MEETING
20thMarch 2017
JCB POWER PRODUCTS BROADCROWN LTD
Broadcrown Ltd was formed in 1976
Developed to engineer, manufacture, install and commission.
Diesel generators for the global market
Two UK manufacturing facilities - Hixon and Newtown
Providing power from 6 kVA to 3.35 MVA.
40 YEARS HISTORY
BROADCROWN HISTORY
1976- 1980- 1990- 2000- 2010- 2015-
Broadcrown Ltd Established.
First to use programmable logic controllers First to be approved to ISO9001 Acquired Dorman Diesels Ltd Introduced CHP systems.
Sold Dorman Diesels Moved to new headquarters
Est. second manufacturing plant.
Began the expansion of overseas sales, through a dealer network.
JCB acquired Broadcrown which formed as JCB
Broadcrown at their HQ in Hixon.
SEPTEMBER 2015 JCB ACQUIRES BROADCROWN LTD
JCB Power Products. The versatile power,
construction and agricultural equipment manufacturer,
JCB; acquires the business and assets of Broadcrown Ltd to significantly extend JCB’s
power products range.
Graeme MacDonald JCB Chief Executive Officer
A $4 BILLION BUSINESS
NUMBER 3 IN THE WORLD BY VOLUME
22 PLANTS WORLDWIDE
24 SUBSIDIARIES AND SALES OFFICES
A GLOBAL NETWORK OF DEDICATED DEALERS
A GLOBAL MANUFACTURER
THE ALL NEW JCB PREMIER RANGE A POWER RANGE FOR ALL APPLICATIONS.
PREMIER RANGE 650kVA – 3.35 MVA
50Hz & 60Hz
Various voltage options Alternative engine & alternator combinations
Open generators as standard ISO 20‟ & 40‟ft containers deliver noise levels from 80dBA @1m
Cummins, Mitsubishi, MTU and Perkins engines A choice of DSE and ComAp controllers
Designed and manufactured in the UK
INTRODUCING THE
JCB POWER PRODUCTS
R A N G E
G20QS - G220QS DIESEL GENERATORS
QS RANGE 20 – 220kVA
G20QS – G220QS
50Hz & 60Hz JCB Dieselmax & JCB Diesel by Kohler engines
Providing Stage IIIA & fuel optimised options Open & canopy models
Delivering a small site footprint in a compact unit
STANDARD DIESEL GENERATOR RANGE
6kVA to 700 kVA power outputs Cummins, John Deere, MTU, Perkins, and
Volvo Engines
Stamford alternators
Silencer options
Fuel transfer system
Comprehensive range of control panels
LIVELINK FOR POWER
JCB’S INNOVATIVE REAL-TIME SYSTEM KEEPS
YOU IN CONTROL
LiveLink delivers all the information you need to maintain a reliable power supply. Remote monitoring allows you to manage your generator from anywhere. LiveLink benefits you with higher machine availability, improved fleet control and enhanced machine value.
PUTTING THE POWER IN YOUR HANDS.
MONITOR OPERATIONAL HOURS AND FUEL LEVELS
ENSURE PRODUCTIVITY THROUGH ALERTS & NOTIFICATIONS
BETTER PLANNED MAINTANENCE
A LIFETIME OF KNOWLEDGE
GENERATE UPTIME
COMPLETE POWER GENERATING SYSTEMS
Trusted worldwide
Wealth of knowledge and expertise
Full aftermarket support
BESPOKE PROJECTS S T. B A R T H O LO M E W ' S H O S P I TA L , LO N D O N .
Design, build & installation of four 1750kVA generators & two1000kVA
generators. Working with construction and development company SKANSKA. The 5 month project was completed in March 2016. 14.5 metric tonne generators at a radius of 25m each. Over 2km of electrical cable was laid throughout the hospital. Purpose-built coolant, engine oil and fuel lines. Stainless steel exhaust pipework. Bespoke design generator room. Specially designed air ducts.
Graham Ashley, Construction Director
at Skanska
Graham Ashley, Construction Director at Skanska said: “You choose a strategic partner for a high profile project such as St Bart‟s with great care to be able to deliver a project to the highest standard.” “JCB Broadcrown provides dedicated resource with the best technical expertise and we were confident that the business would be effective at delivering this critical contract. Everything from design to installation is carried out by their competent engineers. Even the most complex aspects of this installation where undertaken successfully.”
BESPOKE PROJECTS T E L E H O U S E , LO N D O N .
4 diesel power generators Customer - Construction group Mace Prestigious new Telehouse TN2 data centre in London.
The four units would be installed at „day 1‟ with the provision to install a further 4 units at a later date. The project included a bespoke and complex installation of plant room attenuation. 2 x 60ft exhaust masts and a fuel system incorporating 2 x 59,000 litres
underground bulk storage tanks.
The generator system is designed to provide a maximum prime rating of 12MVA from day 1 in island mode operation.
Project was officially signed-off and handed over to the customer in August 2016.
World class generator service and support in the UK
Backup for any make, model and size of generator
Fully trained engineers provide support
Service contract maintenance, fuel management.
INTRODUCING JCB BROADCROWN S E R V I C E & S U P P O R T
CUSTOMER NAME
20thMarch 2017
THANKYO U