.00 Clear 0 181
21-June'14 29.30 37.50 66.00 99.00 Clear 0 181
22-June'14 29.70 33.80 69.00 87.00 Clear 0 181
23-June'14 29.10 33.60 70.00 89.00 Clear 0 181
24-June'14 28.70 33.80 69.00 86.00 Clear 0 181
25-June'14 29.50 33.70 66.00 83.00 Clear 0 181
26-June'14 29.20 33.90 66.00 84.00 Clear 0 181
27-June'14 29.30 34.50 62.00 85.00 Clear 0 181
28-June'14 29.40 34.10 64.00 83.00 Clear 0 181
29-June'14 29.30 34.10 63.00 81.00 Clear 0 181
30-June'14 29.20 34.00 63.00 82.00 Clear 0 181
181.0 mm
2592.0 mm
2773.0 mm
Upto Previous Month Cumulative Rail Faill
Cumulative Rainfall till date
Project :- Four Laning of Jetpur-Somnath Section of NH 8D from Km 0.000 to 127.600 (Design Length 123.454) in the State) of
Gujarat under NHDP Phase III on BOT (Toll) Basis under DBFOT Pattern.
WEATHER REPORT
Month of June-2014 Package No.-4 (Shantipura Camp)
This month total Rain fall
JETPUR SOMNATH TOLLWAYS PVT. LTD.
Page 225 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-15
CORRESPONDANCE
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 226 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ICT - INWARD
LETTERS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 227 of 246
SR
NO.LETTER NO. SUBJECT
INWARD FROM,
ADDRESSED TO JSTPLREMARKS
1ICT/655/NCS/5865
Dt: 02/06/14
Regarding submission of design and drawings of
ROB-4 at ch. 118+938
President, ICT Pvt. Ltd., New
DelhiDrawing Approval
2
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1049
Dt: 05/06/14
New Approval for Borrow Material ATL, ICT Pvt. Ltd., Junagadh Filed for Record
3
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1050
Dt: 05/06/14
Regarding Borrow material ATL, ICT Pvt. Ltd., JunagadhReplied vide Letter No.
JSTPL/IE/1001/2014 Dt: 05/06/14
4
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1053
Dt: 11/06/14
Submission of Financial proposals TL, ICT Pvt. Ltd., Junagadh In Process
5
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1054
Dt: 12/06/14
Schedule of joint site inspection as per the
concession agreementTL, ICT Pvt. Ltd., Junagadh Filed for Record
6
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1055
Dt: 11/06/14
Deficiencies observed in construction TL, ICT Pvt. Ltd., Junagadh In Process
7
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1059
Dt: 13/06/14
Routine Inspection by this office TL, ICT Pvt. Ltd., Junagadh In Process
8ICT/655/NCS/6410
Dt: 13/06/14
Regarding submission Detailed Design and Drawings
of ROB-4 @ ch. 118+938
President, ICT Pvt. Ltd., New
DelhiDrawing Approval
IE - INWARD
Page 228 of 246
SR
NO.LETTER NO. SUBJECT
INWARD FROM,
ADDRESSED TO JSTPLREMARKS
IE - INWARD
9ICT/655/NCS/6413
Dt; 13/06/14
Reg. Submission of Bus Bay Drawing and Truck Lay
with pavement composition for approval
President, ICT Pvt. Ltd., New
DelhiDrawing Approval
10
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1061
Dt: 14/06/14
Independent Tests by the Independent consultant TL, ICT Pvt. Ltd., Junagadh Filed for Record
11ICT/655/NCS/6591
Dt: 16/06/14
Reg. submission of detail design of minor junctions
(3 nos.) for approval
President, ICT Pvt. Ltd., New
DelhiDrawing Approval
12
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1064
Dt: 18/06/14
Scheduled service road from ch. 55+650 to ch.
55+900 LHSTL, ICT Pvt. Ltd., Junagadh In Process
13
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1067
Dt: 21/06/14
Proposed pre casting of Kerb at outer edge of
service roadTL, ICT Pvt. Ltd., Junagadh Drawing Approval
14
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1071
Dt: 21/06/14
Drainage design in the vicinity of Flyover at zero
pointTL, ICT Pvt. Ltd., Junagadh Design Submission
15
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1072
Dt: 23/06/14
Maintenance of existing road TL, ICT Pvt. Ltd., Junagadh In Process
16
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1073
Dt: 23/06/14
Disposal of water in Village Bhanduri TL, ICT Pvt. Ltd., Junagadh
Replied by IE vide Letter no.
ICT/IC/NHAI/IND/NH-8D/NHAI-
PD/1076 Dt: 23/06/14
Page 229 of 246
SR
NO.LETTER NO. SUBJECT
INWARD FROM,
ADDRESSED TO JSTPLREMARKS
IE - INWARD
17
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1074
Dt: 23/06/14
Yellowish lime material at earthen shoulder TL, ICT Pvt. Ltd., Junagadh In Process
18
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1077
Dt: 24/06/14
Regarding dispose the water at R. S. No. 10/P, Vllage
: Navi Sakli, Tal: Jetpur, Dist: RajkotTL, ICT Pvt. Ltd., Junagadh In Process
19
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1083
Dt: 26/06/14
Electrical Utility Shifting - First (1st) RA bill of
Prabhas Patan subdivisionTL, ICT Pvt. Ltd., Junagadh In Process
20
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1084
Dt: 26/06/14
Electrical Utility Shifting - First (1st) RA bill of
Junagadh Rural subdivisionTL, ICT Pvt. Ltd., Junagadh In Process
21
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1086
Dt: 25/06/14
Regarding points discussed during the site visit of
the IETL, ICT Pvt. Ltd., Junagadh In Process
22
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1087
Dt: 28/06/14
Removal of religious structure with right of way TL, ICT Pvt. Ltd., Junagadh In Process
23
ICT/IC/NHAI/IND/NH-
8D/JSTPL/1088
Dt: 30/06/14
Submission of Test Results of Trial stretch for
Construction of Embankment using Fly Ash at ch.
118+450 to 118+500 LHS
TL, ICT Pvt. Ltd., Junagadh Filed for Record
Page 230 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
NHAI - INWARD
LETTERS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 231 of 246
SR
NO.LETTER NO. SUBJECT
INWARD FROM,
ADDRESSED TO JSTPLREMARKS
1
NHAI/PIU/RJK/Jet-
Som/2013/D-1685
Dt: 02/06/14
Compliance report reg. DGM cum PD, NHAI, PIU, RajkotReplied vide Letter No.
JSTPL/2014/417 Dt: 30/06/14
2
NHAI/PIU/RJK/Jet-
Som/2013/D-1709
Dt: 03/06/14
Reg. site inspection of PD, NHAI dated on 04th
April 2014DGM cum PD, NHAI, PIU, Rajkot
Replied vide Letter No.
JSTPL/2014/404 Dt: 04/06/14
3
NHAI/PIU/RJK/F&A/2014/D-
1727
Dt: 04/06/14
Reimbursement of 50% Remuneration, costs &
Expenses to Independent ConsultantDGM cum PD, NHAI, PIU, Rajkot
Replied vide Letter No.
JSTPL/2014/413 Dt: 16/06/14
4
NHAI/PIU/RJK/NH
8D/2014/D-1732
Dt: 04/06/14
Regarding repair the existing bridge at R. S. No.
354, Village:Jetalsar, Tal: Jetpur, Dist: RajkotDGM cum PD, NHAI, PIU, Rajkot
Replied by IE vide letter
no.ICT/IC/NHAI/IND/NH-8D/ NHAI-
PD/1056 Dt: 10/06/14
5
NHAI/PIU/RJK/NH
8D/2014/D-1742
Dt: 05/06/14
Revised estimate for various crossing of pipeline
at various locationDGM cum PD, NHAI, PIU, Rajkot In Process
6
NHAI/PIU/RJK/NH
8D/2014/D-1743
Dt: 05/06/14
Revised estimate for damages occurred in Vadal
V.W. S. Scheme (Tal. Junagadh)DGM cum PD, NHAI, PIU, Rajkot In Process
7
NHAI/PIU/RJK/VTS/2014/D-
1764
Dt: 05/06/14
Vehicle Tracking system (VTS) with facility of
global Positioning System (GPS) to track
ambulance / cranes/route patrol vehicles
DGM cum PD, NHAI, PIU, Rajkot For information & compliance
NHAI - INWARD
Page 232 of 246
SR
NO.LETTER NO. SUBJECT
INWARD FROM,
ADDRESSED TO JSTPLREMARKS
NHAI - INWARD
8
NHAI/PIU/RJK/NH-
8D/2014/D-1783
Dt: 11/06/14
Reg. to provide cirle at mulji bapa market ,
vanthali for solve the Traffic issue for public
safety
DGM cum PD, NHAI, PIU, Rajkot
Replied by IE vide letter
no.ICT/IC/NHAI/IND/NH-8D/ NHAI-
PD/1092 Dt: 30/06/14
9
NHAI/PIU/RJK/NH
8D/2014/D-1809
Dt: 12/06/14
Regarding fortnightly action taken report
regarding according to review meeting held by
Member (Admn.) , NHAI at Gandhidham,
Gujarat on 12.04.2014
DGM cum PD, NHAI, PIU, RajkotReplied vide Letter No.
JSTPL/2014/414 Dt: 17/06/14
10
NHAI/PIU/RJK/ROGNR/201
4/D-1810
Dt: 12/06/14
Advance prepared for proper maintenance
during monsoonDGM cum PD, NHAI, PIU, Rajkot In Process
11
NHAI/PIU/RJK/NH
8D/2014/D-1817
Dt: 13/06/14
Regarding revised proposal for grant of
permission for crossing pipeline under NH-8D
from Jetpur to Maliya in pkg (NC-42) based on
Narmada Canal water pipeline
DGM cum PD, NHAI, PIU, Rajkot In Process
12
NHAI/PIU/RJK/NH
8D/2014/D-1818
Dt: 13/06/14
Regarding revised proposal for grant of
permission for crossing pipeline under NH-8D
from Jetpur to Maliya in pkg (NC-42) based on
Narmada Canal water pipeline
DGM cum PD, NHAI, PIU, Rajkot In Process
13
NHAI/PIU/RJK/NH
8D/2014/D-1819
Dt: 13/06/14
Regarding revised proposal for grant of
permission for crossing pipeline under NH-8D
from Jetpur to Maliya in pkg (NC-42) based on
Narmada Canal water pipeline
DGM cum PD, NHAI, PIU, Rajkot
Replied by IE vide letter
no.ICT/IC/NHAI/IND/NH-8D/ NHAI-
PD/1089 Dt: 30/06/14
Page 233 of 246
SR
NO.LETTER NO. SUBJECT
INWARD FROM,
ADDRESSED TO JSTPLREMARKS
NHAI - INWARD
14
NHAI/PIU/RJK/NH
8D/2014/D-1820
Dt: 13/06/14
Access permission and approval for terail outlet
abutting on NH-8D at km. 101.725 (Between
km. 101.700), LHS at R. S. No 36/P1/P1, Village :
Shantipura, Tal: Maliya, Dist: Junagadh in the
State of Gujarat
DGM cum PD, NHAI, PIU, Rajkot Addressed to IE for Action
15
NHAI/PIU/RJK/NH
8D/2014/D-1825
Dt: 14/06/14
Regarding to provide profile map and meter
chainage of R. s. No. 491/P2 & 491/P3 on keshod
Bypass
DGM cum PD, NHAI, PIU, Rajkot In Process
16
NHAI/PIU/RJK/NH
8D/2014/D-1832
Dt: 14/06/14
Regarding access application for new retail outlet
abutting on NH-8D at m. 48.622 (Between km.
48.600 to km 48.645), RHS at R. S. No. 20/4 at
Village : Kanja, Tal: Vanthali, Dist: Junagadh in the
state of Gujarat
DGM cum PD, NHAI, PIU, Rajkot
Replied by IE vide letter no.
ICT/IC/NHAI/IND/NH-8D/NHAI-
PD/1070 Dt: 21/06/14
17
NHAI/PIU/RJK/F&A/2014/D-
1854
Dt: 17/06/14
Reimbursement of 50% Remuneration, costs &
Expenses to Independent ConsultantDGM cum PD, NHAI, PIU, Rajkot
Replied vide Letter No.
JSTPL/2014/416 Dt: 27/06/14
18
NHAI/PIU/RJK/NH
8D/2014/D-1869
Dt: 21/06/14
Regardingresurvey at R. S. No. 1667/4, Village:
Prabhas-patanDGM cum PD, NHAI, PIU, Rajkot In Process
19
NHAI/PIU/RJK/Policy
Circular/2014/D-1884
Dt: 24/06/14
Guidelines for movement of over dimension /
over weight consignment (OD/ODC) on
National Highways
DGM cum PD, NHAI, PIU, Rajkot Filed for Record. Policy Matters
Page 234 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ICT - OUTWARD
LETTERS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO
Pattern under NHDP Phase III
Page 235 of 246
SR
NO.LETTER NO. SUBJECT Addressed to REMARKS
1JSTPL/IE/999/2014
Dt: 02/06/14
Submission of Test Results of Trial Stretch
for Construction of Embankment using Fly
Ash at ch. 115+450 to ch. 118+500 LHS
ATL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/655/NCS/5676 Dt: 28/05/2014
ICT/655/NCS/…. Dt: 17/05/14
2JSTPL/IE/1000/2014
Dt: 04/06/14Maintenance of Existing Road
ATL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1000 Dt: 08/05/14
NHAI/PIU/RJK/Jet-Som/2013/D-1461 Dt: 07/05/14
NHAI/PIU/RJK/Jet-Som/2013/D-1367 Dt: 29/04/14
3JSTPL/IE/1001/2014
Dt: 05/06/14
Resubmission of Approval of additional
locations for Borrow Area - 2nos. (BA-16/P2
and BA-38/P3)
ATL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/JSTPL/1050 Dt: 05/06/14
4JSTPL/IE/1002/2014
Dt: 05/06/14
Approval of additional quantity for aproved
borrow areas - 3 nos. (BA-40/P3, BA-32/P4
amd BA-25/p4
ATL, ICT Pvt. Ltd.,
JunagadhIntimation regarding Source Approval
5JSTPL/IE/1003/2014
Dt: 06/06/14
Submission of Monthly progress Report for
May 2014
ATL, ICT Pvt. Ltd.,
JunagadhMonthly Report as per CA
6JSTPL/IE/1004/2014
Dt: 06/06/14
Reg. Submission of revised drawing for crash
barrier with friction slab at RE wall locations
for approval
President, ICT Pvt.
Ltd., New Delhi
In Response to Letter No.
ICT/655/NCS/3459 Dt: 27/03/14
7JSTPL/IE/1005/2014
Dt: 11/06/14
Proposed new Pre-cast 60mm thick CC block
(M20) size 257 mm x 257mm)
TL, ICT Pvt. Ltd.,
Junagadh
IE - OUTWARD
Page 236 of 246
SR
NO.LETTER NO. SUBJECT Addressed to REMARKS
IE - OUTWARD
8JSTPL/IE/1006/2014
Dt: 12/06/14
Reg. submission of Design and drawings of
ROB-4 at ch. 118+938
President, ICT Pvt.
Ltd., New Delhi
In Response to Letter No.
ICT/655/NCS/5865 Dt: 02/06/14
9JSTPL/IE/1007/2014
Dt: 12/06/14
Reg. submission of detail design of minor
junctions (3 nos.) for approval
President, ICT Pvt.
Ltd., New DelhiDrawing Submission
10JSTPL/IE/1008/2014
Dt: 14/06/14
Reg. casting of kilometer stones, Boundary
stones etc.
TL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/JSTPL/928 Dt: 28/03/14
11JSTPL/IE/1009/2014
Dt: 17/06/14
Approval of Borrow Area 1 nos. for RE wall
Backfilling (BA-44/P1)
TL, ICT Pvt. Ltd.,
JunagadhIntimation regarding Source Approval
12JSTPL/IE/1010/2014
Dt: 19/06/14
Repair/Rehabilitation/widening of existing
bridges, regarding widening of foundation of
existing pier
TL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/JSTPL/935 Dt: 03/04/14
13JSTPL/IE/1011/2014
Dt: 19/06/14
Compliance of observations by NHAI PD for
report on Joint site inspection
TL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1041 Dt: 29/05/14
ICT/IC/NHAI/IND/NH-8D/JSTPL/1043 Dt: 30/05/14
NHAI/PIU/RJK/NH 8D/2014/D-1664 Dt: 31/05/14
14JSTPL/IE/1012/2014
Dt: 19/06/14Pre-monsoon activities
TL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/JSTPL/1030 Dt: 23/05/14
NHAI/PIU/RJK/GENERAL/2014/D-1625 Dt: 30/05/147
NHAI/PIU/RJK/Pre Mon/2014/D-1478 Dt: 09/05/14
15JSTPL/IE/1013/2014
Dt: 23/06/14
Approval of New and additional Quantity for
Borrow Areas 1 nos. additional Quantity (BA-
11/P2) and 1 nos. New (BA-18/P2)
TL, ICT Pvt. Ltd.,
JunagadhIntimation regarding Source Approval
Page 237 of 246
SR
NO.LETTER NO. SUBJECT Addressed to REMARKS
IE - OUTWARD
16JSTPL/IE/1014/2014
Dt: 24/06/14
Road safety measures as was discussed during
the fourth IRF regional conference
recommendation "Accident prevention"
TL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC//NHAI/IND/NH-8D/JSTPL/1014 Dt: 20/05/14
IE/JSTPL/167 Dt: 26/02/13
17JSTPL/IE/1015/2014
Dt: 27/06/14
Regarding submission of RE wall arrangement
at ROB at ch. 112+938 for Somnath
approach from ch. 113+200 to ch. 113+264
President, ICT Pvt.
Ltd., New DelhiDrawing Submission
18JSTPL/IE/1016/2014
Dt: 28/06/14
Submission of revision in bys bays locations
between ch. 0+0010 to ch. 20+000 for
approval
TL, ICT Pvt. Ltd.,
Junagadh
19JSTPL/IE/1017/2014
Dt: 28/06/14
Regarding submission of revised median width
from ch. 49+080 to 49+420 for approval
TL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/JSTPL/960 Dt: 21/04/14
20JSTPL/IE/1018/2014
Dt: 28/06/14
Revision in alignment between ch. 56+194 to
ch. 56+332 LHS to match with existing minor
bridge at ch. 56+259
TL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/JSTPL/1012 Dt: 19/05/14
21JSTPL/IE/1019/2014
Dt: 30/06/14
Review submission of IE's monthly progress
Report for the month of May 2014 - reg.
TL, ICT Pvt. Ltd.,
Junagadh
In Response to Letter No.
ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1075 Dt: 23/06/14
Page 238 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
N.H.A.I. - OUTWARD
LETTERS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 239 of 246
SR
NO.LETTER NO. SUBJECT Addressed to REMARKS
1JSTPL/2014/403
Dt: 02/06/14
Regarding repair the road of Rajkot-Veraval
bypass which passes through Junagadh
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/NH 8D/2014/D-1574 Dt: 22/05/14
NHAI/PIU/RJK/NH 8D/2014/D- Dt: 30/05/14
NHAI/PIU/RJK/NH 8D/2014/D-1196 Dt: 10/04/14
2JSTPL/2014/404
Dt: 04/06/14
Compliance Report on Joint Site inpsection caried
out by PD-NHAI on 04 Apr 2014
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/Jet-Som/2013/D-1709 Dt: 03/06/14
ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1035 Dt:06/05/14
ICT/655/NCS/5677 Dt: 28/05/14
3JSTPL/2014/405
Dt: 12/06/14Submission of Concession Fee
GM (Guj.), NHAI,
Dwarka, New Delhi
4JSTPL/2014/406
Dt: 12/06/14
Underground crossing of Existing overhead
Electrical lines - 1st RA bill of prabhas patan
subdivision
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/PGVCL/2012/D-4359 Dt: 26/12/13
5JSTPL/2014/407
Dt: 12/06/14
Permission to lay OFC from km. 26.300 to km.
37.350route length 11.050+4 road crossing
(30x4=120 mrt) = 11.170 km. in Junagadh town
on NH-8D in the State of Gujarat
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/NH-8D/2014/D-1506 Dt: 14/05/14
ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1038 Dt: 28/05/14
6JSTPL/2014/408
Dt: 12/06/14
Request for an urgent meeting to finalize various
financial proposals related to COS items and
existing road maintenance works
Sh. Narendra Kumar,
IAS, Member (Admin),
Dwarka, New Delhi
NHAI - OUTWARD
Page 240 of 246
SR
NO.LETTER NO. SUBJECT Addressed to REMARKS
NHAI - OUTWARD
7JSTPL/2014/409
Dt: 12/06/14
Regarding usage charges of plant and machinery
for cost estimation purpose
CGM (T), RO(Guj),
NHAI, Gandhinagar
In Response to Letter No.
NHAI/PIU/RJK/Jet-Som/2014/D-1597 Dt: 30/05/14
NHAI/PIU/RJK/Jet-Som/2014/D-1598 Dt: 30/05/14
NHAI/PIU/RJK/Jet-Som/2014/D-1660 Dt: 30/05/14
8JSTPL/2014/410
Dt: 12/06/14
Update on pre-construction activities and urgent
actions required from Authority
DGM cum PD, NHAI,
PIU, Rajkot
9JSTPL/2014/411
Dt: 13/06/14
Underground crossing of Existing overhead
Electrical lines - 2nd RA bill of Jetpur Rural
subdivision
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/PGVCL/2012/D-4363 Dt: 26/12/13
10JSTPL/2014/412
Dt: 13/06/14
Underground crossing of Existing overhead
Electrical lines - 1st RA bill of Junagadh
subdivision
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/PGVCL/2012/D-4360 Dt: 26/12/13
11JSTPL/2014/413
Dt: 16/06/14
Reimbursement of 50% remuneration, cost &
Expenses of the Independent Engineer
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/F&A/2014/D-1727 Dt: 04/06/14
12JSTPL/2014/414
Dt: 18/06/14
Regarding fortnightly action taken report
regarding according to review meeting held by
Member (Admn.) , NHAI at Gandhidham, Gujarat
on 12.04.2014
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/NH 8D/2014/D-1809 Dt: 12/06/14
13JSTPL/2014/415
Dt: 23/06/14
Updates on pre-construction activities and urgent
action required form Authority - Atricles 5.1.4 ©,
10.3.4, 10.4, 11.2 & 11.4 of CA
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/Jet-Som/2013/D-1370 Dt: 29/04/14
NHAI/PIU/RJK/Jet-Som/2014/D-1638 Dt: 30/05/14
Page 241 of 246
SR
NO.LETTER NO. SUBJECT Addressed to REMARKS
NHAI - OUTWARD
14JSTPL/2014/416
Dt: 27/06/14
Reimbursement of 50% remuneration, cost &
Expenses of the Independent Engineer
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/F&A/2014/D-1854 Dt: 17/06/14
15JSTPL/2014/417
Dt: 30/06/14Payment for Utility Shifting bills
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/Jet-Som/2013/D-1685 Dt: 02/06/14
16JSTPL/2014/418
Dt: 30/06/14Regarding Wayside amenities
DGM cum PD, NHAI,
PIU, Rajkot
In Response to Letter No.
NHAI/PIU/RJK/2013/D-3786 Dt: 30/10/13
NHAI/PIU/RJK/Jet-Som/2013/D-1240 Dt: 15/04/14
NHAI/PIU/RJK/NH 8D/2014/D-1281 Dt: 21/04/14
ICT/IC/NHAI/IND/NH-8D/NHAI-PD/954 Dt: 16/04/14
17JSTPL/2014/419
Dt: 30/06/14
Request for Block time slots from Railway
authority for Launching of steel Girder at Rly km
76.45 (BG) and km 129.500 (MG) between
Navagadh and Teralsar Station near Jetalsar
Junction
DGM cum PD, NHAI,
PIU, Rajkot
Page 242 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-16
PROGRESS PHOTOGRAPHS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO
Pattern under NHDP Phase III Page 243 of 246
SITE PHOTOGRAPHS
Visit of Mr. B S Kapoor, Technical Advisor at Site
Visit of Mr. B S Kapoor, Technical Advisor at Site
Page 244 of 246
SITE PHOTOGRAPHS
Celebration of World Environment Day
Celebration of World Environment Day
Page 245 of 246
SITE PHOTOGRAPHS
Steel Girder for RoB 1 at Site Steel Girder for RoB 1 at Site
Fixing of RE Panel for RE Wall (Near FO at Ch. 0+780) Subgrade bed preparation in progress
Page 246 of 246