8/7/2019 Jeff Green DDCF Presentation
1/24
Ship/Lighter/Platform
Fendering
Problem
Deep Draft Composite Fender
Testing
FY03 Plan
8/7/2019 Jeff Green DDCF Presentation
2/24
Existing Fenders
32 x 50 foam filled sausage fenders
Deployed along the waterline of ship
8/7/2019 Jeff Green DDCF Presentation
3/24
Problem
Existing fenders not Sea State 3 capable
Fender failure
Interface issues due to differentlighterage configurations
8/7/2019 Jeff Green DDCF Presentation
4/24
Deep Draft Composite
Fender
High-strength composite construction
Configured for use with wide range of lighters
Provides 6-foot standoff
Provides low pressure on hull of ship
Deep draft / high inertia stability features
Unsinkable construction
Highway transportable
Design Features
8/7/2019 Jeff Green DDCF Presentation
5/24
Deep Draft Composite
Fender
s
Fender units
Composite box
8/7/2019 Jeff Green DDCF Presentation
6/24
Deep Draft Composite
Fender
Composite box
Fender units
Cushions
8/7/2019 Jeff Green DDCF Presentation
7/24
Composite box
Deep Draft Composite
Fender
Fender units
Cushions Foam flotation blocks
8/7/2019 Jeff Green DDCF Presentation
8/24
Composite box
Weight Tray
Deep Draft Composite
Fender
Fender units
Cushions Foam flotation blocks
8/7/2019 Jeff Green DDCF Presentation
9/24
Composite box
Weight Tray
Spreader Bar
Deep Draft Composite
Fender
Fender units
Cushions Foam flotation blocks
8/7/2019 Jeff Green DDCF Presentation
10/24
Deep Draft Composite
Fender
Principal
Characteristics,
Transport &
Stowed
Length....38
Width....6Height...8
Weight12.3 LT
8/7/2019 Jeff Green DDCF Presentation
11/24
Deep Draft Composite
Fender
Principal
Characteristics,
Deployed
Length...17
Width...6
Height18
Draft...13
Weight..15 LT
8/7/2019 Jeff Green DDCF Presentation
12/24
Deployment
Deep Draft Composite
Fender
8/7/2019 Jeff Green DDCF Presentation
13/24
Lift from stowed position by crane using
spreader bar
Deep Draft Composite
Fender
8/7/2019 Jeff Green DDCF Presentation
14/24
Deep Draft Composite
Fender
Lower into water, fenders flood and move
into deployed position
8/7/2019 Jeff Green DDCF Presentation
15/24
Deep Draft Composite
Fender
Spreader bar lowered onto top of fender,
securing units together by fitting into slots
8/7/2019 Jeff Green DDCF Presentation
16/24
Deep Draft Composite
Fender
Mooring
4 taglines used for deployment & mooring
Water
Line
8/7/2019 Jeff Green DDCF Presentation
17/24
Deep Draft Composite
Fender
Testing Practiced Handling & Deployment
Nov-Dec 02 onboard SS Flickertail State
HSV-X1 Joint Venture Demonstration
8/7/2019 Jeff Green DDCF Presentation
18/24
Deep Draft Composite
Fender
8/7/2019 Jeff Green DDCF Presentation
19/24
Deep Draft Composite
Fender
Lessons Learned: The Good
Lifting and moving fenders
Relatively fast deployment in calm seas
Good stability when deployed
Mooring system allows precise positioning
Easy retrieval and stowage
8/7/2019 Jeff Green DDCF Presentation
20/24
Lessons Learned: The Bad
Deep Draft Composite
Fender
Mooring points deemed undersized
Inexperience with deployment procedurescan be a problem
8/7/2019 Jeff Green DDCF Presentation
21/24
Lessons Learned: The Ugly
Deep Draft Composite
Fender
Deployment would be
very difficult in higher
sea states
Spreader bar poses
hazard to ships
Spreader barpassively locks
fender in place,
active lock is desired
8/7/2019 Jeff Green DDCF Presentation
22/24
Project Plan
DDCF modifications (Feb-Mar)
Deployment Method
At-Sea testing (Apr)
Post test analysis (May-June)
Mooring Points
8/7/2019 Jeff Green DDCF Presentation
23/24
MPF study (Feb-May)
Project Plan
Stowage
Mooring
Hull interface
8/7/2019 Jeff Green DDCF Presentation
24/24
DDCF redesign (June-Aug)
Incorporate lessons learned & test results
MPF study results
Optimize design for cost & weight
Transition to procurement
Project Plan